Nothing Special   »   [go: up one dir, main page]

CN109707399A - Tunnel outlet support structure and its construction method - Google Patents

Tunnel outlet support structure and its construction method Download PDF

Info

Publication number
CN109707399A
CN109707399A CN201910135787.5A CN201910135787A CN109707399A CN 109707399 A CN109707399 A CN 109707399A CN 201910135787 A CN201910135787 A CN 201910135787A CN 109707399 A CN109707399 A CN 109707399A
Authority
CN
China
Prior art keywords
tunnel
hole
construction
support structure
top bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910135787.5A
Other languages
Chinese (zh)
Other versions
CN109707399B (en
Inventor
杨建民
舒东利
张涵
王磊
朱麟晨
廖余
陈朗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201910135787.5A priority Critical patent/CN109707399B/en
Publication of CN109707399A publication Critical patent/CN109707399A/en
Application granted granted Critical
Publication of CN109707399B publication Critical patent/CN109707399B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of tunnel outlet support structure and its construction methods, support structure includes the top bar being equipped in tunnel portal and gets out of a predicament or an embarrassing situation, top bar and connection slope is connected between getting out of a predicament or an embarrassing situation, top bar is equipped with small pilot tunnel, it further include the gib being equipped with around small pilot tunnel, and the advance support for Strengthening Tunnel peripheral rock, system anchor bolt, lock foot anchoring stock and preliminary bracing, it is also included within after small pilot tunnel appears, in tunnel portal by the steel tube shed guiding wall and steel tube shed that are applied in the extroversion hole of hole;Construction method is neighbouring Portal Section of being constructed using benching tunnelling method;Advanced small pilot tunnel is excavated in top bar side, and applies advance support, system anchor bolt, lock foot anchoring stock, preliminary bracing and gib, penetrates through small pilot tunnel to tunnel portal;Steel tube shed guiding wall is applied, steel tube shed guiding drills within the walls, sets steel tube shed advance support;The small pilot tunnel in the excavation supporting top bar other side removes small pilot tunnel gib, excavation supporting is got out of a predicament or an embarrassing situation to hole to hole out of hole.

