CN102352632A - 一种锚杆板桩组合结构及其加固斜坡一侧高填方体的方法 - Google Patents
一种锚杆板桩组合结构及其加固斜坡一侧高填方体的方法 Download PDFInfo
- Publication number
- CN102352632A CN102352632A CN2011102150141A CN201110215014A CN102352632A CN 102352632 A CN102352632 A CN 102352632A CN 2011102150141 A CN2011102150141 A CN 2011102150141A CN 201110215014 A CN201110215014 A CN 201110215014A CN 102352632 A CN102352632 A CN 102352632A
- Authority
- CN
- China
- Prior art keywords
- anchor pole
- filling body
- baffle plate
- concrete baffle
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种锚杆板桩组合结构其加固斜坡一侧高填方体的方法,包括锚杆(1)、混凝土挡板(2)和基础桩(3),所述锚杆(1)穿过斜坡表层覆盖层(6)与稳定基岩(8)灌注浆连接,锚杆(1)的锚头(9)与混凝土挡板(2)连接,基础桩(3)深入稳定基岩(8)并与混凝土挡板(2)底部连接,所述锚杆(1)的杆体(11)在填方体(4)内的部分焊接短杆(10),短杆(10)在竖直方向和水平方向相间排列,且水平方向上的短杆(10)在杆体(11)的上部和下部焊接相间排列,竖直方向上在杆体(11)两侧相间排列。本发明大大地提高了填方体与锚杆的摩擦连接能力,结合混凝土挡板和基础桩,构成了一个稳定可靠的斜坡一侧高填方体支挡加固系统,其稳定支挡填方体中心高度可达20-30m,造价低,适应范围较广。
Description
技术领域
本发明涉及到斜坡一侧高填方路基的支挡加固结构及施工方法。
背景技术
随着西部大开发及城镇建设的高速发展,在山区公路、铁路及市政等工程建设中,高填方路基工程越来越多。填方体加固目标主要是滑塌和沉降稳定性控制两个方面。加筋土、灌注浆、强夯、碎石桩、钻孔灌注桩等主要是增强填方体自身的强度及抗变形能力,但很难独立应用于高填方支挡加固。而重力式挡墙、钢筋混凝土悬壁式挡墙、钢筋混凝土扶臂式挡墙、(预应力锚索)抗滑桩板墙,预应力锚索框架梁、锚锭板挡墙等主要是对高填方体起支挡抗滑作用。
重力式挡土墙多用于石料较丰实的地区,由于其断面尺寸较大,墙身较重,圬工较多,对地基承载力的要求较高,其支挡高度一般小于8m。钢筋混凝土悬壁式挡墙、扶臂式挡墙由于自身结构的局限性,高度一般小于10m,而且工程造价较高。(预应力锚索)抗滑桩板墙,预应力锚索框架梁等虽然加固高度较大,但由于锚索和抗滑桩造价非常高,设计采用并不普遍。现有锚锭板挡墙单级高度一般为6m,由于拉杆拉力不足,且工程中常采用多级叠加组合,整体稳定性较差。
发明内容
本发明的目的是提供一种成本低、加固高度高的锚杆板桩组合结构及其加固斜坡一侧高填方体的方法。
为了实现上述目的,采用以下技术方案:
一种锚杆板桩组合结构,其特征在于:所述组合结构包括锚杆、混凝土挡板和基础桩,所述锚杆穿过斜坡表层覆盖层与稳定基岩灌注浆连接,锚杆的锚头与混凝土挡板连接,基础桩深入稳定基岩并与混凝土挡板底部连接。
所述锚杆的杆体在填方体内的部分焊接短杆,短杆在竖直方向和水平方向相间排列,且水平方向上的短杆在杆体的上部和下部焊接相间排列,竖直方向上在杆体左右两侧相间排列。
所述短杆之间的间距S为0.5-1.0m,长度为填方体分层压实层厚B的0.1-0.3倍,截面尺寸不超过杆体直径的2/3。
为了保证填方体的压实度和施工方便,填方体每个分层压实层内布设的锚杆不超过1排。
为了保证稳定性,所述填方体的坡脚处设置有牵引混凝土挡板的底部锁脚锚索,
所述基础桩为锚索抗滑桩。
为了方便排水,所述混凝土挡板上设置有排水孔。
一种使用如上所述锚杆板桩组合结构的加固斜坡一侧高填方体的方法,其特征在于:所述方法包括如下步骤:
