Nothing Special   »   [go: up one dir, main page]

CN107727070A - Measurement of the level Real-time Data Processing Method and system - Google Patents

Measurement of the level Real-time Data Processing Method and system Download PDF

Info

Publication number
CN107727070A
CN107727070A CN201710802136.8A CN201710802136A CN107727070A CN 107727070 A CN107727070 A CN 107727070A CN 201710802136 A CN201710802136 A CN 201710802136A CN 107727070 A CN107727070 A CN 107727070A
Authority
CN
China
Prior art keywords
test line
data
measuring point
current
current test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710802136.8A
Other languages
Chinese (zh)
Inventor
刘天正
赵智涛
李振东
王霆
黄齐武
叶新丰
杨爱超
张飞
贺文涛
通明
许亚斋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing MTR Construction Administration Corp
Original Assignee
Beijing MTR Construction Administration Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing MTR Construction Administration Corp filed Critical Beijing MTR Construction Administration Corp
Priority to CN201710802136.8A priority Critical patent/CN107727070A/en
Publication of CN107727070A publication Critical patent/CN107727070A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C9/00Measuring inclination, e.g. by clinometers, by levels
    • G01C9/02Details

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention relates to measurement of the level technical field, and in particular to measurement of the level Real-time Data Processing Method and system.Methods described includes:Real-time processing subsystem is provided with a mobile device;The processing subsystem in real time obtains the history measuring point data of current test line from system platform;Pairing is carried out by bluetooth with the measuring apparatus of current test line to be connected;The real-time measuring point data of current test line is obtained from the measuring apparatus of current line;According to the history measuring point data, data validation is carried out to the real-time measuring point data of current test line;Adjustment processing is carried out to the real-time measuring point data for checking the current test line after, obtains the adjustment processing result of current test line;The adjustment processing result of current test line is uploaded to the system platform.The present invention can handle the data that measurement apparatus obtains in real time, and can carry out adjustment processing automatically.

