Nothing Special   »   [go: up one dir, main page]

CN202139833U - Cantilever scaffold for building construction - Google Patents

Cantilever scaffold for building construction Download PDF

Info

Publication number
CN202139833U
CN202139833U CN201120218206U CN201120218206U CN202139833U CN 202139833 U CN202139833 U CN 202139833U CN 201120218206 U CN201120218206 U CN 201120218206U CN 201120218206 U CN201120218206 U CN 201120218206U CN 202139833 U CN202139833 U CN 202139833U
Authority
CN
China
Prior art keywords
steel
girder steel
horizontal girder
scaffold
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120218206U
Other languages
Chinese (zh)
Inventor
李庆文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201120218206U priority Critical patent/CN202139833U/en
Application granted granted Critical
Publication of CN202139833U publication Critical patent/CN202139833U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A cantilever scaffold for building construction comprises a diagonally bracing steel beam, a horizontal steel beam, a connecting piece connected with a building structure beam, and a scaffold, and is characterized in that one ends of the diagonally bracing steel beam and the horizontal steel beam are connected through a connecting piece to form an angle structure, and the other ends of the diagonally bracing steel beam and the horizontal steel beam are fixedly provided with anchoring steel plates for connecting with the structure beam, both ends being on a same vertical line. Short steel pipes for sleeving vertical posts of the scaffold are fixedly connected on the plane of the horizontal steel beam, and the scaffold is installed on the horizontal steel beam. In this way, the cantilever scaffold solves the problems of difficulty in building cantilever scaffold, and minimizes damage on building structure and interior decoration. The cantilever scaffold is convenient for manufacture, installation and dismounting, and is repeatedly usable, safe and reliable.

