CN108508542A CN201810285882.9A CN201810285882A CN108508542A CN 108508542 A CN108508542 A CN 108508542A CN 201810285882 A CN201810285882 A CN 201810285882A CN 108508542 A CN108508542 A CN 108508542A
Authority
CN
China
Prior art keywords
optical fiber
lock pin
snap ring
glue
fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810285882.9A
Other languages
Chinese (zh)
Other versions
CN108508542B (en
Inventor
邵继保
槐恩伟
冯青凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Limited By Share Ltd Inc
Original Assignee
Limited By Share Ltd Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Limited By Share Ltd Inc filed Critical Limited By Share Ltd Inc
Priority to CN201810285882.9A priority Critical patent/CN108508542B/en
Publication of CN108508542A publication Critical patent/CN108508542A/en
Application granted granted Critical
Publication of CN108508542B publication Critical patent/CN108508542B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/24Coupling light guides
    • G02B6/36Mechanical coupling means
    • G02B6/38Mechanical coupling means having fibre to fibre mating means
    • G02B6/3807Dismountable connectors, i.e. comprising plugs
    • G02B6/3898Tools, e.g. handheld; Tuning wrenches; Jigs used with connectors, e.g. for extracting, removing or inserting in a panel, for engaging or coupling connectors, for assembling or disassembling components within the connector, for applying clips to hold two connectors together or for crimping

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Mechanical Coupling Of Light Guides (AREA)

Abstract

A kind of production method of fiber active linker disclosed by the invention, for assembling optical fiber flexible jumper and optical fiber, the fiber active linker includes dust cap, frame set, nut, lock pin, spring, locating snap ring, cutting ferrule, snap ring and tail sheath, and the production method of the fiber active linker includes the following steps:Material preparation step, optical fiber blanking step wear loose mail fiber stripping core step, impregnation step, remove bubble step in glue, lock pin dispensing step, insert fibre core step, baking fibre core step, cut fine step, assembling steps, grinding steps, testing procedure.The entire assembling process of the present invention is relatively simple, not only increases working efficiency, and reduce the probability of error, is additionally equipped with a variety of detection processes, is convenient for the control of quality.