Description

Measurement of the level Real-time Data Processing Method and system
Technical field
The present invention relates to measurement of the level technical field, and in particular to measurement of the level Real-time Data Processing Method and system.
Background technology
It is that the original record for observing measuring instrument imports during the implementation measurement of the level of current engineering monitoring Computer, adjustment processing is then carried out on computers, draws measurement result.There is data handling procedure complexity for such mode Problem, it is not only error-prone, expends people and time again;And for measurement data, it is impossible to handled in real time, cause entirely to survey It is low to measure process efficiency.
The content of the invention
The technical problem to be solved in the present invention is, overcomes the shortcomings of existing technology, there is provided measurement of the level data are real-time Processing method and system, it can handle the data that measurement apparatus obtains in real time, and can carry out adjustment processing automatically.
To reach above-mentioned technical purpose, on the one hand, measurement of the level Real-time Data Processing Method of the present invention, including: Real-time processing subsystem is provided with a mobile device;
When test line needs to carry out the measurement of the level, the processing subsystem in real time carries out measurement of the level data processing:
The history measuring point data of current test line is obtained from system platform;
Pairing is carried out by bluetooth with the measuring apparatus of current test line to be connected;
The real-time measuring point data of current test line is obtained from the measuring apparatus of current line;
According to the history measuring point data, data validation is carried out to the real-time measuring point data of current test line;
Adjustment processing is carried out to the real-time measuring point data for checking the current test line after, obtains current test line Adjustment processing result;
The adjustment processing result of current test line is uploaded to the system platform.
On the other hand, measurement of the level generating date system of the present invention, including:Set in a mobile device Real-time processing subsystem;
The processing subsystem in real time includes:
Point template unit, for obtaining the history measuring point data of current test line from system platform;
Communication setting unit, it is connected for carrying out pairing with the measuring apparatus of current test line by bluetooth;
Route survey unit, for obtaining the real-time measuring point number of current test line from the measuring apparatus of current line According to;
Data processing unit, for according to the history measuring point data, entering to the real-time measuring point data of current test line Row data validation;And the real-time measuring point data to checking the current test line after carries out adjustment processing, obtain current The adjustment processing result of test line;
Data transmission unit, for the adjustment processing result of current test line to be uploaded into the system platform.
In the present invention, real-time processing subsystem is connected with measuring apparatus by bluetooth, pass through mobile device can Control measuring apparatus.The data of measuring apparatus can be uploaded to mobile device in real time, realize measurement data and handle in real time.In addition, By mobile device in real-time processing subsystem can measurement data is checked, adjustment processing.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the schematic flow sheet of the embodiment of the present invention;
Fig. 2 is the schematic flow sheet of another embodiment of the present invention;
Fig. 3 is the system structure diagram of the embodiment of the present invention;
Fig. 4 is the system structure diagram of another embodiment of the present invention;
Fig. 5 is the structural representation of midpoint of embodiment of the present invention modular unit;
Fig. 6 is the structural representation of another embodiment of the present invention midpoint modular unit;
Fig. 7 is the structural representation of route survey unit in the embodiment of the present invention;
Fig. 8 is the structural representation of data transmission unit in the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As shown in figure 1, the measurement of the level Real-time Data Processing Method described in the embodiment of the present invention, including:In mobile device In be provided with real-time processing subsystem;
When test line needs to carry out the measurement of the level, the processing subsystem in real time carries out measurement of the level data processing:
101st, the history measuring point data of current test line is obtained from system platform;
102nd, pairing is carried out with the measuring apparatus of current test line by bluetooth to be connected;
103rd, the real-time measuring point data of current test line is obtained from the measuring apparatus of current line;
104th, according to the history measuring point data, data validation is carried out to the real-time measuring point data of current test line;
105th, adjustment processing is carried out to the real-time measuring point data for checking the current test line after, be currently tested The adjustment processing result of circuit;
106th, the adjustment processing result of current test line is uploaded to the system platform.
As shown in Fig. 2 as another embodiment of the present invention, described measurement of the level Real-time Data Processing Method, including: Real-time processing subsystem is provided with mobile device;
When test line needs to carry out the measurement of the level, the processing subsystem in real time carries out measurement of the level data processing:
201st, newly-built current test line;
202nd, the Back ground Information of current test line is configured;
203rd, the history measuring point data of current test line is obtained from system platform;Specially:
Current test line all measuring points in the last time measurement of the level are downloaded after login system platform from system platform Data;
Current test line data of each measuring point in the last time measurement of the level include:Initial elevation, last time observation time, Last time observation height value, correction value, subsidence threshold, rate-valve value, measuring point type, whether preliminary survey, measuring point ID, affiliated work point ID and Affiliated circuit ID;
By the data of current test line all measuring points in the last time measurement of the level, added to this level of current line In measurement task;
According to the actual measured conditions of current test line, this test line is adjusted, including:
New measuring point is added in current test line afterbody, and the new measuring point is downloaded in affiliated quilt from system platform The data surveyed in the line last measurement of the level;