a. 将基础桩与混凝土挡板连接;
b. 将锚杆穿过覆盖层与基岩连接,并在锚杆上焊接短杆,分层填方并压实,将锚杆与混凝土挡板连接;
c. 按填方分层压实厚度,重复步骤a中的混凝土挡板施工及步骤b,直至达到填方体设计高度结束。
所述步骤a包括如下分步骤:
a1. 施工基础桩;首先布设桩的位置并开挖成桩孔,将制作好的钢筋笼吊运安装入孔,待钢筋笼吊装固定后,浇注混凝土成桩,桩顶预留与混凝土挡板相连的钢筋。
a2. 施工混凝土挡板;按实际的填方体分层压实厚度浇筑相当高度的混凝土挡板;其最下面一块挡板底部通过基础桩顶部预留钢筋并浇筑混凝土与基础桩连接;在锚杆的纵断面的混凝土挡板上布设纵向钢筋和锚头位置在锚杆两侧布置横向钢筋,并预留与焊点锚杆的连接孔,混凝土挡板预留成排成裂的排水孔。
步骤b包括如下分步骤:
b1. 在填方段斜坡上布设并钻锚杆孔;
b2. 在锚杆埋入填方体内的部分预焊接短杆,并将杆体和短杆涂抹防腐层;
b3. 将预制好的锚杆插入锚杆钻孔,并在锚固段灌注砂浆固定,同时将其穿过混凝土挡板上预留孔,浇注锚头使其与混凝土挡板连接;
b4. 待灌注砂浆和浇注锚头凝固稳定后,分层按实际层厚填入填方体并按设计要求压实。
本发明大大地提高了填方体与锚杆的摩擦连接能力,结合混凝土挡板和基础桩,构成了一个稳定可靠的斜坡一侧高填方体支挡加固系统,其稳定支挡填方体中心高度可达20-30m,造价较预应力锚索抗滑桩板墙和框架梁要低得多,且只要填方体一侧斜坡具有浅埋稳定的基岩的锚固条件的地段均适应,适应范围较广,可以用于斜坡一侧填方体坡直立、倾斜或分台阶放坡等坡面设计工况。而且此类斜坡一侧填方体施工可以避免因路基开挖引起的坡体扰动,保证了原有坡体的稳定和生态。
附图说明
图1是本发明中锚杆板桩组合结构示意图;
图2是坡面直立时图1的A—A剖面图;
图3是坡面直立时图1的B—B剖面图;
图4是坡面倾斜时图1的A—A剖面图;
图5为坡面倾斜时图1的B—B剖面图;
图6是本发明中锚杆的结构示意图;
图7是图6的A—A剖面图;
图8为图6的B—B剖面图;
图9为图6的C—C剖面图;
图10为图6的D—D剖面图;
图11为基础桩与混凝土挡板间连接示意图;
图12是锚杆与混凝土挡板间连接示意图。
图中:1-锚杆;2-混凝土挡板;3-基础桩;4-填方体;5-斜坡坡面;6-斜坡表层覆盖层;7-基岩表面;8-基岩;9-锚头;10-短杆;11-杆体;12-混凝土砂浆;13-焊接点;14-底部锁脚锚索;15-排水沟;16-防腐层;17-主钢筋;18-纵向钢筋;19-横向钢筋;20-排水孔; a-锚杆竖向间距;b-锚杆水平方向间距;α-底部锁脚锚索倾角;S-短杆之间的间距。
具体实施方式
下面结合附图和具体实施例对本发明做进一步说明。
如图1~图5所示,一种锚杆板桩组合结构,将填方体4固定到斜坡一侧稳定基岩8上,包括基础桩3、混凝土挡板2、焊点锚杆3三个主要组成部分,适应于斜坡一侧填方体坡面直立、倾斜或分台阶放坡等坡面设计工况。基础桩3采用现场浇注钢筋混凝土,深入稳定基岩8并少量露出原地表,约1m,一方面用于加固原斜坡表层覆盖层6,另一方面用于稳定填方体坡脚,与其上方混凝土挡板2连接形成整体支挡的基础。基础桩3深入稳定基岩8的深度、横截面大小及配筋强度等需要通过填方体沿底部或原斜坡表层覆盖层6剪出失稳的稳定性计算确定。
如图6至图10所示,锚杆1在填方体内等间距的竖直和水平方向上焊接以增大填方体4与锚杆的摩擦和粘接强度的短杆10,水平方向上的短杆10在杆体11的上部和下部焊接相间排列,竖直方向上在杆体左右两侧相间排列,间距为0.5-1.0m。原斜坡内的部分采用灌注混凝土砂浆与坡体连接并深入稳定基岩8,锚固段的长度等根据填方体4稳定所需的锚杆抗拔力设计值确定。锚杆1在原斜坡内均采取灌注浆,一方面使其与稳定基岩锚固连接,另一方面对斜坡表层覆盖层6内的锚杆起到保护作用。锚杆1在填方体4内的部分涂一层有防腐层16,可以使用环氧涂层或沥青船底漆等作为防腐材料。
如图11所示,基础桩3顶部预留纵向主钢筋17,预留长度一般为锚杆纵向间距a的0.5倍,并通过浇筑混凝土挡板2与基础桩3连接形成整体结构。
