CN105016218B - The guide rail mechanism being fixed on building - Google Patents
The guide rail mechanism being fixed on building Download PDFInfo
- Publication number
- CN105016218B CN105016218B CN201510467872.3A CN201510467872A CN105016218B CN 105016218 B CN105016218 B CN 105016218B CN 201510467872 A CN201510467872 A CN 201510467872A CN 105016218 B CN105016218 B CN 105016218B
- Authority
- CN
- China
- Prior art keywords
- building
- guide rail
- fixed
- fixedly connected
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/20—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention belongs to technical field of buildings, is related to a kind of guide rail mechanism being fixed on building.The technical problem connected between crossbeam and building can not be realized by solving prior art.It includes the fixed mount being fixed on building vertical plane, the width of described fixed mount is more than the width for the protruding member being arranged on building vertical plane so that the end of fixed mount is extended outside protruding member, one piece of guide rail installing plate in bar shaped is fixed with the end of fixed mount, guide assembly is fixedly connected with guide rail installing plate.Guide rail can be firmly installed on building by the present invention, be engaged in the connection for realizing beam mechanism and tower crane.
Description
Technical field
The invention belongs to construction engineering technical field, is related to a kind of guide rail mechanism being fixed on building.
Background technology
Tower crane is a kind of crane gear also known as " derrick crane " the most frequently used on construction site, with a section spreading
Referred to as " standard knot ", for hanging the raw material of the constructions such as working reinforcing bar, wood stupefied, concrete, steel pipe.Tower crane is one on building site
The essential equipment of kind.
The function of tower crane tower crane points is subject to the upper load that arm support drawstring and counter-jib drawstring transmit, and leads to
The structure member formula for crossing revolution pylon, turntable, bearing etc. directly passes to tower body structure by turntable.There is truncated cone post from a liter tower top
Formula, lean forward or hypsokinesis truncated cone pillar, herringbone posture and diagonal brace posture.Every upper rotary tower crane is both needed to set balance weight, and its function is
Balance weight is supported, to effect aspect and hoisting moment trimming moment in opposite direction required on Construction designing.Except balance
Weight is outer, also often installs lifting mechanism in its afterbody.Why homostasis weight is placed in counter-jib tail end to lifting mechanism together, first
Part counterweight effect can be played, second increase the distance between rope reel and pinnacle of a pagoda guide wheel, with the row of sharp steel wire rope around and avoid sending out
Raw disorder cable phenomenon.The dosage of balance weight and the length of counter-jib inversely, and are balanced between arm lengths and jib length
Certain proportion relation again be present.Counterpoise is considerable, and light-duty tower crane typically at least wants 3~4t, and heavy wants nearly 30t.
Tower crane can be divided into portable tower tower crane and fixed type tower crane.Portable tower tower crane is according to the difference of running gear
Rail mounted, rubber-tyred, truck mounted, four kinds of crawler type can be divided into again.Rail-mounted tower tower crane tower body is fixed in walking underframe, can
Run on ad hoc track, stability is good, and operating efficiency is high, thus is widely used in building installation engineering.Rubber-tyred, automobile
Formula and crawler-mounted tower tower crane trackless duct device, conveniently moving, but it is unable to on-load walking, less stable.
Fixed tower tower crane is divided into two kinds of attachment jack up and inner climbing type, attachment is certainly again according to the difference of installation position
Rising tower tower crane can raise and raise with building, and suitable for skyscraper, building structure is subjected only to the level transmitted by tower crane
Load, convenient attachment, but it is more to take structural steel;Inner climbing crane tower is in interior of building elevator, staircase, by a set of support
Frame and lifting system are climbed, and jacking is cumbersome, but occupancy structural steel is few, it is not necessary to installing basis, whole deadweights and load
Lotus is born by building.
