Multi-party collaborative office system for building engineering
Technical Field
The invention relates to the field of engineering management systems, in particular to a multiparty cooperative office system for constructional engineering.
Background
With the development of electronic information technology, especially the popularization of mobile internet, the frequency of people to acquire and send data is more and more dense, the means is more and more diverse, and the requirement of real-time is higher, so to speak, the requirement of information interaction is provided at any time and any place.
The construction engineering is characterized in that the site management of the construction site is chaotic, each company has own management system, and the companies do not communicate with each other or participate in each other. When serious problems often occur, mutual withholding occurs, and serious loss or slower overall construction progress of the engineering can be caused.
As the scale of more and more constructional engineering projects is continuously enlarged at present, the original engineering project management method can not better adapt to the large-scale constructional engineering project management requirements for controlling the cost and managing various resources in the construction process. However, in the prior art, the resource information of the building engineering project is usually collected, summarized and calculated manually to form a moon report and other forms to evaluate the progress of the project and analyze the project cost, while the engineering project is dynamically advanced, if the project is smaller, the project can also be dealt with, but if the project is larger in scale, the report presented in the moon report form can not timely reflect the current engineering dynamic information, and great technical difficulties are brought to project cost control and progress management.
However, the existing project management system is simple to manage, such as single manpower management, single engineering process management, single information management and the like, and does not have a management system for comprehensively planning the whole project, so that communication difficulties occur among parties responsible for the project, and the progress of the project, the quality of the project and the like are seriously affected.
Disclosure of Invention
The invention aims to provide a multiparty collaborative office system for construction engineering, which solves the technical problem that the prior engineering project does not have a management system for comprehensively planning the whole project, so that communication difficulties occur among parties responsible for the project.
The system comprises a construction site supervision unit, an industry market detail unit, a server management unit, a project five-party collaboration unit, a project information management unit and a project quality security management unit, wherein the construction site supervision unit, the industry market detail unit, the project five-party collaboration unit, the project information management unit and the project quality security management unit are all connected with the server management unit, and the construction site supervision unit is used for supervising construction data, safety data and supervision data of an engineering site in a construction process; the industrial market detail unit is used for displaying raw material merchants and equipment merchants required in the engineering construction process, positioning the site position and displaying the raw material merchants and equipment merchants nearby the site, the server management unit is used for storing engineering management data, equipment data and backup engineering construction process management data and equipment data, and the project five-party coordination unit is used for communicating and sharing data among a constructor, a supervisor, a designer and a reconnaissance party; the project information management unit is used for recording and inquiring data of project engineering construction process, meeting data, personnel management data, engineering diary data, five-party contact but visa data and five-party communication process recording data, and the project quality and safety management unit is used for recording and processing complaints of the project construction process, recording construction process spot check data and construction safety data entry inquiry.
The industry market detail unit comprises an engineering main material supply module, an engineering manpower service module, a hardware material supply module, a security material supply module, an electrician electrical material supply module, a mechanical equipment supply module, an electric tool supply module, a GPS project positioning module, a nearby supplier display module and a distribution service module, wherein the engineering main material supply module is used for displaying specific information and material price information of the main material supplier required in the engineering construction process, the engineering manpower service module is used for displaying worker information required in the engineering construction process, the worker training is directly contacted with the worker according to construction requirements, the hardware material supply module is used for displaying specific information and hardware material price information of the hardware material supplier required in the engineering construction process, the security material supply module is used for displaying specific information and security material price information of the security material supplier required in the engineering construction process, the mechanical equipment supply module is used for displaying specific information and electrical material price information of the electrician electrical material supplier required in the engineering construction process, the mechanical equipment supply module is used for displaying the specific information and the mechanical equipment supplier required in the engineering construction process, meanwhile, the position of the electrical equipment supply module is used for displaying the GPS position information of the nearby electrical material supplier in the engineering construction process, the position information is used for displaying the nearby electrical material supplier positioning module is used for positioning the position information of the electrical tool, and calculating specific distances and positions, wherein the distribution service module is used for selecting different distribution services to contact different logistics merchants according to the requirements of users.