Description

A kind of production method of fiber active linker
Technical field
The present invention relates to technical field of optical fiber communication more particularly to a kind of production methods of fiber active linker.
Background technology
In optical-fibre communications field, optical fiber is connected with each other by fiber active linker, fiber active linker is important, Indispensable part, existing fiber active linker is during making, the problem of due to technique itself so that entire Assembling process is relatively complicated, influences working efficiency, and the defect rate of finished product is higher, is unfavorable for the control of quality.
Invention content
In place of avoiding the deficiencies in the prior art, a kind of making side of fiber active linker is provided Method, to effectively solve the shortcomings of the prior art.
To achieve the above object, the technical solution that the present invention takes is:A kind of production method of fiber active linker is used In assembling optical fiber flexible jumper and optical fiber, the fiber active linker includes dust cap, frame set, nut, lock pin, bullet Spring, locating snap ring, cutting ferrule, snap ring and tail sheath, the production method of the fiber active linker include the following steps:
Material preparation step:Prepare each composition loose mail of the fiber active linker, including the dust cap, frame set, spiral shell Cap, lock pin, spring, locating snap ring, cutting ferrule, snap ring and tail sheath;
Optical fiber blanking step:Optical fiber idler wheel is attached to and is cut on cable machine, optical fiber is then sent into cutting machine structure, optical fiber is sheared At required length;
Wear loose mail fiber stripping core step:The optical fiber sheared in optical fiber blanking step is pierced into from tail sheath osculum end, by tail Sheath moves to an off at the 40cm of optical fiber head, and every 12 optical fiber is tied with adhesive tape boundling, then optical fiber is penetrated to snap ring, card successively Set, locating snap ring and spring move to an off snap ring, cutting ferrule, locating snap ring and spring that set installs at the 30cm of optical fiber head;With The oversheath on optical fiber head is peelled off a part by wire stripper so that is peelled off rear buffer layer and is exposed 2.5cm, then cuts partial buffer Layer so that the buffer layer residue 2cm of exposing;Buffer layer is taken out into 1.3cm with wire stripper, exposes fibre core;With the spirituous nothing of leaching Consider the optical fiber that cleansing tissue cleaning peels off to be worth doing;The above-mentioned optical fiber for putting on loose mail is bound, orderly hangs on the hook of suspension line;
Impregnation step:353ND glue and curing agent are prepared according to 10: 1 ratio, glue is obtained after stirring evenly;
Remove bubble step in glue:Ready-made glue in impregnation step is put into measuring cup, then puts measuring cup into vacuum In machine, starts vacuum machine and run 21 minutes, obtain not having bladdery glue;Glue is taken out from vacuum machine, pours into thing It has first tightened in the injection glue bucket of syringe needle, glue valve has correctly been put into injection glue bucket with tweezers, position is to contact injection Subject to glue surface, glue bucket adapter is then screwed;
Lock pin dispensing step:It is the lock pin injecting glue by injecting glue bucket;
Insert fibre core step:The lock pin that dispensing finishes in lock pin dispensing step is put into oven, and loose mail fiber stripping will be worn The optical fiber completed in core step is suspended in oven rack, and the fibre core of optical fiber is inserted into lock pin, and fibre core is appeared 2-4mm, and Front and back slow moving in rotation fibre core 2 times makes glue uniformly respectively in the endoporus of lock pin;
Shape is dripped with the glue of tool modification lock pin tail portion;
Toast fibre core step:Start oven, oven temperatures are set as 120 degree, are toasted 15 minutes;
Cut fine step:The fibre core for exposing insertion core end face is cut off with ruby cutter;
Assembling steps:Spring and locating snap ring are inserted into the tail portion of lock pin;By the buffer layer of optical fiber and oversheath from locating snap ring Tail portion pull out, buffer layer is uniformly wrapped the tail portion knurled portion in locating snap ring, then cutting ferrule is caught in, first blocks the with clamping machine Once, then turn over 90 ° again clamping it is primary;Oversheath is pulled out from the tail portion of cutting ferrule, tail end of the two panels packet in snap ring above and below point Outside, in six side's deck clampings of the upper snap ring clamping machine of set;Tail sheath is advanced into the card slot of locating snap ring;Nut is through On locating snap ring;Some screw thread glue is dripped on the screw thread of locating snap ring, locating snap ring is screwed in frame set by screw thread, nut quilt can be left The right side is movable to be limited between locating snap ring and frame set, and assembled fiber active linker is obtained;
Grinding steps:The lock pin of assembled fiber active linker in assembling steps is put into dedicated grinding clamp It removed photoresist, ground;
Testing procedure:After test passes, packaging obtains finished product.
Further, the metalwork of loose mail requires that 48h salt spray tests can be crossed in the material preparation step.
Further, the glue obtained in the impregnation step will be finished within 2 hours.