Either movable tower crane or fixed type tower crane, realize that load is held or being fixed by tower crane bottom with ground
By, or it is that building is completed to bear load, therefore stability has much room for improvement.Especially movable tower crane, band can not be realized
Load is walked, and constrains the application and development of movable tower crane significantly.
And if being combined between tower crane and building by crossbeam tower crane can be enable to obtain the support of building, then gesture
The stability of tower crane work must can be improved, therefore, how obtaining one can make crossbeam realize that the structure of connection turns into building
The technical issues that need to address.
The content of the invention
Regarding the issue above, the present invention provides one kind can easily be fixed on building so as to realize horizontal stroke
The guide rail mechanism that beam is attached in building.
To reach above-mentioned purpose, present invention employs following technical proposal:A kind of guide rail mechanism being fixed on building,
Including the fixed mount being fixed on building vertical plane, the width of described fixed mount, which is more than, to be arranged on building vertical plane
For the width of protruding member so that the end of fixed mount is extended outside protruding member, it is in bar that one piece is fixed with the end of fixed mount
The guide rail installing plate of shape, guide assembly are fixedly connected with guide rail installing plate.
In the above-mentioned guide rail mechanism being fixed on building, described fixed mount have several and it is evenly spaced solid
It is scheduled on building.
In the above-mentioned guide rail mechanism being fixed on building, described guide assembly includes fixing with guide rail installing plate
The guide rail bar of connection, described fixed mount include it is some be parallel to each other and horizontally disposed and both ends respectively with guide rail installing plate and
The horizontal support bar and some being obliquely installed and both ends that building is fixedly connected are fixed with guide rail installing plate and building respectively
The inclined shore bar of connection.
In the above-mentioned guide rail mechanism being fixed on building, described fixed mount is also embedded in building including some
Preburied component that is interior and being fixedly connected with horizontal support bar and inclined shore bar, described preburied component are fixed in building
Portion.
In the above-mentioned guide rail mechanism being fixed on building, described preburied component includes being embedded in building
Embedded board, some reinforcing plates are provided with described embedded board and to the direction that interior of building extends.
In the above-mentioned guide rail mechanism being fixed on building, the cross section of described reinforcing plate is L-shaped, and described is pre-
Plane residing for buried plate is parallel with the vertical plane of building, described embedded board be provided with some anchor angles screw and anchor angle screw with
Embedded board is fixedly connected with building.
In the above-mentioned guide rail mechanism being fixed on building, the surface of described building and corresponding with embedded board
Position be provided with protection panels, anchor angle screw sequentially passes through the both ends point of protection panels, embedded board and building and anchor angle screw
It is not fixedly connected with protection panels and building, fixed mount is fixedly connected with protection panels.
In the above-mentioned guide rail mechanism being fixed on building, described guide rail bar includes fixing with guide rail installing plate and connected
The first panel connect, and the second panel parallel with first panel, cross connecting plate both ends be respectively fixedly connected with first panel and
Second panel and vertical with first panel and second panel.
In the above-mentioned guide rail mechanism being fixed on building, it is arranged with described guide rail bar and is matched with guide rail bar
Sliding block, described sliding block is provided with slipper brake, and described slipper brake can be such that sliding block is fixedly connected with guide rail bar.
In the above-mentioned guide rail mechanism being fixed on building, described slipper brake, which has, front and rear vertically to be stretched
Contract mobile output end, and the end of output end is fixed with sliding block keep plate, and described sliding block keep plate is located at guide rail bar and sliding block
It is middle.
Compared with prior art, the advantage of the invention is that:Guide rail can be firmly installed on building, from the fact
The connection of existing beam mechanism and tower crane.
Brief description of the drawings
Fig. 1 is structural representation provided by the invention;
Fig. 2 is another structural representation that invention provides;
Fig. 3 is another structural representation that invention provides;
Fig. 4 is the structural representation in another direction of Fig. 1;
Fig. 5 is enlarged drawing at Fig. 1 A;
Fig. 6 is the connection diagram of embedded board and building;
Fig. 7 is the structural representation of guide assembly;
The use principle figure of present invention when Fig. 8 is;
Fig. 9 is enlarged drawing at Fig. 8 B.