Description

Tunnel outlet support structure and its construction method
Technical field
The present invention relates to Environment in Railway Engineering Construction technical field, in particular to a kind of tunnel outlet support structure and its construction party Method.
Background technique
With the development of railway construction in China, there is more and more Tunnel Engineering, Southwest Mountainous Areas topography danger in mountain railway It is high, therefore more tunnel portal, often on high gradient slope, appearing is close to bridge.And mountain area high gradient slope constructing tunnel is just Road is built to hole difficulty is big, the more difficult arrangement in entrance construction place, and construction machinery personnel hardly enter entrance construction.Length of tunnel It can choose and unidirectionally tunnel from the preferable one end of hole condition to other end hole in short-term, be contemplated that when tunnel is longer and increase horizontal hole Or inclined shaft enters after main tunnel the hole poor to condition of reversely constructing.Both the above method is faced with construction of appearing, due to hole Often buried depth is shallow for mouthful section, rock crusher, and tunnel excavation section is big in addition, easily causes inside and outside hole and caves in when carrying out and appearing and construct Etc. accidents, and handle landslide engineering challenges, increase investment, construction delay, huge loss can be brought to tunnel construction.Therefore, Which kind of method to guarantee that tunnel outlet construction safety is effectively current urgent problem using.
Currently, it is less to the research of tunnel outlet construction method, it is more and more with the accelerated development of railway construction in China Tunnel is faced with construction risk of appearing, and also has and has resulted in huge economic loss when appearing and constructing compared with Multiple tunnel.How to carry out Tunnel outlet construction protection should guarantee safety for tunnel engineering, and can build entrance construction platform, seek a kind of safety, quickly, Economically and reasonably construction method is imperative.
Summary of the invention
It is an object of the invention to overcome the above-mentioned deficiency in the presence of the prior art, a kind of tunnel outlet supporting structure is provided It makes and its construction method.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of tunnel outlet support structure including the top bar that is equipped in tunnel portal and is got out of a predicament or an embarrassing situation, the top bar and Connection slope is connected between getting out of a predicament or an embarrassing situation, the top bar is equipped with small pilot tunnel;The support structure further includes small leading described The gib being equipped with around hole, and tunnel portal be surrounded by for Strengthening Tunnel peripheral rock advance support, System anchor bolt, lock foot anchoring stock and preliminary bracing are also included within after the small pilot tunnel appears, in tunnel portal by applying in the extroversion hole of hole The steel tube shed guiding wall and steel tube shed of work.
Present invention Strengthening Tunnel hole in such a way that the small pilot tunnel of top bar appears apply hole protection and steel tube shed in advance Shallow embedding reduction stage country rock guarantees tunnel outlet construction safety.It is brought when can reduce tunnel outlet through the invention by Tunnel Landslide Investment increase, the risks such as construction delay, the Tunnel Engineering investment of indirect saving and duration;It can efficiently solve through the invention The high steep tunnel portal in tunnel can not build the problem of construction operation platform, construction personnel and equipment conveying difficulty, guarantee Tunnel Mouth construction safety.The invention provides scientific basis for the design of high gradient slope tunnel outlet, strengthens the peace of tunnel outlet construction Full reliability realizes economical, reasonable, safe and efficient most possibly.
Preferably, the gradient on the connection slope is less than or equal to 1/3, guarantees that the slope of connection up/down steps is flat enough It is slow, convenient for construction personnel and the Transportation Organization of construction machinery.
Preferably, the gib includes profile steel frame concrete spraying support.
Preferably, the advance support includes advanced tubule.
Preferably, supporting construction further includes the drainage system and side slope protection being arranged at tunnel portal, guarantees tunnel Excavation supporting complete stability.
Preferably, the side slope protection includes Anchored frame beam.
The invention also discloses a kind of construction methods of tunnel outlet support structure, comprising the following steps:
Step 1: in constructing tunnel to neighbouring Portal Section, being adjusted to benching tunnelling method for construction, top bar and gets out of a predicament or an embarrassing situation Between by connect slope be connected;
Step 2: advanced small pilot tunnel is excavated in tunnel top bar side, the small every circulation of pilot tunnel applies advanced after excavating Supporting, system anchor bolt, lock foot anchoring stock, preliminary bracing and gib, after carry out small pilot tunnel subsequent cycle after the completion of supporting again It excavates, penetrates through small pilot tunnel to tunnel portal by this process;
Step 3: by small pilot tunnel establishment officer, mechanical arrangement entrance construction place, then steel tube shed guiding wall is applied, greatly Pipe canopy guiding drills within the walls, sets steel tube shed advance support and grouting and reinforcing hole Shallow Section breaking surrounding rock;
Step 4: after completing hole construction of prevention work and steel tube shed reinforcing, the excavation supporting top bar other side is small out of hole is led Small pilot tunnel gib is removed after the completion of top bar excavation supporting in hole to hole, and excavation supporting is got out of a predicament or an embarrassing situation to hole, so far Complete tunnel outlet construction.
Construction method of the present invention provides scientific basis for the design that high gradient slope tunnel outlet is constructed, by upper Step pilot tunnel is appeared in advance, and the method for then applying hole protection and steel tube shed carrys out Strengthening Tunnel hole shallow embedding reduction stage country rock, It solves the problems, such as that construction personnel and equipment conveying are difficult, ensure that tunnel outlet construction safety, reduce construction landslide of appearing Risk.
