CN203165006U - Engineering project management system - Google Patents

Engineering project management system Download PDF

Info

Publication number
CN203165006U
CN203165006U CN 201320036954 CN201320036954U CN203165006U CN 203165006 U CN203165006 U CN 203165006U CN 201320036954 CN201320036954 CN 201320036954 CN 201320036954 U CN201320036954 U CN 201320036954U CN 203165006 U CN203165006 U CN 203165006U
Authority
CN
China
Prior art keywords
project
management
terminal computer
engineering
image acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320036954
Other languages
Chinese (zh)
Inventor
赵丹华
郭昉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Telecommunication Engineering Co Ltd
Original Assignee
Shanghai Telecommunication Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Telecommunication Engineering Co Ltd filed Critical Shanghai Telecommunication Engineering Co Ltd
Priority to CN 201320036954 priority Critical patent/CN203165006U/en
Application granted granted Critical
Publication of CN203165006U publication Critical patent/CN203165006U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses an engineering project management system. The system is characterized in that the system comprises a server connected with a terminal computer, and a communication module arranged in the terminal computer; the terminal computer is connected with an image collection card and/or an image collector, a global-eye image collector, an information output device and/or an apparatus, an information publishing sub-system and a control-instruction sub-system by the communication module; and an engineering project management database is stored in a storage of the server and/or the terminal computer. The engineering project management system organically combines a system management theory, management technology and computer technology with a network communication technology, so that engineering project management efficiency is greatly raised. The system has the advantages of illustration, flexible operation, simple and convenient monitoring, and timely information processing.