Description

A kind of being used at builder's jack with housing construction
Technical field
The utility model relates to a kind of being used at the pin hand of encorbelmenting with the building engineering construction, specifically is a kind of bolt shaped steel diagonal brace builder's jack.
Background technology
At present, shaped steel builder's jack extensively utilization in building operations.Shaped steel builder's jack structural form is divided into outstanding cable-stayed type and following diagonal-bracing type; Wherein, following diagonal-bracing type is that the horizontal girder steel of employing is encorbelmented, and horizontal girder steel of shaped steel and building adopt pre-buried muscle or pre-buried U-bolt anchor connection; This method mainly is applicable to the new building engineering; For in the construction with building construction, because site limitation or high-rise construction be need set up builder's jack the time, anchored end can not be carried out set aside pre-embedded; And it is longer that horizontal girder steel anchored end stretches into building interior, can have a strong impact in the use with building.
Summary of the invention
The purpose of this utility model provides a kind of being used at the builder's jack with housing construction, so that scaffold sets up the assurance construction safety in the building engineering construction
The utility model solves the scheme that its technical problem adopted: a kind of being used at the builder's jack with housing construction; Comprise diagonal brace girder steel, horizontal girder steel and constitute with the connector and the scaffold of architecture beam; An end that specifically is raker beam and horizontal girder steel connects into dihedral; The other end of two parts is connected with the anchor plate that is connected with structural beams, and two ends are on same vertical line; Be connected with the short steel pipes that is used for the cutting ferrule scaffold upright rod on the last plane of horizontal girder steel, scaffold is installed on the horizontal girder steel.
Horizontal girder steel is connected steel plate with the affixed horizontal girder steel of raker beam connecting portion difference and is connected steel plate with raker beam, all has the connection screw that four positions coincide on the steel plate, is connected by connecting bolt.Have four on the anchor plate of raker beam and horizontal girder steel and architecture beam link and be connected screw, wherein, last two of the anchor plate of horizontal girder steel connect screws and are coated with through-wall bolt, the anchoring angle steel that its outer end is connected with the architecture beam opposite side.
Respectively have four on the anchor plate of raker beam and horizontal girder steel and architecture beam link and be connected screw, wherein, last two of horizontal girder steel anchor plate connect screws and are coated with through-wall bolt, and there is the anchoring angle steel that is connected with the architecture beam opposite side its outer end.Have on the anchoring angle steel and be suitable for the screw that through-wall bolt and angle steel expansion bolt and corresponding architecture beam are connected with the building structure plate.
The horizontal girder steel of encorbelmenting is connected with the angle steel anchoring piece and the floor of building end through high-strength bolt; The other end is supported by the diagonal brace girder steel; The diagonal brace girder steel adopts bolt to be connected with horizontal girder steel; The concrete structured beam anchoring of steel plate, bolt and building is adopted in sprag type girder steel lower end, forms cantilevered structure.
The utility model has solved a difficult problem of setting up with the building builder's jack, has at utmost reduced the destruction to building structure and interior decoration, has easy for production, installation and removally, can reuse, and is safe and reliable.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the embodiment sketch map.
Among the figure, the 1st, horizontal girder steel, the 2nd, horizontal girder steel connects steel plate, and the 3rd, raker beam connects steel plate, the 4th, connecting bolt; The 5th, the diagonal brace girder steel, the 6th, raker beam expansion bolt 7 is raker beam anchor plates, the 8th, angle steel expansion bolt, the 9th, anchoring angle steel, the 10th, through-wall bolt; 11. be horizontal girder steel anchor plate, the 12nd, ribs, the 13rd, horizontal girder steel expansion bolt, the 14th, short steel pipes, the 15th, architecture beam; The 16th, building structure plate, the 17th, building outer wall, the 18th, scaffold upright rod, the 19th, scaffold cross bar.
The specific embodiment
With reference to Fig. 1, the utility model is mainly by 5 two main parts of horizontal girder steel 1 and raker beam be connected the two connector that becomes dihedral and constitute with the connector of architecture beam.Be connected with horizontal girder steel respectively at the two link that constitutes dihedral and connect steel plate 2 and be connected steel plate 3 with raker beam, have four connecting holes of position correspondence on every block plate.During use, be fixed into dihedral through four connecting bolts 4.The lower end bevel of raker beam is connected with raker beam anchor plate 7.The other end of horizontal girder steel is connected with horizontal girder steel anchor plate 11, and the contact site of itself and horizontal girder steel above and below is connected with ribs 12; Be positioned on the anchor plate of horizontal girder steel downside and have two connecting holes, be used for being used with horizontal girder steel expansion bolt 13; Be positioned at horizontal girder steel upper side position, have two connecting holes, be used for being used with through-wall bolt 10; The outer end of through-wall bolt and anchoring angle steel 9 are connected through connecting hole; All have connecting hole on the vertical plate of anchoring angle steel and the horizontal plate; Wherein the connecting hole on the vertical plate is used to cooperate through-wall bolt 10 to use, and the connecting hole on the horizontal plate is used for being used with angle steel expansion bolt 8.Two short steel pipes 14 are fixed in horizontal girder steel upper surface, and the spacing distance of being convenient to install scaffold is arranged, and are used for the installation scaffold.
With reference to Fig. 2; Horizontal girder steel 1 one end weld horizontal girder steels connect steel plate 2, and horizontal girder steel connects on the steel plate 2 bores a hole 4 other end weld horizontal girder steel anchor plate 11; And welding ribs 12 is reinforced; Perforation is 4 on the horizontal girder steel anchor plate 11, and anchoring angle steel 9 is respectively opened two holes respectively on two sheets, and through-wall bolt 10 passes building outer wall 17 through two holes above the horizontal girder steel anchor plate 11 and is connected with anchoring angle steel 9; Following two holes that angle steel expansion bolt 8 passes anchoring angle steel 9 are squeezed into building structure plate 16 and are reliably connected, and horizontal girder steel expansion bolt 13 passes below the horizontal girder steel anchor plate 11 two holes and squeezes into architecture beam 15 and reliably connect.The raker beam that weld respectively at the two ends of diagonal brace girder steel 5 connects steel plate 3, raker beam anchor plate 7; Its welding angle of inclination is confirmed according to the building floor height; Raker beam connects steel plate 3, raker beam anchor plate 7 is all opened 4 holes; Diagonal brace girder steel 5 and horizontal girder steel 1 are connected steel plate 2 through horizontal girder steel, and be connected steel plate 3 with raker beam fixing by connecting bolt 4; One deck architecture beam 15 places under with respect to horizontal girder steel building structure layer, raker beam expansion bolt 6 passes raker beam anchor plate 7 and squeezes into architecture beam 15 reliable anchorings.Welding short steel pipes 14 on horizontal girder steel 1, scaffold upright rod 18 is placed in this basis as scaffold, affixed again scaffold cross bar 19.
During construction; The utility model is outside the venue by horizontal girder steel 1, horizontal girder steel are connected steel plate 2, horizontal girder steel anchor plate 11, ribs 12, short steel pipes 14; Welding processing becomes horizontal girder steel assembly, and diagonal brace girder steel 5, raker beam connection steel plate 3, raker beam anchor plate 7 welding processing are become diagonal brace girder steel assembly.
The utility model is located the relevant position punching at external wall 17, building structure plate 16, architecture beam 15 etc. earlier in use, and horizontal girder steel assembly and dress diagonal brace girder steel assembly are installed then, carries out scaffold building then.After treating that construction finishes; Can be through removing connecting bolt 4, horizontal girder steel expansion bolt 13, through-wall bolt 10, raker beam expansion bolt 6, removing all fixation kits; Assembly after the dismounting is reusable, can adopt cutting mode to handle to the expansion bolt screw rod that can not remove.

Claims (4)

1. one kind is used at the builder's jack with housing construction; Comprise diagonal brace girder steel (5), horizontal girder steel (1) and constitute with the connector and the scaffold of architecture beam (15); An end that it is characterized in that raker beam (5) and horizontal girder steel (1) constitutes dihedral through connector; The other end of two parts is connected with the anchor plate (7,11) that is connected with structural beams, and two ends are on same vertical line; Be connected with the short steel pipes (14) that is used for cutting ferrule scaffold upright rod (18) on the last plane of horizontal girder steel (1), scaffold is installed on the horizontal girder steel (1).
2. a kind of being used for according to claim 1 at builder's jack with housing construction; It is characterized in that horizontal girder steel (1) and raker beam (5) constitute the connecting portion of dihedral; Be connected with horizontal girder steel connection steel plate (2) respectively and be connected steel plate (3) with raker beam; All have the connection screw that four positions coincide on the two connection steel plates, connect by connecting bolt (4).
3. a kind of being used for according to claim 1 at builder's jack with housing construction; It is characterized in that respectively having four on the anchor plate (7,11) of raker beam (5) and horizontal girder steel (1) and architecture beam (15) link is connected screw; Wherein, Last two connection screws of horizontal girder steel anchor plate (11) are coated with through-wall bolt (10), and there is the anchoring angle steel (9) that is connected with the architecture beam opposite side its outer end.
4. a kind of being used for according to claim 1, it is characterized in that having on the anchoring angle steel (9) and be suitable for the screw that through-wall bolt (10) and angle steel expansion bolt (8) and corresponding architecture beam (15) are connected with building structure plate (16) at builder's jack with housing construction.
CN201120218206U 2011-06-26 2011-06-26 Cantilever scaffold for building construction Expired - Fee Related CN202139833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120218206U CN202139833U (en) 2011-06-26 2011-06-26 Cantilever scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120218206U CN202139833U (en) 2011-06-26 2011-06-26 Cantilever scaffold for building construction

Publications (1)

Publication Number Publication Date
CN202139833U true CN202139833U (en) 2012-02-08

Family

ID=45550896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120218206U Expired - Fee Related CN202139833U (en) 2011-06-26 2011-06-26 Cantilever scaffold for building construction

Country Status (1)

Country Link
CN (1) CN202139833U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817467A (en) * 2012-08-15 2012-12-12 中建钢构有限公司 Operating platform for high-altitude installation of steel structure
CN103790368A (en) * 2012-10-29 2014-05-14 五冶集团上海有限公司 Simple aerial work platform erection method
CN104389419A (en) * 2014-11-18 2015-03-04 杭州江润科技有限公司 Cantilevered formwork platform installation structure and construction method
CN104481130A (en) * 2014-10-30 2015-04-01 无锡市安捷脚手架有限公司 Overhanging type scaffold component
CN105298098A (en) * 2015-10-23 2016-02-03 南通四建集团有限公司 Overhanging-type fastener steel tube scaffold
CN105736830A (en) * 2016-04-14 2016-07-06 中国能源建设集团陕西省电力设计院有限公司 Piping support joint and construction method
CN106193594A (en) * 2016-07-25 2016-12-07 江苏中南建筑产业集团有限责任公司 Movable composition formula high-altitude long-span overhung formwork bracing system
CN108756203A (en) * 2018-07-11 2018-11-06 江苏九如建设有限公司 Tool-type diagonal brace and its construction technology
CN111236640A (en) * 2020-03-26 2020-06-05 张延年 Structure of encorbelmenting is shared with outer scaffold to high altitude formwork support
CN111236605A (en) * 2020-03-26 2020-06-05 张延年 Non-pre-buried cantilever steel beam and reinforcing structure thereof
CN112854481A (en) * 2021-03-16 2021-05-28 中天建设集团有限公司 Adjustable corner mounted frame
CN113323301A (en) * 2021-05-08 2021-08-31 中国建筑第八工程局有限公司 Special-shaped outward-inclined glass railing structure of overhanging floor slab
CN114016718A (en) * 2021-10-28 2022-02-08 中建四局第六建设有限公司 A face empty operation platform for prefabricated building fire compartment wall is built by laying bricks or stones