Or new measuring point is inserted behind the current measuring point of current test line, and institute is downloaded from system platform State data of the new measuring point in the affiliated test line last time measurement of the level;
Again or, the current measuring point of current test line is deleted, and delete this water that current measuring point is added to current line Data in locating tab assembly task.
204th, pairing is carried out with the measuring apparatus of current test line by bluetooth to be connected;
205th, the real-time measuring point data of current test line is obtained from the measuring apparatus of current line;Specially:
Survey station corresponding to all measuring points of the current test line in this measurement of the level is added successively;
A survey station is often added, including:
By the measuring apparatus of Bluetooth control current line, measuring point corresponding to current survey station is measured, obtained current The backsight measurement data of survey station;
Again by the measuring apparatus of Bluetooth control current line, measuring point corresponding to current survey station is measured, obtained The forward sight measurement data of current survey station;
The backsight measurement data and forward sight measurement data of current survey station are calculated and preserved, obtains current test line Accumulative sedimentation value and the rate of settling;
When accumulative sedimentation value or the rate of settling transfinite, alarm is carried out;
If desired new measuring point is added in current test line, or deletes the measuring point added, then in this level It is added in measurement task or deletion action.
206th, according to the history measuring point data, data validation is carried out to the real-time measuring point data of current test line;
207th, adjustment processing is carried out to the real-time measuring point data for checking the current test line after, be currently tested The adjustment processing result of circuit;
208th, the adjustment processing result of current test line is uploaded to the system platform;Specially:
It will be given birth to by the real-time measuring point data of the current test line checked and the adjustment processing result of current test line Into the results report of current test line;
Results report is encrypted;
Results report after encryption is uploaded to system platform server;
209th, subsidence curve is drawn according to the real-time measuring point data of current test line.
As shown in figure 3, the measurement of the level generating date system described in the embodiment of the present invention, including:It is arranged on movement Real-time processing subsystem in equipment;
The processing subsystem in real time includes:
Point template unit 11, for obtaining the history measuring point data of current test line from system platform;
Communication setting unit 12, it is connected for carrying out pairing with the measuring apparatus of current test line by bluetooth;
Route survey unit 13, for obtaining the real-time measuring point number of current test line from the measuring apparatus of current line According to;
Data processing unit 14, for according to the history measuring point data, to the real-time measuring point data of current test line Carry out data validation;And the real-time measuring point data to checking the current test line after carries out adjustment processing, worked as The adjustment processing result of preceding test line;
Data transmission unit 15, for the adjustment processing result of current test line to be uploaded into the system platform.
As shown in figure 4, as another embodiment of the present invention, described measurement of the level generating date system, including:If Put real-time processing subsystem in a mobile device;
The processing subsystem in real time includes:
Role management unit 21, for newly-built current test line;
Task dispensing unit 22, for configuring the Back ground Information of current test line;
Point template unit 11, for obtaining the history measuring point data of current test line from system platform;
Communication setting unit 12, it is connected for carrying out pairing with the measuring apparatus of current test line by bluetooth;
Route survey unit 13, for obtaining the real-time measuring point number of current test line from the measuring apparatus of current line According to;
Data processing unit 14, for according to the history measuring point data, to the real-time measuring point data of current test line Carry out data validation;And the real-time measuring point data to checking the current test line after carries out adjustment processing, worked as The adjustment processing result of preceding test line;
Data transmission unit 15, for the adjustment processing result of current test line to be uploaded into the system platform;
Drawing unit 23, subsidence curve is drawn according to the real-time measuring point data of current test line.
As shown in figure 5, the point template unit 11, including:
Download module 111, for downloading current test line in last time level from system platform after login system platform The data of all measuring points in measurement;Current test line data of each measuring point in the last time measurement of the level include:Initial elevation, Last time observation time, last time observation height value, correction value, subsidence threshold, rate-valve value, measuring point type, whether preliminary survey, measuring point ID, affiliated work point ID and affiliated circuit ID;
Add module 112, for by the data of current test line all measuring points in the last time measurement of the level, added to working as In this measurement of the level task of preceding circuit.
As shown in fig. 6, the alternatively possible structure as point template unit 11, including:
Download module 111, for downloading current test line in last time level from system platform after login system platform The data of all measuring points in measurement;Current test line data of each measuring point in the last time measurement of the level include:Initial elevation, Last time observation time, last time observation height value, correction value, subsidence threshold, rate-valve value, measuring point type, whether preliminary survey, measuring point ID, affiliated work point ID and affiliated circuit ID;
Add module 112, for by the data of current test line all measuring points in the last time measurement of the level, added to working as In this measurement of the level task of preceding circuit;
Editor module 113, for the actual measured conditions according to current test line, this test line is adjusted Section;
Specifically for adding new measuring point in current test line afterbody, and the new measuring point is downloaded from system platform Or the data in the affiliated test line last time measurement of the level;Or inserted behind the current measuring point of current test line New measuring point, and data of the new measuring point in the affiliated test line last time measurement of the level are downloaded from system platform;Again Or, the current measuring point of current test line is deleted, and delete this measurement of the level task that current measuring point is added to current line In data.
