CN109947024A - A kind of rail traffic data monitoring method based on mobile terminal - Google Patents
A kind of rail traffic data monitoring method based on mobile terminal Download PDFInfo
- Publication number
- CN109947024A CN109947024A CN201910248965.5A CN201910248965A CN109947024A CN 109947024 A CN109947024 A CN 109947024A CN 201910248965 A CN201910248965 A CN 201910248965A CN 109947024 A CN109947024 A CN 109947024A
- Authority
- CN
- China
- Prior art keywords
- data
- monitoring
- measuring point
- datum mark
- treated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Alarm Systems (AREA)
Abstract
The embodiment of the present invention provides a kind of rail traffic data monitoring method based on mobile terminal, which comprises receives the collected data of electronic monitoring equipment;Handle the collected data, storage treated data;Treated the data are uploaded to management system for monitoring.This method provides a set of collection urban rail transit construction field monitoring data monitoring methods, make the work of city track traffic engineering monitoring data can informationization, networking, generalization, ensure the timeliness of data acquisition, reduces the human error in monitoring, improve the confidence level of data.
Description
Technical field
The present invention relates to cloud computer fields, provide a kind of rail traffic data monitoring method based on mobile terminal.
Background technique
With the development of modern science and technology, Chinese city rail traffic development is swift and violent, urban track traffic is the public friendship in city
Logical backbone has the characteristics that energy conservation, province ground, freight volume big, round-the-clock, pollution-free (or of low pollution) are again safe, belongs to environmentally protective
Railway and highway system is particularly adapted to big and medium-sized cities.And monitoring measurement is one of key in city track traffic engineering work progress
Process, it plays a part of guiding construction, safety evaluation, amendment design and data accumulation, is praised through the overall process with construction
It is to guarantee the highly important behave of construction safety for " eyes " of construction.
The characteristics of railway traffic engineering itself, determines that it is a huge comprehensive complication system, to guarantee that track is handed over
The safety of logical engineering itself and surrounding enviroment, monitoring measurement have played positive effect, acquired, transmission, handled by data,
Analysis and feedback, timely guiding construction ensure that the smooth implementation of engineering.
It is directed to the existing a variety of monitoring systems of Source of Railway Communication and Signalling equipment, the vehicle computing including high-speed rail signal monitoring at present
Machine (ATP), railway wireless network (GMS-R), radio block center (RBC), temporary speed limitation (TSRS) and existing signal monitoring
(CSM): interlocking (CBI), dispatching concentration (CTC) and train control center (TCC) and other basis signals, including track switch, track electricity
Road, semaphore and power supply panel etc., other than these equipment monitoring systems, AT STATION, electricity business section, urban rail cluster and urban rail
Wire center also all deploys CMS system, for managing the monitoring data and warning information of various equipment concentratedly, and according to these
Information notifies relevant staff to repair maintenance.
In the prior art, the common monitoring means of China's underground engineering industry is used still based on personal monitoring
Monitoring method it is more mature, but there is also complicated for operation, intelligence degree is not high, data acquisition and processing heavy workload, easily
Appearance is slipped and is difficult in place of the deficiencies of managing.There is monitoring entirety and manage unsound, monitoring number in monitoring measurement from management
The problems such as single, retrieval is complicated according to management;From achievement, there are monitoring low efficiency, data report timeliness poor, data
The problems such as real reliability is poor.
Based on this, it would be highly desirable to develop it is a set of collection data acquisition, transmission, processing, analysis, warning function one software systems and
Handheld device solves some drawbacks of traditional monitoring conscientiously, make the work of city track traffic engineering monitoring data can it is information-based,
Networking, generalization, it is ensured that the timeliness of data acquisition reduces the human error in monitoring, improves the confidence level of data,
Risk present in construction to city track traffic engineering issues early warning in advance, meets Urban Rail Transit Project safety
The actual needs of risk management.
Summary of the invention
In view of this, the embodiment of the present invention provides a kind of rail traffic data monitoring method based on mobile terminal, the party
Method makes the work of city track traffic engineering monitoring data can informationization, networking, generalization, it is ensured that the timeliness that data acquire
Property, the human error in monitoring is reduced, the confidence level of data is improved.