Description

A kind of Engineering Project Mgmt System
Technical field
The utility model relates to a kind of project management equipment, is specifically related to a kind of Engineering Project Mgmt System.
Background technology
Along with China's rapid economic development, construction project day by day increases, and several ten million even more than one hundred million, tens, the engineering of hundreds of hundred million is numerous.Require further to improve for construction quality simultaneously, engineering complexity rises, the multiplex (MUX) plants multi-specialized ginseng and inserts construction, original various project management system is done things in his own way, can not satisfy the managerial demand of present engineering, press for and set up one and overlap the project management system of project management efficiently and investment audit
The project management system of one of prior art scheme is to be based upon on the unified integrated platform, contain and approve and initiate a project, the overall process of execution and concluding a research item, the execution of the special concern project scheduling, formulation and tracking with project scheduling, the workflow management of project examination, the project budget and dynamic cost, link up, risk, personnel, goods and materials, the management function of many key elements such as knowledge, not only can be for the department of project management, the project manager uses, and also is the program member, the client, finance, each a relevant department and the cooperative platform of other all items related personnel such as quality management.Its shortcoming is that service side is single, generally only relates to construction unit.If relate to many construction units, supplier, operator, manager etc., also have foreign side especially, coordination, communication, management do not have complete infosystem to support.Can't carry out omnidistance comprehensive management to project.
The prior art scheme two be that service side is single as Shanghai City its shortcoming of building installation engineering quality completion information management software, generally only relate to unit in charge of construction.If relate to many construction units, supplier, operator, manager etc., also have foreign side especially, coordination, communication, management do not have complete infosystem to support.Can't carry out omnidistance comprehensive management to project.
The utility model content
The purpose of this utility model is to overcome the defective that exists in the prior art, a kind of two control pattern principles that can embody " directorate's collective decision-making; construction unit's flow process is checked on " of large and medium size projects construction headquarters better are provided, need build up one and overlap the project management system of project management efficiently and investment audit.
For achieving the above object, the technical solution of the utility model is a kind of Engineering Project Mgmt System of design, it is characterized in that, described system comprises the server that is connected with terminal computer and the communication module that is arranged in the terminal computer, described terminal computer connects by communication module and image pick-up card and/or image acquisition device, global eyes image acquisition device, information output device and/or equipment, information issue subsystem and steering order executive subsystem, contains the project management database at the store memory of described server and/or terminal computer.
Wherein optimized technical scheme is, described storer comprises read-only storage and portable storer, described read-only storage is fixedly connected on the mainboard of terminal computer and/or server, and described mobile memory connects with described terminal computer and/or server by data line and/or communication network.
Optimized technical scheme also has, contain the project management database at described store memory, described project management database comprises geography information basic platform data, described geography information basic platform data receive the data that image pick-up card and/or image acquisition device, global eyes image acquisition device beam back by communication module and carry out analyzing and processing by terminal computer, and the output steering order.
Optimized technical scheme also has, and described communication module connects with image pick-up card and/or image acquisition device, global eyes image acquisition device, information output device and/or equipment, information issue subsystem and steering order executive subsystem by public network and/or LAN.
Optimized technical scheme also has, and described image pick-up card and/or image acquisition device, global eyes image acquisition device are separately positioned on by the scene of management and control project.
Optimized technical scheme also has, and described information output device and/or equipment comprise display, warning device, printing device, or are engineering equipment, detecting instrument.
Advantage of the present utility model and beneficial effect are: in the past for the large-scale construction project project, though flow process and the system of document storing, the way of management of investment of management have, but owing to mixed too many people for controlling factor, cause being easy to generate administrative vulnerability in the project operation process.This project implementation is intended to make up the engineering information management system of a cover standardization, standardization, facilitation, security, in conjunction with various technological meanses, report standard performance in the barrier project process by informationization technology, the various managing risks that may occur are carried out system take precautions against;
Promote the efficiency of management of project cluster management, in conjunction with the functional management characteristics, foundation is the matrix form project management system of tie with the project management, improve abilities such as multinomial order schedule managerial ability, resource partition equilibrium ability and project decision making package, thereby improve business administration efficient greatly, improve the core competitiveness of business administration.
Based on the project management system, set up by standard execution, system, methods such as the task that solidifies project management flow process, application item management decomposes, dynamically plan formulation, critical path calculating, equilibrium of stock, the general management of projects realize the application of enterprise project management actual effect.
The execution of the process management of standard project, security control and quality newspaper barrier is with plan serve as theme duration, quality, security control and the resource provisioning management of rope.Schedule is the main thread of all kinds of resource provisionings management such as the fund, material, equipment of target control such as project duration, quality, safety and engineering construction, and system realizes this administrative purposes by a plurality of subsystems such as progress monitoring, quality control, security control, store keeping, design management.The project aggregate scheduling is the main thread of project management, works out the overall network plan of project in system according to this plan, carries out critical path analysis, and the duration of strict control key job is with total duration of assurance project; Every work programs such as the inspection of quality of formulation project, safety detection are implemented management work such as quality, safety, guarantee the realization of project quality, Security Target.
Any engineering project all is made up of kinds of construction, sub-partitioned project, partitioned project and unit project, and the construction of engineering project then is to finish by a lot of operation.So, the quality control of project under construction be from process quality to the kinds of construction quality, system's control procedure of sub-branch quality, partitioned project quality, unit project quality.Newest standards standard based on ISO9000 quality standard and quality supervision master station of government comprises the management of aspects such as the specifications of quality, quality objective, quality inspection evaluation, quality affairs.
Safety management system is paid attention to process management, equally safety management is brought in the progress process of whole project, for safety in production, civilized construction provide the general management means, system is based on the safety standard of safety management and government, content has contained the every aspect of working-yard safety management, comprise that secure file, safely instruction, significant risk source, potential safety hazard, job that requires special skills are taken appointment with certificate, potential safety hazard rectification and accident treatment etc., thereby set up perfect working-yard security management system.