Further, after the assembling steps obtain assembled optical fibre device, lock pin should be pressed whether on chipless paper Flexible, nonelastic dismantling is reinstalled.
Further, the test in the testing procedure according to sequencing include end surface measurement, insertion return loss test, end face it is multiple Inspection.
Further, the end surface measurement includes the following steps:
Open the power supply of end face somascope, monitor;
Check whether lock pin damaged surface has removing residual glue, if any then needing to remove, then it is clean with alcohol;
Lock pin is inserted into the hole adapter of detector respective model, the fore-and-aft distance of the camera lens of adjustable side detector, directly The insertion core end face of 400 times of amplification is clearly seen in monitor screen, checks that insertion core end face has no marking, point, bubble, color Spot etc. is done over again Ru defective;
Good lock pin and defective lock pin are stored respectively.
Further, the insertion return loss test is completed using damage detecting instrument is turned back to.
Further, the end face reinspection is identical as the operating method of end surface measurement, detects insertion core end face again and has confirmed that end Whether face is damaged in insertion return loss test.
The above-mentioned technical proposal of the present invention has the advantages that:The entire assembling process of the present invention is relatively simple, no Working efficiency is improved only, and reduces the probability of error, is additionally equipped with a variety of detection processes, is convenient for the control of quality.
Description of the drawings
Fig. 1 is fiber active linker exploded view of the embodiment of the present invention;
Fig. 2 is optical fibre amount connector assembling figure of the embodiment of the present invention;
Fig. 3 is the partial enlarged view at A in Fig. 2.
Specific implementation mode
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for Illustrate the present invention, but cannot be used for limiting the scope of the invention.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term "upper", The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as pair The limitation of the present invention.In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can Can also be electrical connection to be mechanical connection;It can be directly connected, it can also be indirectly connected through an intermediary.For this For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
A kind of production method of fiber active linker, is used for assembling optical fiber flexible jumper and optical fiber 10, and optical fiber is lived Movement connector includes dust cap 1, frame set 2, nut 3, lock pin 4, spring 5, locating snap ring 6, cutting ferrule 7, snap ring 8 and tail sheath 9, light The production method of fine flexible jumper includes the following steps:
Material preparation step:Prepare each composition loose mail of fiber active linker, including dust cap 1, frame cover 2, nut 3, insert Core 4, spring 5, locating snap ring 6, cutting ferrule 7, snap ring 8 and tail sheath 9, require can mistake 48h salt fogs for the metalwork of loose mail in this step Experiment, center set 2, nut 3, spring 5, locating snap ring 6, cutting ferrule 7, snap ring 8 are metalwork;
Optical fiber blanking step:Optical fiber idler wheel is attached to and is cut on cable machine, optical fiber is then sent into cutting machine structure, optical fiber 10 is cut It is cut into the desired length;
Wear loose mail fiber stripping core step:The optical fiber 10 sheared in optical fiber blanking step is pierced into from 9 osculum end of tail sheath, it will Tail sheath 9 moves to an off at the 40cm of optical fiber head, and every 12 optical fiber is tied with adhesive tape boundling, then optical fiber is penetrated snap ring successively Snap ring 8, cutting ferrule 7, locating snap ring 6 and spring 5 that set installs are moved to an off optical fiber head by 8, cutting ferrule 7, locating snap ring 6 and spring 5 At portion 30cm;The oversheath 10a on 10 head of optical fiber is peelled off a part with wire stripper so that peel off rear buffer layer 10b and expose 2.5cm, buffer layer 10b are aramid layers, then cut portion of buffer layer 10b so that the buffer layer 10b residues 2cm of exposing;With stripping Buffer layer 10b is taken out 1.3cm by line tweezer, exposes fibre core 10c;The optical fiber peeled off with spirituous chipless cleansing tissue cleaning is soaked;It will The above-mentioned optical fiber 10 for putting on loose mail is bound, and orderly hangs on the hook of suspension line, flows into next procedure;
It should be noted that optical fiber 10 includes oversheath 10a, buffer layer 10b and fibre core 10c successively from outside to inside;
Impregnation step:353ND glue and curing agent are prepared according to 10: 1 ratio, glue, glue are obtained after stirring evenly Water will be finished within 2 hours, and stirring when is slowly stirred along clockwise direction with toothpick, and wherein 353ND is a kind of light Fibre bonds special glue;
Remove bubble step in glue:Ready-made glue in impregnation step is put into measuring cup, then puts measuring cup into vacuum In machine, starts vacuum machine and run 21 minutes, obtain not having bladdery glue;Glue is taken out from vacuum machine, pours into thing It has first tightened in the injection glue bucket of syringe needle, glue valve has correctly been put into injection glue bucket with tweezers, position is to contact injection Subject to glue surface, glue bucket adapter is then screwed;
