CN204938802U - For the rail supported system of tower crane - Google Patents
For the rail supported system of tower crane Download PDFInfo
- Publication number
- CN204938802U CN204938802U CN201520574934.6U CN201520574934U CN204938802U CN 204938802 U CN204938802 U CN 204938802U CN 201520574934 U CN201520574934 U CN 201520574934U CN 204938802 U CN204938802 U CN 204938802U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- tower crane
- building
- embedded board
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to technical field of buildings, relates to a kind of rail supported system for tower crane.Solve prior art structural instability, the technical matters that lifting capacity is little.It comprises the guide rail be fixed on building, and described guide rail and plane-parallel, be also fixed with embedded board in building, and embedded board is fixedly connected with guide rail.The utility model can improve lifting capacity and the stability of tower crane, and tower crane on-load can be made to walk.
Description
Technical field
The utility model belongs to construction engineering technical field, relates to a kind of rail supported system for tower crane.
Background technology
Tower crane is that a kind of weight-lifting equipment the most frequently used on building ground has another name called " tower crane ", is called for short " standard knot " with a section spreading, is used for hanging the raw MAT'L of the constructions such as working reinforcing bar, wood are stupefied, cement concrete, steel pipe.Tower crane is a kind of requisite equipment on building site.
Tower crane can be divided into portable tower tower crane and fixed type tower crane.Portable tower tower crane can be divided into again rail mounted, rubber-tyred, truck mounted, crawler type four kinds according to the difference of running gear.Rail-mounted tower tower crane tower body is fixed on walking underframe, and can run on ad hoc track, good stability, work efficiency is high, is thus widely used in building installation engineering.Rubber-tyred, truck mounted and crawler-mounted tower tower crane rail-free device, conveniently moving, but can not on-load walking, less stable.
The tower tower crane of fixed type, according to the difference of installation position, is divided into again attachment jack up and inner climbing type two kinds, adheres to and can raise with building from the tower tower crane of liter and raise, be applicable to skyscraper, the horizontal load transmitted by tower crane is only born in building structure, convenient attachment, but it is many to take structural steel; Inner climbing crane tower is at interior of building elevator, stair case, and climb by a set of bracket and elevator system, jacking is more loaded down with trivial details, but it is few to take structural steel, and do not need installing basis, all deadweight and load are born by building.
No matter be movable tower crane or fixed type tower crane, or fixedly realizing load with ground bottom dependence tower crane bears, or be that building completes bearing load, therefore stability all has much room for improvement, and also because of so, constrains the raising of tower crane lifting capacity.
Utility model content
The purpose of this utility model is for the problems referred to above, provides a kind of rail supported system for tower crane that can improve tower crane working stability height and lifting capacity.
For achieving the above object, the utility model have employed following technical proposal: a kind of rail supported system for tower crane, comprises the guide rail be fixed on building, described guide rail and plane-parallel, also be fixed with embedded board in building, and embedded board is fixedly connected with guide rail.
Above-mentioned in the rail supported system of tower crane, described embedded board is fixed with the L-shaped brace panel of some cross-sectional planes, described brace panel is positioned at interior of building.
Above-mentioned in the rail supported system of tower crane, described guide rail is fixedly connected with by anchor angle screw with embedded board, and described anchor angle screw is through being fixedly connected with the sidewall of building after building.
Above-mentioned in the rail supported system of tower crane, connecting panel is fixed with between described guide rail and embedded board, described connecting panel is fixedly connected with by anchor angle screw with embedded board, described anchor angle screw is through being fixedly connected with the sidewall of building after building, and described guide rail is fixedly connected with connecting panel.
Above-mentioned in the rail supported system of tower crane, described guide rail is H-shaped or C font.
Above-mentioned in the rail supported system of tower crane, described guide rail is H-shaped, described guide rail comprises the first panel and the second panel that are parallel to each other, and the two ends of the longitudinal plate of guide rail are fixedly connected with the first panel and the second panel respectively, and the first panel is fixedly connected with embedded board.
Above-mentioned in the rail supported system of tower crane, when guide rail is H-shaped, described guide rail interior has the walking chamber that slide block can be allowed to walk, and described walking chamber is provided with slope away from the side of embedded board.
Above-mentioned in the rail supported system of tower crane, described guide rail and the axial line of embedded board and plane-parallel.
Compared with prior art, the utility model has the advantage of: the firm support that can realize tower crane and building, and tower crane can be made to be walked by guide rail, thus improve moving velocity and the lifting capacity of tower crane, after tower crane and guide rail are fixed, can also on-load walking.
Accompanying drawing explanation
Fig. 1 is the structural representation that the utility model provides;
Fig. 2 is the another kind of structural representation that utility model provides;
Fig. 3 is the another kind of structural representation that utility model provides;
Fig. 4 is the another kind of structural representation of guide rail;
Fig. 5 is the structural representation of the guide rail in Fig. 4.
