Nothing Special   »   [go: up one dir, main page]

CN104389419A - Cantilevered formwork platform installation structure and construction method - Google Patents

Cantilevered formwork platform installation structure and construction method Download PDF

Info

Publication number
CN104389419A
CN104389419A CN201410652884.9A CN201410652884A CN104389419A CN 104389419 A CN104389419 A CN 104389419A CN 201410652884 A CN201410652884 A CN 201410652884A CN 104389419 A CN104389419 A CN 104389419A
Authority
CN
China
Prior art keywords
steel
supporting
overhanging type
type steel
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410652884.9A
Other languages
Chinese (zh)
Other versions
CN104389419B (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN GOLDEN CENTURY ENGINEERING INDUSTRY CO LTD
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201410652884.9A priority Critical patent/CN104389419B/en
Publication of CN104389419A publication Critical patent/CN104389419A/en
Application granted granted Critical
Publication of CN104389419B publication Critical patent/CN104389419B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a cantilevered formwork platform installation structure and a construction method. One end of a cantilever section steel is fixed on a supporting steel casing at a beam-column node, and a plurality of inclined supporting rods are arranged between the bottom of the cantilever section steel and a framework column; stay cables are arranged on the top of the cantilever section steel, and the other ends of the stay cables are connected with an anchoring steel plate; a beam-column supporting rod is arranged between a beam and the column, a horizontal supporting framework and a platform plate are arranged on the top of the cantilever section steel, and a scaffold system is put up on the platform plate. The cantilevered formwork platform is integrated with supporting and pulling, the force transfer system is clear, permanent members of a building are sufficiently utilized, and high economic benefit can be brought.