The embodiment of the present invention provides a kind of rail traffic data monitoring method based on mobile terminal, comprising:
Receive the collected data of electronic monitoring equipment;
Handle the collected data, storage treated data;
Treated the data are uploaded to management system for monitoring.
In the embodiment of the present application, by receiving the collected data of electronic monitoring equipment;The collected data are handled,
Storage treated data;Data that treated described in uploading are merged each node by system to management system for monitoring,
All monitoring informations are handled and are uploaded immediately, and automatic trigger early warning, automatically generate achievement Report, using burse mode, starting
All postposition nodes trigger immediately after monitoring program, have greatly reduced the period of process, improve information flow efficiency, are conducive to
Specific aim measure is taken in time in scene, enhances security management and control effect.
Further, the collected data of electronic monitoring equipment are received, comprising:
According to the basic information of the datum mark and measuring point downloaded from server, observation acquisition in real time comes from electronic monitoring equipment
Rail traffic data.
The basic information of datum mark and measuring point that above-mentioned basis is downloaded from server, in real time observation acquisition come from electronic monitoring
The rail traffic data of equipment are arranged work on the spot program according to measuring and monitoring code requirement, ensure live number
According to the normalization of collection process.
Further, the basic information of the datum mark and measuring point downloaded from server, in real time observation acquisition are supervised from electronics
The rail traffic data of measurement equipment, comprising:
Datum mark and measuring point preset measurement pattern are set in the measurement of the level, limit datum mark and measuring point in monitoring
Parameter presets measurement route;
Rail traffic data of the observation acquisition in real time from electronic monitoring equipment.
Above by datum mark and the preset measurement pattern of measuring point are arranged in the measurement of the level, datum mark in monitoring is limited
With the parameter of measuring point, measurement route is preset, has ensured the normalization of on-site data gathering process.
Further, according to the basic information of the datum mark and measuring point downloaded from server, observation acquisition in real time is from electricity
The rail traffic data of sub- monitoring device, further includes:
Downloading monitoring route, monitoring sequence, personnel's authority information, in real time observation acquisition come from electronic monitoring from server
The rail traffic data of equipment.
By downloading monitoring route, monitoring sequence, personnel's authority information from server, guarantee the legal of data source
Property.
Further, the collected data of electronic monitoring equipment are received, comprising:
Using wireless communication connection electronic monitoring equipment and mobile terminal, reception is collected in real time to be set from electronic monitoring
Standby rail traffic data.
It is above-mentioned using wireless communication connection electronic monitoring equipment and mobile terminal so that mobile terminal collect in real time it is all
Data derive from electronic monitoring equipment, it is ensured that the reliability of collected data.
Further, the collected data are handled, storage treated data, comprising:
The collected data are calculated, adjustment;Storage treated data.
Above by the collected data calculating, adjustment processing, it is right at the first time to be conducive to field monitoring personnel
Rail traffic information is determined.
Further, treated the data are uploaded to management system for monitoring, comprising:
Mobile terminal is according to the datum mark downloaded from server and the basic information of measuring point, the data that judge automatically that treated
It is whether qualified;
Qualified data after upload process are to management system for monitoring.
Treated whether data are qualified for above-mentioned judgement, to because monitoring instrument is abnormal, datum mark and measuring point selection mistake etc.
Think that reason is rejected, checking measurements can be carried out immediately, ensure that the reliability of rail traffic DATA REASONING.
Further, the collected data are handled, storage treated data, comprising:
The collected data are automatically processed, normal baseline point and measuring point and early warning datum mark and measuring point information are obtained,
Storage treated data;
The normal baseline point and measuring point and early warning datum mark and measuring point information subfield are shown.
It is shown above by by the normal baseline point and measuring point and early warning datum mark and measuring point information subfield, to facilitate pair
Rail traffic performance data carries out secondary analysis and application.
Further, treated the data are uploaded to management system for monitoring, comprising:
Data that treated described in uploading are handled to management system for monitoring by management system for monitoring;
In-time generatin achievement Report, according to the early warning immediately of preset pre-alarm rule, immediately send achievement to the side of taking part in building.