In figure: building 1, guide rail 2, embedded board 3, brace panel 4, anchor angle screw 5, connecting panel 6, first panel 7, second panel 8, the longitudinal plate 9 of guide rail, walking chamber 10, slope 11, slide block 12, support beam 13, tower crane 14.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail.
Embodiment 1
As shown in Figure 1, a kind of rail supported system for tower crane, comprise fixing guide rail 2 on the building 1, described guide rail 2 and plane-parallel, be also fixed with embedded board 3 in building 1, and embedded board 3 is fixedly connected with guide rail 2.The axial line of guide rail 2 and embedded board 3 and plane-parallel, guide rail 2 is in H-shaped or C font.Operationally, sheathed slide block 12 on guide rail 2, slide block 12 is hinged with support beam 13, and support beam 13 other end is fixedly connected with the tower body of tower crane 14, then support beam 13 pairs of tower cranes 14 are played a supporting role, and can improve lifting capacity and the stability of tower crane 14.Slide block 12 can slide along guide rail 2, can change the position of support beam 13, in the present embodiment, embedded board 3 is fixed in building 1, and stability is high, and stretching resistance is strong, guide rail 2 is fixedly connected with embedded board 3 thus guide rail also can firmly be fixed on the building 1, and building 1 is played a supporting role.
Preferred version, embedded board 3 is fixed with the L-shaped brace panel of some cross-sectional planes 4, and it is inner that described brace panel 4 is positioned at building 1, and brace panel 4 improves the anchoring strength of embedded board 3 and building 1.Guide rail 2 is fixedly connected with by anchor angle screw 5 with embedded board 3, and described anchor angle screw 5 is through being fixedly connected with the sidewall of building 1 after building 1.The effect of anchor angle screw 5 makes guide rail 2 firmly fix on the building 1 further.
Embodiment 2
The present embodiment is substantially identical with principle of work with the structure of embodiment 1, difference is, as shown in Figure 3 and Figure 5, in order to easy to connect, connecting panel 6 is fixed with between guide rail 2 and embedded board 3, described connecting panel 6 is fixedly connected with by anchor angle screw 5 with embedded board 3, described anchor angle screw 5 is through being fixedly connected with the sidewall of building 1 after building 1, described guide rail 2 is fixedly connected with connecting panel 6, connecting panel 6 is in plane, be convenient to be fixed on the metope of building, when guide rail 2 is fixed with connecting panel 6 more for convenience, fast, and be conducive to the fixed effect improving guide rail 2 and building 1 further.Guide rail 2 is in H-shaped, and described guide rail 2 comprises the first panel 7 and the second panel 8 be parallel to each other, and the two ends of the longitudinal plate 9 of guide rail are fixedly connected with the first panel 7 respectively and the second panel 8, first panel 7 is fixedly connected with embedded board 3.The guide rail 2 of the present embodiment is Demountable, is convenient to make and install, and can improve speed of application.
Embodiment 3
The present embodiment is substantially identical with principle of work with the structure of embodiment 1, difference is, as shown in Figure 4, when guide rail 2 is in H-shaped, described guide rail 2 inside has the walking chamber 10 that slide block 12 can be allowed to walk, described walking chamber 10 is provided with slope 11 away from the side of embedded board 3, and slide block 12 and slope 11 form clamping, are conducive to sliding smoothly.
Embodiment 4
The present embodiment is substantially identical with principle of work with the structure of embodiment 1, and difference is, as shown in Figure 2, guide rail 2 is in C font, and slide block 12 and guide rail 2 clamping, support beam 13 end to be inserted in guide rail 2 and to be fixedly connected with slide block 12.
Specific embodiment described herein is only to the explanation for example of the utility model spirit.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present utility model or surmount the scope that appended claims defines.
Although more employ the term such as building 1, guide rail 2, embedded board 3, brace panel 4, anchor angle screw 5, connecting panel 6, first panel 7, second panel 8, the longitudinal plate 9 of guide rail, walking chamber 10, slope 11, slide block 12, support beam 13, tower crane 14 herein, do not get rid of the possibility using other term.These terms are used to be only used to describe and explain essence of the present utility model more easily; The restriction that they are construed to any one additional is all contrary with the utility model spirit.
Claims (7)
1. the rail supported system for tower crane, comprise the guide rail (2) be fixed on building (1), it is characterized in that, described guide rail (2) and plane-parallel, embedded board (3) is also fixed with in building (1), and embedded board (3) is fixedly connected with guide rail (2), described guide rail (2) is fixedly connected with by anchor angle screw (5) with embedded board (3), and described anchor angle screw (5) through building (1) afterwards and be fixedly connected with the sidewall of building (1).
2. the rail supported system for tower crane according to claim 1, it is characterized in that, described embedded board (3) is fixed with the L-shaped brace panel of some cross-sectional planes (4), and it is inner that described brace panel (4) is positioned at building (1).
3. the rail supported system for tower crane according to claim 1, it is characterized in that, connecting panel (6) is fixed with between described guide rail (2) and embedded board (3), described connecting panel (6) is fixedly connected with by anchor angle screw (5) with embedded board (3), and described guide rail (2) is fixedly connected with connecting panel (6).