Above-mentioned injection glue bucket is a kind of equipment for special injecting glue;
Lock pin dispensing step:It is 4 injecting glue of lock pin by injecting glue bucket, glue is coated in lock pin 4 by injecting glue bucket In the 4a of hole;
Insert fibre core step:The lock pin 4 that dispensing finishes in lock pin dispensing step is put into oven, and loose mail fiber stripping will be worn The optical fiber completed in core step is suspended in oven rack, the fibre core 10c of optical fiber is inserted into the endoporus 4a of lock pin 4, fibre core 10c It appears 2-4mm in the other side, that is, protrudes the left side 2-4mm of lock pin 4, and front and back slow moving in rotation fibre core 2 times, make glue Water is uniformly respectively in the endoporus of lock pin 4;
Shape is dripped with the glue of 4 tail portion of tool modification lock pin, tool can be toothpick;
Toast fibre core step:Start oven, oven temperatures are set as 120 degree, are toasted 15 minutes;
Cut fine step:The fibre core for exposing 4 end face of lock pin is cut off with ruby cutter;
Assembling steps:Spring 5 and locating snap ring 6 are inserted into the tail portion of lock pin 4;By the buffer layer 10b and oversheath 10a of optical fiber It is pulled out from the tail portion of locating snap ring 6, buffer layer is uniformly wrapped the tail portion knurled portion 6a in locating snap ring 6, then cutting ferrule 7 is caught in, With clamping machine first block for the first time, then turn over 90 ° again clamping it is primary;Oversheath is pulled out from the tail portion of cutting ferrule 7, two panels above and below point Packet is outside the tail end of snap ring 8, in six side's deck clampings of the upper clamping machine of snap ring 8 of set;Tail sheath 9 is advanced into locating snap ring 6 Card slot in;Nut 3 is through on locating snap ring 6;Some screw thread glue is dripped on the screw thread of locating snap ring 6, and locating snap ring 6 and frame are covered 2 It is interior to be screwed by screw thread, nut 3 by can left and right it is movable be limited in locating snap ring 6 and frame set 2 between, dust cap 1 is through lock pin 4 On, obtain assembled fiber active linker;
After assembling steps obtain assembled optical fibre device, lock pin 4 should be pressed whether flexible on chipless paper, no bullet Property dismantling reinstall;
Grinding steps:The lock pin 4 of assembled fiber active linker in assembling steps is put into dedicated grinding clamp In removed photoresist, ground;
Specific step of removing photoresist is:It checks at 4 periphery of lock pin and caudal peduncle whether there is glue, qualified lock pin 4 is put into dedicated Grinding clamp has to be attached to position, pays attention to having to gather enough 12 lock pins 4, when such as lock pin 4 less than 12, to consider to be uniformly distributed Or with useless 4 cover of lock pin;Optical fiber boundling is tied with tied silk at from grinding clamp 15cm;The sand paper of 800# is lain in into grinding On rubber cushion, loads onto fixture and remove photoresist, until glue has just been gone;
Specifically grinding steps are:Pouncing paper is cleaned with pure water and chipless paper, air gun is used in combination to blow clean;On pouncing paper Uniformly one circle pure water of drop, then optical fiber is hung on flex holder, grinding clamp is loaded onto into grinder and is roughly ground, is taken after corase grinding Lower grinding clamp cleaning, mill and rubbing down in being carried out referring next to above-mentioned steps, specific milling time and grinding pressure are referring to following table:
Grinding steps Pouncing paper Frosted liquid Milling time (second)
It removes photoresist 30μ 35-40
Corase grinding Pure water 35-40
Middle mill Pure water 35-40
Rubbing down 0.02μ Pure water 25-35
Testing procedure:After test passes, packaging obtains finished product.
Test in testing procedure includes that end surface measurement, insertion return loss test, end face are rechecked according to sequencing.
End surface measurement includes the following steps:
Open the power supply of end face somascope, monitor;Check whether 4 damaged surface of lock pin has removing residual glue, if any then needing It removes, then clean with alcohol;Lock pin 4 is inserted into the hole adapter of detector respective model, the camera lens of adjustable side detector Fore-and-aft distance check that whether there is or not draw for 4 end face of lock pin until clearly seeing 400 times of 4 end face of lock pin of amplification in monitor screen Trace, point, bubble, color spot etc. will do over again as defective;Good lock pin 4 is stored respectively with defective lock pin 4.
Insertion return loss test is completed using damage detecting instrument is turned back to.
End face reinspection is identical as the operating method of end surface measurement, detects 4 end face of lock pin again and has confirmed that whether end face is inserting It is damaged in return loss test.
The embodiment of the present invention provides for the sake of example and description, and is not exhaustively or by this to send out It is bright to be limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Choosing It is and to make those skilled in the art to more preferably illustrate the principle of the present invention and practical application to select and describe embodiment It will be appreciated that various embodiments with various modifications of the present invention to design suitable for special-purpose.

Claims (8)

1. a kind of production method of fiber active linker, is used for assembling optical fiber flexible jumper and optical fiber, the optical fiber is lived Movement connector includes dust cap, frame set, nut, lock pin, spring, locating snap ring, cutting ferrule, snap ring and tail sheath, which is characterized in that The production method of the fiber active linker includes the following steps:
Material preparation step:Prepare each composition loose mail of the fiber active linker, including the dust cap, frame set, nut, inserts Core, spring, locating snap ring, cutting ferrule, snap ring and tail sheath;
Optical fiber blanking step:Optical fiber idler wheel is attached to and is cut on cable machine, optical fiber is then sent into cutting machine structure, optical fiber is cut into institute Need length;
Wear loose mail fiber stripping core step:The optical fiber sheared in optical fiber blanking step is pierced into from tail sheath osculum end, by tail sheath It moves to an off at the 40cm of optical fiber head, then optical fiber is penetrated to snap ring, cutting ferrule, locating snap ring and spring successively, the card that set is installed Ring, cutting ferrule, locating snap ring and spring move to an off at the 30cm of optical fiber head;The oversheath on optical fiber head is peelled off one with wire stripper Part so that peel off rear buffer layer and expose 2.5cm, then cut portion of buffer layer so that the buffer layer residue 2cm of exposing;With Buffer layer is taken out 1.3cm by wire stripper, exposes fibre core;The optical fiber peeled off with spirituous chipless cleansing tissue cleaning is soaked;It will be above-mentioned The optical fiber for putting on loose mail is bound, and orderly hangs on the hook of suspension line;
Impregnation step:353ND glue and curing agent are prepared according to 10: 1 ratio, glue is obtained after stirring evenly;
Remove bubble step in glue:Ready-made glue in impregnation step is put into measuring cup, is then put measuring cup in vacuum machine into, Start vacuum machine and run 21 minutes, obtains not having bladdery glue;Glue is taken out from vacuum machine, is poured into advance It tightens in the injection glue bucket of syringe needle;
Lock pin dispensing step:It is the lock pin injecting glue by injecting glue bucket;
Insert fibre core step:The lock pin that dispensing finishes in lock pin dispensing step is put into oven, and loose mail fiber stripping core step will be worn The optical fiber completed in rapid is suspended in oven rack, and the fibre core of optical fiber is inserted into lock pin, and fibre core is appeared 2-4mm, and front and back Slow moving in rotation fibre core 2 times makes glue uniformly respectively in the endoporus of lock pin;
Shape is dripped with the glue of tool modification lock pin tail portion;
Toast fibre core step:Start oven, oven temperatures are set as 120 degree, are toasted 15 minutes;
Cut fine step:The fibre core for exposing insertion core end face is cut off with ruby cutter;
Assembling steps:Spring and locating snap ring are inserted into the tail portion of lock pin;By the buffer layer of optical fiber and oversheath from the tail of locating snap ring Portion pulls out, and buffer layer is uniformly wrapped the tail portion knurled portion in locating snap ring, then cutting ferrule is caught in, first blocks first with clamping machine It is secondary, then turn over 90 ° again clamping it is primary;Oversheath is pulled out from the tail portion of cutting ferrule, two panels packet is outside the tail end of snap ring above and below point Portion, in six side's deck clampings of the upper snap ring clamping machine of set;Tail sheath is advanced into the card slot of locating snap ring;Nut is through only On rotating ring;Some screw thread glue is dripped on the screw thread of locating snap ring, locating snap ring is screwed in frame set by screw thread, nut can be controlled It is movable to be limited between locating snap ring and frame set, dust cap is through on lock pin, assembled fiber active linker is obtained;
Grinding steps:The lock pin of assembled fiber active linker in assembling steps is put into dedicated grinding clamp and is carried out It removes photoresist, grind;
Testing procedure:After test passes, packaging obtains finished product.
2. a kind of production method of fiber active linker according to claim 1, which is characterized in that the material preparation step The metalwork of middle loose mail requires that 48h salt spray tests can be crossed.
3. a kind of production method of fiber active linker according to claim 1, which is characterized in that the impregnation step In obtained glue to be finished within 2 hours.
4. a kind of production method of fiber active linker according to claim 1, which is characterized in that the assembling steps After obtaining assembled optical fibre device, lock pin should be pressed whether flexible on chipless paper, nonelastic dismantling is reinstalled.
5. a kind of production method of fiber active linker according to claim 1, which is characterized in that the testing procedure In test according to sequencing include end surface measurement, insertion return loss test, end face recheck.
6. a kind of production method of fiber active linker according to claim 5, which is characterized in that the end surface measurement Include the following steps:
Open the power supply of end face somascope, monitor;
Check whether lock pin damaged surface has removing residual glue, if any then needing to remove, then it is clean with alcohol;
Lock pin is inserted into the hole adapter of detector respective model, the fore-and-aft distance of the camera lens of adjustable side detector, Zhi Daojian The insertion core end face of 400 times of amplification is clearly seen in visual organ screen, checks that insertion core end face has no marking, point, bubble, color spot Deng doing over again Ru defective;
Good lock pin and defective lock pin are stored respectively.
7. a kind of production method of fiber active linker according to claim 5, which is characterized in that the insertion return loss is surveyed Examination is completed using damage detecting instrument is turned back to.
8. a kind of production method of fiber active linker according to claim 5, which is characterized in that the end face reinspection It is identical as the operating method of end surface measurement, insertion core end face is detected again has confirmed that whether end face is damaged in insertion return loss test.
CN201810285882.9A 2018-04-03 2018-04-03 Manufacturing method of optical fiber movable connector Active CN108508542B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810285882.9A CN108508542B (en) 2018-04-03 2018-04-03 Manufacturing method of optical fiber movable connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810285882.9A CN108508542B (en) 2018-04-03 2018-04-03 Manufacturing method of optical fiber movable connector