In figure:Building 1, fixed mount 2, protruding member 3, decorative wall 3a, equipment platform 3b, balcony 3c, guide rail installing plate
4th, guide assembly 5, guide rail bar 6, horizontal support bar 7, inclined shore bar 8, preburied component 9, embedded board 10, reinforcing plate 11, anchor angle
Screw 12, protection panels 13, first panel 14, second panel 15, cross connecting plate 16, sliding block 17, slipper brake 18, sliding block
Keep plate 19, tower crane 100, transverse beam assembly 101.
Embodiment
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
As Figure 1-4, a kind of guide rail mechanism being fixed on building, including be fixed on the vertical plane of building 1
Fixed mount 2, the width of described fixed mount 2 are more than the width for the protruding member 3 being arranged on the vertical plane of building 1 so that solid
The end for determining frame 2 is extended outside protruding member 3, the building 1 described in the present embodiment, can be house, wall, bridge, assembling
Formula house etc., protruding member 3 refer to the component with the risers of building 1 not at grade, protrusion structure as Figure 1-3
Part 3 is respectively decorative wall 3a, the equipment platform 3b for disposing outdoor machine of air-conditioner, balcony 3c etc..In the present embodiment, in fixation
The end of frame 2 is fixed with one piece of guide rail installing plate 4 in bar shaped, and guide assembly 5 is fixedly connected with guide rail installing plate 4, fixed mount 2
There are several and evenly spaced fixation is on the building 1.
With reference to shown in Fig. 5, guide assembly 5 includes the guide rail bar 6 being fixedly connected with guide rail installing plate 4, described fixed mount 2
It is parallel to each other and horizontally disposed and both ends are fixedly connected with guide rail installing plate 4 and building 1 respectively horizontal branch including some
The inclined shore bar 8 that strut 7 and some being obliquely installed and both ends are fixedly connected with guide rail installing plate 4 and building 1 respectively, inclines
Inclined support bar 8 is set along the both sides of horizontal support bar 7 respectively, play a part of on leave behind top, improve binding strength.
In conjunction with shown in Fig. 6 and Fig. 9, fixed mount 2 also include it is some be embedded in building 1 and with horizontal support bar 7 and
The preburied component 9 that inclined shore bar 8 is fixedly connected, described preburied component 9 are fixed on inside building 1, and preburied component 9 is with building
It is in strong bonded to build thing 1, when horizontal support bar 7 and inclined shore bar 8 are fixedly connected with preburied component 9, is equally also contributed to
The bond strength with building 1 is improved, further, since horizontal support bar 7 and inclined shore bar 8 are usually steel or the material of irony
Material, can not directly be fixedly connected with building 1, and when preburied component 9 is the material of phase same material, then it can pass through weldering
The mode such as connect or be spirally connected is fixedly connected.
Specifically, preburied component 9 includes being embedded in embedded board 10 in building 1, on described embedded board 10 and to
The direction of the inside of building 1 extension is provided with some reinforcing plates 11.The cross section of reinforcing plate 11 is L-shaped, described embedded board 10
Residing plane is parallel with the vertical plane of building 1, and described embedded board 10 is provided with some anchor angles screw 12 and anchor angle screw
12 are fixedly connected with embedded board 10 and building 1.
The surface of the building 1 and position corresponding with embedded board 10 is provided with protection panels 13, anchor angle screw 12 is worn successively
The both ends of overprotection panel 13, embedded board 10 and building 1 and anchor angle screw 12 are fixed with protection panels 13 and building 1 respectively
Connection, fixed mount 2 are fixedly connected with protection panels 13.