如图12所示,锚杆1通过混凝土挡板2预留孔采用钢筋混凝土锚头9与混凝土挡板2连接成整体,并且在混凝土挡板2内、锚杆1布置的纵断面两侧各设置一排纵向钢筋18和锚头9位置设置两排横向钢筋19以增大锚杆1和混凝土挡板2间的整体连接强度。
本发明利用高填方工程分层回填压实的施工特征,在成排成列的锚杆埋入填方体的部分焊接短小的短杆10,而且采用纵横相间布置,不但产生群锚效应,而且大大提高了锚杆与填方体间的摩擦连接强度,大量地增强了填方体4与稳定基岩8间的连接强度,多点焊接改善了锚头受力集中的状态。因此,可以较多地减小锚杆的使用数量且产生更好的支挡效果。结合填方体4底部的基础桩3和表面的混凝土挡板,共同构成了一个有效的整体的组合支挡结构,既可防止填方体4的局部滑塌,又可以防止其沿底部的整体滑动,而且充分发挥和增强了填方体4的自稳能力。
需要注意的是,根据填方前原斜坡坡表的工程情况,在施工前一般应平整坡面,除去坡表植被及部分粘土,再布置基础桩3和锚杆1。基础桩3的规模、配筋及深度,锚杆1的直径、长度及间距均应根据填方体4的规模及原斜坡的地质条件,依据受力计算确定。如果原斜坡稳定性较差,基础桩也可以选用锚索抗滑桩。对于非基础桩纵断面的最底部一排锚固应选用预应力锚索锁脚,如图4和图5中的底部锁脚锚索14。
本发明的基础桩3宜采用常规的预制钢筋笼灌注混凝土桩。如图6和图7所示,为了保证焊接点13的质量,锚杆1焊接的短杆10的直径不宜超过杆体11的2/3;为了保证填土的压实要求,短杆10的长度为填方体4分层压实层厚B的0.1-0.3倍,每个分层压实层内布设的锚杆1不超过1排,锚杆1埋入填方体4内的部分的长度L和倾角β,与填方体4分层压实层厚B满足:。
本发明还包括一种采用以上锚杆板桩组合结构的加固斜坡一侧高填方的方法,它包括以下具体实施步骤:
a. 将基础桩(3)与混凝土挡板2连接的步骤。
b.将锚杆1穿过斜坡表层覆盖层6与稳定基岩(8)连接,焊接短杆10,分层填方并压实,并将锚杆1与混凝土挡板2连接。
c. 按填方分层压实厚度B重复步骤b,直至达到填方体4设计高度结束。
所述步骤a包括如下分步骤:
a1. 布设基础桩3和锚杆1,并施工基础桩3。首先根据工程、地质特征及计算分析,确定基础桩3及和焊点锚杆1布点。确定基础桩3规模与配筋,并开挖成桩孔,将制作好的钢筋笼吊运安装入孔,待钢筋笼吊装固定后,浇注混凝土成桩,桩顶预留与混凝土挡板2相连的钢筋,常规养护。
a2. 施工混凝土挡板2并使其底部与基础桩3顶部连接。按实际的填方体分层压实厚度首先浇筑最下方一层相当高度的混凝土挡板2,并使其底部通过基础桩3顶部预留钢筋并浇筑混凝土与基础桩(3)连接。在锚杆1的纵断面上布设至少2排纵向钢筋18和锚头9位置,并在焊点锚杆1两侧至少各布置1根横向钢筋19,且预留与焊点锚杆1的连接孔,混凝土挡板2预留成排成列的排水孔20。
步骤b包括如下分步骤:
b1. 确定锚杆1的规格并钻锚杆孔。根据工程、地质特征及计算分析,确定锚杆1及短杆10的直径、长度,焊点个数与间距,确定钻孔深度及大小后,采用工程钻机进行钻孔。
b2. 在锚杆1埋入填方体4内的部分预焊接短杆10,竖向和横向焊接相间排列,并且横向和纵向焊接分别相对杆体上下和左右相间。对锚杆1在填方体内的焊点段涂一层环氧涂层或沥青船底漆等作为防腐层。
b3. 将预制好的锚杆1插入锚杆钻孔,并在原斜坡内的锚固段灌注砂浆固定,同时将其穿过混凝土挡板2上预留孔,浇注锚头9使其与混凝土挡板2连接。
b4. 待灌注砂浆和浇注锚头9凝固稳定后,按实际层厚填入填方体(4)并按设计要求压实。
最后按填方分层压实厚度B重复步骤a中的混凝土挡板2施工及步骤b,直至达到填方体4设计高度结束。
需要注意的是,锚固段注浆时根据锚孔的深度,应给予一定的注浆压力,使浆液扩散,提高浆体质量,进而增加其与稳定基岩8的连接强度。
本发明充分利用填方体内锚杆焊接的短小钢质构件大大地增加了锚杆与填方体间的摩擦效应,通过此方法填方修筑路基,避免了斜坡开挖,减小了对自然斜坡的施工扰动,保持了斜坡本身的稳定和生态特性。用于斜坡一侧高填方支挡加固时,可取代抗滑桩板墙、预应力锚索抗滑桩板墙及框架梁和锚锭板挡墙等结构,且其支挡高度可超过这些结构;用于中等高度的填方体时可取代扶壁式挡墙等结构。具有能有效加固高填方体边坡,且施工简单、投资节约和保护生态环境的明显效果。
Claims (10)