Description

To encorbelment formwork structure for mounting platform and construction method
Technical field
The present invention relates to one to encorbelment formwork structure for mounting platform.Belong to Structural Engineering field, be applicable to executive information systems scaffold construction platform and set up engineering.
Background technology
In recent years along with the fast development of China's economy, the quickening of urbanization process, we are faced with the pressure of the urban population day by day expanded, and in order to alleviate the crowded of urban space, the development of urban space of three-dimensional becomes a kind of trend gradually.Along with the development of this burst of trend and Building technology, increasing high-rise and super highrise building towers in city.
For urban skyscraper, traditional pin hand cradle, the method for the steel pipe scaffold namely upwards set up from ground shown set up take a lot of work, the construction period is long, unsafe drawback of constructing, therefore, the overhanging scaffold for middle-high building arises at the historic moment.
Such as the shaped steel suspension scaffolding generally arranges overhanging component and by a kind of scaffold of overhanging component upper load from building storey.It has not by the advantage that building height affects.The key of overhanging scaffold is that intensity, rigidity and stability must meet related request, and has reliable connection with building structure, the load of scaffold can be passed to building structure safely.Builder's jack can be divided into cantilevered, cable-stayed type and strut-framed by the structural form according to cantilevered structure.Cantilevered for only with shaped steel as choosing outside Cantilever Beams; Cable-stayed type is that the overhanging component stretched out in building structure carries out oblique pull by rod member, in the beam that the oblique pull rod member other end is fixed on last layer or post; Strut-framed adds brace to support in overhanging component bottom.In Practical Project, above three class cantilevered structures are all widely used, but from stressed and use and respectively have feature: the supporting capacity of overhanging type and inclined pull type suspension supporting scaffold is mainly controlled by overhanging component, and the Compression Stability of lower supporting rod is the key of strut-framed builder's jack supporting capacity.The shaped steel suspension scaffolding is also a kind of cantilevered structure that present engineering is often used.It is worth mentioning that the application of constructor for overhanging component is often by experience in the past, for the concrete stress performance of overhanging component, the selection of component etc. the concept that all neither one is clear and definite, and neither be a lot of to the regulation of overhanging component in specification.So existing builder's jack platform all to there is structure power transmission indefinite, bonding strength is not high, the defect that safety is lower.
Given this, urgently invent a kind of force transfer system clear and definite, make full use of building permanent part and connect reliable, the higher builder's jack operation platform with good technical economic benefit of safety.
Summary of the invention
The object of the invention is to connect from improving overhanging type steel, fix and supporting way, provide a kind of force transfer system clear and definite, structural integrity is good, uniform force, bonding strength are high, encorbelment formwork structure for mounting platform and the construction method thereof of easy construction.
Encorbelment formwork structure for mounting platform, pre-buried intercolumniation steel pile casting on the frame column between frame column and the Nodes pre-buried supporting steel casing of Vierendeel girder, two nodes, the cross section of supporting steel casing, intercolumniation steel pile casting is slightly less than Vierendeel girder and frame column.
One end and the supporting steel casing of overhanging type steel are fixed through connecting bolt; Bottom overhanging type steel and between frame column, knighthead is set; Arrange suspension cable above overhanging type steel, suspension cable is connected with the anchor plate of opposite side through after the preformed hole on top frame post;
Arrange counterweight watering on floor, the other end of suspension cable is connected with counterweight;
Described knighthead quantity is two, is respectively to be arranged on bottom overhanging type steel near the support long diagonal brace of end and the short brace of support being arranged on close middle part bottom overhanging type steel; The other end supporting short brace is connected with intercolumniation steel pile casting; Supporting the other end of long diagonal brace is fixed on the spacing steel plate that the pre-buried supporting steel casing in bean column node place below arranges outward;
Between beam column, arrange beam column support bar, one end is connected with inside intercolumniation steel pile casting, and one end is connected with the steel plate be embedded on Vierendeel girder;
Beam column support bar, support long diagonal brace, support short brace, the connecting end portion of overhanging type steel is provided with end plate;
Set up horizontal support skeleton and landing slab on overhanging type steel top, landing slab 14 sets up scaffold system.
To encorbelment the construction method of formwork structure for mounting platform, comprise the following steps:
Step one: make built-in fitting, makes supporting steel casing and intercolumniation steel pile casting according to designing requirement, by supporting steel casing and connecting bolt welding, spacing steel plate and floor are welded with supporting steel casing, and floor is between spacing steel plate and supporting steel casing.
Step 2: make supporting rod and overhanging type steel, at overhanging type steel, the welding edges end plate that supports long diagonal brace, support short brace and beam column support bar, and on end plate prepared screw-bolt hole.
Step 3: frame construction is built, pouring frame structure, is fixed on design attitude by the built-in fitting that step one is made simultaneously, and arranges preformed hole above frame column.
Step 4: overhanging type steel is installed, and overhanging type steel is lifted to Nodes, fixes the end plate of overhanging type steel and supporting steel casing and weld with connecting bolt.
Step 5: supporting rod is installed, and arranges and supports long diagonal brace, supports short brace bottom overhanging type steel and between frame column, the other end supporting long diagonal brace is connected to spacing steel plate, and the other end supporting short brace is connected to intercolumniation steel pile casting.
Step 6: suspension cable is installed, and overhanging type steel arranges suspension cable, suspension cable is fixed on anchor plate through the preformed hole on frame column.When working load is larger, counterweight is set watering on the floor built, the other end of suspension cable is connected to counterweight.
Step 7: arrange beam column support bar, arranges beam column support bar inside frame construction, and top and the intercolumniation steel pile casting of beam column support bar are fixed, bottom and the Interal fixation be arranged on Vierendeel girder.
Step 8: scaffold system is set up, when after overhanging type steel installation, be arranged in parallel horizontal support skeleton above overhanging type steel, and lay landing slab above horizontal support skeleton, and set up scaffold system on landing slab.
7 one step bolt the present invention have following feature and beneficial effect:
(1) overhanging type steel adopts the solid-Zhi-La combination connecting mode hanging with supporting steel casing bolt-weld joint, suspension cable and draw with they sup-port, can effectively must transfer the load on building frame, connects reliable.
(2) supporting steel casing is embedded in bean column node place, as the link of overhanging type steel, can play reinforcement effect again to bean column node.
(3) adopt anchor plate or interim counterweight with fixing suspension cable according to the size of working load, effectively can draw ability according to hanging of suspension cable of working load adjustment, the formwork working platform that makes to encorbelment is more reliable.
(4) beam column support bar is set in frame construction, the intensity of effective reinforced frame structure, avoids that working load is excessive causes damage to frame construction.
Accompanying drawing explanation
Fig. 1 is that the present invention encorbelments formwork platform structure schematic diagram;
Fig. 2 is supporting steel casing structure schematic diagram;
Fig. 3 is overhanging type steel junction supporting steel casing connection diagram;
Fig. 4 supports long diagonal brace junction supporting steel to protect connection diagram;
Fig. 5 is intercolumniation steel pile casting connection diagram.
Accompanying drawing illustrates: 1, frame column; 2, Vierendeel girder; 3, overhanging type steel; 4, supporting steel casing; 5, long diagonal brace is supported; 6, short brace is supported; 7, spacing steel plate; 8, beam column support bar; 9, suspension cable; 10, preformed hole; 11, anchor plate; 12, counterweight; 13, horizontal support skeleton; 14, landing slab; 15, scaffold system; 16,20, connecting bolt; 17,19 end plates; 18, intercolumniation steel pile casting; 21, floor.
Detailed description of the invention
The welding procedure technical requirements of steel plate, high-strength bolt, is not repeated in the present embodiment such as frame construction concrete and the pre-buried design and construction requirement of steel beam column, specifically sets forth embodiments of the present invention.
Fig. 1 is that the present invention encorbelments formwork platform structure schematic diagram, and Fig. 2 is supporting steel casing structure schematic diagram, and Fig. 3 is overhanging type steel junction supporting steel casing connection diagram, and Fig. 4 supports long diagonal brace junction supporting steel to protect connection diagram.Fig. 5 is middle steel pile casting connection diagram.
With reference to shown in Fig. 1 ~ 5, formwork platform structure of encorbelmenting, pre-buried intercolumniation steel pile casting 18 on the frame column 1 between frame column 1 and Nodes pre-buried supporting steel casing 4, two nodes of Vierendeel girder 2.Frame column 1 sectional dimension is 1000 × 1000mm 2, Vierendeel girder 2 sectional dimension is 1000 × 800mm 2.Supporting steel casing 4, intercolumniation steel pile casting 18 are made by Q345 hot-rolled steel section, and thickness is 10mm, and sectional dimension is divided and is all slightly less than corresponding Vierendeel girder 2 and frame column 1, pre-buried in frame construction time, surface is sunk in Vierendeel girder, post slightly.Connecting bolt 16 is embedded in bean column node place and stretches out supporting steel casing 4 and reinforcement of weld together with supporting steel casing 4, one end of overhanging type steel 3 and supporting steel casing 4 are fixed through connecting bolt 6, overhanging type steel adopts 22#a i iron, and connecting bolt 16 adopts M20 high-strength bolt.