Publications (2)

Publication Number Publication Date
CN108508542A true CN108508542A (en) 2018-09-07
CN108508542B CN108508542B (en) 2020-09-08

Family

ID=63379758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810285882.9A Active CN108508542B (en) 2018-04-03 2018-04-03 Manufacturing method of optical fiber movable connector

Country Status (1)

Country Link
CN (1) CN108508542B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110333578A (en) * 2019-07-04 2019-10-15 中天宽带技术有限公司 A kind of production method and fiber active linker of high-performance optical fiber flexible jumper
CN110346875A (en) * 2019-06-06 2019-10-18 佛山市冰蓝科技有限公司 A kind of optical cable connector enhancing stretching resistance
CN110576348A (en) * 2019-09-24 2019-12-17 宁波阳光和谱光电科技有限公司 Low insertion loss As2S3Method for processing end face of optical fiber connector
CN112105978A (en) * 2019-01-08 2020-12-18 住友电气工业株式会社 Method for manufacturing optical connector
CN113495329A (en) * 2021-07-07 2021-10-12 上海晶鹰光电科技有限公司 Method for manufacturing multimode large-wire-diameter suspended SMA (shape memory alloy) optical fiber connector
CN114400498A (en) * 2022-02-18 2022-04-26 山东华光光电子股份有限公司 Semiconductor laser capable of improving uniformity of output light spots and preparation method thereof
CN114706170A (en) * 2022-03-31 2022-07-05 江苏威晟轨道交通科技有限公司 Vehicle-mounted jumper production process
CN115561863A (en) * 2022-10-11 2023-01-03 四川天邑康和通信股份有限公司 Manufacturing method of self-adhesion invisible optical fiber movable connector
CN118244432A (en) * 2024-05-24 2024-06-25 度亘核芯光电技术(苏州)有限公司 Method for preparing optical fiber assembly

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003311597A (en) * 2002-04-30 2003-11-05 Totoku Electric Co Ltd Method and apparatus for slantly grinding end face of optical fiber
CN102841411A (en) * 2012-09-05 2012-12-26 武汉隽龙科技有限公司 SC type optical fiber connector with light filtering function and manufacturing technology thereof
JP2015077648A (en) * 2013-10-16 2015-04-23 並木精密宝石株式会社 Optical fiber end face grinder
CN205720780U (en) * 2016-03-31 2016-11-23 河北东合通信设备有限公司 FC type fiber active linker loose mail
CN106291824A (en) * 2015-04-29 2017-01-04 高安天孚光电技术有限公司 A kind of through-type fiber connector assembly technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003311597A (en) * 2002-04-30 2003-11-05 Totoku Electric Co Ltd Method and apparatus for slantly grinding end face of optical fiber
CN102841411A (en) * 2012-09-05 2012-12-26 武汉隽龙科技有限公司 SC type optical fiber connector with light filtering function and manufacturing technology thereof
JP2015077648A (en) * 2013-10-16 2015-04-23 並木精密宝石株式会社 Optical fiber end face grinder
CN106291824A (en) * 2015-04-29 2017-01-04 高安天孚光电技术有限公司 A kind of through-type fiber connector assembly technology
CN205720780U (en) * 2016-03-31 2016-11-23 河北东合通信设备有限公司 FC type fiber active linker loose mail