Preferably, the step 3 has also applied hole and has cut drainage system and face-upward slope before applying steel tube shed guiding wall Protection guarantees tunnel excavation support complete stability.
Compared with prior art, supporting construction of the present invention the utility model has the advantages that
Present invention Strengthening Tunnel hole in such a way that the small pilot tunnel of top bar appears apply hole protection and steel tube shed in advance Shallow embedding reduction stage country rock guarantees tunnel outlet construction safety.It is brought when can reduce tunnel outlet through the invention by Tunnel Landslide Investment increase, the risks such as construction delay, the Tunnel Engineering investment of indirect saving and duration;It can efficiently solve through the invention The high steep tunnel portal in tunnel can not build the problem of construction operation platform, construction personnel and equipment conveying difficulty, guarantee Tunnel Mouth construction safety.The invention provides scientific basis for the design of high gradient slope tunnel outlet, strengthens the peace of tunnel outlet construction Full reliability realizes economical, reasonable, safe and efficient most possibly.
Compared with prior art, the construction method of supporting construction of the present invention the utility model has the advantages that
Construction method of the present invention provides scientific basis for the design that high gradient slope tunnel outlet is constructed, by upper Step pilot tunnel is appeared in advance, and the method for then applying hole protection and steel tube shed carrys out Strengthening Tunnel hole shallow embedding reduction stage country rock, It solves the problems, such as that construction personnel and equipment conveying are difficult, ensure that tunnel outlet construction safety, reduce construction landslide of appearing Risk.
Detailed description of the invention:
Fig. 1 is a kind of skiagraph of tunnel outlet support structure of the present invention.
Fig. 2 is the A-A cross-sectional view in Fig. 1.
Fig. 3 is the B-B cross-sectional view in Fig. 1.
Marked in the figure: 1- advance support, 2- system anchor bolt, 3- lock foot anchoring stock, 4- preliminary bracing, 5- secondary lining, 6- face When supporting, 7- top bar, 8- gets out of a predicament or an embarrassing situation, the small pilot tunnel of 9-, and 10- steel tube shed is oriented to wall, 11- steel tube shed, 12- connection slope, 13- anchor Bar Vierendeel girder, 14- ground line.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments The range of invention.
Embodiment 1
As shown in Figure 1-Figure 3, a kind of tunnel outlet support structure including the top bar 7 being equipped in tunnel portal and is left office Rank 8, the top bar 7 and gets out of a predicament or an embarrassing situation and is connected with connection slope 12 between 8, and the gradient on the connection slope 12 is less than or equal to 1/ 3, guarantee that slope is gentle enough, convenient for construction personnel and the Transportation Organization of construction machinery.
The side of the top bar 7 is equipped with small pilot tunnel 9, further include be equipped in time after the small pilot tunnel 9 excavates it is interim Supporting 6, the gib 6 include profile steel frame concrete spraying support;And it is used to add what tunnel portal was surrounded by Gu the advance support 1 of tunnel perimeter country rock, system anchor bolt 2, lock foot anchoring stock 3 and preliminary bracing 4, the advance support 1 includes super Preceding ductule, Strengthening Tunnel peripheral rock guarantee pilot tunnel construction safety.The small pilot tunnel 9 of top bar is excavated to tunnel portal in advance, is Personnel and machinery, which are appeared, provides channel.
Support structure is also included within after the small pilot tunnel 9 appears, in tunnel portal by the steel tube shed that applies in the extroversion hole of hole It is oriented to wall 10 and steel tube shed 11, advanced pre-reinforcement Portal Section country rock.Supporting construction further includes the draining being arranged at tunnel portal System and side slope protection, the side slope protection include Anchored frame beam 13, and 14 be ground line in figure.
Embodiment 2
As shown in Figure 1-Figure 3, a kind of construction method of tunnel outlet support structure, comprising the following steps:
Step 1: in constructing tunnel to neighbouring Portal Section, construction is adjusted to benching tunnelling method, top bar 7 and leave from office It is connected between rank 8 by connecting slope 12, up/down steps length is elongated as far as possible, and guarantees to connect the connection slope of up/down steps 12 is gentle enough, convenient for construction personnel and the Transportation Organization of construction machinery;
Step 2: in tunnel, advanced small pilot tunnel 9 is excavated in 7 side of top bar, and the every circulation of the small pilot tunnel 9 applies super after excavating The supporting measures such as preceding supporting 1, system anchor bolt 2, lock foot anchoring stock 3, preliminary bracing 4, secondary lining 5 and gib 6 guarantee small lead Hole excavation supporting safety and stability, the excavation after carry out small 9 subsequent cycle of pilot tunnel after the completion of supporting again penetrate through small pilot tunnel by this process 9, to tunnel portal, the channel outside hole are transported as personnel, mechanical equipment;
Step 3: it by small 9 establishment officer of pilot tunnel, mechanical arrangement entrance construction place, has applied hole and has cut drainage system And side slope protection, steel tube shed guiding wall 10 is then applied again, and steel tube shed is oriented to 10 internal drilling of wall, sets steel tube shed 11 and props up in advance Protect simultaneously grouting and reinforcing hole Shallow Section breaking surrounding rock;
Step 4: after completing hole construction of prevention work and the reinforcing of steel tube shed 11,7 other side of excavation supporting top bar is small out of hole Pilot tunnel is to hole, after the completion of 7 excavation supporting of top bar, removes small pilot tunnel gib 6, and excavation supporting gets out of a predicament or an embarrassing situation 8 to hole, So far tunnel outlet construction is completed.
Above embodiments are only to illustrate the present invention and not limit the technical scheme described by the invention, although this explanation The present invention has been described in detail referring to above-mentioned each embodiment for book, but the present invention is not limited to above-mentioned specific implementation Mode, therefore any couple of present invention modifies or equivalent replacement;And the technical side of all spirit and scope for not departing from invention Case and its improvement, are intended to be within the scope of the claims of the invention.