Arrange support long diagonal brace 5 respectively near the position at end and middle part and support short brace 6 bottom overhanging type steel 3, both all adopt 12# i iron, and the length supporting long diagonal brace 5 is 4.24m, and the length supporting short brace 6 is 2.2m; The other end supporting short brace 6 is connected with intercolumniation steel pile casting 18, and intercolumniation steel pile casting 18 is of a size of 980 × 980 × 500mm; Support the other end of long diagonal brace 5 to be fixed on the pre-buried outer spacing steel plate 7 arranged of supporting steel casing 4 in bean column node place below, spacing steel plate 7 is the Q345 hot rolled steel plate of 980 × 400 × 20mm.
Arrange many group suspension cables 9 near the position of middle part and end above overhanging type steel 3, suspension cable model is 6 × 19S.Suspension cable 9 is 30mm through preformed hole 10(diameter on top frame post 1) be connected with the anchor plate 11 of opposite side afterwards, anchor plate 11 is Q345 hot rolled steel plate, be of a size of 300mm × 300mm × 10mm, arrange counterweight 12 when working load is larger watering on floor, the other end of suspension cable 9 is connected with counterweight 12.
Between beam column, arrange beam column support bar 8, one end is connected with inside intercolumniation steel pile casting 18, and one end is connected with the steel plate be embedded on Vierendeel girder 2.Beam column support bar 8 length is 3m, adopt 12# i iron, beam column support bar 8 is provided with end plate 19 with support long diagonal brace 5 with the end supporting short brace 6, end plate 19 adopts the Q345 hot rolled steel plate of 200 × 200 × 10 mm, and all adopts M12 high-strength bolt auxiliary welding to be connected with the built-in fitting in frame construction.
Set up horizontal support skeleton 13 and landing slab 14 on overhanging type steel 3 top, landing slab 14 is set up scaffold system 15.Horizontal support skeleton 13 adopts 12# i iron, and landing slab adopts steel plate or wood glue plate.Scaffold adopts diameter to be the steel pipe of 48mm.
To encorbelment the construction method of formwork structure for mounting platform, mainly comprise following step:
Step one: make built-in fitting.Supporting steel casing 4 and intercolumniation steel pile casting 18 is made according to designing requirement, perforate on supporting steel casing, connecting bolt 16 is welded together through behind hole, spacing steel plate 7 and floor 21 are welded with supporting steel casing 4, and floor is between spacing steel plate 7 and supporting steel casing 4.
Step 2: make supporting rod and overhanging type steel.Select corresponding shaped steel as supporting rod and overhanging type steel 3 according to designing requirement, and end plate 17 is set at overhanging type steel 3 link; Support long diagonal brace 5, support the welding edges end plate 19 of short brace 6 and beam column support bar 8, and at end plate 19 two ends prepared screw-bolt hole.
Step 3: frame construction is built.When frame construction is built, the supporting steel casing 4 having welded connecting bolt 16 is embedded in bean column node place, will the intercolumniation steel pile casting 18 of spacing steel plate 7 and floor 21 has been welded and be embedded between bean column node, and arrange preformed hole 10 above frame column 1.
Step 4: overhanging type steel is installed.Utilize loop wheel machine that overhanging type steel 3 is lifted to bean column node place, then utilize connecting bolt 16 that supporting steel casing 4 is fixed with the end plate 17 of overhanging type steel end and welded.
Step 5: supporting rod is installed.Welded with the position near end bottom overhanging type steel 3 one end supporting long diagonal brace 5, the end plate 19 of the other end utilizes connecting bolt 20 to be connected with spacing steel plate 7, can weld reinforcement if desired.The one end supporting short brace 6 is welded with the position near middle part bottom overhanging type steel 3, and the end plate 19 of the other end is connected with the connecting bolt 20 of intercolumniation steel pile casting 18 arranged outside, can connect equally with welding is auxiliary.
Step 6: suspension cable is installed.Arrange many group suspension cables 9 on overhanging type steel 3 top, the other end of suspension cable 9 is connected with the anchor plate 11 of opposite side through the preformed hole 10 on frame column 1.If working load is comparatively large, counterweight 12 can be set watering on the floor built, and the other end of suspension cable is fixed in counterweight 12.
Step 7: beam column support bar is set.Inside frame construction, arrange beam column support bar 8, one end of beam column support bar 8 is connected with the connecting bolt 20 pre-buried with intercolumniation steel pile casting 18 and welds to be strengthened, and the other end is connected with the steel plate bolt be arranged on Vierendeel girder 2.
Step 8: scaffold system is set up.When after overhanging type steel 3 installation, be arranged in parallel horizontal support skeleton 13 up, and above horizontal support skeleton 13, lay the landing slab 14 that steel plate or wood glue plate make, and set up scaffold system 15 on landing slab 14.
Above-mentioned detailed description of the invention does not limit technical scheme of the present invention in any form, and the technical scheme that the mode that every employing is equal to replacement or equivalent transformation obtains all drops on protection scope of the present invention.

Claims (7)

1. to encorbelment formwork structure for mounting platform; it is characterized in that pre-buried intercolumniation steel pile casting on the frame column between frame column and the Nodes pre-buried supporting steel casing of Vierendeel girder, two nodes, the cross section of supporting steel casing, intercolumniation steel pile casting is slightly less than Vierendeel girder and frame column;
One end and the supporting steel casing of overhanging type steel are fixed through connecting bolt; Bottom overhanging type steel and between frame column, knighthead is set; Arrange suspension cable above overhanging type steel, suspension cable is connected with anchor plate through after the preformed hole on top frame post;
Between beam column, arrange beam column support bar, one end is connected with inside intercolumniation steel pile casting, and one end is connected with the steel plate be embedded on Vierendeel girder;
Set up horizontal support skeleton and landing slab on overhanging type steel top, landing slab sets up scaffold system.
2. formwork structure for mounting platform of encorbelmenting according to claim 1, it is characterized in that arranging counterweight watering on floor, the other end of suspension cable is connected with counterweight.
3. formwork structure for mounting platform of encorbelmenting according to claim 1, it is characterized in that described knighthead quantity is two, is be arranged on bottom overhanging type steel near the support long diagonal brace of end and the short brace of support being arranged on close middle part bottom overhanging type steel respectively; The other end supporting short brace is connected with intercolumniation steel pile casting; Support the other end of long diagonal brace to be fixed on the spacing steel plate that the pre-buried supporting steel casing in bean column node place below arranges outward.
4. formwork structure for mounting platform of encorbelmenting according to claim 1, is characterized in that beam column support bar, supports long diagonal brace, supports short brace, the connecting end portion of overhanging type steel is provided with end plate, end plate has bolt hole.
5. formwork structure for mounting platform of encorbelmenting according to claim 1, is characterized in that the quantity of suspension cable is more than one or one, is separately positioned on the position near end and middle part above overhanging type steel.
6. formwork structure for mounting platform of encorbelmenting according to claim 3, is characterized in that arranging floor between described spacing steel plate and intercolumniation steel pile casting.
7. to encorbelment the construction method of formwork structure for mounting platform, it is characterized in that comprising the following steps:
Step one: make built-in fitting, makes supporting steel casing and intercolumniation steel pile casting according to designing requirement, by supporting steel casing and connecting bolt welding, spacing steel plate and floor are welded with supporting steel casing, and floor is between spacing steel plate and supporting steel casing;
Step 2: make supporting rod and overhanging type steel, at overhanging type steel, the welding edges end plate that supports long diagonal brace, support short brace and beam column support bar, and on end plate prepared screw-bolt hole;
Step 3: frame construction is built, pouring frame structure, is fixed on design attitude by the built-in fitting that step one is made simultaneously, and arranges preformed hole above frame column;
Step 4: overhanging type steel is installed, and overhanging type steel is lifted to Nodes, fixes the end plate of overhanging type steel and supporting steel casing and weld with connecting bolt;
Step 5: supporting rod is installed, and arranges and supports long diagonal brace, supports short brace bottom overhanging type steel and between frame column, the other end supporting long diagonal brace is connected to spacing steel plate, and the other end supporting short brace is connected to intercolumniation steel pile casting;
Step 6: suspension cable is installed, and overhanging type steel arranges suspension cable, suspension cable is fixed on anchor plate through the preformed hole on frame column;
When working load is larger, counterweight is set watering on the floor built, the other end of suspension cable is connected to counterweight;
Step 7: arrange beam column support bar, arranges beam column support bar inside frame construction, and top and the intercolumniation steel pile casting of beam column support bar are fixed, bottom and the Interal fixation be arranged on Vierendeel girder;
Step 8: scaffold system is set up, when after overhanging type steel installation, be arranged in parallel horizontal support skeleton above overhanging type steel, and lay landing slab above horizontal support skeleton, and set up scaffold system on landing slab.
CN201410652884.9A 2014-11-18 2014-11-18 Encorbelment and prop up mould structure for mounting platform and a constructional method Expired - Fee Related CN104389419B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410652884.9A CN104389419B (en) 2014-11-18 2014-11-18 Encorbelment and prop up mould structure for mounting platform and a constructional method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410652884.9A CN104389419B (en) 2014-11-18 2014-11-18 Encorbelment and prop up mould structure for mounting platform and a constructional method

Publications (2)

Publication Number Publication Date
CN104389419A true CN104389419A (en) 2015-03-04
CN104389419B CN104389419B (en) 2016-06-08

Family

ID=52607371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410652884.9A Expired - Fee Related CN104389419B (en) 2014-11-18 2014-11-18 Encorbelment and prop up mould structure for mounting platform and a constructional method

Country Status (1)

Country Link
CN (1) CN104389419B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989092A (en) * 2015-05-28 2015-10-21 杭州江润科技有限公司 Construction method of high-altitude overhang superposition type steel truss bearing platform
CN107354946A (en) * 2017-08-16 2017-11-17 中铁第四勘察设计院集团有限公司 A kind of supporting construction of encorbelmenting for foundation pit steel support
CN107461033A (en) * 2017-09-08 2017-12-12 深圳前海特辰科技有限公司 Construction protection canopy and its construction method
CN109680923A (en) * 2019-02-23 2019-04-26 江苏精享裕建工有限公司 A kind of mounting structure and building method of builder's jack bottom platform
CN110397155A (en) * 2016-10-20 2019-11-01 徐州乐泰机电科技有限公司 A kind of green balcony for multi-storey building
CN110644611A (en) * 2016-10-20 2020-01-03 徐州乐泰机电科技有限公司 Can dismantle green balcony
CN110700543A (en) * 2019-10-16 2020-01-17 上海建工一建集团有限公司 Steel truss inclined strut system structure with section steel cantilever and construction method thereof
CN111395777A (en) * 2020-04-24 2020-07-10 五冶集团上海有限公司 Construction method of mounting cantilever platform of preheating tower
CN113565307A (en) * 2021-07-02 2021-10-29 华北冶建工程建设有限公司 High-altitude suspension modeling construction device and method thereof
CN114482266A (en) * 2022-01-26 2022-05-13 淮安市博彦土木工程科学研究院有限公司 Cantilever platform widening beam structure and assembling method thereof
CN115613798A (en) * 2022-10-27 2023-01-17 北京房地集团有限公司 Mounting structure and mounting method for cantilever beam of cantilever scaffold

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH206133A (en) * 1939-07-04 1939-07-31 Rivkine Henri Extendable bracket adapting to windows.
WO2000070169A1 (en) * 1999-05-13 2000-11-23 Otis Elevator Company Lift shaft working platform
CN202139833U (en) * 2011-06-26 2012-02-08 李庆文 Cantilever scaffold for building construction
US20130248286A1 (en) * 2012-03-21 2013-09-26 Richard P. Murphy Window jack scaffold and method of operation thereof
CN203856183U (en) * 2014-05-16 2014-10-01 深圳市汇达通建筑工程有限公司 Fabricated overhanging type discharging platform
CN204282803U (en) * 2014-11-18 2015-04-22 中大建设有限公司 To encorbelment formwork structure for mounting platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH206133A (en) * 1939-07-04 1939-07-31 Rivkine Henri Extendable bracket adapting to windows.
WO2000070169A1 (en) * 1999-05-13 2000-11-23 Otis Elevator Company Lift shaft working platform
CN202139833U (en) * 2011-06-26 2012-02-08 李庆文 Cantilever scaffold for building construction
US20130248286A1 (en) * 2012-03-21 2013-09-26 Richard P. Murphy Window jack scaffold and method of operation thereof
CN203856183U (en) * 2014-05-16 2014-10-01 深圳市汇达通建筑工程有限公司 Fabricated overhanging type discharging platform
CN204282803U (en) * 2014-11-18 2015-04-22 中大建设有限公司 To encorbelment formwork structure for mounting platform

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989092B (en) * 2015-05-28 2017-03-01 杭州江润科技有限公司 A kind of construction method of high-altitude overhanging superposed type steel truss bearing platform
CN104989092A (en) * 2015-05-28 2015-10-21 杭州江润科技有限公司 Construction method of high-altitude overhang superposition type steel truss bearing platform
CN110644611B (en) * 2016-10-20 2021-06-25 徐州乐泰机电科技有限公司 Can dismantle green balcony
CN110397155A (en) * 2016-10-20 2019-11-01 徐州乐泰机电科技有限公司 A kind of green balcony for multi-storey building
CN110644611A (en) * 2016-10-20 2020-01-03 徐州乐泰机电科技有限公司 Can dismantle green balcony
CN110397155B (en) * 2016-10-20 2020-12-18 安徽嘉禾植保科技有限公司 Green balcony for multi-storey house
CN107354946A (en) * 2017-08-16 2017-11-17 中铁第四勘察设计院集团有限公司 A kind of supporting construction of encorbelmenting for foundation pit steel support
CN107461033A (en) * 2017-09-08 2017-12-12 深圳前海特辰科技有限公司 Construction protection canopy and its construction method
CN109680923A (en) * 2019-02-23 2019-04-26 江苏精享裕建工有限公司 A kind of mounting structure and building method of builder's jack bottom platform
CN109680923B (en) * 2019-02-23 2021-05-04 江苏精享裕建工有限公司 Mounting structure and building method of cantilever scaffold bottom platform
CN110700543A (en) * 2019-10-16 2020-01-17 上海建工一建集团有限公司 Steel truss inclined strut system structure with section steel cantilever and construction method thereof
CN111395777A (en) * 2020-04-24 2020-07-10 五冶集团上海有限公司 Construction method of mounting cantilever platform of preheating tower
CN113565307A (en) * 2021-07-02 2021-10-29 华北冶建工程建设有限公司 High-altitude suspension modeling construction device and method thereof
CN114482266A (en) * 2022-01-26 2022-05-13 淮安市博彦土木工程科学研究院有限公司 Cantilever platform widening beam structure and assembling method thereof
CN115613798A (en) * 2022-10-27 2023-01-17 北京房地集团有限公司 Mounting structure and mounting method for cantilever beam of cantilever scaffold
CN115613798B (en) * 2022-10-27 2023-10-03 北京房地集团有限公司 Mounting structure and mounting method of cantilever beam of cantilever scaffold

Also Published As

Publication number Publication date
CN104389419B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN102733606B (en) The construction method of High Large Cantilever structure
CN105672678A (en) Method for mounting overall steel protective shed cantilever frame
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN104453197A (en) High-altitude large-cantilever concrete structure structural steel supporting platform
CN102535845A (en) Construction method of bearing frame of corridor structure
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN107419893A (en) A kind of elevator steel platform and preparation method thereof
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN107227814A (en) Sectional construction method for large cantilever concrete structure
CN107882328B (en) Construction method of large-span steel truss suspension structure
CN102454292A (en) Supporting steel frame of high altitude large-span cantilever structure mold frame
CN202214968U (en) Overhanging scaffold erection structure
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN103866692A (en) Novel assembling method for bent cap bearing frame
CN212866793U (en) Assembled construction elevator stops layer platform
CN213204915U (en) Overweight overhanging suspended component supporting system of super high-rise residential conversion layer
CN211666206U (en) Overhanging and landing dual-purpose scaffold
CN203640257U (en) Support of overhanging type scaffold
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN203113226U (en) Formwork support system with towering asymmetric concrete cantilever structure
CN202766974U (en) Bent cap bearing frame without full framing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wu Zerui

Inventor before: Wang Xinquan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170609

Address after: Luohu District Baoan road Shenzhen city Guangdong province 518000 No. 3083 Caiwuwei development building 2101

Patentee after: SHENZHEN GOLDEN CENTURY ENGINEERING INDUSTRY Co.,Ltd.

Address before: Hangzhou City, Zhejiang province 310003 City Ring Road No. 63 sky Fortune Center Office Room 405

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20211118