The building site supervision unit includes deep basal pit monitoring module, crane monitoring module, lift monitoring module, house monitoring module, high formwork monitoring module, side slope monitoring module, raise dust monitoring module, noise monitoring module, dangerous source monitoring module, engineering image display module, attendance module and engineering panorama record module, deep basal pit monitoring module is used for monitoring and recording deep basal pit work process data, crane monitoring module is used for monitoring crane operation data to record data, the lift monitoring module is used for monitoring lift operation data to record data, the house monitoring module is used for monitoring building site workman house's environmental data, high formwork monitoring module has high data through the vertical degree of sensor monitoring high formwork, side slope monitoring module uses camera monitoring side slope environmental condition data, raise dust monitoring module uses dust sensor to monitor engineering construction site's dust concentration to judge whether to accord with the standard, start water smoke fall processing when not accord with the standard, noise monitoring module passes through sound sensor construction site's noise data to judge whether to accord with the interior time zone of sound sensor construction site, the noise data of taking place, and judge whether to accord with the panorama construction site work environment data that the time zone, the high formwork monitoring module is used for carrying out the record with the environmental condition data of the side slope monitoring module, whether the panorama construction site is used for carrying out the panorama construction site, the life-time zone of the factory work, the life image display module is used for carrying out the record of the environmental condition data of the high formwork.
The server management unit comprises a management data storage module, an equipment data storage module and a data backup module, wherein the management data storage module is used for storing management data information and process data information of construction in the engineering construction process, the equipment data storage module is used for storing equipment data used for construction, and the data backup module is used for backing up all data related to the engineering construction process in real time.
The project quality and safety management unit comprises an engineering complaint management module, an engineering selective inspection module and an engineering construction safety data input module, wherein the engineering complaint management module is used for receiving citizen complaints and checking complaint processing progress conditions, the engineering selective inspection module is used for recording specific data of selective inspection in a construction process, and the engineering construction safety data input module is used for recording safety data at each stage of the construction process.
The project information management unit comprises an engineering diary module, an engineering conference detail module, an engineering data module, an engineering personnel management module, a five-party contact list and visa list module and a five-party communication recording module, wherein the engineering diary module is used for recording daily recording data information in the construction process, the engineering conference detail module is used for recording conference information of each time in the construction process and recording problems and final solutions of conference discussion, the engineering data module is used for recording information of all materials used in engineering, the engineering personnel management module is used for recording related responsibility and related responsible persons of engineering construction, the five-party contact list and visa list module is used for managing and communicating among five parties, and the five-party communication recording module is used for recording and storing communication information among the five parties.
The project five-party collaboration unit comprises a constructor using end module, a designer using end module, a reconnaissance party using end module, a constructor using end module, a supervisor using end module and an engineering period supervision module, wherein the constructor using end module is used for checking and supervising whether engineering drawings of the constructor, the supervisor, the designer and the reconnaissance party accord with relevant standards, meanwhile, construction and reconnaissance are carried out according to requirements of the relevant standards, the designer using end module is used for uploading engineering drawings required to be used in engineering and communicating with other parties, the reconnaissance party using end module is used for reconnaissance detection of an engineering place to obtain detection data, the constructor using end module is used for carrying out construction according to the design drawings of the designer, the supervisor using end module is used for carrying out construction according to the relevant standards by the constructor, and the engineering period supervision module is used for recording whole process data from design to finish inspection and acceptance of the engineering and carrying out real-time inquiry by the five parties.
The invention adopts the technical proposal and has the following technical effects:
the system supports multiparty common management based on the basis of multiparty management, solves the problems of personnel communication, project management, information sharing, work arrangement implementation, project site real-time monitoring and the like, integrates personnel, data and management through collaborative management, improves project management informatization level, achieves the aim of finely managing building engineering, and is capable of cross-platform use, clear in personnel setting responsibility, data storage cloud, convenient to call, light in weight and simple in operation.
Drawings
Fig. 1 is a block diagram of the system of the present invention.
Fig. 2 is a block diagram of a worksite supervisory unit module of the present invention.
FIG. 3 is a block diagram of an industry market detail unit of the present invention.
Fig. 4 is a block diagram of a server management unit module of the present invention.
FIG. 5 is a block diagram of the project quality and safety management unit module of the present invention.
Fig. 6 is a block diagram of an item information management unit module of the present invention.
Fig. 7 is a block diagram of a five-party collaboration unit module in accordance with the present invention.