Guide rail bar 6 can be C-shaped or H-shaped, in this embodiment, as shown in fig. 7, guide rail bar 6 includes consolidating with guide rail installing plate 4
Surely the first panel 14 connected, and the second panel 15 parallel with first panel 14, the both ends of cross connecting plate 16 are fixed respectively to be connected
Connect first panel 14 and second panel 15 and vertical with first panel 14 and second panel 15.Present embodiments provide a kind of removable
Unload the guide rail bar 6 of structure, convenient construction installation, transport etc..
In conjunction with shown in Fig. 7 and Fig. 8, and the sliding block 17 to be matched with guide rail bar 6, described cunning are arranged with guide rail bar 6
Block 17 is provided with slipper brake 18, and described slipper brake 18 can be such that sliding block 17 is fixedly connected with guide rail bar 6.
Slipper brake 18 have can elastic movement vertically output end, the end of output end is fixed with sliding block system
Dynamic plate 19, described sliding block keep plate 19 are located among guide rail bar 6 and sliding block 17.Slipper brake 18 is cylinder or hydraulic power
Device such as oil cylinder etc..
The present invention operation principle be:As shown in Figure 8 and Figure 9, tower crane 100 is real by transverse beam assembly 101 and guide assembly 5
Now connecting, transverse beam assembly 101 is played a supporting role to tower crane 100, for improving the stability and load of tower crane 100, due to
Guide assembly 5 is strip and in the track of plane, it is therefore desirable to installed in not having in irregular structure, and the appearance of building 1
Face is not because provided with various components, such as balcony, equipment platform etc., the outer surface that can make building 1 is in plane, now such as to be pacified
Guide assembly 5 is filled, then needs a planar structure.The combination of fixed mount 2 and guide rail installing plate 4, which provides one and can supported, to be led
The structure of rail assembly 5, the structure protrude from the outside of protruding member 3, make the installation of guide assembly 5 not by the shadow of protruding member 3
Ring, therefore solve the vertical plane of building 1 not being complete plane and the technical problem of guide assembly 5 can not be installed, make guide rail
Component 5 is mountable on various buildings 1.Embedded board 10, reinforcing plate 11, anchor angle screw 12 and protection panels 13 make fixed mount
2 are firmly combined with building 1, improve support degree of the guide rail bar 6 to tower crane 100, so as to improve the stability of tower crane 100
And load.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led
The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode
Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.
Although building 1, fixed mount 2, protruding member 3, decorative wall 3a, equipment platform 3b, sun have more been used herein
Platform 3c, guide rail installing plate 4, guide assembly 5, guide rail bar 6, horizontal support bar 7, inclined shore bar 8, preburied component 9, embedded board
10th, reinforcing plate 11, anchor angle screw 12, protection panels 13, first panel 14, second panel 15, cross connecting plate 16, sliding block 17,
The terms such as slipper brake 18, sliding block keep plate 19, tower crane 100, transverse beam assembly 101, but be not precluded from using other terms
Possibility.It is used for the purpose of more easily describing and explaining the essence of the present invention using these terms;It is construed as any
A kind of additional limitation is all disagreed with spirit of the present invention.
Claims (9)
1. a kind of guide rail mechanism being fixed on building, it is characterised in that including being fixed on consolidating on building (1) vertical plane
Determine frame (2), the width of described fixed mount (2) be more than the width of the protruding member (3) being arranged on building (1) vertical plane from
And the end of fixed mount (2) is extended protruding member (3) outside, one piece of leading in bar shaped is fixed with the end of fixed mount (2)
Rail installing plate (4), guide assembly (5) are fixedly connected with guide rail installing plate (4),
Described fixed mount (2) includes some be parallel to each other and horizontally disposed and both ends are respectively with guide rail installing plate (4) and building
Build horizontal support bar (7) that thing (1) is fixedly connected and some being obliquely installed and both ends respectively with guide rail installing plate (4) and building
The inclined shore bar (8) that thing (1) is fixedly connected,
Described fixed mount (2) also include it is some be embedded in building (1) and with horizontal support bar (7) and inclined shore bar
(8) preburied component (9) being fixedly connected, it is internal that described preburied component (9) is fixed on building (1).