As shown in fig. 7, the route survey unit 13, including:
Survey station module 131 is added, for adding all measuring points pair of the current test line in this measurement of the level successively The survey station answered;Specifically for often adding a survey station, just by the measuring apparatus of Bluetooth control current line, to current survey station pair The measuring point answered measures, and obtains the backsight measurement data of current survey station;Set again by the measurement of Bluetooth control current line It is standby, measuring point corresponding to current survey station is measured, obtains the forward sight measurement data of current survey station;The backsight of current survey station is surveyed Amount data and forward sight measurement data are calculated and preserved, and obtain the accumulative sedimentation value and the rate of settling of current test line;When When accumulative sedimentation value or the rate of settling transfinite, alarm is carried out;
Removing module 132 is added, for if desired adding new measuring point in current test line, or deletes and has added Measuring point, then be added in this measurement of the level task or deletion action.
As shown in figure 8, the data transmission unit 15, including:
Reports module 151 is generated, for will be tested by the real-time measuring point data of the current test line checked with current The adjustment processing result of circuit generates the results report of current test line;
Encrypting module 152, for results report to be encrypted;
Uploading module 153, for the results report after encryption to be uploaded into system platform server.
The following detailed description of technical scheme, in the real-time processing subsystem of the present invention, mainly include:Task Administrative unit 21, task dispensing unit 22, communication setting unit 12, point template unit 11, route survey unit 13, data processing Unit 14, data transmission unit 15 and drawing unit 23.
Real-time processing subsystem is fabricated to app in the handheld device of survey crew, clicked in handheld device Real-time processing subsystem app icon runs softwares, handheld device need to run in the environment of having net (wireless or mobile data); Handheld device is first after real-time processing subsystem app, it is necessary to which authorization code could use;It is scanned, obtains equipment machine code and (set Standby ID), machine code is sent to software vendor and obtains authorization code, authorization code is inputted, authorizes successfully.
Enter role management unit 21, newly-built current test line, the summary information of the current test line of typing:Project Title:No. 12 line Ji raft of pontoons stations of subway;Monitoring cycle 20170420;Line name j3-01.
It is differentiated control to test line in role management unit 21, entry name is exactly that work is called the roll, and monitoring cycle can be with It is observation frequency and observation date, line name can be as the line profile title in system platform, for same item Mesh (work point) and template circuit, each newly-built task is exactly newly-built observation cycle.If you wish to the configuration information before application, can Come in selecting old task to clone its configuration.
Into task dispensing unit 22, measurement essential information can be set, such as instrument title, INSTRUMENT MODEL, observation people, day The information such as gas.Pay attention to checking the starting elevation and terminal elevation shown in Back ground Information, if consistent with this test line. Then set before preserving current survey.
Entry communication setting unit 12, local bluetooth is opened, open handheld device bluetooth.Then the bluetooth near searching for is set It is standby, select measuring apparatus to be matched and connected.The mobile device of First Contact Connections need to input pairing password, DINI03 bluetooth Password is " 1234 ", and the password for coming card is generally " 0000 ".When there is bluetooth connection success prompting frame, bluetooth connection success.
Inlet point modular unit 11, Successful login it must be put down in data processing unit 14 before operating point modular unit 11 Point data could be downloaded behind platform website.After handheld device is by registration, primary system platform is logged in after each newly-built complete circuit. Log-on message is returned to point template unit 11, display " units of measurement ", " operator ", " circuit name and ID ", " work by system platform Call the roll and ID " in, then preserve configuration information.
Line information is downloaded in download module 111, the line information on platform is downloaded in list, chooses currently quilt Survey line road.
After the circuit name of current test line in selected list, (measuring point is in the last time measurement of the level for the point information of the circuit In data) be shown in list below.After confirming that measuring point is errorless, download point information, current test line in last time level The initial elevation of all measuring points, last time observation time, last time observation height value, correction value, subsidence threshold, speed threshold in measurement Value, measuring point type, whether the information such as preliminary survey, measuring point ID number, affiliated work point ID number, affiliated circuit ID number is downloaded in list.When After there is " download finishes " prompting frame, current task is loaded a template into add module 112, prompts template data to load successfully After prompting frame, expression loads successfully, exit point substrate interface.
Into in editor module 113, into template circuit details interface, certain in line profile can be added or deleted Individual measuring point.When needing to add measuring point, a point can be increased in current line tail, the point for needing to add is filled in period text box Number, this information put then is downloaded from platform.Because being not belonging to current test line before this point, belong to other by survey line Road, so what is downloaded from platform is the data that test line corresponding to this puts leaves in the last time measurement of the level.Need to insert It is one point of insertion behind the current point of selection during measuring point, operation is identical with addition point.If delete unwanted survey Point, the point to be deleted is found, the data being loaded onto before deleting it in this subtask.
The process that the above-mentioned historical data (data of the last time measurement of the level) by current line is added to this subtask is to work as The edit model of preceding circuit-under-test.After the completion of editor, circuit and point information can be checked in the list of editor module 113.