Detailed Description
The present invention will be described in further detail with reference to preferred embodiments for the purpose of making the objects, technical solutions and advantages of the present invention more apparent. It should be noted, however, that many of the details set forth in the description are merely provided to provide a thorough understanding of one or more aspects of the invention, and that these aspects of the invention may be practiced without these specific details.
As shown in fig. 1, the multi-party collaborative office system for construction engineering comprises a construction site supervision unit, an industry market detail unit, a server management unit, a project five-party collaborative unit, a project information management unit and a project quality and safety management unit. The construction site supervision unit, the industry market detail unit, the project five-party cooperation unit, the project information management unit and the project quality and security management unit are all connected with the server management unit. The technology takes national standard definition building industry role specification as a basis, takes collaborative management project as a target, links engineering management five parties, namely constructors, proctoring parties, design parties, reconnaissance parties and other personnel, supports multiparty common management based on the basis of the five party management, solves the problems of personnel communication, project management, information sharing, work arrangement implementation, project field real-time monitoring and the like, and enables personnel, data and management to be integrated through collaborative management, improves project management informatization level and achieves the purpose of finely managing building engineering. The multi-party collaborative management project can be used in a cross-platform manner, the responsibility right of personnel setting is clear, the data can be stored in the cloud, the data are convenient to call, the weight is reduced, and the operation is simple.
The existing project management technology is single, mainly solves the technical problems of manufacturing cost, design or part of engineering data in a certain project of participating in construction, does not have a cooperative office function, cannot solve communication management and the like, is not light enough, cannot cover most of the participants in the building, is complex in operation and is glorious in terms, a great deal of learning training is needed before use, and the use learning cost is too high.
The system not only can carry out mutual communication of other participators for sub-project engineering, such as related enterprises, finance, insurance, supervision, government and the like, but also can carry out post setting on related enterprises of projects through authority setting for all the enterprises of all the parties involved in building projects, the post authorities of different enterprises are different, responsibility rights are clear and easy to trace back and facilitate communication, and meanwhile, the system can be technically expanded to more participators according to national and market rule change platforms, is simple and convenient to operate, can be used across platforms, can be used for mobile phones and computers, and can be used for storing and retrieving project data at any time.
Personnel using the platform can manage (check) project progress at any time and any place at the terminal, so that remote control is convenient, and project conditions can be known without personally arriving at a project site;
the multi-side management worksite has clear responsibility and is convenient to trace;
a large amount of complicated project data are stored in the cloud, and can be referred by one-key searching;
the work is fairer, fair and public, the multi-party supervision and common management are performed, withholding and loss of projects caused by loose supervision are reduced, and the management efficiency is improved.
As shown in fig. 3, the worksite supervision unit is used for supervising construction data, safety data and supervision data of the engineering worksite during the construction process. The building site supervision unit includes deep basal pit monitoring module, crane monitoring module, house monitoring module, high formwork monitoring module, side slope monitoring module, raise dust monitoring module, noise monitoring module, dangerous source monitoring module, engineering image display module, attendance module and engineering panorama take photo recording module by plane, deep basal pit monitoring module is used for monitoring and recording deep basal pit work process data, crane monitoring module is used for monitoring crane operation data to record data, the elevator monitoring module is used for monitoring elevator operation data to record data, house monitoring module is used for monitoring the environmental data of building site workman house, high formwork monitoring module passes through sensor monitoring high formwork vertical degree and has high data, side slope monitoring module uses camera monitoring side slope environmental condition data, raise dust monitoring module uses dust sensor to monitor the dust concentration of engineering construction site to judge whether to accord with the standard, start the water smoke when not accord with, noise monitoring module passes through sound sensor monitoring construction site's noise data to judge whether to accord with the time quantum inner bag, the panorama is used for monitoring engineering image display module and taking photo by plane work site life, the dangerous condition data is used for recording each time quantum of engineering image display module, the engineering panorama take photo of life image display module is used for carrying out the engineering panorama construction site work picture each day.