2. the guide rail mechanism according to claim 1 being fixed on building, it is characterised in that described fixed mount (2)
There are several and evenly spaced be fixed on building (1).
3. the guide rail mechanism according to claim 1 being fixed on building, it is characterised in that described guide assembly
(5) guide rail bar (6) being fixedly connected with guide rail installing plate (4) is included.
4. the guide rail mechanism according to claim 1 being fixed on building, it is characterised in that described preburied component
(9) include being embedded in embedded board (10) in building (1), on described embedded board (10) and to extending inside building (1)
Direction be provided with some reinforcing plates (11).
5. the guide rail mechanism according to claim 4 being fixed on building, it is characterised in that described reinforcing plate (11)
Cross section it is L-shaped, plane residing for described embedded board (10) embedded board parallel, described with the vertical plane of building (1)
(10) it is provided with some anchor angles screw (12) and anchor angle screw (12) is fixedly connected with embedded board (10) and building (1).
6. the guide rail mechanism according to claim 5 being fixed on building, it is characterised in that described building (1)
Surface and the position corresponding with embedded board (10) be provided with protection panels (13), anchor angle screw (12) sequentially passes through protection panels
(13), embedded board (10) and the both ends of building (1) and anchor angle screw (12) are solid with protection panels (13) and building (1) respectively
Fixed connection, fixed mount (2) are fixedly connected with protection panels (13).
7. the guide rail mechanism according to claim 3 being fixed on building, it is characterised in that described guide rail bar (6)
Including the first panel (14) being fixedly connected with guide rail installing plate (4), and the second panel (15) parallel with first panel (14),
Cross connecting plate (16) both ends be respectively fixedly connected with first panel (14) and second panel (15) and with first panel (14) and
Two panels (15) are vertical.
8. the guide rail mechanism according to claim 3 being fixed on building, it is characterised in that described guide rail bar (6)
On be arranged with the sliding block (17) to match with guide rail bar (6), described sliding block (17) is provided with slipper brake (18), described
Slipper brake (18) can be such that sliding block (17) is fixedly connected with guide rail bar (6).
9. the guide rail mechanism according to claim 8 being fixed on building, it is characterised in that described slipper brake
(18) have can elastic movement vertically output end, the end of output end is fixed with sliding block keep plate (19), described
Sliding block keep plate (19) is located among guide rail bar (6) and sliding block (17).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510467872.3A CN105016218B (en) | 2015-08-02 | 2015-08-02 | The guide rail mechanism being fixed on building |
PCT/CN2016/000498 WO2017020541A1 (en) | 2015-08-02 | 2016-08-29 | Guide rail mechanism fixed on building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510467872.3A CN105016218B (en) | 2015-08-02 | 2015-08-02 | The guide rail mechanism being fixed on building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105016218A CN105016218A (en) | 2015-11-04 |
CN105016218B true CN105016218B (en) | 2018-03-13 |
Family
ID=54406604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510467872.3A Active CN105016218B (en) | 2015-08-02 | 2015-08-02 | The guide rail mechanism being fixed on building |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105016218B (en) |
WO (1) | WO2017020541A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105016218B (en) * | 2015-08-02 | 2018-03-13 | 周兆弟 | The guide rail mechanism being fixed on building |