It is above-mentioned to use instant uploading system, in-time generatin achievement Report, according to the early warning immediately of preset pre-alarm rule, i.e.
When send achievement to the side of taking part in building, data can be uploaded immediately, feed back to the respectively side of taking part in building, greatly improve monitoring information feedback and
Shi Xing.
Further, in-time generatin achievement Report, comprising:
To the data for being successfully uploaded to management system for monitoring;
Achievement Report is automatically generated by observation system, and is pushed to user in real time.
Above by data are transferred to monitoring management data system by treated, achievement report is generated by observation acquisition system
It accuses, and pushes in real time, favorably take specific aim measure in time on site, enhance security management and control effect.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of rail traffic data monitoring method process signal based on mobile terminal provided in an embodiment of the present invention
Figure;
Fig. 2 is a kind of rail traffic data flow diagram based on mobile terminal provided in an embodiment of the present invention;
Fig. 3 is that a kind of rail traffic performance data based on mobile terminal provided in an embodiment of the present invention shows schematic diagram;
Fig. 4 is a kind of rail traffic data monitoring structural schematic diagram based on mobile terminal provided in an embodiment of the present invention;
Fig. 5 is that a kind of rail traffic data monitoring acquisition method based on mobile terminal provided in an embodiment of the present invention is specific
Operational flowchart.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
The term used in embodiments of the present invention is only to be not intended to be limiting merely for for the purpose of describing particular embodiments
The present invention.In the embodiment of the present invention and the "an" of singular used in the attached claims, " described " and "the"
It is also intended to including most forms, unless the context clearly indicates other meaning, " a variety of " generally comprise at least two, but not
It excludes to include at least one situation.
It should be appreciated that term "and/or" used herein is only a kind of incidence relation for describing affiliated partner, indicate
There may be three kinds of relationships, for example, A and/or B, can indicate: individualism A, exist simultaneously A and B, individualism B these three
Situation.In addition, character "/" herein, typicallys represent the relationship that forward-backward correlation object is a kind of "or".
Depending on context, word as used in this " if ", " if " can be construed to " ... when " or
" when ... " or " in response to determination " or " in response to detection ".Similarly, context is depended on, phrase " if it is determined that " or " such as
Fruit detection (condition or event of statement) " can be construed to " when determining " or " in response to determination " or " when detection (statement
Condition or event) when " or " in response to detection (condition or event of statement) ".
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability
Include, so that commodity or system including a series of elements not only include those elements, but also including not clear
The other element listed, or further include for this commodity or the intrinsic element of system.In the feelings not limited more
Under condition, the element that is limited by sentence "including a ...", it is not excluded that in the commodity or system for including the element also
There are other identical elements.
In addition, the step timing in following each method embodiments is only a kind of citing, rather than considered critical.
Referring to Fig. 1, the embodiment of the present invention provides a kind of rail traffic data monitoring method based on mobile terminal, comprising:
S101: the collected data of electronic monitoring equipment are received;
S103: the processing collected data, storage treated data;
S105: data that treated described in uploading to management system for monitoring.
In the embodiment of the present application, by receiving the collected data of electronic monitoring equipment;The collected data are handled,
Storage treated data;Data that treated described in uploading are to management system for monitoring, so that city track traffic engineering monitors
Datamation can informationization, networking, generalization, it is ensured that the timeliness of data acquisition reduces the artificial mistake in monitoring
Difference improves the confidence level of data.
Referring to fig. 2, it is described below and specifically operates, specifically:
Step 1: according to the basic information of datum mark and measuring point, by electronic monitoring equipment to rail traffic field data
It is acquired in real time.
Step 2: electronic monitoring equipment and mobile terminal are connected by wireless communication, electronic monitoring equipment is acquired in real time
Mobile terminal is uploaded to data, mobile terminal carries out preliminary instant computing and preliminary instant check to data.
Step 3: mobile terminal is judged automatically and is adopted according to the information for the datum mark and measuring point downloaded and stored from server
Whether the data collected are qualified, by the collected data by mobile terminal preliminary treatment and collect initial data and upload to
Management system for monitoring.