1.一种锚杆板桩组合结构,其特征在于:所述组合结构包括锚杆(1)、混凝土挡板(2)和基础桩(3),所述锚杆(1)穿过斜坡表层覆盖层(6)与稳定基岩(8)灌注浆连接,锚头(9)与混凝土挡板(2)连接,基础桩(3)深入稳定基岩(8)并与混凝土挡板(2)底部连接;
所述锚杆(1)的杆体(11)在填方体(4)内的部分焊接有短杆(10),短杆(10)在竖直方向和水平方向相间排列,且水平方向上的短杆(10)在杆体(11)的上部和下部焊接相间排列,竖直方向上在杆体(11)左右两侧相间排列。
2.如权利要求1所述的锚杆板桩组合结构,其特征在于:所述短杆(10)之间的间距S为0.5-1.0m,长度为填方体(4)分层压实层厚B的0.1-0.3倍,截面尺寸不超过杆体(11)直径的2/3。
3.如权利要求2所述的锚杆板桩组合结构,其特征在于:填方体(4)每个分层压实层内布设的锚杆(1)不超过1排。
5.如权利要求1至4任一所述的锚杆板桩组合结构,其特征在于:所述填方体(4)的坡脚处设置有牵引混凝土挡板(2)的底部锁脚锚索(14)。
6.如权利要求5所述的焊点锚杆板桩组合结构,其特征在于:所述基础桩(3)为锚索抗滑桩。
7.如权利要求6所述的焊点锚杆板桩组合结构,其特征在于:所述混凝土挡板(2)上设置有排水孔(20)。
8.一种使用如权利要求1至7任一所述锚杆板桩组合结构的加固斜坡一侧高填方体的方法,其特征在于:所述方法包括如下步骤:
a. 将基础桩(3)与混凝土挡板(2)连接;
b. 将锚杆(1)穿过覆盖层(6)与基岩连接,并在锚杆(1)上焊接短杆(10),分层填方并压实,将锚杆(1)与混凝土挡板(2)连接;
c. 按填方分层压实厚度,重复步骤a中的混凝土挡板(2)施工及步骤b,直至达到填方体(4)设计高度结束。
9.如权利要求8所述的加固斜坡一侧高填方体的方法,其特征在于:所述步骤a包括如下分步骤:
a1. 施工基础桩(3);首先布设桩的位置并开挖成桩孔,将制作好的钢筋笼吊运安装入孔,待钢筋笼吊装固定后,浇注混凝土成桩,桩顶预留与混凝土挡板(2)相连的钢筋;
a2. 施工混凝土挡板(2);按实际的填方体分层压实厚度浇筑相当高度的混凝土挡板(2);其最下面一块挡板底部通过基础桩(3)顶部预留钢筋并浇筑混凝土与基础桩(3)连接;在锚杆(1)的纵断面上布设至少2排纵向钢筋(18)和锚头(9)位置布置在焊点锚杆(1)两侧至少各布置1根横向钢筋(19),并预留与焊点锚杆(1)的连接孔,混凝土挡板(2)预留成排成裂的排水孔(20)。
10.如权利要求8所述的加固斜坡一侧高填方体的方法,其特征在于:步骤b包括如下分步骤:
b1. 在填方段斜坡上布设并钻锚杆孔;
b2. 在锚杆(1)埋入填方体(4)内的部分预焊接短杆(10),并将杆体(11)和焊接短杆(10)涂抹防腐层(16);
b3. 将预制好的锚杆(1)插入锚杆钻孔,并在锚固段灌注砂浆(12)固定,同时将其穿过混凝土挡板(2)上预留孔,浇注锚头(9)使其与混凝土挡板(2)连接;
b4. 待灌注砂浆(12)和浇注锚头(9)凝固稳定后,分层按实际层厚填入填方体(4)并按设计要求压实。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110215014 CN102352632B (zh) | 2011-07-29 | 2011-07-29 | 一种锚杆板桩组合结构及其加固斜坡一侧高填方体的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110215014 CN102352632B (zh) | 2011-07-29 | 2011-07-29 | 一种锚杆板桩组合结构及其加固斜坡一侧高填方体的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102352632A true CN102352632A (zh) | 2012-02-15 |
CN102352632B CN102352632B (zh) | 2013-09-18 |
Family
ID=45576263
