CN107842311A - A kind of multifunctional tunnel rock drilling arching all-in-one - Google Patents

A kind of multifunctional tunnel rock drilling arching all-in-one Download PDF

Info

Publication number
CN107842311A
CN107842311A CN201711399183.9A CN201711399183A CN107842311A CN 107842311 A CN107842311 A CN 107842311A CN 201711399183 A CN201711399183 A CN 201711399183A CN 107842311 A CN107842311 A CN 107842311A
Authority
CN
China
Prior art keywords
arm
rock drilling
arching
slewing equipment
bow member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711399183.9A
Other languages
Chinese (zh)
Other versions
CN107842311B (en
Inventor
邵凡
郎媛
谭伟成
张惠斌
彭龙
罗运长
林叔斌
龚小柱
曹宪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Keda Intelligent Equipments Inc Co
Original Assignee
Changsha Keda Intelligent Equipments Inc Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Keda Intelligent Equipments Inc Co filed Critical Changsha Keda Intelligent Equipments Inc Co
Priority to CN201711399183.9A priority Critical patent/CN107842311B/en
Publication of CN107842311A publication Critical patent/CN107842311A/en
Application granted granted Critical
Publication of CN107842311B publication Critical patent/CN107842311B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

A kind of multifunctional tunnel rock drilling arching all-in-one, including it is built up in chassis(1)On host platform(2), the rear portion of the host platform passes through revolving bed(5)Two arm supports are set(6), the arm support can fold withdrawal under traveling or inactive state;The front end revolution of forearm, which is provided with, grabs arch device(18), rock drilling device(19), manned platform(24), truck-mounted crane(23).The present invention can carry out bow member supporting operation when full section of tunnel, two steps, three bench excavations, pass through the cooperation of two arm supports and its equipment above, the drilling and installation for can realize that bow member is transported with car, bow member is installed, hanging bar-mat reinforcement, weld horizontal bar, anchor pole and advanced tubule, and efficiency is far above artificial.