Step 4: after qualified data upload immediately, in-time generatin achievement Report, instant early warning send achievement to ginseng immediately
The side of building.
Step 5: the application apparatus connecting with Cloud Server after receiving instant early warning information, makes corresponding rear place
Reason.
In the embodiment of the present application, the collected data of electronic monitoring equipment are received, comprising:
According to the basic information of the datum mark and measuring point downloaded from server, observation acquisition in real time comes from electronic monitoring equipment
Rail traffic data.
The basic information of datum mark and measuring point that above-mentioned basis is downloaded from server, standardized process of measurement built in system
In mobile terminal, wherein process of measurement, such as: it can be datum mark, be also possible to the selection of adjustment mode, can also observe
Mode of route etc., it is not limited to this, specifically can according to the actual situation depending on.Measurement process is judged automatically according to process of measurement
Whether the regulation of related specifications is met, and whether measurement result meets the requirement of specification.The introducing of at-once monitor uploading system, will be big
It measures the element tasks such as simple duplicate benchmark point height typing, the typing of measuring point point number, achievement calculating, early warning judgement and is changed into equipment
It completes, the performance that advantage of the machine language in terms of achievement calculating obtains, quality of achievement significantly improves.
In the embodiment of the present application, the basic information of the datum mark and measuring point downloaded from server, in real time observation acquisition is come from
The rail traffic data of electronic monitoring equipment, including;
Datum mark and measuring point preset measurement pattern are set in the measurement of the level, limit datum mark and measuring point in monitoring
Parameter presets measurement route;
Rail traffic data of the observation acquisition in real time from electronic monitoring equipment.
In the embodiment of the present application, the above-mentioned described measurement of the level is a kind of monitoring means.Monitoring means is divided into personal monitoring
And automatic monitoring.There are commonly: levelling monitorings, geometrical plane measurement monitoring, test for artificial detection technological means
Measurement, and automated monitoring technology it is common there are mainly two types of: the first, static level, beam type based on test equipment
Dipmeter set up automatic monitoring system, based on static level, extensometer automatic monitoring system mainly by static level
Instrument, displacement flowmeter sensor, DAU data acquisition unit module, computer, data capture management software systems composition, static level
The sensors such as instrument, extensometer are mainly used in the vertical deformation prison of structure of the subway, roadbed, bridge based on capacitance type sensor
It surveys, the opposite variation observation of structure of the subway seam and track equipment;Second, the automatic monitoring system set up based on robot measurement
System.In the application monitoring means specifically can according to the actual situation depending on.
In the embodiment of the present application, datum mark and the preset measurement pattern of measuring point, measurement pattern are set in the above-mentioned measurement of the level
Such as can be " BFFB ", it is also possible to " FBBF " etc., depending on actual conditions, does not constitute the restriction of the application.
In the embodiment of the present application, according to the basic information of the datum mark and measuring point downloaded from server, in real time observation acquisition
Rail traffic data from electronic monitoring equipment, further includes:
Downloading monitoring route, monitoring sequence, personnel's authority information, in real time observation acquisition come from electronic monitoring from server
The rail traffic data of equipment.
By Monitoring Data Management System, all basic informations needed for monitoring process are set to cloud server, and complete
At the information setting such as monitoring route, monitoring sequence, personnel's permission, the examination & approval management of equipment permission identifies front end applications device systems
Unique physical location information, equipment and cloud server are bound, realize work point permission, the basic informations such as monitoring project
Imparting, control data source, while realizing the traceable of data;All monitoring primary datas are automatic from monitoring instrument
It reads, and has carried out ciphertext processing, prevent human intervention, establish that data source is unique, can not distort, effectively improve information
Reliability.Here basic information is not limited to monitoring route, monitoring sequence, personnel's permission etc., specifically can be according to practical feelings
Depending on condition.
In the embodiment of the present application, the collected data of electronic monitoring equipment are received, comprising:
Using wireless communication connection electronic monitoring equipment and mobile terminal, reception is collected in real time to be set from electronic monitoring
Standby rail traffic data.