Platform is uploaded to after existing line can be updated at handheld device end, is uploaded in point template unit 11, i.e., Line profile data on renewable platform, accomplish the synchronization of platform handset data.
Into route survey unit 13, survey station is added, starts to observe.Handheld device control operation instrument measure ( Operation instrument can be made to start to measure by hand), backsight measurement data directly displays real-time processing subsystem app by Bluetooth transmission Interface on;Continue handheld device control operation instrument to measure, forward sight measurement data is directly displayed by Bluetooth transmission On real-time processing subsystem app interface.Calculate after preserving forward sight measurement data and backsight measurement data, when accumulative sedimentation value or When the rate of settling transfinites, the prompting of text collimation mark color.
Above-mentioned measuring process is repeated in, until all measuring points of current test line are all finished with measurement, processing in real time It can prompt to have arrived circuit ending on subsystem app interface., can if certain measurement makes a mistake in operating instrument measurement process Resurvey, empty this measurement, observe again." measuring point " can be added or delete at any time in measurement, program synchronously can add to current The template file of load is made an amendment, to ensure that template data aligns with survey station data.And the operation to survey station (addition survey station, takes Disappear addition, deletion survey station etc.) template can't be changed, only individually change survey station data.Speed shown in units of mm/ days, Temporal logic mistake is to show:Timing error.
Into data processing unit 14, after route survey is complete, start compensating computation.The text box emblem color when data over run Prompting, after checking that data are errorless, it can enter and operate in next step.
Into data transmission unit 15, new handheld device is needed by that could be used after registration, and user must be in strict accordance with 1 Verify that mac, 2 obtain list, 3 acquisition units, 4 registrations, this four sequence of steps are operated;It should be noted that registration only has Chance, prompting frame is ejected after registration, determines to upload again after the log-on message that must ensure to fill in is errorless, and otherwise point takes Disappear.After log-on message is sent to system platform, waits or contact platform related personnel's manual examination and verification, after examination & verification, survey every time It will be logged in before amount task, task can be measured after obtaining authorization message.
After logging on server, Monitoring Data is uploaded, real-time processing subsystem app can automatically select the route of this measurement Data upload, and after confirming that data are errorless, the route data of this measurement are converted into results report, and be encrypted;Will encryption Results report afterwards is uploaded to system platform server;When prompting frame display uploads successfully i.e. by initial data and performance data System platform server is uploaded to.Real-time processing subsystem app can also be sent out the route data of this measurement by mail Mailbox is delivered to, the route data of this measurement can also be downloaded to by handheld device by local export.
Into drawing unit 23, measuring point all under the work point is shown in processing subsystem app interfaces, measuring point is according to measuring point The letter and number order of title is arranged.Click needs to check the measuring point of subsidence curve, shows subsidence curve.Red two Bar straight line represents the upper threshold and bottom threshold of the measuring point, and blue curve represents the subsidence curve of the measuring point.
The processing of special circumstances:
1st, data preserve when failure, power-off;
After having surveyed a complete survey station every time, program will preserve the initial data of the survey station once automatically, ensure Data recovery can be carried out when existing failure, breakpoint.When next time logs in, the survey of a upper unfinished survey station will be loaded automatically Amount progress.
2nd, data prevent from forging, distort function;
The measure interface data of data can not be changed, and only show measurement data.It is directly according to indigo plant to upload data Uploaded after the data processing that tooth is passed back, manual operation can not be carried out in upload procedure.The file being stored in local data base It can be read out, but platform can not be uploaded.
3rd, security is tried out;
This program is logged in for the first time after mounting to generate machine code at random, and the machine code need to be fed back to research staff's rope Registration code is taken to login program, the setting has carried out confirming to authorize for the first time to units of measurement and personnel.Use hand-held set It is standby can be logged in by platform management unit progress mac address authorized parties, it ensure that having specific survey crew only uses Specific handheld device can just carry out procedure operation, while be also that units of measurement and personnel have been carried out confirming to authorize again.
The beneficial effects of the present invention are:(1) save the numerous and diverse processing processing of interior industry and upload working platform, liberate skill Art personnel's productivity.By compensating computation, achievement is arranged, the process of upload is incorporated in the module of sequencing, by technical staff from again Free, put into important process in the work of renaturation, improve operating efficiency.One technical cadre is in the past in tradition Industry processing upload achievement workload is numerous and diverse, at most presides over 5 work points, is calculated automatically using the present invention, a technical cadre At least ten work point can be presided over;(2) achievement error caused by manual operation error is reduced, it is secure to monitoring accuracy:The present invention Compared with traditional artificial office work management achievement arranges, human error is eliminated, and it is simple and easy to do, ensure that monitoring essence Degree;(3) the smooth development to civil engineering has certain facilitation:On the premise of efficiency is improved, whole soil is also saved Build the duration of construction, and by the steady operation of Risk Monitoring, each relevant unit of civil engineering can understand monitoring pair in time The deformation state of elephant, so as to have certain promotion to safe and smooth development construction.