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110215014 Expired - Fee Related CN102352632B (zh) | 2011-07-29 | 2011-07-29 | 一种锚杆板桩组合结构及其加固斜坡一侧高填方体的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102352632B (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102839686A (zh) * | 2012-09-26 | 2012-12-26 | 中铁二院工程集团有限责任公司 | 稳定板式锚固桩支挡结构 |
CN104452784A (zh) * | 2014-12-12 | 2015-03-25 | 山东大学 | 一种用于边坡加固的复合锚杆桩及其施工工艺 |
CN104895008A (zh) * | 2015-06-09 | 2015-09-09 | 杭州江润科技有限公司 | 环境友好型生态带肋壁板式挡墙护岸的施工方法 |
CN105821730A (zh) * | 2016-05-12 | 2016-08-03 | 大连交通大学 | 应用于场地快速加宽的临时支护结构及其施工方法 |
CN107059897A (zh) * | 2017-06-22 | 2017-08-18 | 谢金钊 | 防塌方的护坡加固构件及护坡结构 |
CN107447776A (zh) * | 2017-05-11 | 2017-12-08 | 吴震 | 锚拉式垂直挡土墙结构及施工方法 |
CN109371987A (zh) * | 2018-10-17 | 2019-02-22 | 中建六局安装工程有限公司 | 一种回填土层中预应力锚索抗滑桩支护综合施工方法 |
CN110055982A (zh) * | 2019-04-24 | 2019-07-26 | 兰州理工大学 | 一种新型锚托框格微型钢管桩支护体系 |
CN110258628A (zh) * | 2019-07-18 | 2019-09-20 | 中国电建集团成都勘测设计研究院有限公司 | 锚拉路肩挡土墙 |
CN110593326A (zh) * | 2019-10-11 | 2019-12-20 | 西南交通大学 | 一种盆地丘陵陡坡地带高层建筑综合抗震结构 |
CN110674553A (zh) * | 2019-09-30 | 2020-01-10 | 河南大学 | 一种预应力锚索埋入式桩计算方法 |
CN111235991A (zh) * | 2020-03-09 | 2020-06-05 | 中铁二院工程集团有限责任公司 | 一种岩质陡坡道路结构及构筑方法 |
CN111764943A (zh) * | 2020-07-08 | 2020-10-13 | 中国电建集团昆明勘测设计研究院有限公司 | 一种可排水自钻式分级让压锚杆及其支护方法 |
CN111794102A (zh) * | 2020-07-17 | 2020-10-20 | 中铁大桥勘测设计院集团有限公司 | 一种板桩式锚碇结构及其施工方法 |
CN113308954A (zh) * | 2021-05-17 | 2021-08-27 | 浙大城市学院 | 锚杆泡沫混凝土拼宽路基的施工方法 |
CN114592516A (zh) * | 2022-03-31 | 2022-06-07 | 叶晓明 | 一种球形旋转锚具及挡墙锚固结构 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100742335B1 (ko) * | 2006-09-21 | 2007-07-24 | 김숙희 | 절토부의 자연석을 이용한 조경물 및 그 시공방법 |
JP2007291707A (ja) * | 2006-04-25 | 2007-11-08 | Nishi Nippon Spc Kk | 盛土構造物およびその構築方法 |
CN201125354Y (zh) * | 2007-11-23 | 2008-10-01 | 中铁二院工程集团有限责任公司 | 陡坡路基支挡加固结构 |
CN101838998A (zh) * | 2010-04-27 | 2010-09-22 | 中国科学院武汉岩土力学研究所 | 沿河路肩预应力锚索桩板墙及其施工方法 |
-
2011
- 2011-07-29 CN CN 201110215014 patent/CN102352632B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007291707A (ja) * | 2006-04-25 | 2007-11-08 | Nishi Nippon Spc Kk | 盛土構造物およびその構築方法 |
KR100742335B1 (ko) * | 2006-09-21 | 2007-07-24 | 김숙희 | 절토부의 자연석을 이용한 조경물 및 그 시공방법 |
CN201125354Y (zh) * | 2007-11-23 | 2008-10-01 | 中铁二院工程集团有限责任公司 | 陡坡路基支挡加固结构 |
CN101838998A (zh) * | 2010-04-27 | 2010-09-22 | 中国科学院武汉岩土力学研究所 | 沿河路肩预应力锚索桩板墙及其施工方法 |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102839686A (zh) * | 2012-09-26 | 2012-12-26 | 中铁二院工程集团有限责任公司 | 稳定板式锚固桩支挡结构 |
CN104452784A (zh) * | 2014-12-12 | 2015-03-25 | 山东大学 | 一种用于边坡加固的复合锚杆桩及其施工工艺 |
CN104452784B (zh) * | 2014-12-12 | 2017-01-18 | 山东大学 | 一种用于边坡加固的复合锚杆桩及其施工工艺 |
CN104895008A (zh) * | 2015-06-09 | 2015-09-09 | 杭州江润科技有限公司 | 环境友好型生态带肋壁板式挡墙护岸的施工方法 |
CN104895008B (zh) * | 2015-06-09 | 2016-11-09 | 杭州江润科技有限公司 | 环境友好型生态带肋壁板式挡墙护岸的施工方法 |
CN105821730A (zh) * | 2016-05-12 | 2016-08-03 | 大连交通大学 | 应用于场地快速加宽的临时支护结构及其施工方法 |
CN107447776A (zh) * | 2017-05-11 | 2017-12-08 | 吴震 | 锚拉式垂直挡土墙结构及施工方法 |
CN107059897A (zh) * | 2017-06-22 | 2017-08-18 | 谢金钊 | 防塌方的护坡加固构件及护坡结构 |
CN109371987A (zh) * | 2018-10-17 | 2019-02-22 | 中建六局安装工程有限公司 | 一种回填土层中预应力锚索抗滑桩支护综合施工方法 |
CN110055982A (zh) * | 2019-04-24 | 2019-07-26 | 兰州理工大学 | 一种新型锚托框格微型钢管桩支护体系 |
CN110258628A (zh) * | 2019-07-18 | 2019-09-20 | 中国电建集团成都勘测设计研究院有限公司 | 锚拉路肩挡土墙 |
CN110674553A (zh) * | 2019-09-30 | 2020-01-10 | 河南大学 | 一种预应力锚索埋入式桩计算方法 |
CN110674553B (zh) * | 2019-09-30 | 2021-07-02 | 河南大学 | 一种预应力锚索埋入式桩计算方法 |
CN110593326A (zh) * | 2019-10-11 | 2019-12-20 | 西南交通大学 | 一种盆地丘陵陡坡地带高层建筑综合抗震结构 |
CN111235991A (zh) * | 2020-03-09 | 2020-06-05 | 中铁二院工程集团有限责任公司 | 一种岩质陡坡道路结构及构筑方法 |
CN111764943A (zh) * | 2020-07-08 | 2020-10-13 | 中国电建集团昆明勘测设计研究院有限公司 | 一种可排水自钻式分级让压锚杆及其支护方法 |