4. the rail supported system for tower crane according to claim 1 or 2 or 3, is characterized in that, described guide rail (2) is in H-shaped or C font.
5. the rail supported system for tower crane according to claim 4, it is characterized in that, described guide rail (2) is in H-shaped, described guide rail (2) comprises the first panel (7) and the second panel (8) that are parallel to each other, the two ends of the longitudinal plate (9) of guide rail are fixedly connected with the first panel (7) and the second panel (8) respectively, and the first panel (7) is fixedly connected with embedded board (3).
6. the rail supported system for tower crane according to claim 4, it is characterized in that, when guide rail (2) is in H-shaped, described guide rail (2) inside has the walking chamber (10) that slide block can be allowed to walk, and described walking chamber (10) is provided with slope (11) away from the side of embedded board (3).
7. the rail supported system for tower crane according to claim 1, is characterized in that, described guide rail (2) and the axial line of embedded board (3) and plane-parallel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520574934.6U CN204938802U (en) | 2015-08-02 | 2015-08-02 | For the rail supported system of tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520574934.6U CN204938802U (en) | 2015-08-02 | 2015-08-02 | For the rail supported system of tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204938802U true CN204938802U (en) | 2016-01-06 |
Family
ID=55006245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520574934.6U Withdrawn - After Issue CN204938802U (en) | 2015-08-02 | 2015-08-02 | For the rail supported system of tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204938802U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105016222A (en) * | 2015-08-02 | 2015-11-04 | 周兆弟 | Track supporting system for tower crane |
CN107381345A (en) * | 2017-08-23 | 2017-11-24 | 中铁五局集团第六工程有限责任公司 | A kind of gantry crane work anti-dumping bracing means |
CN112008686A (en) * | 2020-09-03 | 2020-12-01 | 南京派光高速载运智慧感知研究院有限公司 | Track suspension device arranged along suspension track |
-
2015
- 2015-08-02 CN CN201520574934.6U patent/CN204938802U/en not_active Withdrawn - After Issue
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105016222A (en) * | 2015-08-02 | 2015-11-04 | 周兆弟 | Track supporting system for tower crane |
CN107381345A (en) * | 2017-08-23 | 2017-11-24 | 中铁五局集团第六工程有限责任公司 | A kind of gantry crane work anti-dumping bracing means |
CN107381345B (en) * | 2017-08-23 | 2020-01-07 | 中铁五局集团第六工程有限责任公司 | Gantry crane anti-tilt reinforcing device |
CN112008686A (en) * | 2020-09-03 | 2020-12-01 | 南京派光高速载运智慧感知研究院有限公司 | Track suspension device arranged along suspension track |
CN112008686B (en) * | 2020-09-03 | 2021-07-30 | 南京派光高速载运智慧感知研究院有限公司 | Track suspension device arranged along suspension track |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105000482B (en) | Tower crane with walking mechanism | |
CN105016223A (en) | Cross beam supporting system used for tower crane | |
CN201077721Y (en) | Gantry crane with falling girder | |
CN105016218B (en) | The guide rail mechanism being fixed on building | |
CN205713147U (en) | A kind of quick positioning apparatus of precast floor slab | |
CN204938802U (en) | For the rail supported system of tower crane | |
CN105060135B (en) | Tower crane | |
CN204980946U (en) | Take running gear's tower crane | |
CN205294665U (en) | Jack -up tower crane based on engineering mechanics | |
CN102777037B (en) | Simple and practical hoisting construction method of long-span steel girder | |
CN204848050U (en) | A crossbeam braced system for tower crane | |
CN210976552U (en) | Foldable operation platform device in elevator shaft | |
CN204823919U (en) | Tower crane | |
CN205874987U (en) | Simply put up bridge crane | |
CN204938801U (en) | The tower crane that is connected can be realized with building | |
CN202706899U (en) | Movable steel ladder for super-high walls | |
CN105016222A (en) | Track supporting system for tower crane | |
CN205015415U (en) | Electric block test bench | |
CN204299157U (en) | The mounted lifting device in attached lifting scaffold side | |
CN103726449B (en) | Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof | |
CN203807950U (en) | Operation device underneath expressway grand bridge | |
CN205976396U (en) | Portable operation platform that indoor construction and installation used | |
CN204823905U (en) | Fix guide rail mechanism on building | |
CN105000484B (en) | Tower crane capable of being connected with building | |
CN204823928U (en) | A guide rail braced system for connecting tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: Hangzhou Luyuan Ginkgo Garden Road is the 310007 city in Zhejiang province 5 unit 2002 room Patentee after: Zhou Zhaodi Address before: Kaohsiung streets Pu Beilun District 315800 in Zhejiang province Ningbo City No. 18 Patentee before: Zhou Zhaodi |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20160106 Effective date of abandoning: 20170908 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160106 Effective date of abandoning: 20170929 |
|
AV01 | Patent right actively abandoned |