It should be understood that the particular order or level of the step of during disclosed are the examples of illustrative methods.Based on setting Count preference, it should be appreciated that during the step of particular order or level can be in the feelings for the protection domain for not departing from the disclosure Rearranged under condition.Appended claim to a method gives the key element of various steps with exemplary order, and not It is to be limited to described particular order or level.
In above-mentioned detailed description, various features combine in single embodiment together, to simplify the disclosure.No This open method should be construed to reflect such intention, i.e. the embodiment of theme claimed needs to compare The more features of feature clearly stated in each claim.On the contrary, as appended claims is reflected Like that, the present invention is in the state fewer than whole features of disclosed single embodiment.Therefore, appended claims It is hereby expressly incorporated into detailed description, wherein each claim is alone as the single preferred embodiment of the present invention.
To enable any technical staff in the art to realize or using the present invention, disclosed embodiment being entered above Description is gone.To those skilled in the art;The various modification modes of these embodiments will be apparent from, and this The General Principle of text definition can also be applied to other embodiments on the basis of the spirit and scope of the disclosure is not departed from. Therefore, the disclosure is not limited to embodiments set forth herein, but most wide with principle disclosed in the present application and novel features Scope is consistent.
Described above includes the citing of one or more embodiments.Certainly, in order to above-described embodiment is described and description portion The all possible combination of part or method is impossible, but it will be appreciated by one of ordinary skill in the art that each implementation Example can do further combinations and permutations.Therefore, embodiment described herein is intended to fall into appended claims Protection domain in all such changes, modifications and variations.In addition, with regard to the term used in specification or claims "comprising", the mode that covers of the word are similar to term " comprising ", just as " including " solved in the claims as link word As releasing.In addition, the use of any one term "or" in the specification of claims is to represent " non-exclusionism Or ".
Those skilled in the art will also be appreciated that the various illustrative components, blocks that the embodiment of the present invention is listed (illustrative logical block), unit, and step can pass through the knot of electronic hardware, computer software, or both Conjunction is realized.To clearly show that the replaceability of hardware and software (interchangeability), above-mentioned various explanations Property part (illustrative components), unit and step universally describe their function.Such work( Can be that specific application and the design requirement of whole system are depended on to realize by hardware or software.Those skilled in the art Various methods can be used to realize described function, but this realization is understood not to for every kind of specific application Beyond the scope of protection of the embodiment of the present invention.
Various illustrative logical blocks described in the embodiment of the present invention, or unit can by general processor, Digital signal processor, application specific integrated circuit (ASIC), field programmable gate array or other programmable logic devices, discrete gate Or the design of transistor logic, discrete hardware components, or any of the above described combination is come the function described by realizing or operate.General place It can be microprocessor to manage device, and alternatively, the general processor can also be any traditional processor, controller, microcontroller Device or state machine.Processor can also be realized by the combination of computing device, such as digital signal processor and microprocessor, Multi-microprocessor, one or more microprocessors combine a Digital Signal Processor Core, or any other like configuration To realize.
The step of method or algorithm described in the embodiment of the present invention can be directly embedded into hardware, computing device it is soft Part module or the combination of both.Software module can be stored in RAM memory, flash memory, ROM memory, EPROM storages Other any form of storaging mediums in device, eeprom memory, register, hard disk, moveable magnetic disc, CD-ROM or this area In.Exemplarily, storaging medium can be connected with processor, to allow processor to read information from storaging medium, and Write information can be deposited to storaging medium.Alternatively, storaging medium can also be integrated into processor.Processor and storaging medium can To be arranged in ASIC, ASIC can be arranged in user terminal.Alternatively, processor and storaging medium can also be arranged at use In different parts in the terminal of family.
In one or more exemplary designs, above-mentioned function described by the embodiment of the present invention can be in hardware, soft Part, firmware or any combination of this three are realized.If realized in software, these functions can store and computer-readable On medium, or with one or more instruction or code form be transmitted on the medium of computer-readable.Computer readable medium includes electricity Brain storaging medium and it is easy to so that allowing computer program to be transferred to other local telecommunication medias from a place.Storaging medium can be with It is that any general or special computer can be with the useable medium of access.For example, such computer readable media can include but It is not limited to RAM, ROM, EEPROM, CD-ROM or other optical disc storage, disk storage or other magnetic storage devices, or other What can be used for carrying or store with instruct or data structure and it is other can be by general or special computer or general or specially treated The medium of the program code of device reading form.In addition, any connection can be properly termed computer readable medium, example Such as, if software is to pass through a coaxial cable, fiber optic cables, double from a web-site, server or other remote resources Twisted wire, Digital Subscriber Line (DSL) or with defined in being also contained in of the wireless way for transmitting such as infrared, wireless and microwave In computer readable medium.Described disk (disk) and disk (disc) include Zip disk, radium-shine disk, CD, DVD, floppy disk And Blu-ray Disc, disk is generally with magnetic duplication data, and disk generally carries out optical reproduction data with laser.Combinations of the above It can also be included in computer readable medium.
Above-described embodiment, the purpose of the present invention, technical scheme and beneficial effect are carried out further Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc., all should include Within protection scope of the present invention.