CN107217815B (en) * | 2017-07-28 | 2022-11-11 | 江苏沪宁钢机股份有限公司 | Resistance to compression, safe type assembled steel construction elevartor shaft |
CN107569167A (en) * | 2017-10-20 | 2018-01-12 | 上海普英特高层设备股份有限公司 | Inner blocking type wall-attached moves suspension rod |
CN109928307B (en) * | 2017-12-19 | 2023-11-10 | 广东庞源工程机械有限公司 | Novel tower wing type wall-attached structure |
CN111910904A (en) * | 2020-08-13 | 2020-11-10 | 恒强(天津)模架有限公司 | Attached lifting operation safety protection platform guide rail for building construction |
CN113914602B (en) * | 2021-11-16 | 2023-01-06 | 中交一公局集团有限公司 | Anti-falling device for lifting type climbing frame |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5797504A (en) * | 1997-06-16 | 1998-08-25 | Mangum; Burney | Portable hoisting system |
CN101440660B (en) * | 2007-11-22 | 2010-09-01 | 唐继忠 | Guiding-rail attached lifting scaffold |
CN101215928B (en) * | 2008-01-10 | 2011-08-17 | 湖南省第五工程有限公司 | Attached lifting scaffold trolley type inclining-proof device and method of use thereof |
KR100874865B1 (en) * | 2008-06-16 | 2008-12-19 | 이송복 | Apparatus for salvaging slab mold |
CN201826516U (en) * | 2010-10-28 | 2011-05-11 | 崔玉平 | Novel attached lifting scaffold |
US20130259609A1 (en) * | 2012-03-30 | 2013-10-03 | Bruce W. Creed | Truss lifter and stabilizer |
CN104310234B (en) * | 2014-08-28 | 2016-03-30 | 沈阳建筑大学 | Outer outstanding climbing tower crane support system |
CN204938801U (en) * | 2015-08-02 | 2016-01-06 | 周兆弟 | The tower crane that is connected can be realized with building |
CN204823905U (en) * | 2015-08-02 | 2015-12-02 | 周兆弟 | Fix guide rail mechanism on building |
CN105000484B (en) * | 2015-08-02 | 2017-05-03 | 周兆弟 | Tower crane capable of being connected with building |
CN105016218B (en) * | 2015-08-02 | 2018-03-13 | 周兆弟 | The guide rail mechanism being fixed on building |
-
2015
- 2015-08-02 CN CN201510467872.3A patent/CN105016218B/en active Active
-
2016
- 2016-08-29 WO PCT/CN2016/000498 patent/WO2017020541A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2017020541A1 (en) | 2017-02-09 |
CN105016218A (en) | 2015-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105016218B (en) | The guide rail mechanism being fixed on building | |
CN105000482B (en) | Tower crane with walking mechanism | |
CN104088449B (en) | Safe and fast double-track construction platform of super high-rise curtain wall | |
AU2013334190B2 (en) | Hoisting platform system | |
CN105016223B (en) | Cross beam supporting system used for tower crane | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
CN102953553B (en) | Method for mounting large-span pipe truss by using boom luffing mechanism | |
CN105060135B (en) | Tower crane | |
CN205294665U (en) | Jack -up tower crane based on engineering mechanics | |
CN204980946U (en) | Take running gear's tower crane | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN204434116U (en) | A kind of hanging device for interior courtyard lifting pipeline | |
CN204938802U (en) | For the rail supported system of tower crane | |
CN204823919U (en) | Tower crane | |
CN204938801U (en) | The tower crane that is connected can be realized with building | |
CN204982628U (en) | Horizontal pull rope bridge | |
CN105000484B (en) | Tower crane capable of being connected with building | |
CN106553968A (en) | It is a kind of can on-load luffing lifting arm elevator apparatus | |
CN205873594U (en) | Special construction elevator of cooling tower section of thick bamboo wall | |
CN203961317U (en) | Slip list Pin and many truss structures moulding bed | |
CN204848050U (en) | A crossbeam braced system for tower crane | |
CN204823905U (en) | Fix guide rail mechanism on building | |
CN104495653A (en) | Multifunctional large-tonnage beam erecting crane and beam erecting method | |
CN203461720U (en) | Simple cantilever hoisting machine | |
CN203794505U (en) | Internal climbing steel beam conveying device of internal climbing movable arm tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |