CN110144808A - A kind of collapsible Option of Piping across Bridge - Google Patents
A kind of collapsible Option of Piping across Bridge Download PDFInfo
- Publication number
- CN110144808A CN110144808A CN201910386236.6A CN201910386236A CN110144808A CN 110144808 A CN110144808 A CN 110144808A CN 201910386236 A CN201910386236 A CN 201910386236A CN 110144808 A CN110144808 A CN 110144808A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- inclined plate
- load
- bearing panel
- piping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D18/00—Bridges specially adapted for particular applications or functions not provided for elsewhere, e.g. aqueducts, bridges for supporting pipe-lines
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of collapsible Option of Piping across Bridge, including pipeline support seat, cross vehicle inclined plate and cterpillar drive, it crosses vehicle inclined plate and is articulated with the load-bearing panel of pipeline support seat or the both ends of pipeline assembly bench, by the pipeline support seat that self-contained structure is arranged, pass through vehicle in the upper surface of load-bearing panel, in the lower surface of load-bearing panel, setting supports the supporting leg at interval and the pipeline fitting groove for positioning and being adapted to pipeline is arranged, placement space is provided for pipeline and vehicle is formd above pipeline and region that equipment passes through, vehicle inclined plate is crossed to be articulated on load-bearing panel or pipeline assembly bench by hinged form, the vehicle inclined plate of crossing of the collapsible Option of Piping across Bridge under folded state is set to overlay on load-bearing panel, save occupied space, convenient for storing and transporting the guidance formed between load-bearing panel and ground in use state, improve vehicle And equipment pass through efficiency.
Description
Technical field
The present invention relates to pipeline equipment technical field, in particular to a kind of collapsible Option of Piping across Bridge.
Background technique
In a large amount of construction sites or rescue scene, a large amount of pipeline is usually arranged, however criss-cross pipe
Road often blocks passing through for vehicle and relevant device, if strong fleet vehicles and equipment roll pipeline and pass through, continually roll through
The damage for often resulting in pipeline, influences operating efficiency.
Also, it speedily carries out rescue work and is waited in operation process in actual construction, after often equal pipe installations are good, can just find vehicle hardly possible
If excavating irrigation canals and ditches paving pipe laying road again for a large amount of Expenses Costs, to reduce efficiency, and inconvenience by the pipeline architecture laid
In the searching of pipeline, if the metal plate protection that handling is self-contained, has handling inconvenience, although and block of metal plate laying
Certain protection is formd to pipeline, but still there is a problem of that vehicle and equipment pass through inconvenience.
Summary of the invention
For this reason, it may be necessary to a kind of collapsible Option of Piping across Bridge is provided with solve vehicle in the prior art and equipment continually roll through
The damage for often resulting in pipeline, influences operating efficiency, and adopt remedial measures inconvenient problem after pipeline is laid.
To achieve the above object, a kind of collapsible Option of Piping across Bridge, including pipeline support seat, mistake vehicle inclined plate are inventor provided
And cterpillar drive;
The pipeline support seat includes load-bearing panel, pipeline assembly bench and supporting leg, and load-bearing panel is horizontally disposed, pipeline assembly
Platform is connected with the bottom surface of load-bearing panel, and the bottom surface of pipeline assembly bench is equipped with pipeline fitting groove compatible with pipeline, supporting leg with
Load-bearing panel or pipeline assembly bench are connected;
The both ends crossed vehicle inclined plate and be articulated with the load-bearing panel or pipeline assembly bench of pipeline support seat, cross vehicle inclined plate and pass through
Hinge joint is stacked in above load-bearing panel or is placed in the both ends of pipeline support seat, cross vehicle inclined plate both ends be respectively facing bottom surface and
The plate face of load-bearing panel;
The crawler type walking mechanism is set in two side directions of pipeline support seat, the traveling side of crawler type walking mechanism
To the end with pipeline fitting groove towards the both ends of pipeline support seat.
Further, the guide wheel of the cterpillar drive includes driving wheel, guide wheel, bogie wheel and crawler belt, described
Driving wheel and guide wheel are assemblied in the both ends of cterpillar drive, and bogie wheel is assemblied in the bottom of cterpillar drive, carry out
Band is around driving wheel, guide wheel and bogie wheel setting.
Further, the collapsible Option of Piping across Bridge further includes hinge leaf, the pipeline support seat and excessively vehicle inclined plate
Hinge joint is set to pipeline support seat by hinge leaf and crosses between vehicle inclined plate.
Further, the supporting leg selects hydraulic oil cylinder support legs.
Further, the supporting leg selects screw rod supporting leg, and the screw rod supporting leg is threadedly coupled with load-bearing panel.
Further, the load-bearing panel and the plate face for crossing vehicle inclined plate are equipped with conduction hole.
Further, the vehicle inclined plate of crossing further includes inclined plate support column, and the vehicle inclined plate of crossing is triangular structure, inclined plate branch
Dagger was connected on vehicle inclined plate along short transverse.
Further, the quantity of the pipeline fitting groove of the pipeline assembly bench is two or more, and along the two of load-bearing panel
Side direction setting.
It being different from the prior art, above-mentioned technical proposal has the advantages that the pipeline support seat by the way that self-contained structure is arranged,
In the upper surface of load-bearing panel by vehicle, in the supporting leg at the lower surface of load-bearing panel setting support interval and setting for fixed
The pipeline fitting groove of position and adaptation pipeline, provides placement space for pipeline and forms vehicle above pipeline and equipment passes through
Region, cross vehicle inclined plate be articulated on load-bearing panel or pipeline assembly bench by hinged form, make the folding under folded state
The vehicle inclined plate of crossing of formula Option of Piping across Bridge is able to overlay on load-bearing panel, saves occupied space, is using shape convenient for storage and transhipment
The guidance between load-bearing panel and ground is formed when state, improve vehicle and equipment passes through efficiency.
Detailed description of the invention
Fig. 1 is the deployed configuration schematic diagram of collapsible Option of Piping across Bridge in the embodiment of the present invention;
Fig. 2 is the folded state schematic diagram of collapsible Option of Piping across Bridge in the embodiment of the present invention;
Fig. 3 is the thin portion structural schematic diagram of collapsible Option of Piping across Bridge cterpillar drive in the embodiment of the present invention;
Fig. 4 is the use state diagram of collapsible Option of Piping across Bridge in the embodiment of the present invention.
Description of symbols:
101, pipeline support seat;102, load-bearing panel;103, pipeline assembly bench;
1031, pipeline fitting groove;104, supporting leg;105, table support bar;
106, platform pad;
201, vehicle inclined plate is crossed;202, inclined plate support column;
301, hinge leaf;
401, conduction hole;
501, cterpillar drive;502, driving wheel;503, guide wheel;
504, bogie wheel;505, crawler belt.
Specific embodiment
Technology contents, construction feature, the objects and the effects for detailed description technical solution, below in conjunction with specific reality
It applies example and attached drawing is cooperated to be explained in detail.
Also referring to Fig. 1, Fig. 2 and Fig. 3, present embodiment discloses a kind of collapsible Option of Piping across Bridge, including pipeline branch
It supports seat 101 and crosses vehicle inclined plate 201, pipeline support seat 101 includes load-bearing panel 102, pipeline assembly bench 103 and supporting leg 104, load-bearing
Panel 102 is horizontally disposed, and the two sides of load-bearing panel 102 is respectively top and bottom, and pipeline assembly bench 103 is set to load-bearing panel
The bottom surface of 102 bottom surface, pipeline assembly bench 103 is equipped with pipeline fitting groove 1031, the size phase of pipeline fitting groove 1031 and pipeline
(in the present embodiment, pipeline fitting groove 1031 is arcuate structure to adaptation, convenient for being adapted to circular pipeline architecture, in other implementations
It, can also be according to the prefabricated correspondingly sized size of pipeline at scene or the pipeline fitting groove of rectangular configuration in example).Cterpillar drive
501 are set in two side directions of pipeline support seat 101, including driving wheel 502, guide wheel 503, bogie wheel 504 and crawler belt
505, driving wheel 502 is set on the direction of 101 one end of pipeline support seat, and it is another that guide wheel 503 is set to pipeline support seat 101
On the direction at end, bogie wheel 504 is set between driving wheel 502 and guide wheel 503, and crawler belt 505 is around driving wheel, guide wheel
503 and bogie wheel 504 and form ring structure.Supporting leg 104 is vertically arranged, the one end of supporting leg 104 upward and load-bearing panel
102 are connected, and the one end of supporting leg 104 downward and ground touch.It crosses vehicle inclined plate 201 and is articulated with pipeline support seat 101
102 both ends of load-bearing panel.
According to above structure, in the use process of collapsible Option of Piping across Bridge, when collapsible Option of Piping across Bridge be in transhipment or
When storing state, the vehicle inclined plate of crossing positioned at pipeline support seat weight-bearing surface board ends is driven along hinge joint, and is stacked and be set to load-bearing
On the top surface of panel, two shapes for crossing vehicle inclined plate are triangle, one of loading end and load-bearing panel phase for crossing vehicle inclined plate
Fitting, bottom surface is in contact with the loading end that another crosses vehicle inclined plate, so that plate face is bonded to each other, in order to save placement space.
And it is placed on storage place or vehicle carrying platform, is convenient for storing and transported by supporting leg.In a state of use, pipeline
Support base is mobile by crawler type walking mechanism, and pipeline is passed through below the pipeline fitting groove of pipeline support seat, pipeline
The pipeline fitting groove of assembly bench is adapted with pipeline, is bonded and is protected to pipeline, will be crossed vehicle inclined plate and is unfolded and is placed in hold
The both ends of weight panel, when needing to adjust equipment and vehicle passes through region, by moving crawler-type traveling along line layout direction
Device, pipeline support seat and cross vehicle inclined plate can be mobile in line layout region so that equipment and vehicle by region be able to by
Quickly adjust, be adapted to construction or repairing scene practical passage situation, pipeline by bending or arc steering knuckle from cross vehicle
Inclined plate bottom is stretched out, and the loading end for crossing vehicle inclined plate is docked with the top surface of bearing panel, and is formed between bearing panel and ground
Guidance, convenient for passing through for vehicle and equipment, supporting leg improves vehicle by adjusting to be adapted to ground, avoiding pipeline support seat from tilting
And equipment pass through efficiency.
Referring to Fig. 1, further including hinge leaf 301 in certain preferred embodiments, hinge leaf 301 is set to carrying
It panel 102 and crosses on vehicle inclined plate 201, hinge joint in hinge leaf 301 stretches out bearing panel 102 and crosses vehicle inclined plate 201, and sets
It is placed between the two, by bearing panel and crossing outside vehicle inclined plate hinge joint setting, convenient for being carried when being unfolded and packing up
Gap is reserved between panel and excessively vehicle inclined plate, avoid bearing panel and is crossed between vehicle inclined plate because foreign matter can not be unfolded or be closed.
Referring to Fig. 3, hydraulic oil cylinder support legs can be selected in supporting leg, by using hydraulic cylinder in certain preferred embodiments
Supporting leg is convenient for quick folding and unfolding, in other embodiments, threaded rod also can be selected and be threadedly coupled supporting leg, pass through threaded rod
Rotation realize the control of supporting leg length, and collapsing length is guaranteed by the frictional force on supporting leg and ground.
Referring to Fig. 3, further including table support bar 105 and platform supporting pad 106, platform in certain preferred embodiments
Support rod 105 is vertically arranged, and is arranged through pipeline assembly bench 103, and one end of table support bar 105 is towards load-bearing panel 102
Bottom surface, the other end is respectively arranged at the both ends of table support bar 105 towards ground, platform pad 106.By the way that platform is arranged
Support rod and platform supporting pad pass through the platform pad pair at both ends in the storage and transport process of collapsible Option of Piping across Bridge
Overall structure is supported, and is buffered to equipment, is avoided vibration and is generated noise or hit to equipment generation damage.
Referring to Fig. 1, bearing panel 102 is equipped with conduction hole 401 with vehicle inclined plate 201 is crossed in certain preferred embodiments,
Conduction hole 401 is through bearing panel 102 and the two sides for crossing vehicle inclined plate 201, by the way that conduction hole is arranged, convenient for arranging ponding
It puts, avoids the problem that ponding generates skidding.
Referring to Fig. 1, crossing vehicle inclined plate 201 further includes inclined plate support column 202, inclined plate support in certain preferred embodiments
Column 202 further improved the intensity of vehicle inclined plate, avoided vehicle inclined plate because using the time long by the way that inclined plate support column is arranged
Bending is generated, influence equipment and vehicle passes through efficiency.
Referring to Fig. 4, pipeline support seat 101 is equipped with traveling wheel 107 in certain preferred embodiments, traveling wheel 107 is filled
Bottom assigned in load-bearing panel 102 or pipeline assembly bench 103, by the way that traveling wheel is arranged, convenient for being carried out to collapsible Option of Piping across Bridge
It is mobile.
In certain preferred embodiments, the quantity of pipeline fitting groove can be two or more, and pipeline fitting groove is along load-bearing
Two side direction through tube road assembly bench of panel.
In certain preferred embodiments, supporting leg can also be assemblied on pipeline assembly bench, be realized by pipeline assembly bench and load-bearing
Panel supports jointly, improves forced area, avoids load-bearing panel deformation.
Here, we are defined the directionality word of both ends and two sides, when both ends are that bearing panel is horizontally disposed
The driving direction of vehicle and equipment on bearing panel, two sides be horizontally disposed load-bearing panel in the horizontal plane with traveling side
To perpendicular both sides.
It should be noted that being not intended to limit although the various embodiments described above have been described herein
Scope of patent protection of the invention.Therefore, it based on innovative idea of the invention, change that embodiment described herein is carried out and is repaired
Change, or using equivalent structure or equivalent flow shift made by description of the invention and accompanying drawing content, it directly or indirectly will be with
Upper technical solution is used in other related technical areas, is included within the scope of protection of the patent of the present invention.
Claims (8)
1. a kind of collapsible Option of Piping across Bridge, which is characterized in that including pipeline support seat, cross vehicle inclined plate and cterpillar drive;
The pipeline support seat includes load-bearing panel, pipeline assembly bench and supporting leg, and load-bearing panel is horizontally disposed, pipeline assembly bench with
The bottom surface of load-bearing panel is connected, and the bottom surface of pipeline assembly bench is equipped with pipeline fitting groove compatible with pipeline, supporting leg and load-bearing
Panel or pipeline assembly bench are connected;
The both ends crossed vehicle inclined plate and be articulated with the load-bearing panel or pipeline assembly bench of pipeline support seat, cross vehicle inclined plate and pass through hingedly
Point is stacked in above load-bearing panel or is placed in the both ends of pipeline support seat, and the both ends for crossing vehicle inclined plate are respectively facing bottom surface and load-bearing
The plate face of panel;
The crawler type walking mechanism is set in two side directions of pipeline support seat, the driving direction of crawler type walking mechanism with
The end of pipeline fitting groove is towards the both ends of pipeline support seat.
2. collapsible Option of Piping across Bridge according to claim 1, which is characterized in that the guide wheel packet of the cterpillar drive
Driving wheel, guide wheel, bogie wheel and crawler belt are included, the driving wheel and guide wheel are assemblied in the both ends of cterpillar drive, bear
Roller is assemblied in the bottom of cterpillar drive, and crawler belt is around driving wheel, guide wheel and bogie wheel setting.
3. collapsible Option of Piping across Bridge according to claim 1, which is characterized in that the collapsible Option of Piping across Bridge further includes hinge
Chain hinge, the pipeline support seat and the hinge joint for crossing vehicle inclined plate are set to pipeline support seat by hinge leaf and cross vehicle inclined plate
Between.
4. collapsible Option of Piping across Bridge according to claim 1, which is characterized in that the supporting leg selects hydraulic oil cylinder support legs.
5. collapsible Option of Piping across Bridge according to claim 1, which is characterized in that the supporting leg selects screw rod supporting leg, described
Screw rod supporting leg is threadedly coupled with load-bearing panel.
6. collapsible Option of Piping across Bridge according to claim 1, which is characterized in that the load-bearing panel and the plate for crossing vehicle inclined plate
Face is equipped with conduction hole.
7. collapsible Option of Piping across Bridge according to claim 1, which is characterized in that the vehicle inclined plate of crossing further includes inclined plate support
Column, the vehicle inclined plate of crossing is triangular structure, and inclined plate support column was connected on vehicle inclined plate along short transverse.
8. collapsible Option of Piping across Bridge according to claim 1, which is characterized in that the pipeline fitting groove of the pipeline assembly bench
Quantity be two or more, and along two side directions of load-bearing panel be arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910386236.6A CN110144808A (en) | 2019-05-09 | 2019-05-09 | A kind of collapsible Option of Piping across Bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910386236.6A CN110144808A (en) | 2019-05-09 | 2019-05-09 | A kind of collapsible Option of Piping across Bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110144808A true CN110144808A (en) | 2019-08-20 |
Family
ID=67594193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910386236.6A Pending CN110144808A (en) | 2019-05-09 | 2019-05-09 | A kind of collapsible Option of Piping across Bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110144808A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113306595A (en) * | 2021-06-22 | 2021-08-27 | 上海磁浮交通发展有限公司 | Rescue cab apron for U-shaped beam in subway overhead area |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2364298A1 (en) * | 1976-09-14 | 1978-04-07 | Goppner Ulrich | Vehicle with lowerable pontoon bridge ramp - has two part approach ramp hinged as deck continuation, with inward folding half |
US4962556A (en) * | 1989-03-02 | 1990-10-16 | The United States Of America As Represented By The Secretary Of The Army | Lightweight, collapsible bridge module, and system with deployment and retrieval trailer |
US5105494A (en) * | 1990-12-03 | 1992-04-21 | Highway Construction Bridge Systems, Inc. | Continuously moving highway reconstruction device |
EP0899155A1 (en) * | 1997-03-21 | 1999-03-03 | Europodium (S.à.r.l.) | Deployable and collapsible mobile podium |
US20080124170A1 (en) * | 2004-10-01 | 2008-05-29 | James Frederick Seymour | Temporary Roadway |
JP2014234596A (en) * | 2013-05-31 | 2014-12-15 | 日軽金アクト株式会社 | Vehicular hose bridge |
CN204298723U (en) * | 2014-11-22 | 2015-04-29 | 山东科瑞国际油气工程有限公司 | A kind of vehicle is temporarily by road and bridge |
CN204455795U (en) * | 2015-02-11 | 2015-07-08 | 上海营邑城市规划设计有限公司 | Bridge pipeline crosses the river structure |
CN204459615U (en) * | 2014-12-25 | 2015-07-08 | 倪忠山 | A kind of traversing device of simple and easy lightweight |
CN205557295U (en) * | 2016-04-18 | 2016-09-07 | 中国石油集团渤海钻探工程有限公司 | Blowout pipeline line vehicle is current passes a bridge |
CN106567299A (en) * | 2016-09-20 | 2017-04-19 | 黄开友 | Traffic dispersion device |
CN206352262U (en) * | 2016-12-21 | 2017-07-25 | 岳阳市公路桥梁基建总公司 | A kind of bearing support hydraulic system for cross-line bridge construction |
CN210315189U (en) * | 2019-05-09 | 2020-04-14 | 福建侨龙应急装备股份有限公司 | Folding pipeline gap bridge |
-
2019
- 2019-05-09 CN CN201910386236.6A patent/CN110144808A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2364298A1 (en) * | 1976-09-14 | 1978-04-07 | Goppner Ulrich | Vehicle with lowerable pontoon bridge ramp - has two part approach ramp hinged as deck continuation, with inward folding half |
US4962556A (en) * | 1989-03-02 | 1990-10-16 | The United States Of America As Represented By The Secretary Of The Army | Lightweight, collapsible bridge module, and system with deployment and retrieval trailer |
US5105494A (en) * | 1990-12-03 | 1992-04-21 | Highway Construction Bridge Systems, Inc. | Continuously moving highway reconstruction device |
EP0899155A1 (en) * | 1997-03-21 | 1999-03-03 | Europodium (S.à.r.l.) | Deployable and collapsible mobile podium |
US20080124170A1 (en) * | 2004-10-01 | 2008-05-29 | James Frederick Seymour | Temporary Roadway |
JP2014234596A (en) * | 2013-05-31 | 2014-12-15 | 日軽金アクト株式会社 | Vehicular hose bridge |
CN204298723U (en) * | 2014-11-22 | 2015-04-29 | 山东科瑞国际油气工程有限公司 | A kind of vehicle is temporarily by road and bridge |
CN204459615U (en) * | 2014-12-25 | 2015-07-08 | 倪忠山 | A kind of traversing device of simple and easy lightweight |
CN204455795U (en) * | 2015-02-11 | 2015-07-08 | 上海营邑城市规划设计有限公司 | Bridge pipeline crosses the river structure |
CN205557295U (en) * | 2016-04-18 | 2016-09-07 | 中国石油集团渤海钻探工程有限公司 | Blowout pipeline line vehicle is current passes a bridge |
CN106567299A (en) * | 2016-09-20 | 2017-04-19 | 黄开友 | Traffic dispersion device |
CN206352262U (en) * | 2016-12-21 | 2017-07-25 | 岳阳市公路桥梁基建总公司 | A kind of bearing support hydraulic system for cross-line bridge construction |
CN210315189U (en) * | 2019-05-09 | 2020-04-14 | 福建侨龙应急装备股份有限公司 | Folding pipeline gap bridge |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113306595A (en) * | 2021-06-22 | 2021-08-27 | 上海磁浮交通发展有限公司 | Rescue cab apron for U-shaped beam in subway overhead area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100748781B1 (en) | Support booms for mobile working machines and mobile concrete pump with said support booms | |
US8225947B2 (en) | Crane, in particular mobile crane with a narrow track and enlarged supporting base | |
RU2006130457A (en) | METHOD OF DRAWING IN THE REVERSE ORDER OF THE WHOLE WITH THE CHAMBER-POST SYSTEM OF DEVELOPMENT AND THE SECTION OF THE MOUNT FOR THE CHAMBER-POST SYSTEM OF THE DEVELOPMENT WITH THE DRAWING OF WHOLE IN REVERSE ORDER | |
EA200870256A1 (en) | MOBILE WORKING MACHINE WITH SUPPORTING RACKS | |
CN108716413A (en) | A kind of waterproof cloth is laid with and the construction method of lining cutting bar-mat reinforcement binding | |
CN110144808A (en) | A kind of collapsible Option of Piping across Bridge | |
US20150160659A1 (en) | Material distributing control method for material distributing apparatus and the material distributing apparatus | |
CN106223865B (en) | Mast folding-back rotary drilling rig and method with drilling rod movable mast | |
CN208949882U (en) | The adjustable pile foundation steel pile casting positioning device of a kind of diameter | |
JP2000257022A (en) | Erection device for bridge | |
CN210315189U (en) | Folding pipeline gap bridge | |
CN209114417U (en) | Harbour integrated construction system based on stake top top pushing platform | |
RU2476645C1 (en) | Bulldozer with retractable blade | |
CN116835033A (en) | Quick packing apparatus of building site basement steel pipe | |
CN111119028A (en) | Movable folding overbridge | |
CN102261030B (en) | Two flexible frames and paver | |
RU2423314C2 (en) | Moving ballast for portable tower crane | |
US2612242A (en) | Portable well servicing rig | |
CN210313183U (en) | Truss tower and contain its strideing across construction protective equipment | |
CN110093847A (en) | A kind of self-propelled Option of Piping across Bridge | |
CN206297563U (en) | A kind of foreign steamer becomes rail construction work vehicle | |
BE1004106A3 (en) | Treatment device for oblong objects such as pipes on performance of drill work. | |
CA2313266A1 (en) | Foldable frame for a conveyor system | |
CN220016319U (en) | Highway pipeline laying device | |
BE1005755A3 (en) | Method and device for attaching reinforcements in a quay wall from thewaterside |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 364000 Dongbao Road, east city, Xinluo District, Longyan, Fujian Province, No. 421 Applicant after: Fujian Qiaolong emergency equipment Co., Ltd Address before: 364000 Dongbao Road, east city, Xinluo District, Longyan, Fujian Province, No. 421 Applicant before: Fujian overseas Chinese dragon emergency equipment Co., Ltd. |
|
CB02 | Change of applicant information |