Claims (10)

  1. A kind of 1. measurement of the level Real-time Data Processing Method, it is characterised in that including:Real-time processing is provided with a mobile device Subsystem;
    When test line needs to carry out the measurement of the level, the processing subsystem in real time carries out measurement of the level data processing:
    The history measuring point data of current test line is obtained from system platform;
    Pairing is carried out by bluetooth with the measuring apparatus of current test line to be connected;
    The real-time measuring point data of current test line is obtained from the measuring apparatus of current line;
    According to the history measuring point data, data validation is carried out to the real-time measuring point data of current test line;
    Adjustment processing is carried out to the real-time measuring point data for checking the current test line after, obtains the flat of current test line Poor result;
    The adjustment processing result of current test line is uploaded to the system platform.
  2. 2. measurement of the level Real-time Data Processing Method according to claim 1, it is characterised in that described from system platform The history measuring point data of current test line is obtained, is specifically included:
    The data of current test line all measuring points in the last time measurement of the level are downloaded after login system platform from system platform;
    Current test line data of each measuring point in the last time measurement of the level include:Initial elevation, last time observation time, last time Observe height value, correction value, subsidence threshold, rate-valve value, measuring point type, whether preliminary survey, measuring point ID, affiliated work point ID and affiliated Circuit ID;
    By the data of current test line all measuring points in the last time measurement of the level, added to this measurement of the level of current line In task.
  3. 3. measurement of the level Real-time Data Processing Method according to claim 2, it is characterised in that it is described will be currently by survey line The data of road all measuring points in the last time measurement of the level, added in this measurement of the level task of current line, also wrap afterwards Include:
    According to the actual measured conditions of current test line, this test line is adjusted, including:
    New measuring point is added in current test line afterbody, and downloads the new measuring point from system platform or is tested affiliated Data in the line last measurement of the level;
    Or new measuring point is inserted behind the current measuring point of current test line, and download from system platform described new Data of the measuring point in the affiliated test line last time measurement of the level;
    Again or, the current measuring point of current test line is deleted, and this level for deleting current measuring point added to current line is surveyed Data in amount task.
  4. 4. measurement of the level Real-time Data Processing Method according to claim 2, it is characterised in that described from current line The real-time measuring point data of current test line is obtained in measuring apparatus, is specifically included:
    Survey station corresponding to all measuring points of the current test line in this measurement of the level is added successively;A survey station is often added, Including:
    By the measuring apparatus of Bluetooth control current line, measuring point corresponding to current survey station is measured, obtains current survey station Backsight measurement data;
    Again by the measuring apparatus of Bluetooth control current line, measuring point corresponding to current survey station is measured, obtained current The forward sight measurement data of survey station;
    The backsight measurement data and forward sight measurement data of current survey station are calculated and preserved, obtains the tired of current test line Count sedimentation value and the rate of settling;
    When accumulative sedimentation value or the rate of settling transfinite, alarm is carried out;
    Survey station corresponding to all measuring points that current test line is added successively in this measurement of the level, also includes afterwards:
    If desired new measuring point is added in current test line, or deletes the measuring point added, then in this measurement of the level It is added in task or deletion action.
  5. 5. measurement of the level Real-time Data Processing Method according to claim 1, it is characterised in that described from system platform The history measuring point data of current test line is downloaded, is also included before:
    Newly-built current test line;
    Configure the Back ground Information of current test line;
    It is described that the adjustment processing result of current test line is uploaded to the system platform, specifically include:
    Adjustment processing result generation by the real-time measuring point data of the current test line checked and current test line is worked as The results report of preceding test line;
    Results report is encrypted;
    Results report after encryption is uploaded to system platform server;
    It is described that the adjustment processing result of current test line is uploaded to the system platform, also include afterwards:
    Subsidence curve is drawn according to the real-time measuring point data of current test line.
  6. A kind of 6. measurement of the level generating date system, it is characterised in that including:Real-time processing in a mobile device is set Subsystem;
    The processing subsystem in real time includes:
    Point template unit, for obtaining the history measuring point data of current test line from system platform;
    Communication setting unit, it is connected for carrying out pairing with the measuring apparatus of current test line by bluetooth;
    Route survey unit, for obtaining the real-time measuring point data of current test line from the measuring apparatus of current line;
    Data processing unit, for according to the history measuring point data, entering line number to the real-time measuring point data of current test line According to checking;And the real-time measuring point data to checking the current test line after carries out adjustment processing, currently it is tested The adjustment processing result of circuit;
    Data transmission unit, for the adjustment processing result of current test line to be uploaded into the system platform.
  7. 7. measurement of the level generating date system according to claim 6, it is characterised in that the point template unit, Including:
    Download module, for downloading current test line institute in the last time measurement of the level after login system platform from system platform There are the data of measuring point;Current test line data of each measuring point in the last time measurement of the level include:Initial elevation, last time observation Time, last time observation height value, correction value, subsidence threshold, rate-valve value, measuring point type, whether preliminary survey, measuring point ID, affiliated work Point ID and affiliated circuit ID;
    Add module, for by the data of current test line all measuring points in the last time measurement of the level, added to current line This measurement of the level task in.
  8. 8. measurement of the level generating date system according to claim 7, it is characterised in that the point template unit, Also include:
    Editor module, for the actual measured conditions according to current test line, this test line is adjusted;
    Specifically for adding new measuring point in current test line afterbody, and the new measuring point is downloaded in institute from system platform Belong to the data in the test line last time measurement of the level;Or insert new survey behind the current measuring point of current test line Point, and data of the new measuring point in the affiliated test line last time measurement of the level are downloaded from system platform;Again or, delete The current measuring point of current test line, and current measuring point is deleted added to the number in this measurement of the level task of current line According to.
  9. 9. measurement of the level generating date system according to claim 7, it is characterised in that the route survey list Member, including:
    Survey station module is added, for adding survey corresponding to all measuring points of the current test line in this measurement of the level successively Stand;
    Specifically for often adding a survey station, just by the measuring apparatus of Bluetooth control current line, to corresponding to current survey station Measuring point measures, and obtains the backsight measurement data of current survey station;It is right again by the measuring apparatus of Bluetooth control current line Measuring point corresponding to current survey station measures, and obtains the forward sight measurement data of current survey station;Number is measured to the backsight of current survey station Calculated and preserved according to forward sight measurement data, obtain the accumulative sedimentation value and the rate of settling of current test line;When accumulative When sedimentation value or the rate of settling transfinite, alarm is carried out;
    The route survey unit, in addition to:
    Removing module is added, for if desired adding new measuring point in current test line, or deletes the measuring point added, Then it is added in this measurement of the level task or deletion action.
  10. 10. measurement of the level generating date system according to claim 6, it is characterised in that the system also includes:
    Role management unit, for newly-built current test line;
    Task dispensing unit, for configuring the Back ground Information of current test line;
    The data transmission unit, including:
    Reports module is generated, for by the flat of the real-time measuring point data of current test line by checking and current test line Poor result generates the results report of current test line;
    Encrypting module, for results report to be encrypted;
    Uploading module, for the results report after encryption to be uploaded into system platform server;
    The system, in addition to:
    Drawing unit, subsidence curve is drawn according to the real-time measuring point data of current test line.
CN201710802136.8A 2017-09-07 2017-09-07 Measurement of the level Real-time Data Processing Method and system Pending CN107727070A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710802136.8A CN107727070A (en) 2017-09-07 2017-09-07 Measurement of the level Real-time Data Processing Method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710802136.8A CN107727070A (en) 2017-09-07 2017-09-07 Measurement of the level Real-time Data Processing Method and system

