Nothing Special   »   [go: up one dir, main page]

CN209231777U - Wisdom building site management system - Google Patents

Wisdom building site management system Download PDF

Info

Publication number
CN209231777U
CN209231777U CN201821335564.0U CN201821335564U CN209231777U CN 209231777 U CN209231777 U CN 209231777U CN 201821335564 U CN201821335564 U CN 201821335564U CN 209231777 U CN209231777 U CN 209231777U
Authority
CN
China
Prior art keywords
connect
several
cloud server
internet
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821335564.0U
Other languages
Chinese (zh)
Inventor
黄泽民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Runchang Construction Engineering Co., Ltd.
Original Assignee
Dongguan Tai Longwan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Tai Longwan Construction Engineering Co Ltd filed Critical Dongguan Tai Longwan Construction Engineering Co Ltd
Priority to CN201821335564.0U priority Critical patent/CN209231777U/en
Application granted granted Critical
Publication of CN209231777U publication Critical patent/CN209231777U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model relates to a kind of wisdom building site management systems, comprising: Internet of Things cloud server;Several terminals are communicated to connect with Internet of Things cloud server respectively;Recruitment real-name management unit, comprising: several gates;Personnel information acquisition unit;Information comparison platform;Danger large-engineering administrative unit, comprising: construction elevator management assembly;Tower crane anticollision component;Component is supervised in deep basal pit safety monitoring;High-supported formwork Monitoring and supervision component;Long-range monitor component, comprising: headend equipment;Image procossing transmission device;Video wall.The system surrounds work progress management, the project under construction informationization ecosphere for establishing interconnection collaboration, intelligent Manufacturing science management realizes that engineering applies visual intelligent management, realizes that project management informationization is horizontal to improve, it is horizontal to promote construction safety, green construction is done step-by-step and ecology is built.

Description

Wisdom building site management system
Technical field
The utility model belongs to building site management technical field, and in particular to a kind of wisdom building site management system.
Background technique
Construction site is to develop construction project at one, carries out the place of civil engineering, and range often has coaming plate, iron wire Net or enclosure wall are closed, and the disengaging of personnel and material, machinery and vehicle is limited.There is estate management administrator to guard.Discrepancy can Identity can be registered, and to dress safety cap etc..
Wisdom construction is the harmonious development of industry, is that industry is allowed to equip with arms advanced number with the Nature harmonious and sustainable development Word nervous system keeps management environment justice transparent, allows industry, enterprise's project management efficient fine, and quality safety management is effectively reliable.
Wisdom builds the fining construction by one line of engineering site, increased quality, extends project life cycle, substantially subtracts Few resource loss and reduction carbon emission, while the large-scale management level for building enterprise is promoted, guarantee safe production smooth sequential.
Wisdom building site is that industry tool of the theory in journey field is existing, is a kind of brand-new engineering lifecycle management thought.
Construction industry is a high risk industries, along with the continuous development of science and technology, information-based means, mobile technology, intelligence Energy wearable device and tool are constantly promoted in the application of Construction stage, and wisdom building site construction is being realized green construction, led Information technology application, raising quality safety management level, promotion social synthesis's competitiveness etc. are of great significance.
Construction site is managed, a kind of construction site management system of the prior art, including remote management platform, discrepancy Building site vehicle monitoring system, elevator recognition of face control system, site staff's monitoring management system and dust from construction sites detection system System;Entering and leaving building site vehicle monitoring system includes infrared detector, automatic tag identification reader, on-ground weigher and video camera;Elevator Recognition of face control system includes recognition of face terminal and elevator control module;Site staff's monitoring management system includes swiping the card Time Attendance Device, gate and the second video camera;Dust from construction sites detection system includes fugitive dust detection device, control system, automatic water-supply System and dust-extraction unit.Above-mentioned construction site management system, convenient for building site management personnel without to site inspection, To the real time monitoring and management of building site operation;Building site vehicle monitoring system is entered and left due to being equipped with, work can be entered and left to each The relevant information of ground vehicle is monitored, conducive to the normal management in building site.However, the construction site management that the prior art refers to System, technical solution only provide general outline, do not provide to specific implementation details, operational feasibility is small.
Utility model content
The utility model embodiment is designed to provide a kind of wisdom building site management system, solves existing building building site pipe Manage confusing problem.
To achieve the above object, a kind of wisdom building site management system, the system provided by the utility model embodiment Around work progress management, the project under construction informationization ecosphere of interconnection collaboration, intelligent Manufacturing science management is established, realizes engineering Visual intelligent management is applied, realizes that project management informationization is horizontal to improve, promotes construction safety level, be done step-by-step green Color is built and ecology is built.
Specifically, the utility model embodiment the technical solution adopted is that:
A kind of wisdom building site management system, the system comprises:
Internet of Things cloud server;
Several terminals are installed in mobile phone or PC and respectively with the Internet of Things cloud server respectively and communicate to connect;
Recruitment real-name management unit, comprising: be set to several gates of building site inlet and outlet, gate imports and exports position difference It is provided with all-purpose card identifier, gate upper surface both ends are respectively erected with face recognition device;Personnel information acquisition unit, including The Message Entry Device of camera and the camera communications connection of collector's photographic intelligence, the Message Entry Device output end It is communicated to connect with the Internet of Things cloud server, forms upload, the storage to collected personal information, the all-purpose card is known Other device and face recognition device pass through Message Entry Device respectively and Internet of Things cloud server communicates to connect;Danger large-engineering management Unit, comprising: construction elevator management assembly, comprising: Fingerprint Identification Unit is installed in construction elevator, built-in to communicate with fingerprint window The finger print information memory module of connection and the finger print information communicated to connect with finger print information memory module compare processor, described Finger print information compares processor and construction elevator starts switch control connection;Tower crane anticollision component, comprising: be set to tower crane and drive The display sailing indoor host and being connect with main-machine communication, be arranged at intervals on tower crane counter-jib and respectively with main-machine communication The height sensor and rotary sensor of connection are set to the air velocity transducer connecting on tower crane tower cap and with main-machine communication, if The luffing sensor for being placed on tower crane boom and connecting with main-machine communication is set to tower crane tower body and what is connect with main-machine communication inclines Angle detector, the host are communicated by a wireless transport module being set on counter-jib with the Internet of Things cloud server Connection;Component is supervised in deep basal pit safety monitoring, comprising: the frame being set up in foundation pit, the frame upper surface are provided with coagulation Native supporting element is provided with reinforcing rib meter in concrete support, and several bracing members parts both ends are inscribed in respectively on the inside of frame two sidewalls, Axle power meter is provided in supporting element, if being set to frame upper surface and the dry deposition on ground on the outside of foundation pit opening both ends Instrument is set to the inclinometer of frame two sides inside sidewalls, and the soil pressure cell being set between frame side wall and foundation pit inner wall is located at A water level monitoring blind hole is offered along the vertical direction respectively on ground on the outside of foundation pit opening both ends, and a ventage piezometer is set to The monitoring blind via bottom is simultaneously communicated to connect with sedimentometer, and one and the reinforcing bar are provided on the ground of foundation pit open outer side The induction collector that meter, axle power meter, sedimentometer, inclinometer and soil pressure cell communicate to connect respectively, the induction collector output end It is connect with pit retaining monitoring main-machine communication, the pit retaining monitoring host and the Internet of Things cloud server communicate to connect;High-supported formwork Monitoring and supervision component, comprising: several high-supported formwork combined aural and visual alarms for being distributed in building site, several high-precisions for being distributed in building-site Inductor, the data collecting instrument that input terminal is communicated to connect with the high-supported formwork combined aural and visual alarm and high-precision inductor respectively, should Data collecting instrument output end and the Internet of Things cloud server communicate to connect;
Long-range monitor component, comprising: headend equipment, including being distributed in several holders of building-site, being set up in cloud respectively Video camera, several sound pick-ups and several warning devices on platform;Image procossing transmission device, several video cameras pass through solution Code device and video distributor and image procossing transmission device input terminal communicate to connect, several sound pick-ups and warning device difference It is communicated to connect with image procossing transmission device input terminal, described image handles transmission device output end and the Internet of Things cloud takes Business device communication connection;Video wall is installed in control room and communicates to connect with described image processing transmission device, formed to image Broadcasting, display.
Further, the system also includes automatic spray depositing dust linkage units comprising: several environment monitors, packet Include tower crane environment monitor, climbing frame environment monitor, enclosing environment monitor and channel environment monitor, formed to tower crane, The monitoring of climbing frame, enclosing and passageway perimeter environment, several environment monitor output ends respectively with the Internet of Things cloud service Device communication connection;Sprinkling equipment, comprising: tower crane sprinkling equipment, climbing frame sprinkling equipment, enclosing sprinkling equipment and channel ice fog disk Sprinkling equipment.
Further, the system also includes ultra-wideband wireless positioning units comprising: several positioning mainboards fill respectively On the inside of worker safety helmet, integrally disposed respectively on positioning mainboard to have GPS positioning chip, positioning main board power supply end is electrically connected with One rechargeable battery, the helmet brim side are provided with a charging hole being electrically connected with the rechargeable battery, the brim of a hat other side It is provided with the control switch with the positioning mainboard communication connection;Several locating base stations for being distributed in building-site, signal receive End is connect with the GPS positioning chip communication respectively, and signal sending end passes through Internet of Things cloud server and the terminal respectively Communication connection.
Further, the construction elevator management assembly further includes recognition of face device, is installed in construction elevator, built-in people Face information storage module and the face information communicated to connect with face information memory module compare processor, the face information It compares processor and construction elevator starts switch control connection.
Further, described image processing transmission device is digital network hard disk video recorder;The long-range monitor component is also Including speaker, printer, computer and the video matrix respectively with described image processing transmission device communication connection, the video square Battle array output end and the video wall communicate to connect;The video matrix output end is also connected with an alarm host machine, the alarm host machine Output end and the warning device communicate to connect, the warning device include the probe for being distributed in building-site, gate inhibition, light with And alarm lamp.
Further, the high-precision inductor includes pressure sensor, displacement sensor and obliquity sensor.
Further, the system also includes the danger source dynamic publicity screen for being set to building-site, danger source dynamics Publicity screen is communicated to connect by Internet of Things cloud server and the terminal, is formed public to the concentration of danger source and operating condition of constructing Show;The danger source dynamic publicity screen is LED display.
Further, it is additionally provided in the tower crane cab and is filled with the recognition of face of tower crane control switch communication connection It sets.
The beneficial effect of the utility model embodiment is:
The double identification methods of all-purpose card+recognition of face, personnel handle all-purpose card and recognition of face, system of real name registration after marching into the arena Personal information, by Message Entry System, and the information comparison platform by being installed in terminal (third-party platform, such as building port, Cloud builds net etc.) information comparison is carried out, the personnel that bad behavior (maliciously ask for salary, make trouble) can be effectively prevent to record march into the arena;
Construction elevator management assembly by the double identification methods of fingerprint recognition+recognition of face, before operation comparison fingerprint and/or Face characteristic can manipulate construction elevator after identification is consistent, and prevent the phenomenon that is switched on without card, it is ensured that special messenger's special plane, elevator use peace Entirely;
Tower crane collision avoidance system acquires the phase of height under hook, trolley stroke, ambient wind velocity in real time in tower crane operational process The relativeness of data, automatic identification and surrounding tower crane or building is closed, driver is reminded, ensures group towers work safety;
It is existing that foundation pit installs 24 hours mobile phones such as soil pressure cell, ventage piezometer, sedimentometer, inclinometer, reinforcing rib meter, axle power meter Field foundation pit all data gives warning in advance to dangerous situation, by data center's analysis, setting early warning value and alarming value to subway transportation The monitoring of the stability and deformation characteristic, foundation pit enclosure support system stress deformation and stability of track foundation pit or deep pit digging It supervises significant;
Using high-supported formwork combined aural and visual alarm, when monitor value is more than early warning value, construction personnel is on operation Shi Nengcong machine Read pre-warning signal, pinpoint precise positioning danger hidden danger, while alarm sound requirement on-site personnel stop construction, rapidly It withdraws;
Long-range monitor component can by installing vertex high-definition monitoring equipment in positions such as Office Area, ring field enclosure wall or tower cranes, Collect on-site supervision image data;
Automatic spray depositing dust linkage unit is joined using data such as environment monitor acquisition PM2.5, PM10 by environmental monitoring Dynamic to carry out data analysis, when transfiniting, which occurs, in a certain region of site operation to be worth, system automatically turns on corresponding region sprinkling equipment drop Dirt ensures that air quality is up to standard;
Ultra-wideband wireless positioning unit by installing positioning chip on worker safety helmet, in conjunction with locating base station, it can be achieved that Personnel positioning monitoring;
Project major hazard source is carried out dynamic publicity using LED screen by danger source dynamic publicity screen, according to different phase Construction operating condition real-time update, clearly supervision person liable, it is ensured that safety in production.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of wisdom building site management system provided by the utility model embodiment;
Fig. 2 is recruitment real-name management unit in a kind of wisdom building site management system provided by the utility model embodiment Structural schematic diagram;
Fig. 3 is a kind of recruitment real-name management unit of wisdom building site management system provided by the utility model embodiment The structural schematic diagram of middle gate;
Fig. 4 is construction elevator management assembly in a kind of wisdom building site management system provided by the utility model embodiment Structural schematic diagram;
Fig. 5 is the knot of tower crane anticollision component in a kind of wisdom building site management system provided by the utility model embodiment Structure schematic diagram;
Fig. 6 is deep basal pit safety monitoring supervision in a kind of wisdom building site management system provided by the utility model embodiment The structural schematic diagram of component;
Fig. 7 is high-supported formwork Monitoring and supervision component in a kind of wisdom building site management system provided by the utility model embodiment Structural schematic diagram;
Fig. 8 is a kind of structure of wisdom building site management system medium-long range monitor component provided by the utility model embodiment Schematic diagram;
Fig. 9 is single for automatic spray depositing dust linkage in a kind of wisdom building site management system provided by the utility model embodiment The structural schematic diagram of member;
Figure 10 is ultra-wideband wireless location list in a kind of wisdom building site management system provided by the utility model embodiment The structural schematic diagram of member.
Specific embodiment
The utility model is described further below by specific embodiment, but to be not intended to limit this practical new for embodiment The protection scope of type.
Embodiment 1
Referring to FIG. 1 to FIG. 8, a kind of wisdom building site management system provided by the utility model, the system comprises:
Internet of Things cloud server 100;
Several terminals 200, be installed in mobile phone or PC respectively and respectively with 100 communication link of Internet of Things cloud server It connects;
Recruitment real-name management unit 300, comprising: be set to several gates 301 of building site inlet and outlet, gate 301 passes in and out Mouth position is respectively arranged with all-purpose card identifier (not shown), and 301 upper surface both ends of gate are respectively erected with face recognition device 302;Personnel information acquisition unit 303, what camera 304 and camera 304 including collector's photographic intelligence communicated to connect Message Entry Device 305,305 output end of Message Entry Device and the Internet of Things cloud server 100 communicate to connect, shape Upload, the storage of pairs of collected personal information, the all-purpose card identifier and face recognition device 302 pass through information respectively Recording device 305 and Internet of Things cloud server 100 communicate to connect;
Wherein, recruitment real-name management unit is collection computer information safety technique, channel automated control technology, network Mechanics of communication, digital signal analogue technique, RFID identification technology, biological identification technology, video transmission technologies are in the safety of one Management system is communicated by the information comparison platform being installed in the terminal 200 with the Internet of Things cloud server 100 Connection forms the comparison to the personal information being uploaded in Internet of Things cloud server 100;
The daily programming count worker of recruitment real-name management unit turns out for work and the working time, automatically generates attendance discipline, hair It is provided on time when putting wage according to attendance record, avoids the occurrence of dispute between workers & employer, it is ensured that securely generated harmonious orderly.
Danger large-engineering administrative unit 400, comprising:
Construction elevator management assembly 401, comprising: Fingerprint Identification Unit 402 is installed in construction elevator (not shown), built-in With the finger print information memory module 403 of fingerprint window communication connection (not shown) and with 403 communication link of finger print information memory module The finger print information connect compares processor 404, and the finger print information compares processor 404 and construction elevator starts switch control and connects It connects;
Further, the construction elevator management assembly 401 further includes recognition of face device 427, is installed in construction elevator, Built-in face information memory module 428 and the face information communicated to connect with face information memory module 428 compare processor 429, the face information compares processor 429 and construction elevator starts switch control connection.
Construction elevator fingerprint+recognition of face is mainly Fingerprint Lock and biological identification technology, utilizes sensing detection technology, insertion Formula technology, computer technology solve the problems, such as site operation personnel's identification.
Tower crane anticollision component 405, comprising: the host (not shown) and and host being set in 1 driver's cabin 11 of tower crane The display (not shown) of communication connection is arranged at intervals at the height connecting on 1 counter-jib 12 of tower crane and with main-machine communication respectively Sensor 406 and rotary sensor 407 are set to the air velocity transducer 408 connecting on 1 tower cap 13 of tower crane and with main-machine communication, It is set to the luffing sensor 409 connecting on 1 boom 14 of tower crane and with main-machine communication, is set to 1 tower body 15 of tower crane and and host The tilt angle detector 410 of communication connection, the host by one be set to wireless transport module 411 on counter-jib 12 with it is described Internet of Things cloud server 100 communicates to connect;
Further, it is additionally provided in the tower crane cab 11 and is filled with the recognition of face of tower crane control switch communication connection Set (not shown).
Tower crane collision avoidance system is the collision prevented between tower crane and tower crane, tower crane and other objects, prevents tower crane hanging object Enter the integrated electronic system of entry region in violation of rules and regulations.
Component 412 is supervised in deep basal pit safety monitoring, comprising: the frame 413 being set up in foundation pit 2,413 upper end of frame Face is provided with concrete support 414, and reinforcing rib meter 415, several 416 both ends of bracing members part are provided in concrete support 414 Be inscribed on the inside of 413 two sidewalls of frame respectively, be provided with axle power meter 417 in supporting element 416, be set to 413 upper surface of frame and Several sedimentometers 418 on ground 20 on the outside of the opening of foundation pit 2 both ends, are set to the deviational survey of 413 two sides inside sidewalls of frame Instrument 419, the soil pressure cell 420 being set between 2 inner wall of 413 side wall of frame and foundation pit, the ground on the outside of the opening of foundation pit 2 both ends Offer a water level monitoring blind hole 21 on face 20 along the vertical direction respectively, a ventage piezometer 421 is set to the monitoring blind hole 21 Bottom simultaneously with sedimentometer 418 communicate to connect, be provided on the ground 20 of 2 open outer side of foundation pit one with the reinforcing rib meter 415, The induction collector 422 that axle power meter 417, sedimentometer 418, inclinometer 419 and soil pressure cell 420 communicate to connect respectively, the induction 422 output end of collector and the communication connection (not shown) of pit retaining monitoring host, the pit retaining monitoring host and the Internet of Things cloud Server 100 is held to communicate to connect;
Deep basal pit safety monitoring supervisory systems is mainly made of induction collector and pit retaining monitoring host, passes through Internet of Things skill Art links field monitoring induction instrument aratus, the detection data automatic collection (number such as level, vertical displacement, crack, water level, stress According to), and by 4G wireless network real-time Transmission, system centre handles initial data in real time, and digital model is analyzed, It is worth Realtime Alerts early warning to transfiniting;Using virtual method of section measuring technique, the differentiation principle of FInite Element is used for reference, more function are passed through Energy numerical frequency readout instrument, high-precision osmotic pressure water-level gauge, low energy consumption data wireless transmission instrument and Multichannel data acquisition device etc. are set It is standby, realize water level, stress data integral collecting.
High-supported formwork Monitoring and supervision component 423, comprising: several high-supported formwork combined aural and visual alarms 424, Ruo Ganfen for being distributed in building site It is distributed in the high-precision inductor 425 of building-site, input terminal incudes with the high-supported formwork combined aural and visual alarm 424 and high-precision respectively The data collecting instrument 426 that device 425 communicates to connect, 426 output end of data collecting instrument and the Internet of Things cloud server 100 are logical Letter connection;
Further, the high-precision inductor 425 includes pressure sensor 430, displacement sensor 431 and inclination angle sensing Device 432.
High-supported formwork Monitoring and supervision component is mainly made of sensor, host and warning system three parts, is passed using high-precision Sensor and automatic collector to template sedimentation, deformation of timbering and the upright bar axle power real-time monitoring of high and big die plate support system, and lead to It crosses 4G wireless network and carries out real-time Transmission, and handled by host analysis.
Long-range monitor component 500, comprising:
Headend equipment 501, including being distributed in several holders 502 of building-site, being set up in camera shooting on holder 502 respectively Machine 503, several sound pick-ups 504 and several warning devices 505;
Image procossing transmission device 506, several video cameras 503 pass through decoder 507 and video distributor 508 and figure As processing 506 input terminal of transmission device communication connection, several sound pick-ups 504 and warning device 505 respectively with image procossing The communication connection of 506 input terminal of transmission device, described image handle 506 output end of transmission device and the Internet of Things cloud server 100 communication connections;
Video wall 5070 is installed in control room and communicates to connect with described image processing transmission device 506, formed to figure Broadcasting, the display of picture.
Further, described image processing transmission device 506 is digital network hard disk video recorder;The long-range monitor component It further include speaker 5010, printer 509, computer 510 and the video communicated to connect respectively with described image processing transmission device 506 Matrix 511,511 output end of video matrix and the video wall 5070 communicate to connect;511 output end of video matrix is also It is connected with an alarm host machine 512,512 output end of alarm host machine and the warning device 505 communicate to connect, the warning device 505 include probe 513, gate inhibition 514, light 515 and the alarm lamp 516 for being distributed in building-site.
Embodiment 2
Referring to Fig. 1 and Fig. 9, the system also includes automatic spray depositing dust linkage units 600 comprising:
Several environment monitors 601, including tower crane environment monitor 602, climbing frame environment monitor 603, enclosing environment prison Instrument 604 and channel environment monitor 605 are surveyed, the monitoring to tower crane, climbing frame, enclosing and passageway perimeter environment is formed, it is several 601 output end of environment monitor is communicated to connect with the Internet of Things cloud server 100 respectively;
Sprinkling equipment 606, comprising: tower crane sprinkling equipment 607, climbing frame sprinkling equipment 608, enclosing sprinkling equipment 609 and Channel ice fog disk sprinkling equipment 610.
The automatic spray depositing dust linkage unit 600 by be installed in the end PC and with Internet of Things cloud server 100 The data analysis unit 611 of communication connection matches, and forms the control to sprinkling equipment 606, and the data analysis unit 611 is wrapped The tower crane spray that tower crane environment compares processor 612 and compares the communication connection of 612 output end of processor with tower crane environment is included to control Device 613, climbing frame environment comparison processor 614 and the climbing frame that the communication connection of 614 output end of processor is compared with climbing frame environment processed Spray controller 615, enclosing environment compare processor 616 and compare the climbing frame of the communication connection of processor 616 with enclosing environment Spray controller 617, channel environment compare processor 618 and compare the channel of the communication connection of processor 618 with channel environment Ice fog disk sprays controller 619.
Automatic spray dust falling system is collected data by terminal devices such as environment monitors and is analyzed, by remote control skill The equipment such as art sprays tower crane, climbing frame spray, enclosing spray, channel ice fog disk spray carry out automatically controlling.
Remaining is the same as embodiment 1.
Embodiment 3
Referring to Fig. 1 and Figure 10, the system also includes ultra-wideband wireless positioning units 700 comprising:
Several positioning mainboards 701 are installed in respectively on the inside of worker safety helmet 3, integrally disposed respectively on positioning mainboard 701 to have GPS positioning chip 702, positioning 701 feeder ear of mainboard are electrically connected with a rechargeable battery (not shown), 3 the brim of a hat 31 of safety cap Side is provided with a charging hole 703 being electrically connected with the rechargeable battery, and 31 other side of the brim of a hat is provided with and the positioning mainboard The control switch 704 of 701 communication connections;
Several locating base stations 705 for being distributed in building-site, signal receiving end are logical with the GPS positioning chip 702 respectively Letter connection, signal sending end passes through Internet of Things cloud server 100 respectively and the terminal communicates to connect.
Ultra-wideband wireless positioning unit transmits data using the GPS positioning chip on safety cap, by locating base station, realizes Real-time positioning to operating personnel, clear and intuitive understanding personnel distribution situation and demographic.
Remaining is the same as embodiment 1.
Embodiment 4
Referring to Fig. 1, the system also includes the danger source dynamic publicity screen 800 for being set to building-site, the danger source is dynamic State publicity screen 800 is communicated to connect by Internet of Things cloud server 100 and the terminal 200, is formed to danger source and construction work The concentration publicity of condition;The danger source dynamic publicity screen 800 is LED display.
Using LED screen by project major hazard source carry out dynamic publicity, according to different phase construct operating condition real-time update, Clearly supervise person liable, it is ensured that safety in production.
Remaining is the same as embodiment 1.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, or some functional module is deleted, this is to ability It is obvious for field technique personnel.Therefore, these modifications made on the basis of without departing from the spirit of the present invention Or improve or delete, belong to the range of the requires of the utility model protection.

Claims (8)

1. a kind of wisdom building site management system, which is characterized in that the system comprises:
Internet of Things cloud server (100);
Several terminals (200), be installed in mobile phone or PC respectively and respectively with Internet of Things cloud server (100) communication link It connects;
Recruitment real-name management unit (300), comprising: be set to building site inlet and outlet several gates (301), gate (301) into Outlet port is respectively arranged with all-purpose card identifier, and gate (301) upper surface both ends are respectively erected with face recognition device (302);Personnel information acquisition unit (303), camera (304) and camera (304) including collector's photographic intelligence are logical Believe the Message Entry Device (305) of connection, Message Entry Device (305) output end and the Internet of Things cloud server (100) it communicates to connect, forms upload, the storage to collected personal information, the all-purpose card identifier and recognition of face are set Standby (302) are communicated to connect by Message Entry Device (305) and Internet of Things cloud server (100) respectively;
It endangers large-engineering administrative unit (400), comprising:
Construction elevator management assembly (401), comprising: Fingerprint Identification Unit (402) is installed in construction elevator, built-in and fingerprint window The finger print information memory module (403) of communication connection and the finger print information communicated to connect with finger print information memory module (403) It compares processor (404), the finger print information compares processor (404) and construction elevator starts switch control connection;
Tower crane anticollision component (405), comprising: the host that is set in tower crane (1) driver's cabin (11) and connect with main-machine communication The display connect, the height sensor (406) for being arranged at intervals on tower crane (1) counter-jib (12) and being connect respectively with main-machine communication With rotary sensor (407), it is set to the air velocity transducer (408) connecting on tower crane (1) tower cap (13) and with main-machine communication, if It is placed in the luffing sensor (409) connecting on tower crane (1) boom (14) and with main-machine communication, is set to tower crane (1) tower body (15) And the tilt angle detector (410) connecting with main-machine communication, the host are set to the wireless transmission on counter-jib (12) by one Module (411) and the Internet of Things cloud server (100) communicate to connect;
Component (412) are supervised in deep basal pit safety monitoring, comprising: the frame (413) being set up in foundation pit (2), the frame (413) Upper surface is provided with concrete support (414), is provided with reinforcing rib meter (415), several bracing members in concrete support (414) Part (416) both ends are inscribed in respectively on the inside of frame (413) two sidewalls, are provided with axle power meter (417) in supporting element (416), are arranged In frame (413) upper surface and several sedimentometers (418) on ground (20) on the outside of foundation pit (2) opening both ends, it is set to The inclinometer (419) of frame (413) two sides inside sidewalls, the soil pressure being set between frame (413) side wall and foundation pit (2) inner wall Power box (420), is located on the ground (20) on the outside of foundation pit (2) opening both ends that offer a water level monitoring along the vertical direction respectively blind Hole (21), a ventage piezometer (421) are set to monitoring blind hole (21) bottom and communicate to connect with sedimentometer (418), be located at Be provided on the ground (20) of foundation pit (2) open outer side one with the reinforcing rib meter (415), axle power meter (417), sedimentometer (418), The induction collector (422) that inclinometer (419) and soil pressure cell (420) communicate to connect respectively, the induction collector (422) output End is connect with pit retaining monitoring main-machine communication, and the pit retaining monitoring host and the Internet of Things cloud server (100) communicate to connect;
High-supported formwork Monitoring and supervision component (423), comprising: several high-supported formwork combined aural and visual alarms (424) for being distributed in building site, Ruo Ganfen Be distributed in the high-precision inductor (425) of building-site, input terminal respectively with the high-supported formwork combined aural and visual alarm (424) and high-precision The data collecting instrument (426) of inductor (425) communication connection, data collecting instrument (426) output end and the Internet of Things cloud Server (100) communication connection;
Long-range monitor component (500), comprising:
Headend equipment (501), including being distributed in several holders (502) of building-site, being set up in taking the photograph on holder (502) respectively Camera (503), several sound pick-ups (504) and several warning devices (505);
Image procossing transmission device (506), several video cameras (503) pass through decoder (507) and video distributor (508) It is communicated to connect with image procossing transmission device (506) input terminal, several sound pick-ups (504) and warning device (505) are respectively It is communicated to connect with image procossing transmission device (506) input terminal, described image handles transmission device (506) output end and the object Networking cloud server (100) communication connection;
Video wall (5070) is installed in control room and communicates to connect with described image processing transmission device (506), formation pair Broadcasting, the display of image.
2. wisdom building site management system according to claim 1, which is characterized in that the system also includes automatic spray drops Dirt linkage unit (600) comprising:
Several environment monitors (601), including tower crane environment monitor (602), climbing frame environment monitor (603), enclosing environment Monitor (604) and channel environment monitor (605) form the prison to tower crane, climbing frame, enclosing and passageway perimeter environment It surveys, several environment monitor (601) output ends are communicated to connect with the Internet of Things cloud server (100) respectively;
Sprinkling equipment (606), comprising: tower crane sprinkling equipment (607), climbing frame sprinkling equipment (608), enclosing sprinkling equipment (609) And channel ice fog disk sprinkling equipment (610).
3. wisdom building site management system according to claim 1, which is characterized in that it is wireless that the system also includes ultra-wideband Positioning unit (700) comprising:
Several positioning mainboards (701) are installed in respectively on the inside of worker safety helmet (3), integrally disposed respectively in positioning mainboard (701) Have GPS positioning chip (702), positioning mainboard (701) feeder ear is electrically connected with a rechargeable battery, safety cap (3) the brim of a hat (31) side is provided with a charging hole (703) being electrically connected with the rechargeable battery, the brim of a hat (31) other side be provided with it is described Position the control switch (704) of mainboard (701) communication connection;
Several locating base stations (705) for being distributed in building-site, signal receiving end are logical with the GPS positioning chip (702) respectively Letter connection, signal sending end passes through Internet of Things cloud server (100) respectively and the terminal communicates to connect.
4. wisdom building site management system according to claim 1, which is characterized in that the construction elevator management assembly (401) further include recognition of face device (427), be installed in construction elevator, built-in face information memory module (428) and and people The face information of face information storage module (428) communication connection compares processor (429), and the face information compares processor (429) control connection is started switch with construction elevator.
5. wisdom building site management system according to claim 1, which is characterized in that described image handles transmission device It (506) is digital network hard disk video recorder;
The long-range monitor component further includes the speaker communicated to connect respectively with described image processing transmission device (506) (5010), printer (509), computer (510) and video matrix (511), video matrix (511) output end and the video Wall (5070) communication connection;
Video matrix (511) output end is also connected with an alarm host machine (512), alarm host machine (512) output end and institute Warning device (505) communication connection is stated, the warning device (505) includes the probe (513) for being distributed in building-site, gate inhibition (514), light (515) and alarm lamp (516).
6. wisdom building site management system according to claim 1, which is characterized in that high-precision inductor (425) packet Include pressure sensor (430), displacement sensor (431) and obliquity sensor (432).
7. wisdom building site management system according to claim 1, which is characterized in that the system also includes be set to building site The danger source dynamic publicity screen (800) at scene, the danger source dynamic publicity screen (800) pass through Internet of Things cloud server (100) It is communicated to connect with the terminal (200), forms the concentration publicity to danger source and operating condition of constructing;
The danger source dynamic publicity screen (800) is LED display.
8. wisdom building site management system according to claim 1, which is characterized in that in tower crane (1) driver's cabin (11) It is additionally provided with the face identification device with the communication connection of tower crane control switch.
CN201821335564.0U 2018-08-20 2018-08-20 Wisdom building site management system Active CN209231777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821335564.0U CN209231777U (en) 2018-08-20 2018-08-20 Wisdom building site management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821335564.0U CN209231777U (en) 2018-08-20 2018-08-20 Wisdom building site management system

Publications (1)

Publication Number Publication Date
CN209231777U true CN209231777U (en) 2019-08-09

Family

ID=67497814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821335564.0U Active CN209231777U (en) 2018-08-20 2018-08-20 Wisdom building site management system

Country Status (1)

Country Link
CN (1) CN209231777U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110745713A (en) * 2019-11-22 2020-02-04 安徽海瀚物联科技有限公司 Wisdom building site cloud service system
CN110880096A (en) * 2019-11-20 2020-03-13 广西越知网络股份有限公司 Multi-party cooperative office system for constructional engineering
CN111077858A (en) * 2019-12-06 2020-04-28 中铁四局集团建筑工程有限公司 Construction site safety scheduling supervision method and system
CN111552216A (en) * 2020-05-26 2020-08-18 周中兴 Construction site intelligent supervision system based on 5G
CN111986461A (en) * 2020-08-19 2020-11-24 武汉瑞莱保能源技术有限公司 Construction safety supervisory systems

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110880096A (en) * 2019-11-20 2020-03-13 广西越知网络股份有限公司 Multi-party cooperative office system for constructional engineering
CN110880096B (en) * 2019-11-20 2023-10-31 广西越知网络股份有限公司 Multi-party collaborative office system for building engineering
CN110745713A (en) * 2019-11-22 2020-02-04 安徽海瀚物联科技有限公司 Wisdom building site cloud service system
CN111077858A (en) * 2019-12-06 2020-04-28 中铁四局集团建筑工程有限公司 Construction site safety scheduling supervision method and system
CN111552216A (en) * 2020-05-26 2020-08-18 周中兴 Construction site intelligent supervision system based on 5G
CN111986461A (en) * 2020-08-19 2020-11-24 武汉瑞莱保能源技术有限公司 Construction safety supervisory systems
CN111986461B (en) * 2020-08-19 2022-05-10 武汉瑞莱保能源技术有限公司 Construction safety supervisory systems

Similar Documents

Publication Publication Date Title
CN111126838B (en) Intelligent engineering management system
CN209231777U (en) Wisdom building site management system
CN113804598B (en) Construction environment monitoring system and monitoring method based on big data
CN104994346B (en) Construction safety manages intelligent monitor system and its image alarm processing method
CN111552216A (en) Construction site intelligent supervision system based on 5G
CN107544326A (en) Ensure the multifunction monitoring system of construction site security
CN205748466U (en) A kind of dust from construction sites noise supervisory systems
CN104729587B (en) A kind of monitoring system and method for large-scale power Material Transportation
CN107146168A (en) Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology
CN107333113A (en) A kind of pipe gallery wireless supervisory control system
CN110533231A (en) Disaster-ridden kind of monitoring and warning and emergency commading system
CN110189070B (en) Intelligent logistics Internet of things system
CN115278543A (en) Intelligent building site system based on BIM
CN211877114U (en) Construction site supervisory system based on 5G
CN117575170B (en) Intelligent management system
CN113988647A (en) Municipal works wisdom building site management system based on BIM
CN209214677U (en) A kind of wisdom dust from construction sites noise maintenance device based on GIS
CN114399265A (en) Electric power engineering construction project overall process management and control system
CN114928814A (en) Personnel safety positioning system and positioning method
CN111260506A (en) Information management system for Internet of things of construction engineering
CN108071423A (en) mine explosion monitoring system based on infrared image monitoring device
CN112686511A (en) Construction safety management system based on building information model
CN115456595A (en) Engineering construction project comprehensive control method based on multi-source data fusion
CN108071422A (en) Mine explosion monitoring system based on image monitoring equipment
CN205910719U (en) Platform is patrolled and examined in forestry based on mobile network

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 202, 21 Yayuan Industrial Park Road, Nancheng Street, Dongguan City, Guangdong Province

Patentee after: Guangdong Runchang Construction Engineering Co., Ltd.

Address before: 523000 Yingfeng Business Center, 26 Sports Road, Nancheng District, Dongguan City, Guangdong Province, 3 offices 705 and 706

Patentee before: Dongguan Tai Longwan Construction Engineering Co., Ltd.

CP03 Change of name, title or address