Real-time early warning realizes that really Concept of Agile Enterprise handling by user-defined parameter data responsive in the project, in time pinpoints the problems and the correction problem for the business leader.As quality and safety index, progress is delayed, cost overrun, the critical point of artificial, material, machinery payment, the contract benchmark etc. of honouring an agreement.In case have when taking place to surpass the situation of intended target, system gives to feed back timely, support the SMS early warning.
Realization is to the fine-grained management of investment management and control overall process, set up a cover and cover the full-range lean management system of investment management and control, the ex-post analysis of investment is become in advance, mid-event control, pogo plan, investment execution, process management and control are become a complete PDCA closed loop management flow process, thereby satisfy standard process, information transparency, the requirement that process is controlled.
Standardization, the management of investment means that become more meticulous can be guaranteed the fund security of project, running in order, keep the vestige of investment decision and implementation, satisfy the requirement of audit clean government.Make and ensure information safety the efficient collaborative work of each tame participant of investing management and control reliably.
Set up collaboration platform in many ways easy and simple to handle, that safety is controlled, by with the combined efforts of Shanghai telecommunications, introduce state-of-the-art information-based mode of operation, the most stable system's operation architecture and safest information newspaper barrier platform, guarantee that all workbenches can satisfy the requirement that continues operation, and carry out dilatation whenever and wherever possible according to the use capacity of system, the operation ability of system is farthest promoted.
Reliable and stable telecommunications cloud platform, Shanghai company of China Telecom is the maximum operator of data center in area, Shanghai, its data center's scale and userbase account for clear ahead position, market.By the first quarter in 2012, Shanghai company of China Telecom the area, Shanghai have 30 surplus a data center, various places, the distribution whole city.At present, the local data center trusteeship customer of Shanghai company of China Telecom reaches over thousands of family, and market share reaches 95%.
The telecommunications cloud service also has following advantage: resource guarantee, safeguard redundant guarantees of guarantee, institutional guarantee, risk control, availability, security against fire guarantee, freeze guarantee, access and exit control and safety
Description of drawings
Fig. 1 is the structured flowchart of the utility model Engineering Project Mgmt System.
Among the figure: 1, terminal computer; 2, server; 3, communication module; 4, image pick-up card and/or image acquisition device; 5, global eyes image acquisition device; 6, information output device and/or equipment; 7, information issue subsystem; 8, steering order executive subsystem.
Embodiment
Below in conjunction with drawings and Examples, embodiment of the present utility model is further described.Following examples only are used for the technical solution of the utility model more clearly is described, and can not limit protection domain of the present utility model with this.
As shown in Figure 1, the utility model is a kind of Engineering Project Mgmt System, this system comprises the server 2 that is connected with terminal computer 1 and the communication module 3 that is arranged in the terminal computer 1, terminal computer 1 with image pick-up card and/or image acquisition device 4, global eyes image acquisition device 5, information output device and/or equipment 6, information issues subsystem 7 and steering order executive subsystem 8 connects, contains project management database at the store memory of server 2 and/or terminal computer 1 by communication module 3.
Embodiment preferred is in the utility model, described storer comprises read-only storage and portable storer, read-only storage is fixedly connected on the mainboard of terminal computer 1 and/or server 2, and mobile memory connects with terminal computer 1 and/or server 2 by data line and/or communication network.
Embodiment preferred also has in the utility model, contain the project management database at store memory, the project management database comprises geography information basic platform data, geography information basic platform data receive the data that image pick-up cards and/or image acquisition device 4, global eyes image acquisition device 5 beam back by communication module 3 and carry out analyzing and processing by terminal computer 1, and the output steering order.
Embodiment preferred also has in the utility model, and communication module 3 connects with image pick-up card and/or image acquisition device 4, global eyes image acquisition device 5, information output device and/or equipment 6, information issue subsystem 7 and steering order executive subsystem 8 by public network and/or LAN.
Embodiment preferred also has in the utility model, and image pick-up card and/or image acquisition device 4, global eyes image acquisition device 5 are separately positioned on by the scene of management and control project.
Embodiment preferred also has in the utility model, and described information output device and/or equipment 6 comprise display, warning device, printing device, or are engineering equipment, detecting instrument.
The embodiment of system described in the utility model is:
The foundation of this cover system, hope can form the creative management pattern of a standardization (both integrating with international governance), standardization (all operations transparent open, use system), facilitation (supporting multiple terminals, multimode real-time typing, renewal, inquiry) and safe (security of system, use safety, Administrative Security etc.) at the construction of present Important Project project and management domain, thus management level and the efficiency of management of lifting project.
Based on such thinking, project will be based on the GIS(Geographic Information System) platform carries out the engineering information management system development, realizes multinomial purpose cluster management, includes the management of project management key elements such as progress, quality, safety, investment in system; The real-time video management and the panoramic pictures that realize building-site represent, and satisfy the code requirement of green construction; Realize mobile office, the mobile inspection, mobile examining allows leader and related work personnel break away from the constraint in time and space.
Native system is to the effect that: set up GIS spatial information basic platform, and make up based on the GIS basic platform and to comprise that planning management, engineering management, building site supervision, vehicle, personnel pass in and out the application system of management function, realize the digital management of project construction overall process.Can provide relevant basis, supplementary with further development ﹠ construction for other application systems again simultaneously.
The scheme characteristic of system is: can be other application systems such as planning management, logistics, traffic, emergency preplan establishment based on the spatial information of GIS basic platform and venue information supplementary is provided; Operation, management that the network that the building site surveillance is set up and monitoring facility can be the runtime provide service; All kinds of space diagram information, the attribute information that accumulates and form based on the GIS basic platform can be day-to-day operation, command scheduling is offered help.System can not only bring into play the supervision effect during engineering construction, but and the engineering operation phase continue to play a role, simultaneously because such system's support is arranged, transfer and safeguard to send in single process and also can bring into play enormous function in project.
The architectural feature of this system is:
Project management system is made of following subsystem:
Based on the GIS basic platform: spatial information and architecture information can be other application systems such as engineering management, logistics, traffic, emergency preplan establishment supplementary are provided.
The management of investment subsystem: the investment to engineering construction forms closed loop management.The ex-post analysis that becomes investment in advance, mid-event control.Satisfy standard process, information transparency, the requirement that process is controlled.
Planning management subsystem: will realize making the related personnel understand programme to the macro-management of project planning and construction data, and can grasp the planned project construction progress at any time, and reach the purpose of planning monitoring and construction project tracing management.