Claims (8)

1. a kind of tunnel outlet support structure, which is characterized in that including the top bar (7) being equipped in tunnel portal and get out of a predicament or an embarrassing situation (8), it the top bar (7) and gets out of a predicament or an embarrassing situation and is connected with connection slope (12) between (8), the top bar (7) is equipped with small pilot tunnel (9);The support structure further includes the gib (6) being equipped with around the small pilot tunnel (9), and in tunnel portal surrounding Be equipped with for the advance support (1) of Strengthening Tunnel peripheral rock, system anchor bolt (2), lock foot anchoring stock (3) and preliminary bracing (4), It is also included within after the small pilot tunnel (9) appears, in tunnel portal by steel tube shed guiding wall (10) that is applied in the extroversion hole of hole and big Pipe canopy (11).
2. a kind of tunnel outlet support structure according to claim 1, which is characterized in that described to connect the oblique of slope (12) Degree is less than or equal to 1/3.
3. a kind of tunnel outlet support structure according to claim 1, which is characterized in that the gib (6) include Profile steel frame concrete spraying support.
4. a kind of tunnel outlet support structure according to claim 1, which is characterized in that the advance support (1) includes Advanced tubule.
5. a kind of tunnel outlet support structure according to claim 1 to 4, which is characterized in that supporting construction further includes Drainage system and side slope protection at tunnel portal are set.
6. a kind of tunnel outlet support structure according to claim 5, which is characterized in that the side slope protection includes anchor Bar Vierendeel girder (13).
7. a kind of construction method of tunnel outlet support structure, which is characterized in that construction as described in claim 1-6 is any one Kind tunnel outlet support structure, comprising the following steps:
Step 1: in constructing tunnel to neighbouring Portal Section, being adjusted to benching tunnelling method for construction, top bar (7) and gets out of a predicament or an embarrassing situation (8) it is connected between by connecting slope (12);
Step 2: in tunnel, advanced small pilot tunnel (9) is excavated in top bar (7) side, and the small every circulation of pilot tunnel (9) applies after excavating Advance support (1), system anchor bolt (2), lock foot anchoring stock (3), preliminary bracing (4) and gib (6), after the completion of the supporting again into The excavation of small pilot tunnel (9) subsequent cycle of row penetrates through small pilot tunnel (9) to tunnel portal by this process;
Step 3: by small pilot tunnel (9) establishment officer, mechanical arrangement entrance construction place, then applying steel tube shed guiding wall (10), Steel tube shed is oriented to wall (10) internal drilling, sets steel tube shed (11) advance support and grouting and reinforcing hole Shallow Section breaking surrounding rock;
Step 4: after completing hole construction of prevention work and steel tube shed (11) reinforcing, excavation supporting top bar (7) other side is small out of hole Pilot tunnel removes small pilot tunnel gib (6) after the completion of top bar (7) excavation supporting to hole, and excavation supporting gets out of a predicament or an embarrassing situation (8) To hole, tunnel outlet construction is so far completed.
8. a kind of construction method of tunnel outlet support structure according to claim 7, which is characterized in that the step 3 Before applying steel tube shed guiding wall (10), hole is also applied and has cut drainage system and side slope protection.
CN201910135787.5A 2019-02-21 2019-02-21 Tunnel exit supporting structure and construction method thereof Active CN109707399B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910135787.5A CN109707399B (en) 2019-02-21 2019-02-21 Tunnel exit supporting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910135787.5A CN109707399B (en) 2019-02-21 2019-02-21 Tunnel exit supporting structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN109707399A true CN109707399A (en) 2019-05-03
CN109707399B CN109707399B (en) 2024-01-30