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112105978A (en) * 2019-01-08 2020-12-18 住友电气工业株式会社 Method for manufacturing optical connector
CN112105978B (en) * 2019-01-08 2022-11-08 住友电气工业株式会社 Method for manufacturing optical connector
CN110346875A (en) * 2019-06-06 2019-10-18 佛山市冰蓝科技有限公司 A kind of optical cable connector enhancing stretching resistance
CN110346875B (en) * 2019-06-06 2024-06-07 佛山市冰蓝科技有限公司 Optical cable connector capable of enhancing tensile resistance
CN110333578A (en) * 2019-07-04 2019-10-15 中天宽带技术有限公司 A kind of production method and fiber active linker of high-performance optical fiber flexible jumper
CN110576348A (en) * 2019-09-24 2019-12-17 宁波阳光和谱光电科技有限公司 Low insertion loss As2S3Method for processing end face of optical fiber connector
CN113495329B (en) * 2021-07-07 2022-06-28 上海晶鹰光电科技有限公司 Method for manufacturing multimode large-wire-diameter suspended SMA (shape memory alloy) optical fiber connector
CN113495329A (en) * 2021-07-07 2021-10-12 上海晶鹰光电科技有限公司 Method for manufacturing multimode large-wire-diameter suspended SMA (shape memory alloy) optical fiber connector
CN114400498A (en) * 2022-02-18 2022-04-26 山东华光光电子股份有限公司 Semiconductor laser capable of improving uniformity of output light spots and preparation method thereof
CN114706170A (en) * 2022-03-31 2022-07-05 江苏威晟轨道交通科技有限公司 Vehicle-mounted jumper production process
CN115561863A (en) * 2022-10-11 2023-01-03 四川天邑康和通信股份有限公司 Manufacturing method of self-adhesion invisible optical fiber movable connector
CN118244432A (en) * 2024-05-24 2024-06-25 度亘核芯光电技术(苏州)有限公司 Method for preparing optical fiber assembly
CN118244432B (en) * 2024-05-24 2024-09-27 度亘核芯光电技术(苏州)有限公司 Method for preparing optical fiber assembly

Also Published As

Publication number Publication date
CN108508542B (en) 2020-09-08

Similar Documents

Publication Publication Date Title
CN108508542A (en) A kind of production method of fiber active linker
CA2351326C (en) Optical fiber connector and ferrule used for it and production method for ferrule
Voigts et al. An easy-to-assemble, robust, and lightweight drive implant for chronic tetrode recordings in freely moving animals
CN106217030B (en) A kind of control system of blood taking needle kludge
JP2022084721A (en) Apparatus and methods for inspecting wire segment
CN107923821A (en) Observe preparation of specimen cell holding substrate holder and the external member including it and the production method for observing sample
WO2013012256A2 (en) Brush and brushgun for collecting cervical cells
CN109262256A (en) A kind of production equipment and its automatic assembly method with nail bin automatic assembling
CN209310459U (en) A kind of multi-functional digestion instrument sampling probe cleaning-drying instrument
CN105759366B (en) A kind of preparation method of zero loss optical fiber connector
EP2217920A1 (en) Device and method for automatically releasing and measuring active ingredients of a pharmaceutical preparation
CN106475903A (en) rock clamper
DE112016001776B4 (en) Tablet transfer device
CN207742649U (en) The joint tool and abutted equipment of touch screen and display screen
CN208351045U (en) A kind of optical fiber cable beam tube knife
CN104713703B (en) Bar display detection mechanism
CN110860978B (en) Medical optical fiber end peeling and polishing machine
CN207636839U (en) A kind of self-positioning objective table of microscope Multi-example
CN209304457U (en) Aircraft fuel oil filter cover removal tool
CN203455158U (en) Cornea contact lens detection positioning device
CN207746647U (en) A kind of Kato dismounting module
CN208459198U (en) A kind of fiber wet friction test equipment
CN208146040U (en) A kind of rack for test tube of chemical experiment
CN107052770B (en) A kind of assembly method of infrared sphere
CN209695165U (en) A kind of paediatrics bronchoscope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Fabrication Method of Optical Fiber Movable Connector

Effective date of registration: 20221221

Granted publication date: 20200908

Pledgee: Bank of China Limited by Share Ltd. Cangzhou branch

Pledgor: YIBO COMMUNICATION EQUIPMENT GROUP Co.,Ltd.

Registration number: Y2022980027194

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20200908

Pledgee: Bank of China Limited by Share Ltd. Cangzhou branch

Pledgor: YIBO COMMUNICATION EQUIPMENT GROUP Co.,Ltd.

Registration number: Y2022980027194