The engineering management subsystem: by pinpoint the problems-deal with problems-flow process of analyzing feedback can realize the security control function, realize the project management function based on the each side that takes part in building.
Engineering Visual subsystem: adopt panorama Rich Media technology, the visualization of presence reduction under realization project integral body, the different progresses of engineering; The in-situ data filing of the contrast of realization progress, hidden/key position.
The building site subsystem of video: the network of setting up and monitoring facility can provide service for the management of security and safe mass.
GIS unifies the construction of workbench
Whole project situation is mainly showed in the construction of this platform, is divided into GIS map, list area, three zones of chart area, can allow supvrs at different levels see construction and the progress of local engineering project very intuitively.
The GIS map is supported multistage zoom function, first rank shows situation such as overall planned land use and plans intermediate item early stage and prepartion of land, place form the type project, along with the amplification of map, second level shows the ground block message of refinement, then amplifies the project that can show refinement more.GIS map shows projects positional information, event location information, global eyes and 360 degree panoramic picture positional informations.Basic operations such as the map support is dilatory, convergent-divergent can be checked details by corresponding icon on the click map.
List area is divided into land bank and planning with all items, core space " four one " engineering, road and grade separation engineering outside the garden, railway traffic engineering, power engineering, peripheral water system engineering (undetermined), the greening sanitation project, the municipal works of core space secondary, nine classifications of theme park and auxiliary facility project, count item number according to each classification, the unit project number, construction scale, investment situation, progress status, quality state (comprises the acceptance(check) number, finish the number of providing quality goods or brilliant) etc., by clicking the investment that project category can show these classification detailed programs, progress, quality information etc.Project for binding global eyes and panorama sketch point position can be opened global eyes and panorama sketch by clicking respective icon.
Chart area is showed overall project investment situation, project process situation, project investment ratio, cash flow situation and inspection of quality situation by different charts.
The management of investment subsystem
The management of investment subsystem supports becoming more meticulous of project investment estimation, investment estimation to decompose and control.Investment is progressively decomposed according to project decomposition texture, equipment summary table, bill of quantities, reach the purpose of monitoring pogo plan, investment execution and investment actual achievement.The management of investment subsystem is based on operation flow, and the routine work of directorate being invested management and control is embodied in the system in informationalized mode, plays management effect efficient, green, clean government.This part is most important link in the whole engineering information management system, also is the important component part that promotes project management level and spare no efforts to build a clean and honest government.
Basic management
To project construction process or the cost subject that needs in the stage, information such as the WBS of enterprise java standard library, quantities java standard library manage.
Investment cost subject storehouse, investment cost responsibility matrix provide project standardized information management person to cost subject management of information function, comprising: make up the cost subject inforamtion tree, increase, revise, delete cost subject information newly.
Company standard WBS storehouse, the function that enterprise's WBS java standard library is increased newly, revises, deletes.
The quantities java standard library,, modification newly-increased to the quantities java standard library, delete function.
Management subsystem, system metadata, daily record, operation flow, system authorization, little code administration, data set mandate, data check management software, the system management softwares such as personal management, organizational structure's management, role authorization
Scope management, scope management module support the standardization of project to decompose fractionation.Whole project is decomposed into the ingredient of the more small grain size that can operate and control, in whole project implementation process with these more implementation status and the tracking results of the unit inspection item of small grain size.
Work out the people to project authorized strength work decomposition texture WBS by scope of project after approving and initiate a project, the project work decomposition texture can be chosen from template base company standard WBS storehouse, also can the custom item decomposition texture.Comprise establishment, examine, change function.
On the basis of project decomposition texture, can work out the equipment summary table of project.Comprise establishment, examine, change the equipment summary table, summary table equipment is the refinement to the WBS mechanical discipline.
On the basis of project decomposition texture, that can work out project builds the peace bill of quantities.Comprise establishment, examine, change and build the peace bill of quantities, building the peace bill of quantities is the refinement of WBS being built the peace specialty.
Project work decomposition texture WBS provides the work breakdown structure (WBS) management function, comprising: the inquiry of work breakdown structure (WBS), increase, revise, delete, examine, change function newly.
The equipment summary table provides the management function of equipment summary table, comprising: the inquiry of equipment summary table, increase, revise, delete, examine, change function newly.
Build the peace bill of quantities, provide build the peace bill of quantities management function, comprising: build the peace quantities inquiry, increase, revise, delete, examine, change function newly.
The bid bill of quantities, provide the bid bill of quantities management function, comprising: the bid bill of quantities inquiry, increase, revise, delete, examine, change function newly.
Project change provides the management function of project change, comprising: the inquiry of project change, increase newly, revise, delete, examine.
Management of investment, management of investment support becoming more meticulous of project investment estimation, investment estimation to decompose and control.Investment is progressively decomposed according to project decomposition texture, equipment summary table, bill of quantities, reach the purpose of monitoring pogo plan and investment actual achievement.
The tender year plan, the support of annual funding program module advances overall planning to formulate bid plan next year according to construction project and examines circulation.
Annual funding program, annual funding program module support that schedule is worked out annual project funds plan and examined circulation according to project (contract).
Approve and initiate a project, can grind, just establish workflow management, related side, project team is approved and initiate a project at first needs to declare, declare examine by after just can include project planning in--in-the annual plan.After project examination is passed through, write project proposal, project and can grind two stages of analyzing, also must the experience project concept phase to some project.Experience is after above two (or three) stages, and project just can enter actual process of construction.Because actual conditions change, need change timely project in the project implementation process.
The module of approving and initiate a project support to new projects declare with examine, project proposal establishment with examine, project can be ground the typing of reply information and be examined, the typing of project preliminary design approval with examine, change modification application and examine.
Project estimation workflow management provides project estimation management function, comprising: the inquiry of estimation, increase newly, revise, delete, examine, change, estimation check and approve volume establishment, examine, change.
The project estimation workflow management provides the project estimation management function, comprising: the inquiry of budgetary estimate, increase newly, revise, delete, examine, change, budgetary estimate check and approve volume establishment, examine, change.
Inner than the choosing management, contract can adopt the mode of directly giving out a contract for a project less than 500,000 yuan.Adopt the mode of directly giving out a contract for a project in principle should " getting a good buy by shopping around " namely to select three above candidate units of family by than selecting mode to determine supplier.
Working drawing budget provides the management function of working drawing budget, comprising: the inquiry of working drawing budget, increase newly, revise, delete, examine.Have gal and reach the same function of budget management in the software, can unit in charge of construction, supervisor, the tripartite fixed version audit of owner unit.
Engineering newspaper amount (testing worker's monthly magazine), visa provide the management function of engineering newspaper amount (testing worker's monthly magazine), engineering visa, comprising: the inquiry of engineering newspaper amount, increase newly, revise, delete, examine.Have gal and reach and test the same function of worker's monthly magazine in the software, can unit in charge of construction, supervisor, the tripartite fixed version audit of owner unit.Wherein the auditing result of engineering newspaper amount is directly as the foundation of construction contract progress money payment, the payment of management and control construction cost in contract is stopped payment amount.
The management of engineering wholesale price, unit in charge of construction reports and submits owner unit and audit circulation according to contract engagement with material, equipment quotation check list and the related data of need audit.
Build peace purchasing management, equipment purchase management, services procurement management and corresponding payment information that purchasing management, purchasing management have comprised in the project implementation process are managed.
Wherein contract approval, payment are examined, bidding document examines the relevant departments that three flow processs will contain Shen Di group in design.
Build peace buying (building peace investment actual achievement), build the peace purchasing management and comprised and build the peace bidding management, construction contract management, engineering newspaper amount (testing worker's monthly magazine), engineering visa, functions such as material wholesale price, engineering clearing.Their common cooperation has been finished the function of building the peace purchasing management and has been used.
Build the peace contract management
The construction contract settlement management
Equipment purchase (equipment investment actual achievement), equipment purchase has comprised functions such as equipment list, equipment purchase plan, contract management.Their common cooperations have been finished the function of equipment purchase and have been used.
Services procurement (other fees investment actual achievement), services procurement management comprise the Contract Administration Functions that services procurement is relevant, for establishment, the maintenance of service contract, the service needed of inquiring about with project purchasing departments such as examining provide abstract realization.
Reimbursement of expense comprises the payment management of building peace expense, cost of equipment, other fees.Reaction project investment actual delivery detail.
Payment and the statistics of the relevant cost of contract of peace built in management, to reach the purpose of monitoring contract purchasing implementation status.
The payment of management equipment cost of contract and statistics are to reach the purpose of monitoring contract purchasing implementation status.
Manage payment and the statistics of other service contract expenses, to reach the purpose of monitoring contract purchasing implementation status.
The payment of no contract other fees and statistics under the management project are to reach the purpose of monitoring project purchasing implementation status.
Bill management
Payment application management, the control of investment analysis provides the function of the statistical study report printing of project management infosystem.Typical statistical study form uses the BJX reporting system to develop and design, and satisfies user's self-defined report demand.
Comprise following function: provide investment to estimate account and the statistical report form of budgetary estimate implementation status, contract execution situation.
The planning management subsystem
System will realize making the related personnel understand programme to the macro-management of project planning and construction data, can grasp the planned project construction progress at any time, reach the purpose of planning monitoring and construction project tracing management.
Engineering management subsystem, the construction of this subsystem mainly solve multinomial concrete organize content such as planning management at each detailed programs, information management, contract management, bidding management, progress control, quality safety management, document management.
This subsystem mainly uses for the unit of taking part in building of project, carries out the displaying of the single project of the collection of data and image data as project management unit or supervisor etc.This part will solve acquired original and the typing of a lot of basic datas, so we will open the safe access-in management means of the multiple mode of multiple terminal, allow the user can use native system easily.In this module, we have taken into full account the multiple technologies means, and panorama Rich Media Technology ﹠ Telecommunications global eyes technology has been done good fusion, and these functions will play an important role in project management in the future.
About telecommunications global eyes technology and traditional self-built video monitoring system, the utility model was also done deep research and comparison.Adopt self-built video system, the input relative fixed at initial stage, but can only in the LAN (Local Area Network) of inside, watch, link public network if desired, the bandwidth that will apply for is along with the increase of follow-up camera quantity so, and its expense increases very fast.And the global eyes of employing telecommunications, telecommunications guarantees our wireless service property (quality) (self-built wireless network, its stability also are pretty troublesome factors) on the one hand, can provide preferential set meal in telecommunications aspect the whole rate on the other hand, comprehensive quotation.Therefore the global eyes solution of telecommunications is selected in our suggestion for use.This sets of plan successfully has been used in a plurality of main projects such as World Expo, commercial aircraft project, safe city construction.
The Engineering Visual subsystem
Native system in conjunction with Rich Media's functions such as video, Flash, voice, literal, human-computer interactions, is realized the magnanimity visual information to project progress by 360 degree full-view image technology, presents and operational administrative in high perceptibility mode.
The Engineering Visual subsystem has comprised three parts: periodic data collection of material and Data Update in the project data collection of material at initial stage and deployment, Engineering Visual display systems, the process of construction
The building site subsystem of video
" global eyes " video monitoring service: based on telecommunications fix, mobile broadband network, a kind of value-added telecom services of image, sound and various alerting signal remote collection, transmission, storage, processing are provided for the user.
By a widely used Remote Network Monitoring center service platform, to be that the user provides convenient, economical, effective remote monitoring total solution with centralized subregion operation way.By this business, the user can not be subjected to the restriction in time, place, and monitoring objective is carried out real-time remote monitoring, management.
The characteristics of this system are:
The remote image Real-Time Scheduling: the remote monitoring platform is controlled the unlatching of supervisory system equipment, storage and the inquiry of information in real time by single-image or many picture functions.
Image poll: when Surveillance center assumes overall responsibility, saved the network bandwidth again.Networked control function: whenever satisfy, any place, the monitoring demand by various intelligent terminals such as PC, mobile phones
Image is captured function: can capture at any time site environment, and store
System's centralized management control: different monitoring rank and authorities is provided
The digitizing store function: according to predefined storage time and storage policy, store video images and related data incessantly.
The principle of work of this system
Communication network+internet+Internet of Things formation base communication network; And the superposition urban informationization is used on communication network.
The above only is preferred implementation of the present utility model; should be understood that; for those skilled in the art; under the prerequisite that does not break away from the utility model know-why; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (6)