Family

ID=66263733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910135787.5A Active CN109707399B (en) 2019-02-21 2019-02-21 Tunnel exit supporting structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN109707399B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030001A (en) * 2019-05-30 2019-07-19 广西大学 A kind of construction method that mountain tunnel is appeared
CN110645003A (en) * 2019-10-17 2020-01-03 中铁二局集团有限公司 Completely weathered granite bias steep slope tunnel entry construction method
CN111119913A (en) * 2020-02-24 2020-05-08 中铁二院工程集团有限责任公司 TBM (tunnel boring machine) escaping processing method in tunnel construction and tunnel construction structure
CN111594229A (en) * 2020-05-28 2020-08-28 中国建筑第七工程局有限公司 Construction method for multi-arch tunnel entrance under shallow-buried water-rich geological condition
CN113047846A (en) * 2021-03-10 2021-06-29 北京永创众信建筑设计有限公司 Construction method for tunneling tunnel through slope
CN113482630A (en) * 2021-08-06 2021-10-08 中铁二局第四工程有限公司 Pilot construction method applied to small-clear-distance double-hole tunnel
CN114673181A (en) * 2022-05-31 2022-06-28 中国铁路设计集团有限公司 Construction method of interval tunnel at bridge-tunnel connection position near existing railway

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280862A (en) * 1997-04-04 1998-10-20 Shimizu Corp Construction method of tunnel junction
CN101864960A (en) * 2010-05-17 2010-10-20 中铁二十局集团有限公司 Carst region double-arch road tunnel construction method
CN102226399A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN102305077A (en) * 2011-09-23 2012-01-04 中南大学 Rapid construction method of large-section multi-arc tunnel
CN104879131A (en) * 2015-05-06 2015-09-02 中国电建集团华东勘测设计研究院有限公司 Large-span tunnel excavation method for upper soft and lower hard compound strata
CN104929649A (en) * 2015-06-17 2015-09-23 大连市市政设计研究院有限责任公司 Tunnel transverse cave-to-master cave top brushing construction method and top brushing structure
CN105156121A (en) * 2015-10-08 2015-12-16 中铁二十五局集团第五工程有限公司 Construction method of large-cross section loess tunnel cave entering shallow buried section
CN107060771A (en) * 2016-12-28 2017-08-18 广东省长大公路工程有限公司 Middle short tunnel is unidirectionally appeared excavation method
CN206860179U (en) * 2017-07-11 2018-01-09 北京市市政三建设工程有限责任公司 A kind of tunnel construction mid-board
CN108222947A (en) * 2017-12-26 2018-06-29 长安大学 A kind of construction method of two benching tunnelling method of super-span tunnel top bar CD normal direction conversion
CN108374674A (en) * 2018-01-08 2018-08-07 济南城建集团有限公司 Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN108798679A (en) * 2018-06-11 2018-11-13 中铁二局第工程有限公司 Steel tube shed goes out cavity construction method in shallow embedding single-track railway tunnel hole
CN209523756U (en) * 2019-02-21 2019-10-22 中铁二院工程集团有限责任公司 A kind of tunnel outlet support structure