CN111764943B (zh) * | 2020-07-08 | 2022-06-24 | 中国电建集团昆明勘测设计研究院有限公司 | 一种可排水自钻式分级让压锚杆及其支护方法 |
CN111794102A (zh) * | 2020-07-17 | 2020-10-20 | 中铁大桥勘测设计院集团有限公司 | 一种板桩式锚碇结构及其施工方法 |
CN111794102B (zh) * | 2020-07-17 | 2021-08-10 | 中铁大桥勘测设计院集团有限公司 | 一种板桩式锚碇结构及其施工方法 |
CN113308954A (zh) * | 2021-05-17 | 2021-08-27 | 浙大城市学院 | 锚杆泡沫混凝土拼宽路基的施工方法 |
CN114592516A (zh) * | 2022-03-31 | 2022-06-07 | 叶晓明 | 一种球形旋转锚具及挡墙锚固结构 |
Also Published As
Publication number | Publication date |
---|---|
CN102352632B (zh) | 2013-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102352632B (zh) | 一种锚杆板桩组合结构及其加固斜坡一侧高填方体的方法 | |
CN102828518B (zh) | 一种人工挖孔支护桩预应力锚索锚固构造的施工方法 | |
CN201722704U (zh) | 一种预应力悬臂对拉式置筋挡墙 | |
CN201148621Y (zh) | 微型抗滑桩组合结构 | |
CN101215815B (zh) | 适于陡峻山区的整体式悬挑结构复合道路的修筑方法 | |
CN107100180A (zh) | 超高轻型支挡结构及治理高填方、高边坡工程的方法 | |
CN104652475B (zh) | 一种桁架式挡土墙 | |
CN109371989B (zh) | 一种适用于边坡稳定支护的组合式支挡结构及其施工方法 | |
CN109403371A (zh) | 一种陡坡路堤支挡结构及施工方法 | |
CN101220597A (zh) | 微型桩抗滑组合结构及其边坡加固方法 | |
CN101899839A (zh) | 一种预应力悬臂对拉式置筋挡墙 | |
CN104631440B (zh) | 一种既有大直径灌注桩劲芯增长基坑支护结构及施工方法 | |
CN104532868A (zh) | 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法 | |
CN107700366A (zh) | 深水高墩大跨度桥梁施工用坚石裸岩河床栈桥及施工方法 | |
CN209368867U (zh) | 一种陡坡路堤支挡结构 | |
CN206844132U (zh) | 超高轻型支挡结构 | |
CN111894026B (zh) | 一种隧洞式桩基承台组合锚碇结构的施工方法 | |
CN110805049B (zh) | 一种山体边坡超厚度喷锚永久支护结构的施工方法 | |
CN113430870A (zh) | 绿色加固处理新建铁路岩溶地基的路基结构及其施工方法 | |
CN113389220A (zh) | 岩质边坡非开挖路肩挡土墙及其施工方法 | |
CN211285725U (zh) | 一种盆地丘陵陡坡地带高层建筑综合抗震结构 | |
CN210104765U (zh) | 一种软弱地质边坡的高大支挡结构 | |
CN117646437A (zh) | 边坡与基坑双排桩支护结构以及施工方法 | |
CN202131610U (zh) | 适用于岩石地基上的预应力锚索扶壁式挡墙 | |
CN206337566U (zh) | 基坑竖向预应力锚杆支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130918 Termination date: 20150729 |
|
EXPY | Termination of patent right or utility model |