Publications (1)

Publication Number Publication Date
CN107727070A true CN107727070A (en) 2018-02-23

Family

ID=61205823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710802136.8A Pending CN107727070A (en) 2017-09-07 2017-09-07 Measurement of the level Real-time Data Processing Method and system

Country Status (1)

Country Link
CN (1) CN107727070A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109947024A (en) * 2019-03-29 2019-06-28 中铁隧道局集团有限公司 A kind of rail traffic data monitoring method based on mobile terminal

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104048644A (en) * 2013-03-11 2014-09-17 广东工业大学 Method for recording and calculating leveling data by mobile phone
CN204041117U (en) * 2014-08-11 2014-12-24 北京市勘察设计研究院有限公司 Multi-parameters real-time monitoring controller in a kind of mortar depositing construction process
CN204087467U (en) * 2014-06-18 2015-01-07 北京城建勘测设计研究院有限责任公司 A kind of monitoring system based on engineering survey
CN106225766A (en) * 2016-07-01 2016-12-14 陕西铁道工程勘察有限公司 Monitoring and managing method is analyzed in structure sedimentation based on 3S technology monitoring

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104048644A (en) * 2013-03-11 2014-09-17 广东工业大学 Method for recording and calculating leveling data by mobile phone
CN204087467U (en) * 2014-06-18 2015-01-07 北京城建勘测设计研究院有限责任公司 A kind of monitoring system based on engineering survey
CN204041117U (en) * 2014-08-11 2014-12-24 北京市勘察设计研究院有限公司 Multi-parameters real-time monitoring controller in a kind of mortar depositing construction process
CN106225766A (en) * 2016-07-01 2016-12-14 陕西铁道工程勘察有限公司 Monitoring and managing method is analyzed in structure sedimentation based on 3S technology monitoring

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109947024A (en) * 2019-03-29 2019-06-28 中铁隧道局集团有限公司 A kind of rail traffic data monitoring method based on mobile terminal

Similar Documents

Publication Publication Date Title
CN107508619B (en) Mobile power based on Bluetooth technology rents self-help serving system
CN106586734A (en) Elevator remote debugging method, application terminal and debugging system
CN109829296A (en) The sandbox implementation method of intelligent contract based on alliance's chain
CN107180175A (en) Allocator and dispenser and delivery system
CN107301074A (en) Method and system of automatic packing APK installation kits on the server
CN102236527A (en) Method and device for unlocking touch screen and touch screen terminal
CN103828291B (en) The method that application service is provided
CN107741950A (en) Processing method, device, processor and the service end of data syn-chronization task
CN106960162A (en) A kind of data sharing method, apparatus and system
CN110221841A (en) A kind of interactive application deployment delivery method and system based on web
CN105740670B (en) Using encryption, starting method and apparatus
CN107273060A (en) The method and apparatus of data distribution formula storage
CN107727070A (en) Measurement of the level Real-time Data Processing Method and system
CN110149241A (en) A kind of automated testing method and storage medium based on IMS equipment
CN107357530A (en) A kind of method to set up and device for OpenStack cloud hard disks
CN106990720A (en) Virtual controlling experiment porch and control method based on real-time cloud computation model
CN107633411A (en) Authentication administrative system
CN103970536B (en) Method and device for generating APP installation program
CN109333952A (en) Injection molding machine management method and device
CN106528406A (en) Cloud service-based intelligent electric meter software test system
CN106682889A (en) Mobile payment method when server-side device is not networked
CN106028381A (en) Method and device for testing transmission rate on mobile terminal
CN109214746A (en) Delivering method and system
CN108008977A (en) A kind of software development service platform towards function outsourcing
CN108198341A (en) Internet of Things instrument settlement method and system based on table end, the double settlement modes in backstage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223