1. Engineering Project Mgmt System, it is characterized in that, described system comprises the server that is connected with terminal computer and the communication module that is arranged in the terminal computer, described terminal computer connects by communication module and image pick-up card and/or image acquisition device, global eyes image acquisition device, information output device and/or equipment, information issue subsystem and steering order executive subsystem, contains the project management database at the store memory of described server and/or terminal computer.
2. Engineering Project Mgmt System as claimed in claim 1, it is characterized in that, described storer comprises read-only storage and portable storer, described read-only storage is fixedly connected on the mainboard of terminal computer and/or server, and described mobile memory connects with described terminal computer and/or server by data line and/or communication network.
3. Engineering Project Mgmt System as claimed in claim 1, it is characterized in that, contain the project management database at described store memory, described project management database comprises geography information basic platform data, described geography information basic platform data receive the data that image pick-up card and/or image acquisition device, global eyes image acquisition device beam back by communication module and carry out analyzing and processing by terminal computer, and the output steering order.
4. Engineering Project Mgmt System as claimed in claim 1, it is characterized in that described communication module connects with image pick-up card and/or image acquisition device, global eyes image acquisition device, information output device and/or equipment, information issue subsystem and steering order executive subsystem by public network and/or LAN.
5. Engineering Project Mgmt System as claimed in claim 1 is characterized in that, described image pick-up card and/or image acquisition device, global eyes image acquisition device are separately positioned on by the scene of management and control project.
6. Engineering Project Mgmt System as claimed in claim 1 is characterized in that, described information output device and/or equipment comprise display, warning device, printing device, or is engineering equipment, detecting instrument.
CN 201320036954 2013-01-23 2013-01-23 Engineering project management system Expired - Lifetime CN203165006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320036954 CN203165006U (en) 2013-01-23 2013-01-23 Engineering project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320036954 CN203165006U (en) 2013-01-23 2013-01-23 Engineering project management system