In the embodiment of the present application, using wireless communication connection electronic monitoring equipment and mobile terminal, wireless communication is to utilize
The characteristic that electromagnetic wave signal can be propagated in free space carries out a kind of communication mode of information exchange.Such as it can be indigo plant
Tooth is also possible to mobile 2G network, mobile 3G network, can also be wireless Wi-Fi.
In the embodiment of the present application, the collected data are handled, storage treated data, comprising:
The collected data are calculated, adjustment;Storage treated data.
In the embodiment of the present application, mobile terminal calculates collected data, adjustment processing, to because monitoring instrument is abnormal,
Measuring point selection mistake etc. thinks that reason is rejected, and can carry out checking measurements immediately.Certainly, processing here is not limited to carry out
Calculate, adjustment, specific processing mode can according to the actual situation depending on, do not constitute the restriction of the application.
In the embodiment of the present application, data that treated described in upload to management system for monitoring, comprising:
Mobile terminal is according to the datum mark downloaded from server and the basic information of measuring point, the data that judge automatically that treated
It is whether qualified;
Qualified data after upload process are to management system for monitoring.
Referring to Fig. 3, in the embodiment of the present application, data are acquired by electronic monitoring equipment, collected data are transferred to shifting
Dynamic terminal, mobile terminal upload to Monitoring Data Management System by cloud, wherein the basic information of the datum mark and measuring point
It refers to: before track datum mark and measuring point are embedded, it is necessary first to utilize route design parameter, track plates design parameter and track
The design mileage of datum mark calculates straightway, circular curve segment and the design coordinate for mitigating curved section upper rail datum mark.When calculating
It is considered as circular curve segment and mitigates influence of the route superelevation of curved section to track datum mark design position, to guarantee subsequent rail
The smooth development of datum mark setting-out and measurement work.The coordinate of track datum mark and measuring point is calculated using fabric swatch software.Here, it applies
Work fabric swatch software major function is meter setting-out coordinate, the inspection of GRP measurement data adjustment and various measurement results.
In the embodiment of the present application, the collected data are handled, storage treated data, comprising:
The collected data are automatically processed, normal baseline point and measuring point and early warning datum mark and measuring point information are obtained,
Storage treated data;
The normal baseline point and measuring point and early warning datum mark and measuring point information subfield are shown.
Referring to fig. 4, left figure is that performance data classification shows that situation, right figure are that one key of performance data uploads situation in Fig. 4, on
It states and automatically processes the collected data, classification storage, safe condition judgement, early warning, feedback and post-processing are carried out to data
Etc. treatment process, subfield show the accumulative deformation of application apparatus, this deformation, rate of deformation etc., certainly, subfield is shown
Content be not limited thereto, depending on actual conditions.
In the embodiment of the present application, data that treated described in upload to management system for monitoring, comprising:
Data that treated described in uploading are handled to management system for monitoring by management system for monitoring;
In-time generatin achievement Report, according to the early warning immediately of preset pre-alarm rule, immediately send achievement to the side of taking part in building.
Medium of the above-mentioned Monitoring Data Management System as all monitoring data classification storages of the whole network, while bearing monitoring letter
It ceases instant early warning, warning information and the functions such as pushes immediately.
In the embodiment of the present application, in-time generatin achievement Report, comprising:
To the data for being successfully uploaded to management system for monitoring;
Achievement Report is automatically generated by observation system, and is pushed to user in real time.
The above-mentioned information for being successfully uploaded to Monitoring Data Management System, automatically generates achievement report by observation acquisition system
It accuses, and is pushed to onsite user's mailbox immediately, to facilitate field layer to carry out secondary analysis and application to performance data.
Referring to Fig. 5, a specific embodiment is set forth below and is described in more detail.