As shown in fig. 2, the industry market detail unit is used for displaying raw material merchants and equipment merchants required in the engineering construction process, and positioning the site and displaying raw material merchants and equipment merchants nearby the site. The industrial market detail unit comprises an engineering main material supply module, an engineering manpower service module, a hardware material supply module, a security material supply module, an electrical and electronic material supply module, a mechanical equipment supply module, an electric tool supply module, a GPS project positioning module, a nearby supplier display module and a distribution service module, wherein the engineering main material supply module is used for displaying specific information and material price information of a main material supplier required in an engineering construction process, the engineering manpower service module is used for displaying worker information required in the engineering construction process, the worker is directly contacted with workers according to construction requirements to train the workers, the hardware material supply module is used for displaying specific information and hardware material price information of a hardware material supplier required in the engineering construction process, the security material supply module is used for displaying specific information and security material price information of the electrical and electronic material supplier required in the engineering construction process, the mechanical equipment supply module is used for displaying specific information and electrical and electronic material price information of the electrical and electronic material supplier required in the engineering construction process, the mechanical equipment supply module is used for displaying specific information and mechanical equipment price information of the mechanical equipment supplier required in the engineering construction process, meanwhile, the electrical tool supply module is used for displaying the position information of the electrical and the electrical material supplier in the vicinity of the engineering construction process, the electrical equipment supply module is used for positioning the GPS project positioning module according to the position information of the GPS project positioning module, and calculating specific distances and positions, wherein the distribution service module is used for selecting different distribution services to contact different logistics merchants according to the requirements of users.
As shown in fig. 4, the server management unit is configured to store engineering management data and equipment data, and backup engineering construction process management data and equipment data. The server management unit comprises a management data storage module, an equipment data storage module and a data backup module, wherein the management data storage module is used for storing management data information and process data information of construction in the engineering construction process, the equipment data storage module is used for storing equipment data used for construction, and the data backup module is used for backing up all data related to the engineering construction process in real time.
As shown in fig. 7, the project five-party collaboration unit is used for communication and data sharing among a constructor, a supervisor, a designer and a reconnaissance party. The project five-party collaboration unit comprises a constructor using end module, a designer using end module, an reconnaissance party using end module, a constructor using end module, a supervisor using end module and an engineering period supervision module, wherein the constructor using end module is used for checking and supervising whether engineering drawings of the constructor, the supervisor, the designer and the reconnaissance party accord with relevant standards, meanwhile, construction and reconnaissance are carried out according to requirements of the relevant standards, the designer using end module is used for uploading engineering drawings required to be used in the engineering and communicating with other parties, the reconnaissance party using end module is used for reconnaissance detection of an engineering land to obtain detection data, the constructor using end module is used for carrying out construction according to the design drawings of the designer, the supervisor using end module is used for supervising the construction of the constructor according to the relevant standards, and the engineering period supervision module is used for recording the whole process data from the engineering design to the completion of the engineering and acceptance and is used for five parties to query in real time.
As shown in fig. 6. The project information management unit is used for recording and inquiring data of project engineering construction process, meeting data, personnel management data, engineering diary data, five-party contact but visa data and five-party communication process record data. The project information management unit comprises an engineering diary module, an engineering conference detail module, an engineering data module, an engineering personnel management module, a five-party contact list and visa list module and a five-party communication recording module, wherein the engineering diary module is used for recording daily record data information in the construction process, the engineering conference detail module is used for recording conference information of each time in the construction process and recording problems and final solutions of conference discussion, the engineering data module is used for recording information of all materials used in engineering, the engineering personnel management module is used for recording related responsibility and related responsible persons of engineering construction, the five-party contact list and visa list module is used for management and communication among five parties, and the five-party communication recording module is used for recording and storing communication information among the five parties.
As shown in fig. 5, the project quality and safety management unit is used for recording and processing complaints of engineering construction processes, recording construction process spot check data and construction safety data entry query. The project quality and safety management unit comprises an engineering complaint management module, an engineering selective inspection module and an engineering construction safety data input module, wherein the engineering complaint management module is used for receiving citizen complaints and checking complaint processing progress conditions, the engineering selective inspection module is used for recording concrete data of selective inspection in a construction process, and the engineering construction safety data input module is used for recording safety data at each stage of the construction process.
The foregoing is merely a preferred embodiment of the present invention and it should be noted that modifications and adaptations to those skilled in the art may be made without departing from the principles of the present invention, which are intended to be comprehended within the scope of the present invention.