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817467B (en) * 2012-08-15 2015-05-13 中建钢构有限公司 Operating platform for high-altitude installation of steel structure
CN102817467A (en) * 2012-08-15 2012-12-12 中建钢构有限公司 Operating platform for high-altitude installation of steel structure
CN103790368A (en) * 2012-10-29 2014-05-14 五冶集团上海有限公司 Simple aerial work platform erection method
CN103790368B (en) * 2012-10-29 2016-06-01 五冶集团上海有限公司 Simple platform for work high above ground erection method
CN104481130A (en) * 2014-10-30 2015-04-01 无锡市安捷脚手架有限公司 Overhanging type scaffold component
CN104389419A (en) * 2014-11-18 2015-03-04 杭州江润科技有限公司 Cantilevered formwork platform installation structure and construction method
CN105298098A (en) * 2015-10-23 2016-02-03 南通四建集团有限公司 Overhanging-type fastener steel tube scaffold
CN105736830B (en) * 2016-04-14 2018-01-19 中国能源建设集团陕西省电力设计院有限公司 A kind of construction method of support of pipelines node
CN105736830A (en) * 2016-04-14 2016-07-06 中国能源建设集团陕西省电力设计院有限公司 Piping support joint and construction method
CN106193594A (en) * 2016-07-25 2016-12-07 江苏中南建筑产业集团有限责任公司 Movable composition formula high-altitude long-span overhung formwork bracing system
CN108756203A (en) * 2018-07-11 2018-11-06 江苏九如建设有限公司 Tool-type diagonal brace and its construction technology
CN108756203B (en) * 2018-07-11 2024-05-28 江苏九如建设有限公司 Tool type diagonal bracing and construction process thereof
CN111236640A (en) * 2020-03-26 2020-06-05 张延年 Structure of encorbelmenting is shared with outer scaffold to high altitude formwork support
CN111236605A (en) * 2020-03-26 2020-06-05 张延年 Non-pre-buried cantilever steel beam and reinforcing structure thereof
CN112854481A (en) * 2021-03-16 2021-05-28 中天建设集团有限公司 Adjustable corner mounted frame
CN113323301A (en) * 2021-05-08 2021-08-31 中国建筑第八工程局有限公司 Special-shaped outward-inclined glass railing structure of overhanging floor slab
CN114016718A (en) * 2021-10-28 2022-02-08 中建四局第六建设有限公司 A face empty operation platform for prefabricated building fire compartment wall is built by laying bricks or stones

Similar Documents

Publication Publication Date Title
CN202139833U (en) Cantilever scaffold for building construction
CN101886466B (en) Construction method for support structure of coal tower template for tamping type coke oven
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN201506692U (en) Roofing steel structure simple lifting device and installation structure thereof
CN102312563A (en) Method for connecting external scaffold with wall for large-span and ultra-story-height structures
CN211470603U (en) Telescopic tower crane passageway
CN204876526U (en) Instrument formula girder steel of encorbelmenting
CN203640257U (en) Support of overhanging type scaffold
CN203113226U (en) Formwork support system with towering asymmetric concrete cantilever structure
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN215441502U (en) Bridge side-span cast-in-place section short cantilever construction device
CN214996234U (en) Combined locking type safe outward-overhanging flat net capable of being used in turnover mode for steel structure building
CN210798994U (en) Concrete structure wall body unilateral template structure
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction
CN211228136U (en) Combined construction platform for hogging moment tensioning of prefabricated T-shaped beam
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN115478710A (en) High-rise building roof cantilever structure dismantling construction method
CN205663199U (en) Edge member vertical braces device
CN209228053U (en) Large cantilever combined type anchor curable type steel operation platform
CN103114712B (en) Buckle steel platform support system and construction method thereof
CN102720353A (en) Post-construction one-side shear wall formwork for settlement joint of tower and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120208

Termination date: 20140626

EXPY Termination of patent right or utility model