Step 1: the basic information of setting datum mark and measuring point presets measurement route.Datum mark and measuring point is arranged in server
Basic information specifically: according to measure and monitoring code requirement work on the spot program is arranged, will be in the measurement of the level
" BFFB " or " FBBF " measurement pattern is pre-seted, parameter is checked away from monitorings such as, mis-tie misclosures to front-and rear-view and is defined;
Step 2: the basic information of downloading datum mark and measuring point.Mobile terminal downloads the benchmark set from server
The basic information of point and measuring point, is stored in mobile terminal;
Step 3: connection, real-time Transmission monitoring data are established.Mobile terminal is established using bluetooth and electronic monitoring equipment connects
It connects, by electronic monitoring equipment, collected data are transferred to mobile terminal in real time, and mobile terminal completes acquisition datamation;
Step 4: initial data, performance data are uploaded.It uploads by the collected initial data of electronic monitoring equipment, and
It is calculated by mobile terminal, the performance data after adjustment processing to management system for monitoring;
Step 5: network address is arranged according to server address and downloads initial data and performance data from mobile terminal;Into
The processing such as row classification storage, safe condition judgement.
Step 6: application apparatus is connect with management system for monitoring by wireless communication, is analyzed and is tied according to management system for monitoring
Fruit starts application apparatus pre-alarming device.
In conclusion by receiving the collected data of electronic monitoring equipment;The collected data are handled, at storage
Data after reason;Data that treated described in uploading are merged each node by system, Suo Youjian to management system for monitoring
Measurement information is handled and is uploaded immediately, and automatic trigger early warning, automatically generates achievement Report, using burse mode, starting monitoring journey
All postposition nodes trigger immediately after sequence, have greatly reduced the period of process, improve information flow efficiency, favorably on site and
When take specific aim measure, enhance security management and control effect;Further, according to the base of the datum mark and measuring point downloaded from server
Plinth information, rail traffic data of the observation acquisition in real time from electronic monitoring equipment, according to measurement and monitoring code requirement to existing
Field working procedure is arranged, and ensures the normalization of on-site data gathering process;Further, by the way that base is arranged in the measurement of the level
On schedule with the preset measurement pattern of measuring point, the parameter of datum mark and measuring point in monitoring is limited, measurement route is preset, ensures
The normalization of on-site data gathering process;Further, by downloading monitoring route, monitoring sequence, personnel's permission from server
Information guarantees the legitimacy of data source;Further, electronic monitoring equipment and mobile terminal are connected by using wireless communication,
So that mobile terminal collects all data in real time and derives from electronic monitoring equipment, it is ensured that collected data it is reliable
Property;Further, by judgement, treated whether data are qualified, to because monitoring instrument is abnormal, datum mark and measuring point select mistake
Etc. thinking that reason is rejected, checking measurements can be carried out immediately, ensure that the reliability of rail traffic DATA REASONING;Further,
By showing the normal baseline point and measuring point and early warning datum mark and measuring point information subfield, to facilitate to rail traffic achievement
Data carry out secondary analysis and application;Further, by the way that by treated, data are transferred to monitoring management data system, by observing
Acquisition system generates achievement Report, and pushes in real time, favorably takes specific aim measure in time on site, enhances security management and control effect
Fruit.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (10)
1. a kind of rail traffic data monitoring method based on mobile terminal, which is characterized in that the described method includes:
Receive the collected data of electronic monitoring equipment;
Handle the collected data, storage treated data;
Treated the data are uploaded to management system for monitoring.
2. the method according to claim 1, wherein the collected data of the reception electronic monitoring equipment, packet
It includes:
According to the basic information of the datum mark and measuring point downloaded from server, rail of the observation acquisition in real time from electronic monitoring equipment
Road traffic data.
3. according to the method described in claim 2, it is characterized in that, the basis of the datum mark downloaded from server and measuring point
Information, rail traffic data of the observation acquisition in real time from electronic monitoring equipment, including;
Datum mark and measuring point preset measurement pattern are set in the measurement of the level, limit the ginseng of datum mark and measuring point in monitoring
Number presets measurement route;
Rail traffic data of the observation acquisition in real time from electronic monitoring equipment.
4. according to the method described in claim 2, it is characterized in that, datum mark that the basis is downloaded from server and measuring point
Basic information, rail traffic data of the observation acquisition in real time from electronic monitoring equipment, further includes:
Downloading monitoring route, monitoring sequence, personnel's authority information, in real time observation acquisition come from electronic monitoring equipment from server
Rail traffic data.