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280862A (en) * 1997-04-04 1998-10-20 Shimizu Corp Construction method of tunnel junction
CN101864960A (en) * 2010-05-17 2010-10-20 中铁二十局集团有限公司 Carst region double-arch road tunnel construction method
CN102226399A (en) * 2011-06-02 2011-10-26 中铁二院工程集团有限责任公司 Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN102305077A (en) * 2011-09-23 2012-01-04 中南大学 Rapid construction method of large-section multi-arc tunnel
CN104879131A (en) * 2015-05-06 2015-09-02 中国电建集团华东勘测设计研究院有限公司 Large-span tunnel excavation method for upper soft and lower hard compound strata
CN104929649A (en) * 2015-06-17 2015-09-23 大连市市政设计研究院有限责任公司 Tunnel transverse cave-to-master cave top brushing construction method and top brushing structure
CN105156121A (en) * 2015-10-08 2015-12-16 中铁二十五局集团第五工程有限公司 Construction method of large-cross section loess tunnel cave entering shallow buried section
CN107060771A (en) * 2016-12-28 2017-08-18 广东省长大公路工程有限公司 Middle short tunnel is unidirectionally appeared excavation method
CN206860179U (en) * 2017-07-11 2018-01-09 北京市市政三建设工程有限责任公司 A kind of tunnel construction mid-board
CN108222947A (en) * 2017-12-26 2018-06-29 长安大学 A kind of construction method of two benching tunnelling method of super-span tunnel top bar CD normal direction conversion
CN108374674A (en) * 2018-01-08 2018-08-07 济南城建集团有限公司 Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN108798679A (en) * 2018-06-11 2018-11-13 中铁二局第工程有限公司 Steel tube shed goes out cavity construction method in shallow embedding single-track railway tunnel hole
CN209523756U (en) * 2019-02-21 2019-10-22 中铁二院工程集团有限责任公司 A kind of tunnel outlet support structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周满兵: "公路山岭隧道单向出洞技术研究", 《安徽建筑》, vol. 24, no. 2, pages 78 - 80 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030001A (en) * 2019-05-30 2019-07-19 广西大学 A kind of construction method that mountain tunnel is appeared
CN110030001B (en) * 2019-05-30 2020-06-30 广西大学 Construction method for mountain tunnel to go out of hole
CN110645003A (en) * 2019-10-17 2020-01-03 中铁二局集团有限公司 Completely weathered granite bias steep slope tunnel entry construction method
CN111119913A (en) * 2020-02-24 2020-05-08 中铁二院工程集团有限责任公司 TBM (tunnel boring machine) escaping processing method in tunnel construction and tunnel construction structure
CN111119913B (en) * 2020-02-24 2024-05-17 中铁二院工程集团有限责任公司 TBM escaping treatment method in tunnel construction and tunnel construction structure
CN111594229A (en) * 2020-05-28 2020-08-28 中国建筑第七工程局有限公司 Construction method for multi-arch tunnel entrance under shallow-buried water-rich geological condition
CN111594229B (en) * 2020-05-28 2021-08-20 中建七局交通建设有限公司 Construction method for multi-arch tunnel entrance under shallow-buried water-rich geological condition
CN113047846A (en) * 2021-03-10 2021-06-29 北京永创众信建筑设计有限公司 Construction method for tunneling tunnel through slope
CN113482630A (en) * 2021-08-06 2021-10-08 中铁二局第四工程有限公司 Pilot construction method applied to small-clear-distance double-hole tunnel
CN113482630B (en) * 2021-08-06 2024-01-12 中铁二局第四工程有限公司 Advanced pilot pit construction method applied to small-clear-distance double-hole tunnel
CN114673181A (en) * 2022-05-31 2022-06-28 中国铁路设计集团有限公司 Construction method of interval tunnel at bridge-tunnel connection position near existing railway

Also Published As

Publication number Publication date
CN109707399B (en) 2024-01-30

Similar Documents

Publication Publication Date Title
CN109707399A (en) Tunnel outlet support structure and its construction method
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN110017144B (en) Loess tunnel three-step construction method considering substrate reinforcement treatment
CN103643979B (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN110529144B (en) A hybrid advance support method for small section mining roadway
CN107130613A (en) Large span tunnel is just wearing the retaining structure and its construction method of existing barricade
CN103452561A (en) Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN105065037A (en) Double-layer arch center support construction method for highway soft rock tunnel
CN110617072A (en) Tunnel excavation construction method for obliquely passing existing operation tunnel at minimum clear distance
CN110242305A (en) A kind of inclined shaft applies the construction technique in main hole into single side heading method
CN204113319U (en) A kind of folding telescopic alley hydraulic support
CN106988760A (en) Facility-sliding strata tunnel portal reinforcing construction and construction method
CN109611103A (en) A method of for boulder group consolidation process outstanding on shield section
CN108643940A (en) Large section Shallow-Buried Soft Rock tunnel groined type double side wall support system and method for tunnel construction
CN207111103U (en) A kind of benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three
CN104373147B (en) Folding extension type roadway hydraulic bracket
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN108374674B (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN109356193B (en) Prefabricated piping lane propelling movement construction equipment
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN107091092A (en) The approximate full face tunneling structure of mountain highway tunnel neutrality country rock and method
CN209523756U (en) A kind of tunnel outlet support structure
CN104612719B (en) The anti-collapse processing method in a kind of soft rock tunnel hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant