CN205276314U - Utility tunnel open cut construction slipform device - Google Patents
Utility tunnel open cut construction slipform device Download PDFInfo
- Publication number
- CN205276314U CN205276314U CN201521074406.0U CN201521074406U CN205276314U CN 205276314 U CN205276314 U CN 205276314U CN 201521074406 U CN201521074406 U CN 201521074406U CN 205276314 U CN205276314 U CN 205276314U
- Authority
- CN
- China
- Prior art keywords
- wall
- sliding formwork
- cylinder
- pulley
- ferrum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to an utility tunnel open cut construction slipform device, the mould roof easily collapsed and when concrete placement was smooth in the time of can effectively solving the corridor open cut problem. The structure is, slipform body bottom down is equipped with the pulley support, is equipped with the pulley on the pulley support, and on the slide of pulley dress on the sleeper, the slipform body comprises advancing slip die body and the backward slip die body that the cross section that the structure is the same is door frame shape, being the convex -concave in front and linking up mutually of the back of advancing slip die body and backward slip die body to link together through walking push -and -pull hydro -cylinder, the utility model discloses novel structure is unique, installation convenient to use, and effectual, the efficiency of construction is high, has alleviateed intensity of labour, and it is wide to use the face, is applicable to the soil layer except that the szyrt, and economy and social are showing.
Description
Technical field
This utility model relates to urban infrastructure equipment, particularly a kind of underground pipe gallery open-cut sliding form apparatus.
Background technology
Urban Underground piping lane construction is that the heating power on ground, right gas, plumbing, broadcasting and TV, electric power, communication pipe network are all entered ground, eliminates the problems such as city " road slide fastener ", " aerial Aranea ", is the required of urban construction. The piping lane construction of current newly built city district generally all adopts open-cut scheme, but current commonly used plywood form, full hall scaffold steel pipe support backform, split bolt fix wall mould etc. in cast-in-place concrete gallery is constructed. Owing to gallery is up to dozens of kilometres, traditional formwork construction efficiency is low, cost is high, speed is slow, it is poor to also result in building site environment. Far from meeting urban infrastructure development and the needs in highly civilized health city, it it is the technical barrier urgently captured of China's underground gallery pipe gallery construction.
Summary of the invention
For above-mentioned situation, for overcoming the defect of prior art, the purpose of this utility model is just to provide a kind of underground pipe gallery open-cut sliding form apparatus, the problem that when concreting is sliding when can effectively solve gallery open cut, mould top board is easily caving.
The technical scheme that this utility model solves is, including sliding formwork body, slideway, pulley, pulley support and sleeper, sliding formwork body lower bottom part is equipped with pulley support, equipped with pulley on pulley support, pulley is contained on the slideway above sleeper, sliding formwork body is made up of the advancing slip die body that the cross section that structure is identical is doorframe shape and rear sliding formwork body, it is connected mutually in convex-concave with before rear sliding formwork body after advancing slip die body, and link together through walking push cylinder, the structure of advancing slip die body or rear sliding formwork body is, the top ferrum of cross cylinder and crossbeam front end is by being bolted together, through bolt equipped with being connected the diagonal brace that top ferrum links together with the first post lower limb below crossbeam, first post lower limb connects the lower section of top ferrum and is connected with hoist cylinder top through bolt, hoist cylinder bottom connects top ferrum equipped with the second post lower limb, second post lower limb connects ferrum bottom, top equipped with the transverse direction walking push cylinder being placed on pulley support, it is provided with steel plate between outside and the body of wall being made up of concrete of hoist cylinder, steel plate upper end is externally provided with, in the upper cross wall face of body of wall, the cross-tie linked together with steel plate, the straight wall of body of wall both sides, the cross wall on top is outer equipped with wall exterior sheathing, equipped with the screw mandrel being perpendicular to wall exterior sheathing on wall exterior sheathing, support equipped with oblique connection between screw mandrel outer end and wall exterior sheathing, second post lower limb connects on the ferrum of top equipped with the stull being perpendicular to hoist cylinder.
This utility model novel structure is unique, easy to install, effective, and efficiency of construction is high, alleviates labor intensity, wide application, it is adaptable to the soil layer except quicksand, economic and social benefit is notable.
Accompanying drawing explanation
Fig. 1 is structure top view of the present utility model.
Fig. 2 is that the A-A of this utility model Fig. 1 is to sectional front view.
Detailed description of the invention
Below in conjunction with accompanying drawing, concrete truth mode of the present utility model is elaborated.