5. the method according to claim 1, wherein the collected data of the reception electronic monitoring equipment, packet
It includes:
Using wireless communication connection electronic monitoring equipment and mobile terminal, receive collected in real time from electronic monitoring equipment
Rail traffic data.
6. the method according to claim 1, wherein described handle the collected data, after storage processing
Data, comprising:
The collected data are calculated, adjustment;Storage treated data.
7. the method according to claim 1, wherein treated described in upload data are to monitoring management system
System, comprising:
Mobile terminal is according to the datum mark downloaded from server and the basic information of measuring point, and whether the data that judge automatically that treated
It is qualified;
Qualified data after upload process are to management system for monitoring.
8. the method according to claim 1, wherein described handle the collected data, after storage processing
Data, comprising:
The collected data are automatically processed, normal baseline point and measuring point and early warning datum mark and measuring point information, storage are obtained
Data that treated;
The normal baseline point and measuring point and early warning datum mark and measuring point information subfield are shown.
9. according to the method described in claim 6, it is characterized in that, treated described in upload data are to monitoring management system
System, comprising:
Data that treated described in uploading are handled to management system for monitoring by management system for monitoring;
In-time generatin achievement Report, according to the early warning immediately of preset pre-alarm rule, immediately send achievement to the side of taking part in building.
10. according to the method described in claim 6, it is characterized in that, the in-time generatin achievement Report, comprising:
To the data for being successfully uploaded to management system for monitoring;
Achievement Report is automatically generated by observation system, and is pushed to user in real time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910248965.5A CN109947024A (en) | 2019-03-29 | 2019-03-29 | A kind of rail traffic data monitoring method based on mobile terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910248965.5A CN109947024A (en) | 2019-03-29 | 2019-03-29 | A kind of rail traffic data monitoring method based on mobile terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109947024A true CN109947024A (en) | 2019-06-28 |
Family
ID=67012953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910248965.5A Pending CN109947024A (en) | 2019-03-29 | 2019-03-29 | A kind of rail traffic data monitoring method based on mobile terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109947024A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110426977A (en) * | 2019-08-09 | 2019-11-08 | 中国科学院武汉岩土力学研究所 | A kind of engineering monitoring data-acquisition system and method |
CN112613834A (en) * | 2020-12-15 | 2021-04-06 | 北京高诚科技发展有限公司 | Method and system for automatically generating and reporting comprehensive traffic operation detection report |
CN113536194A (en) * | 2021-07-06 | 2021-10-22 | 河南省水利勘测设计研究有限公司 | Leveling data processing system and method in hydraulic engineering measurement |
CN113536559A (en) * | 2021-07-06 | 2021-10-22 | 河南省水利勘测设计研究有限公司 | Wire data processing system and method in hydraulic engineering measurement |
CN114758487A (en) * | 2022-03-30 | 2022-07-15 | 浙江华东工程数字技术有限公司 | Cloud processing, analysis and early warning system and method for leveling data |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201484439U (en) * | 2009-06-02 | 2010-05-26 | 唐德尧 | Rail transit vehicle walking part and steel rail failure vehicle-mounted online monitoring and diagnostic system |
CN204065794U (en) * | 2014-06-27 | 2014-12-31 | 深圳市通业科技发展有限公司 | Track traffic remote supervision system |
CN105783868A (en) * | 2016-05-18 | 2016-07-20 | 青岛理工大学 | Subway tunnel deformation online monitoring system and monitoring method |
CN107727070A (en) * | 2017-09-07 | 2018-02-23 | 北京市轨道交通建设管理有限公司 | Measurement of the level Real-time Data Processing Method and system |
CN109736895A (en) * | 2019-03-04 | 2019-05-10 | 中铁十六局集团有限公司 | A kind of tunnel deformation warning monitoring system |
CN109927763A (en) * | 2019-04-12 | 2019-06-25 | 杨馨 | Rail traffic wireless transmission signal intellectual monitoring and early warning system and its method |
-
2019
- 2019-03-29 CN CN201910248965.5A patent/CN109947024A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201484439U (en) * | 2009-06-02 | 2010-05-26 | 唐德尧 | Rail transit vehicle walking part and steel rail failure vehicle-mounted online monitoring and diagnostic system |
CN204065794U (en) * | 2014-06-27 | 2014-12-31 | 深圳市通业科技发展有限公司 | Track traffic remote supervision system |
CN105783868A (en) * | 2016-05-18 | 2016-07-20 | 青岛理工大学 | Subway tunnel deformation online monitoring system and monitoring method |
CN107727070A (en) * | 2017-09-07 | 2018-02-23 | 北京市轨道交通建设管理有限公司 | Measurement of the level Real-time Data Processing Method and system |
CN109736895A (en) * | 2019-03-04 | 2019-05-10 | 中铁十六局集团有限公司 | A kind of tunnel deformation warning monitoring system |
CN109927763A (en) * | 2019-04-12 | 2019-06-25 | 杨馨 | Rail traffic wireless transmission signal intellectual monitoring and early warning system and its method |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110426977A (en) * | 2019-08-09 | 2019-11-08 | 中国科学院武汉岩土力学研究所 | A kind of engineering monitoring data-acquisition system and method |
CN112613834A (en) * | 2020-12-15 | 2021-04-06 | 北京高诚科技发展有限公司 | Method and system for automatically generating and reporting comprehensive traffic operation detection report |
CN113536194A (en) * | 2021-07-06 | 2021-10-22 | 河南省水利勘测设计研究有限公司 | Leveling data processing system and method in hydraulic engineering measurement |
CN113536559A (en) * | 2021-07-06 | 2021-10-22 | 河南省水利勘测设计研究有限公司 | Wire data processing system and method in hydraulic engineering measurement |
CN114758487A (en) * | 2022-03-30 | 2022-07-15 | 浙江华东工程数字技术有限公司 | Cloud processing, analysis and early warning system and method for leveling data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109947024A (en) | A kind of rail traffic data monitoring method based on mobile terminal | |
CN102881162B (en) | Data processing and fusion method for large-scale traffic information | |
WO2016129715A1 (en) | Air quality prediction and management system for early detection of environmental disasters | |
CN110133669A (en) | A kind of three-dimensional laser foreign body intrusion monitoring method and system | |
CN102044127A (en) | Early warning service management system based on remote expert service | |
CN105574593A (en) | Track state static-state detection and control system and method based on cloud computing and big data | |
CN103729908A (en) | Intelligent inspection device of railway tunnel and application method thereof | |
CN105083331A (en) | Operation management system for locomotive running preparation | |
CN101393689A (en) | Road patrol management method and road patrol management system | |
CN104835102B (en) | Train speed measurement scheme evaluation method and device | |
CN108803312A (en) | A kind of new road damage detecting system | |
CN106855491A (en) | A kind of emission from vehicles detection judgement system based on intelligent lamp net | |
CN202124809U (en) | Track geometry detecting complete system device | |
CN109764795A (en) | High-speed railway track plate arch automatic monitoring system based on NB-iot | |
CN109142978A (en) | A kind of railway contact line operating status actively monitoring method | |
CN114062516B (en) | Tunnel-oriented ultrasonic detection system | |
CN116518945A (en) | Subway tunnel structure safety monitoring method based on measuring robot | |
CN109035837A (en) | A kind of intelligent transportation system test method based on unmanned plane | |
CN103498701A (en) | Intelligent safety tour inspection method | |
CN204244248U (en) | A kind of intelligent tower safety monitoring system | |
CN207380496U (en) | A kind of Long-Distance Monitoring System About for being adapted for contact with net detection tool car | |
CN104986188A (en) | Rail train positioning system and method | |
CN107783750A (en) | A kind of bridge method for information display, apparatus and system | |
CN109931862A (en) | A kind of rail traffic data monitoring acquisition method based on mobile terminal | |
CN117234156A (en) | Ore dressing plant inspection system and inspection method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190628 |
|
WD01 | Invention patent application deemed withdrawn after publication |