Publications (1)

Publication Number Publication Date
CN203165006U true CN203165006U (en) 2013-08-28

Family

ID=49026174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320036954 Expired - Lifetime CN203165006U (en) 2013-01-23 2013-01-23 Engineering project management system

Country Status (1)

Country Link
CN (1) CN203165006U (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104217284A (en) * 2014-08-25 2014-12-17 才明嵩 An ecological balance system for productivity
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN104537452A (en) * 2014-11-04 2015-04-22 无锡鹰智科技有限公司 Electric power project computer management system
CN105844438A (en) * 2016-03-21 2016-08-10 中国十七冶集团有限公司 Project material centralized procurement and field management and control system
CN105844451A (en) * 2016-04-15 2016-08-10 中交上海三航科学研究院有限公司 Construction informatization management method, system and service terminal
CN106096915A (en) * 2016-06-08 2016-11-09 国网安徽省电力公司检修公司 A kind of engineering project data handling system
CN106127398A (en) * 2016-06-30 2016-11-16 国网山东省电力公司经济技术研究院 A kind of construction costs being applicable to project of transmitting and converting electricity calculates system
CN106557908A (en) * 2016-11-15 2017-04-05 北京威科伟业信息技术有限公司 A kind of engineering construction control method based on WEB terminal
CN106779284A (en) * 2016-11-15 2017-05-31 北京威科伟业信息技术有限公司 A kind of WEB terminal control system of engineering construction
CN106790360A (en) * 2016-11-15 2017-05-31 北京威科伟业信息技术有限公司 The WEB terminal and Mobile terminal control system of a kind of engineering construction
CN106779578A (en) * 2016-11-15 2017-05-31 北京威科伟业信息技术有限公司 A kind of engineering construction control method based on WEB terminal and mobile terminal
CN107909349A (en) * 2017-11-30 2018-04-13 郑州云海信息技术有限公司 A kind of project management Cloud Server and its method for realizing project management
CN108195423A (en) * 2017-12-26 2018-06-22 上海岩土工程勘察设计研究院有限公司 A kind of data integrated system and method for engineering monitoring
CN109559054A (en) * 2018-12-04 2019-04-02 国网山东省电力公司无棣县供电公司 A kind of Phase of Electric Power Projects information processing system
CN109740835A (en) * 2018-11-14 2019-05-10 遵义华正电缆桥架有限公司 A kind of power construction command system
CN109947805A (en) * 2019-03-22 2019-06-28 国网上海市电力公司 A kind of engineering project process management system and its management method
CN109961268A (en) * 2019-02-25 2019-07-02 政和科技股份有限公司 A kind of supervision of project and case study feedback system and its method
CN111507681A (en) * 2020-03-23 2020-08-07 南京熊猫电子股份有限公司 Building engineering integrated management system
CN112101713A (en) * 2020-08-06 2020-12-18 福建中信网安信息科技有限公司 Safety management system with level protection construction operation and maintenance
CN116777387A (en) * 2023-06-29 2023-09-19 华腾建信科技有限公司 Engineering data processing method and system for visual progress display

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104217284A (en) * 2014-08-25 2014-12-17 才明嵩 An ecological balance system for productivity
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system
CN104537452A (en) * 2014-11-04 2015-04-22 无锡鹰智科技有限公司 Electric power project computer management system
CN105844438A (en) * 2016-03-21 2016-08-10 中国十七冶集团有限公司 Project material centralized procurement and field management and control system
CN105844451A (en) * 2016-04-15 2016-08-10 中交上海三航科学研究院有限公司 Construction informatization management method, system and service terminal
CN106096915A (en) * 2016-06-08 2016-11-09 国网安徽省电力公司检修公司 A kind of engineering project data handling system
CN106127398A (en) * 2016-06-30 2016-11-16 国网山东省电力公司经济技术研究院 A kind of construction costs being applicable to project of transmitting and converting electricity calculates system
CN106779578A (en) * 2016-11-15 2017-05-31 北京威科伟业信息技术有限公司 A kind of engineering construction control method based on WEB terminal and mobile terminal
CN106779284A (en) * 2016-11-15 2017-05-31 北京威科伟业信息技术有限公司 A kind of WEB terminal control system of engineering construction
CN106790360A (en) * 2016-11-15 2017-05-31 北京威科伟业信息技术有限公司 The WEB terminal and Mobile terminal control system of a kind of engineering construction
CN106557908A (en) * 2016-11-15 2017-04-05 北京威科伟业信息技术有限公司 A kind of engineering construction control method based on WEB terminal
CN107909349A (en) * 2017-11-30 2018-04-13 郑州云海信息技术有限公司 A kind of project management Cloud Server and its method for realizing project management
CN108195423A (en) * 2017-12-26 2018-06-22 上海岩土工程勘察设计研究院有限公司 A kind of data integrated system and method for engineering monitoring
CN108195423B (en) * 2017-12-26 2020-08-25 上海勘察设计研究院(集团)有限公司 Engineering monitoring data integration system
CN109740835A (en) * 2018-11-14 2019-05-10 遵义华正电缆桥架有限公司 A kind of power construction command system
CN109559054A (en) * 2018-12-04 2019-04-02 国网山东省电力公司无棣县供电公司 A kind of Phase of Electric Power Projects information processing system
CN109961268A (en) * 2019-02-25 2019-07-02 政和科技股份有限公司 A kind of supervision of project and case study feedback system and its method
CN109947805A (en) * 2019-03-22 2019-06-28 国网上海市电力公司 A kind of engineering project process management system and its management method
CN111507681A (en) * 2020-03-23 2020-08-07 南京熊猫电子股份有限公司 Building engineering integrated management system
CN112101713A (en) * 2020-08-06 2020-12-18 福建中信网安信息科技有限公司 Safety management system with level protection construction operation and maintenance
CN116777387A (en) * 2023-06-29 2023-09-19 华腾建信科技有限公司 Engineering data processing method and system for visual progress display

Similar Documents

Publication Publication Date Title
CN203165006U (en) Engineering project management system
CN112950164B (en) Information system engineering supervision working hour recording information system based on standardized rules
CN112241924B (en) Wisdom gas system
CN105303306B (en) Electric power material dispatching platform system
CN103136626B (en) The online management method of engineering project
CN117391640B (en) Engineering construction project construction period management method and system based on BIM and GIS
CN110874718A (en) Concrete enterprise big data management system
CN113626914A (en) Engineering project management method, device and system based on digital twins
CN108629534A (en) A kind of staple commodities logistic management system based on BPM automatic technologies
CN115375146B (en) Digital construction integrated platform
CN101256647A (en) Item management system being suitable for garden engineering
CN104504543A (en) Project investment control and management system and use method thereof
CN104408559A (en) Engineering information management system
WO2009070755A1 (en) A real estate management system and method
CN111081361A (en) Intelligent logistics platform management system
CN103390218A (en) Three-chain coupling integrated emergency security system and method for emergencies
CN105225051A (en) Project management system
CN113112233A (en) BIM-based intelligent management method and platform for full life cycle of wind power project
CN106408351A (en) WeChat based CRM system for small and medium enterprises
CN102044044A (en) Group credit granting business processing method based on credit granting business system
CN115170090A (en) Project management method and device, electronic equipment and readable storage medium
CN115660567A (en) GIS-based intelligent engineering management system and method
CN115034740A (en) Full life cycle project management cloud platform system
CN117172498A (en) Project management system for papermaking industry
CN114511296A (en) High-standard farmland construction project management platform