By Fig. 1, 2 provide, this utility model includes sliding formwork body, slideway, pulley, pulley support and sleeper, sliding formwork body lower bottom part is equipped with pulley support 7, equipped with pulley 8 on pulley support, pulley is contained on sleeper 10 slideway 9 above, sliding formwork body is made up of the advancing slip die body 19 that the cross section that structure is identical is doorframe shape and rear sliding formwork body 20, it is connected mutually in convex-concave with before rear sliding formwork body 20 after advancing slip die body 19, and link together through walking push cylinder 4, the structure of advancing slip die body or rear sliding formwork body is, the top ferrum 1 of cross cylinder 14 and crossbeam 3 front end is by being bolted together, through bolt 12 equipped with being connected the top ferrum 5-1 diagonal brace 11 linked together with the first post lower limb below crossbeam, first post lower limb connects the lower section of top ferrum 5-1 and is connected with hoist cylinder 6 top through bolt, hoist cylinder bottom connects top ferrum 5-2 equipped with the second post lower limb, second post lower limb connects ferrum 5-2 bottom, top equipped with the transverse direction walking push cylinder 4 being placed on pulley support 7, it is provided with steel plate 2 between outside and the body of wall 21 being made up of concrete 17 of hoist cylinder 6, steel plate upper end is externally provided with, in the upper cross wall face of body of wall, the cross-tie 18 linked together with steel plate, the straight wall of body of wall both sides, the cross wall on top is outer equipped with wall exterior sheathing 15, equipped with the screw mandrel 16 being perpendicular to wall exterior sheathing on wall exterior sheathing 15, 23 are supported equipped with oblique connection between screw mandrel 16 outer end and wall exterior sheathing 15, second post lower limb connects on the ferrum 5-2 of top equipped with the stull 13 being perpendicular to hoist cylinder 6.
In order to ensure result of use, described walking push cylinder 4 is four, is respectively placed in the top and the bottom inside two steel plates 2 in left and right, steel plate thickness 4mm; The linking in convex-concave of described advancing slip die body 19 and rear sliding formwork body 20, constitutes anti-concrete roof and is caving structure;
Described rear sliding formwork body rear end is equipped with two diagonal brace oil cylinders 22, and the piston rod of diagonal brace oil cylinder stretches out, and constitutes slip support abutment structure; Being connected with between described cross cylinder 14 end and the top ferrum 1 of corresponding crossbeam 3, the piston of cross cylinder stretches, and constitutes the width adjusting structure of sliding formwork body; Described hoist cylinder 6 is connected top ferrum 5-1 with the first post lower limb, the second post lower limb connects top ferrum 5-2 and connected by bolt, and hoist cylinder 6 piston stretches, and constitutes the height adjustment structure of sliding formwork body;
The body of wall edge that described advancing slip die body 19 front end concrete is made is inclined plane shape (namely concrete angle of repose is inclined plane shape), body of wall height 300mm.
By said structure it can be seen that this utility model sliding formwork by having bottom slideway 9, return pulley 8, pulley support 7, slideway 9 bottom front sliding formwork 19 and 20 liang of group sliding formworks of rear sliding formwork to spread sleeper 10, paving sleeper is the concrete floor built in advance and the high body of wall 21 of 300mm for 10 times. Two set sliding formworks are connected by four set walking push cylinder 4. The effect of front sliding formwork 19 is casting concrete 17, after its backform with rear sliding formwork 20 backform before concavo-convex section be concrete reach initial setting strength time, the transition region that template sliding is taken over from the past and set a new course for the future. This section can ensure that forward and backward sliding formwork supports smoothly transitting of concrete roof. The support concrete roof that the effect of rear mold is above-mentioned will not cave in, more supporting liftable individual prop follow-up roof supporting, it is ensured that perfectly safe. During sliding formwork, diagonal brace oil cylinder 22 works as bearing after stretching out.
Backform cross cylinder 14 of the present utility model and the top ferrum 1 of crossbeam 3 front end, be bolted, it is simple to installing/dismounting. In order to improve the rigidity of crossbeam, diagonal brace 11 is installed under crossbeam. Spreading 4mm steel plate 2 cross cylinder piston outside sliding formwork to stretch, the width of sliding formwork is adjustable. Equally, hoist cylinder 6 is connected top ferrum 5 bolt connection with post lower limb. When hoist cylinder 6 piston stretches, so that it may adjust the height of sliding formwork. The function of so two-way adjustment, sliding formwork is suitable for the gallery of different change section. Two sliding formworks close up can work as again together formwork jumbo use, get twice the result with half the effort.
The concrete 17 that reinforcing bar binding is complete, build reaches initial set. During sliding formwork sliding, the diagonal brace oil cylinder piston 18 of rear mold 20 stretches out support and works as bearing on ground, and walking oil cylinder 4 stretches out piston, promotes front one step pitch of sliding formwork 19 sliding. Now, by the concrete of the concavo-convex backform roof supporting of front sliding formwork 19. After sliding completes, rear mold 20 is regained by diagonal brace oil cylinder 18 and walking push cylinder 4, one step pitch of sliding formwork 20 sliding after drive, now, the embossed area of rear mold 20 closes up, the gallery that moved in circles construct, the wall exterior sheathing 15 of both sides be vertically by wall mould triangular support bracket bottom adjustment screw mandrel 16 regulate, meet vertical requirement pull bar 18 and lock.
In order to ensure the smooth sliding of gallery sliding formwork, when producing, the super instant coagulant shortening the presetting period can be added in concrete, improve concrete early strength. Concrete angle of repose bevel(l)ing is pressed in front sliding formwork 19 wall mould front end, and adopts the electronic demoulding, makes to produce a kind of steam between concrete and the template just built, serve the effect of lubricant, facilitate sliding formwork, it is ensured that continuous concreting, improve waterproof effect and the presentation quality of gallery. Interior wall side form by above-mentioned front end bevel(l)ing, wear the triangular support bracket of return pulley, regulate screw mandrel, slideway, hydraulic moving, support system etc. and just can be used for the interior wall side form slding form operation of underground civil defense engineering, purposes is wide, and economic and social benefit is notable.
Claims (7)
1. a underground pipe gallery open-cut sliding form apparatus, including sliding formwork body, slideway, pulley, pulley support and sleeper, it is characterized in that, sliding formwork body lower bottom part is equipped with pulley support (7), equipped with pulley (8) on pulley support, pulley is contained on sleeper (10) slideway (9) above, sliding formwork body is made up of the advancing slip die body (19) that the cross section that structure is identical is doorframe shape and rear sliding formwork body (20), it is connected mutually in convex-concave with before rear sliding formwork body (20) after advancing slip die body (19), and link together through walking push cylinder (4), the structure of advancing slip die body or rear sliding formwork body is, the top ferrum (1) of cross cylinder (14) and crossbeam (3) front end is by being bolted together, through bolt (12) equipped with being connected the diagonal brace (11) that top ferrum (5-1) links together with the first post lower limb below crossbeam, first post lower limb connects the lower section on top ferrum (5-1) and is connected with hoist cylinder (6) top through bolt, hoist cylinder bottom connects top ferrum (5-2) equipped with the second post lower limb, second post lower limb connects ferrum (5-2) bottom, top equipped with transverse direction walking push cylinder (4) being placed on pulley support (7), it is provided with steel plate (2) between outside and the body of wall (21) being made up of concrete (17) of hoist cylinder (6), steel plate upper end is externally provided with the cross-tie (18) linked together with steel plate in the upper cross wall face of body of wall, the straight wall of body of wall both sides, the cross wall on top is outer equipped with wall exterior sheathing (15), equipped with the screw mandrel (16) being perpendicular to wall exterior sheathing on wall exterior sheathing (15), (23) are supported equipped with oblique connection between screw mandrel (16) outer end and wall exterior sheathing (15), second post lower limb connects on top ferrum (5-2) equipped with the stull (13) being perpendicular to hoist cylinder (6).
2. underground pipe gallery open-cut sliding form apparatus according to claim 1, it is characterised in that described walking push cylinder (4) is four, is respectively placed in the top and the bottom of two steel plate (2) inner sides, left and right, steel plate thickness 4mm.
3. underground pipe gallery open-cut sliding form apparatus according to claim 1, it is characterised in that after the described advancing slip die body of door shape (19) and door shape, sliding formwork body (20) is connected in convex-concave, constitutes anti-concrete roof and is caving structure.
4. underground pipe gallery open-cut sliding form apparatus according to claim 1, it is characterised in that after described door shape, sliding formwork body rear end is equipped with two diagonal brace oil cylinders (22), and the piston rod of diagonal brace oil cylinder stretches out, constitutes slip support abutment structure.
5. underground pipe gallery open-cut sliding form apparatus according to claim 1, it is characterized in that, being connected with between described cross cylinder (14) end with the top ferrum (1) of corresponding crossbeam (3), the piston of cross cylinder stretches, and constitutes the width adjusting structure of sliding formwork body.
6. underground pipe gallery open-cut sliding form apparatus according to claim 1, it is characterized in that, described hoist cylinder (6) is connected top ferrum (5-1) with the first post lower limb, the second post lower limb connects top ferrum (5-2) and connected by bolt, hoist cylinder (6) piston stretches, and constitutes the height adjustment structure of sliding formwork body.
7. underground pipe gallery open-cut sliding form apparatus according to claim 1, it is characterised in that the body of wall edge that described door shape advancing slip die body (19) front end concrete is made is inclined plane shape, body of wall height 300mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521074406.0U CN205276314U (en) | 2015-12-22 | 2015-12-22 | Utility tunnel open cut construction slipform device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521074406.0U CN205276314U (en) | 2015-12-22 | 2015-12-22 | Utility tunnel open cut construction slipform device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205276314U true CN205276314U (en) | 2016-06-01 |
Family
ID=56060898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521074406.0U Expired - Fee Related CN205276314U (en) | 2015-12-22 | 2015-12-22 | Utility tunnel open cut construction slipform device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205276314U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013234A (en) * | 2016-07-14 | 2016-10-12 | 中国建筑第八工程局有限公司 | Construction method for underground comprehensive pipe rack |
CN106049532A (en) * | 2016-07-25 | 2016-10-26 | 中铁工程装备集团有限公司 | Supporting and retaining device for open excavation construction of comprehensive pipe gallery and construction method thereof |
CN106884437A (en) * | 2017-02-28 | 2017-06-23 | 中国十七冶集团有限公司 | For the automatic contraction movable type inner template system and application method of underground pipe gallery |
CN107119715A (en) * | 2017-04-28 | 2017-09-01 | 东北大学 | A kind of overall mould bases of pipe gallery and its application method |
-
2015
- 2015-12-22 CN CN201521074406.0U patent/CN205276314U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013234A (en) * | 2016-07-14 | 2016-10-12 | 中国建筑第八工程局有限公司 | Construction method for underground comprehensive pipe rack |
CN106049532A (en) * | 2016-07-25 | 2016-10-26 | 中铁工程装备集团有限公司 | Supporting and retaining device for open excavation construction of comprehensive pipe gallery and construction method thereof |
CN106049532B (en) * | 2016-07-25 | 2018-03-30 | 中铁工程装备集团有限公司 | A kind of pipe gallery open-cut branch blocking means and its construction method |
CN106884437A (en) * | 2017-02-28 | 2017-06-23 | 中国十七冶集团有限公司 | For the automatic contraction movable type inner template system and application method of underground pipe gallery |
CN107119715A (en) * | 2017-04-28 | 2017-09-01 | 东北大学 | A kind of overall mould bases of pipe gallery and its application method |
WO2018196101A1 (en) * | 2017-04-28 | 2018-11-01 | 东北大学 | Integrated formwork for utility tunnel, and method of using same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205276314U (en) | Utility tunnel open cut construction slipform device | |
CN104533456B (en) | Super-large section chamber reinforced concrete modelling construction method | |
CN102562094B (en) | Cast-in-place construction method for support structure of tunnel groove formwork | |
CN109577453B (en) | Integrally-formed drainage ditch construction system and construction method thereof | |
CN205205857U (en) | Integral concrete utility tunnel of prefabricated assembly | |
CN205804904U (en) | A kind of leveling unit | |
CN1307348C (en) | Construction method for underground structure through half reverse course of action of inverting connection | |
CN108798705A (en) | First branch precast framework module, system and the construction method of TBM constructions | |
CN208717763U (en) | A kind of cast-in-place box culvert rapid molding device | |
CN105697019B (en) | Shaft wall cast-in-situ concrete joint and its erecting device and construction method | |
CN104712360A (en) | Adjustable high-adaptability formwork support for large mining height fully-mechanized face and gob-side entry retaining method | |
CN109371910A (en) | Pad ground raising protection and construction method | |
CN206844275U (en) | Mutual buckle type precast concrete cover ditch and its suspender | |
CN103982200A (en) | Full-face inner sliding rail moving steel mould trolley | |
CN106481347B (en) | A kind of anti-internal water pressure composite shield section of jurisdiction | |
CN213682135U (en) | Horizontal scalable foundation ditch support frame based on U type shield constructs machine | |
CN205532629U (en) | All -hydraulic central ditch die carrier | |
CN212958650U (en) | Municipal administration is box tunnel side wall and roof hydraulic template platform truck down worn | |
CN109137986A (en) | Urban road inspection shaft walling crib green promotes reinforced construction method | |
CN203702180U (en) | Single-track railway outer mold tunnel trolley | |
CN208518675U (en) | The first branch precast framework module and system of TBM construction | |
CN208578065U (en) | A kind of transport assembly equipment system of prefabricated components | |
CN105220582A (en) | Based on Disease Treatment method at the bottom of the solid concrete roabed of combined support and slip casting template and tunnel | |
CN205532607U (en) | Utility tunnel secretly digs canopy and constructs quick -witted equipment | |
CN205531313U (en) | Outer wall side form slipform device is construct to underground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160601 Termination date: 20181222 |