Description

A kind of multifunctional tunnel rock drilling arching all-in-one
Technical field
The present invention relates to engineering machinery, more particularly to a kind of multifunctional tunnel rock drilling arching all-in-one.
Background technology
In constructing tunnel, when country rock grade is poor, generally require to carry out bow member supporting, to improve the stabilization of country rock Property.
Existing bow member machine is generally two-arm, is configured with one or two hanging basket, and arm support is generally two section telescopic arms.Due to arm Frame can not fold, and the manipulator of arm support front end can not reach the installation that bow member is carried out inside the step of tunnel three, and practice of construction In the bow member supportings of three steps be very universal, thus still need manually to carry out the bow member supporting of three steps.Arch in addition Frame, which installs, need to beat lock foot anchoring stock and system anchor bolt, if country rock is very poor, also need to carry out advanced tubule supporting, due to Existing bow member machine be not equipped with anchor pole and advanced tubule drilling and erecting device, it is necessary in addition arrange manual operation gas supporting leg Roof-bolter is very low come the installation that drills and carry out anchor pole, efficiency.
Bow member machine uses truck chassis or crawler body at present, and some is even to the simple refit of digging machine, structure, work( Can be all fairly simple, a complete set of solutions for bow member supporting is not formed, is not brand-new arch center mounting device, thus all Do not succeeded in constructing tunnel use.
In a word, existing bow member machine can not realize the full working scope of tunnel arch installation(Tunneling boring, two steps, three steps)、 Full process(The drilling and installation that bow member transports with car, bow member docks, hangs bar-mat reinforcement, welds horizontal bar, anchor pole and advanced tubule)Apply Work, and efficiency is low, seriously constrains use of the bow member machine in constructing tunnel, and up to the present, the country is real without one The equipment of tunnel arch installation can be met.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of brand-new tunnel support with arching and rock drilling function Mobile workbench, when the chassis can carry out the three kinds of benching tunnelling method excavations in tunnel(Tunneling boring, two steps, three steps)Arch construction, together When can realize that bow member transports with car, bow member docking, hangs bar-mat reinforcement, weldering horizontal bar, the drilling of anchor pole and advanced tubule and installation All process steps are constructed, and efficiency is far above artificial.
In order to solve the above problems, the technical solution adopted in the present invention is:A kind of multifunctional tunnel rock drilling arching one Machine, including the host platform being built up on chassis, the rear portion of the host platform set two arm supports, host platform by revolving bed Both sides be disposed with support arch device, the front and back ends bottom of host platform is disposed with front leg strut and rear support leg, wherein:
The arm support includes integral large arm, middle arm and the forearm of hinge connections, and sets and can make between the large arm and revolving bed The big arm cylinder of large arm reverse flip, middle arm oil cylinder of the middle arm parallel folds in large arm can be made by being set between middle arm and large arm, The leveling cyclinder of forearm keep level can be made by being set between forearm and middle arm, arm support is folded receipts under traveling or inactive state Return;The front end revolution of forearm, which is provided with, grabs arch device, rock drilling device, manned platform, truck-mounted crane;It is described to grab arch device and rock drilling dress Put and be integrated on the above and below at a balladeur train both ends, the middle part of the balladeur train is connected to by the first slewing equipment rotated around X-axis Forearm, make described to grab arch device and the position of rock drilling device is switched over by the rotation of the first slewing equipment;
The rock drilling device includes rock drill, upper guide plate, drilling rod, propelling cylinder, forward beam, compensating cylinder, lower guide plate, institute State rock drill and be connected the first prismatic pair of composition with forward beam by upper guide plate, one end and the forward beam of the propelling cylinder connect Connect, the other end of propelling cylinder is connected by wire rope pulley mechanism with rock drill;The forward beam passes through lower guide plate and cunning Frame connection the second prismatic pair of composition, compensating cylinder one end are connected with balladeur train, and the other end is connected with forward beam.
The support arch device is arranged on host platform both sides, support arch device bag by the first mounting seat and the second mounting seat First and second connecting rod is included, one end of first and second connecting rod is hingedly connected to first and second mounting seat, and first connecting rod and second connecting rod The other end be hinged one be used to place the bracket with fixed steel arch, oscillating oil cylinder is hinged between the first mounting seat and second connecting rod.
The chassis is the wheel undercarriage of four-wheel drive.
The big arm cylinder is arranged on the top of large arm.
The middle arm includes middle arm overcoat, is arranged telescopic oil cylinder in middle arm overcoat, middle arm inner sleeve is arranged in telescopic oil cylinder, and The telescopic end of middle arm inner sleeve and telescopic oil cylinder connects, one end connection large arm of the middle arm oil cylinder, arm overcoat in other end connection.
One end of first slewing equipment is fixedly connected with balladeur train, and the other end is hinged on the second revolution dress rotated around Y-axis Put, the second slewing equipment is fixedly connected with forearm by connecting seat.
The arch device of grabbing grabs bow member including one, and the both ends for grabbing bow member set clamp structure and guide frame respectively, should The bottom for grabbing bow member sets the 5th slewing equipment, and the axis of the 5th slewing equipment is with grabbing the axially vertical of bow member;5th revolution The bottom of device is connected with the 6th slewing equipment, and the axis of the five, the six slewing equipments is mutually perpendicular to, and making to grab bow member can be around The axis rotation of five slewing equipments, it can also be rotated around the axis of the 6th slewing equipment.
The clamp structure is fastened on the fixed seat for grabbing bow member both ends including two, the middle parts of two clamping limbs respectively with The outside of fixed seat is hinged, and the upper end of two clamping limbs is fixedly connected with one end of connecting plate, and the other end of two connecting plates leads to respectively Hinge briquetting is crossed, clamping oil cylinder is set between the lower end of two clamping limbs.
The guide frame includes relative two guide plates set up, and the upper end of two guide plates is respectively set to relative tilt Hypotenuse.
The horizontal inner sleeve that the rear support leg is stretched out by energy after oblique is connected with host platform, to keep the stabilization of complete machine Property.
The multi-functional chassis of tunnel support includes diesel power systems independent of each other and motor power system, institute State diesel power systems and provide power for traveling, supporting leg action, the motor power system passes through in cable and tunnel Power station is connected, and power is provided for equipment and accessory system.
Arm support of the present invention is under traveling or inactive state, and in the presence of big arm cylinder, reverse flip is placed in parallel large arm On the support base of host platform, in the presence of middle arm oil cylinder, parallel folds are placed in large arm middle arm.Forearm is in leveling oil Keep level in the presence of cylinder.More arm support folding retract modes of such a original creation, perfection solves conventional bow member horn frame can not Withdrawal causes the big problem of the long radius of turn of vehicle, and is so designed that, arm support development rate is fast, arm support stretch it is longer more Height, more due to there is folding arm, in constructing tunnel, arm support can be made to cross middle step, reach and bow member supporting is carried out inside three steps.
The present invention grabs the opposite that arch device is arranged on balladeur train with rock drilling device, and one end of balladeur train and the first slewing equipment is consolidated Fixed, the other end of the first slewing equipment is fixed by connecting seat and the second slewing equipment.First slewing equipment and the second revolution fill Putting can be rotated around X-axis and Y-axis respectively, and the switching of arch function and rock drilling function and the change of working range are grabbed so as to reach.
The present invention is using cumulative principle, the half stroke using the displacement of the relative forward beam of rock drill as rock drilling device, Displacement other half stroke as rock drilling device of the forward beam with respect to frame.So whole rock drilling device is in identical impulse stroke In the case of forward beam length dimension by be conventional apparatus half, need of the rock drilling device in operation in narrow space can be met Will.
Bow member is lifted into by truck-mounted crane by the multi-functional chassis of tunnel support of the present invention grabs arch device and grabs on bow member, grabs bow member Adjust posture after clamping bow member, carry out the docking of two sections of bow members in the air, afterwards workmen on hanging basket with bolt by bow member It is fixed.After installing a Pin bow members, horizontal bar is welded, hangs bar-mat reinforcement.Finally drilled by rock drill and anchor pole and advanced tubule be installed. This completes the once mounting of bow member.When the multi-functional chassis of tunnel support of the present invention carry out full section of tunnel, two steps or During the arch construction of three steps, the freedom of equipment on collapsing length, luffing angle and arm support that can be by adjusting arm support Degree, meets various operating mode needs.
Brief description of the drawings
Fig. 1 is a kind of stereogram of multifunctional tunnel rock drilling arching all-in-one of the present invention.
Fig. 2 is the schematic diagram after the arm support of the present invention is withdrawn
Fig. 3 is the schematic diagram of the arm support of the present invention(Rock drilling device is in front end).
Fig. 4 is the schematic diagram one grabbed arch device and switched with rock drilling device by the first slewing equipment of the present invention(Rock drilling fills Put in front end).
Fig. 5 is the schematic diagram two grabbed arch device and switched with rock drilling device by the first slewing equipment of the present invention(Grab arch dress Put in front end).
Fig. 6 is the assembling schematic diagram that the present invention grabs arch device.
Fig. 7 is that the present invention grabs the clamping device installation diagram that arch device is used for I-steel bow member.
Fig. 8 is the rock drilling device structural representation that there is the present invention two-stage to promote.
Fig. 9 is two/one stroke structural representation before rock drilling device of the present invention promotes.
Figure 10 is half stroke structural representation after rock drilling device of the present invention promotes.
Figure 11 is the assembling schematic diagram that present invention support encircles device.
Figure 12 is leg structure schematic diagram of the present invention.
Embodiment
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of multifunctional tunnel rock drilling arching all-in-one provided by the invention, is mainly put down by chassis 1, main frame Platform 2, support arch device 4, arm support 6, supporting leg 7 form.Chassis 1 is wheel undercarriage, four-wheel drive, there is faster travel speed and preferably Climbing capacity.On host platform 2, hydraulic pressure, automatically controlled, dynamical system and other accessory systems are disposed with, host platform 2 is arranged There is supporting leg 7, keep whole vehicle stability when bow member machine is constructed, avoid tumbling.Arm support 6 is arranged on host platform 2 by revolving bed 5 On, and arm support 6 has two, structure is similar, is arranged in the rear portion of host platform 2.Support arch device 4 is arranged on master by mounting seat 3 The both sides of machine platform 2, quantity have 2, and structure is similar.
As shown in Fig. 2 under traveling or inactive state, the large arm 11 of arm support 6 is reversely turned in the presence of big arm cylinder 12 Turn to be placed in parallel on the support base 8 of host platform 6, for middle arm 9 in the presence of middle arm oil cylinder 10, parallel folds are placed on large arm On 11.The keep level in the presence of leveling cyclinder 13 of forearm 14.More arm support folding retract modes of such a original creation, perfection solve Conventional bow member horn frame can not withdraw the problem for causing the long radius of turn of vehicle big, and arm support development rate is fast.This hair This tunnel support Mobile workbench with arching and rock drilling function of bright offer, can be in 6m single-track tunnel in cross-sectional width Smoothly current and construction.
As shown in figure 3, the arm support 6 of the present invention includes revolving bed 5, the one end of big arm cylinder 12 is hinged on revolving bed 5, another End is hinged on the upper edge of large arm 11;Middle arm 9 includes the middle arm overcoat 15 that one end is hinged in large arm 11, one end of middle arm inner sleeve 17 It is set in middle arm overcoat 15 and makees relative slip, the other end of middle arm inner sleeve 17 is hinged on forearm 14, and middle arm inner sleeve 17 is logical The flexible of telescopic oil cylinder 16 is crossed to drive.The keep level in the presence of leveling cyclinder 13 of forearm 14.The front end of forearm 14 is set Grab arch device 18 and rock drilling device 19.Manned platform 24 is connected by the 3rd slewing equipment 21 with forearm 14, can pitching and flexible, Pass through the automatically controlled real-time level for realizing manned platform 24.Truck-mounted crane 23 is connected by slew gear 22 with forearm 14, energy pitching, is stretched Contracting, can 360 ° revolution bow member is lifted into grab arch device 18 clamping head on.
As shown in Figure 4, Figure 5, grab arch device 18 to be arranged on the upper and lower surface of a balladeur train 40 with rock drilling device 19, grab arch Device 18 is connected by the 4th slewing equipment 26 with balladeur train 40, and rock drilling device 19 is set directly on balladeur train 40, and balladeur train 40 Middle part is fixedly connected with one end of the first slewing equipment 20, and the other end of the first slewing equipment 20 is turned round by connecting seat 27 and second Device 25 is fixedly connected, and the second slewing equipment 25 is fixedly linked with forearm 14.First slewing equipment 20 rotates around X-axis, thus logical The rotation of the first slewing equipment 20 is crossed, can be achieved to grab the switching of arch device 18 and rock drilling device 19, cunning is in when grabbing arch device 18 During 40 top of frame, can clamping bow member, and pass through the first slewing equipment 20 rotated around X-axis, the second slewing equipment rotated around Y-axis 25th, the 4th slewing equipment 26 adjustment bow member posture, carries out the installation of bow member.When the first slewing equipment 20 rotates 180 degree again, chisel Rock device 19 is in the top of balladeur train 40, you can is drilled and installed anchor pole and ductule operation.
As shown in Figure 6, Figure 7, grab arch device 18 and grab bow member 1813 including one, the both ends for grabbing bow member set clamping to tie respectively Structure 1811 and guide frame 1812, the bottom for grabbing bow member 1813 set the 5th slewing equipment 1814, and the 5th slewing equipment 1814 axis is with grabbing the axially vertical of bow member 1813;The bottom of 5th slewing equipment 1814 connects with the 6th slewing equipment 1815 Connect, and the axis of the five, the six slewing equipments 1814,1815 is mutually perpendicular to, making to grab bow member 1813 can be around the 5th slewing equipment 1814 axis rotation, it can also be rotated around the axis of the 6th slewing equipment 1815.Clamp structure 1811 is connected including two Grabbing the fixed seat 18115 at the both ends of bow member 1813, the outside of the middle parts of two clamping limbs 18112 respectively with fixed seat 18115 is hinged, And two the upper end of clamping limb 18112 be fixedly connected with one end of connecting plate 18113, the other end of two connecting plates 18113 passes through respectively Hinge briquetting 18114, clamping oil cylinder 18111 is set between the lower end of two clamping limbs 18112.Guide frame 1812 includes phase To two guide plates 18121 set up, the upper end of two guide plates 18121 is respectively set to the hypotenuse of relative tilt.
As Figure 8-Figure 10, rock drilling device 19 includes rock drill 191, upper guide plate 192, drilling rod 193, propelling cylinder 194th, forward beam 195, compensating cylinder 196, lower guide plate 197.Rock drill 191 is connected by upper guide plate 192 with forward beam 195 The first prismatic pair is formed, one end of propelling cylinder 194 is connected with forward beam 195, and the other end of propelling cylinder 194 passes through steel wire rope Pulley mechanism is connected with rock drill 191, and rock drill will be acted on by wire rope pulley mechanism when propelling cylinder 194 works 191, relative motion of the rock drill 191 with respect to forward beam 195 is realized, so as to realize the half stroke of rock drilling device 19.Forward beam 195 are connected the second prismatic pair of composition by lower guide plate 197 with balladeur train 40, and the one end of compensating cylinder 196 is connected with balladeur train 40, another End is connected with forward beam 195, when compensating cylinder 196 works forward beam 195 will be promoted to be moved with respect to balladeur train 40, to realize rock drilling Another half trip of device.
Drilling rod 193 is connected with rock drill 191, balladeur train 40 is provided with the puncheon centralizing device 1910 for being used for buttressing drilling rod 193.Balladeur train Positional cylinder 198 is additionally provided with 40, the front end of positional cylinder 198 is provided with locating rod 199, will when positional cylinder 198 stretches out Locating rod 199 is driven toward extension, until it is pushed up onto working face.
As shown in figure 11, steel arch 31 is placed on the carrier 34, and the one end of first connecting rod 29 is be hinged on the carrier 34, other end hinge It is connected in the first mounting seat 28, the first mounting seat 28 is connected with host platform 2.The one end of second connecting rod 33 is be hinged on the carrier 34, The other end is hinged in the second mounting seat 32, and the second mounting seat 32 is connected with host platform 2.The one end of oscillating oil cylinder 30 is hinged on On two connecting rods 33, the other end is hinged in the first mounting seat 28.By the flexible of oscillating oil cylinder 30, bracket 34 and steel arch 31 are driven It is front and rear to move up and down, it is easy to lift steel arch 31.
As shown in figure 12, supporting leg 7 includes front leg strut 35 and rear support leg 38, and front leg strut 35 and rear support leg 38 are arranged in master The both sides of machine platform 6, and scalable front leg strut inner sleeve 36 is provided with front leg strut 35, it is provided with telescopic rear support leg in rear support leg 38 Inner sleeve 39, while rear support leg 38 is connected by horizontal inner sleeve 37 with host platform 2.When tunnel excavation length of bench is shorter When, front leg strut inner sleeve 36 is stretched out longer than rear support leg inner sleeve 39, thus can be supported on the A of slope, be made complete machine level to carry out Operation.Other horizontal inner sleeve 37 can it is oblique after stretch the stability for keeping complete machine.

Claims (10)

1. a kind of multifunctional tunnel rock drilling arching all-in-one, including it is built up in chassis(1)On host platform(2), the main frame puts down The rear portion of platform passes through revolving bed(5)Two arm supports are set(6), the both sides of host platform are disposed with support arch device(4), host platform Front and back ends bottom be disposed with front leg strut(35)And rear support leg(38), it is characterised in that:
The arm support(6)Including the integral large arm of hinge connections(11), middle arm(9)And forearm(14), and the large arm and revolution Large arm reverse flip can be made and realize the big arm cylinder of folding by being set between seat(12), middle arm can be made by being set between middle arm and large arm Middle arm oil cylinder of the parallel folds in large arm(10), the leveling cyclinder that can make forearm keep level is set between forearm and middle arm (13), arm support is folded withdrawal under traveling or inactive state;The front end of forearm is provided with by slew gear grabs arch device (18), rock drilling device(19), manned platform(24), truck-mounted crane(23), and described grab arch device(18)And rock drilling device(19)Collection Cheng Yi balladeur trains(40)Above and below on, the middle part of the balladeur train passes through the first slewing equipment for being rotated around X-axis(20)It is connected to small Arm, make described to grab arch device and the position of rock drilling device is switched over by the rotation of the first slewing equipment;
The rock drilling device includes rock drill(191), upper guide plate(192), drilling rod(193), propelling cylinder(194), forward beam (195), compensating cylinder(196), lower guide plate(197), the rock drill is connected by upper guide plate with forward beam forms first Prismatic pair, one end of the propelling cylinder are connected with forward beam, and the other end of propelling cylinder passes through wire rope pulley mechanism and chisel Rock machine connects;The forward beam is connected the second prismatic pair of composition by lower guide plate with balladeur train, and compensating cylinder one end connects with balladeur train Connect, the other end is connected with forward beam.
A kind of 2. multifunctional tunnel rock drilling arching all-in-one according to claim 1, it is characterised in that the support arch device (4)Pass through the first mounting seat(28)With the second mounting seat(32)Installed in host platform both sides, support arch device includes first and second Connecting rod(29、33), one end of first and second connecting rod is hingedly connected to first and second mounting seat, and first connecting rod and second connecting rod The other end be hinged one is used to place the bracket with fixed steel arch(34), oscillating oil cylinder is hinged between the first mounting seat and second connecting rod (30).
3. a kind of multifunctional tunnel rock drilling arching all-in-one according to claim 1, it is characterised in that the chassis is four The wheel undercarriage of wheel drive.
A kind of 4. multifunctional tunnel rock drilling arching all-in-one according to claim 1, it is characterised in that the big arm cylinder It is arranged on the top of large arm.
5. a kind of multifunctional tunnel rock drilling arching all-in-one according to claim 1, it is characterised in that the middle arm includes Middle arm overcoat(15), telescopic oil cylinder is arranged in middle arm overcoat(16), middle arm inner sleeve is arranged in telescopic oil cylinder(17), and middle arm inner sleeve It is connected with the telescopic end of telescopic oil cylinder, one end connection large arm of the middle arm oil cylinder, arm overcoat in other end connection.
A kind of 6. multifunctional tunnel rock drilling arching all-in-one according to claim 1, it is characterised in that first revolution One end of device is fixedly connected with balladeur train, and the other end is hinged on the second slewing equipment rotated around Y-axis(25)On, the second slewing equipment Pass through connecting seat(27)It is fixedly connected with forearm.
7. a kind of multifunctional tunnel rock drilling arching all-in-one according to claim 1, it is characterised in that described to grab arch device Bow member is grabbed including one(1813), the both ends for grabbing bow member set clamp structure (1811) and guide frame (1812) respectively, and this is grabbed The bottom of bow member sets the 5th slewing equipment(1814), and the axis of the 5th slewing equipment is with grabbing the axially vertical of bow member;5th The bottom of slewing equipment and the 6th slewing equipment(1815)Connection, and the axis of the five, the six slewing equipments is mutually perpendicular to, and makes to grab arch Frame can rotate around the axis of the 5th slewing equipment, can also be rotated around the axis of the 6th slewing equipment.
A kind of 8. multifunctional tunnel rock drilling arching all-in-one according to claim 7, it is characterised in that the clamp structure The fixed seat for grabbing bow member both ends is fastened on including two(18115), two clamping limbs(18112)Middle part respectively with fixed seat Outside be hinged, and the upper end of two clamping limbs is fixedly connected with connecting plate(18113)One end, the other end of two connecting plates leads to respectively Cross hinge briquetting(18114), clamping oil cylinder is set between the lower end of two clamping limbs(18111).
A kind of 9. multifunctional tunnel rock drilling arching all-in-one according to claim 7, it is characterised in that the guide frame Including relative two guide plates set up(18121), the upper end of two guide plates is respectively set to the hypotenuse of relative tilt.
A kind of 10. multifunctional tunnel rock drilling arching all-in-one according to claim 1, it is characterised in that the rear support leg The horizontal inner sleeve stretched out by energy after oblique(37)It is connected with host platform.
CN201711399183.9A 2017-12-22 2017-12-22 Multifunctional tunnel rock drilling and arch erecting integrated machine Active CN107842311B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711399183.9A CN107842311B (en) 2017-12-22 2017-12-22 Multifunctional tunnel rock drilling and arch erecting integrated machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711399183.9A CN107842311B (en) 2017-12-22 2017-12-22 Multifunctional tunnel rock drilling and arch erecting integrated machine

Publications (2)

Publication Number Publication Date
CN107842311A true CN107842311A (en) 2018-03-27
CN107842311B CN107842311B (en) 2024-06-21

Family

ID=61684043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711399183.9A Active CN107842311B (en) 2017-12-22 2017-12-22 Multifunctional tunnel rock drilling and arch erecting integrated machine

Country Status (1)

Country Link
CN (1) CN107842311B (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868600A (en) * 2018-08-15 2018-11-23 中铁工程装备集团有限公司 A kind of tunnel boring trolley being loaded with the more mechanisms that drill
CN109057835A (en) * 2018-09-27 2018-12-21 长沙科达智能装备股份有限公司 Multiple arch supporting trolley
CN109209452A (en) * 2018-11-22 2019-01-15 长沙科达智能装备股份有限公司 A kind of multiple arch clamping manipulator
CN109538252A (en) * 2018-11-20 2019-03-29 四川蓝海智能装备制造有限公司 The erection method of multi-functional arch trolley and more Pin arches
CN109869169A (en) * 2019-04-03 2019-06-11 蓝传雯 A kind of arch clamping cantilever crane
CN109882191A (en) * 2019-04-02 2019-06-14 许和翔 A kind of all-hydraulic cleave-cracking bench vehicle
CN109882214A (en) * 2019-04-03 2019-06-14 蓝传雯 A kind of multi-functional arch installation trolley
CN110107302A (en) * 2019-06-14 2019-08-09 中铁工程服务有限公司 A kind of multi-functional trolley suitable for drill bursting construction
CN110159322A (en) * 2019-06-05 2019-08-23 四川蓝海智能装备制造有限公司 A kind of clamping device and steel arch-shelf installation trolley for steel arch-shelf
CN110617089A (en) * 2019-10-21 2019-12-27 中铁五局集团第一工程有限责任公司 Stable clamping arch installing machine
CN110630175A (en) * 2019-09-06 2019-12-31 河南铁福来装备制造股份有限公司 Foldable omnibearing drilling mechanism
CN110645028A (en) * 2019-10-21 2020-01-03 中铁五局集团第一工程有限责任公司 Multidirectional operation type arch mounting machine
CN110645027A (en) * 2019-10-21 2020-01-03 中铁五局集团第一工程有限责任公司 Construction method by arch installing machine
CN110685725A (en) * 2019-10-21 2020-01-14 中铁五局集团第一工程有限责任公司 Take bow member mounting plate of integrated valve piece
CN111520081A (en) * 2020-05-28 2020-08-11 徐州徐工铁路装备有限公司 Advanced duct beating device for underground excavation trolley
CN111706253A (en) * 2020-05-27 2020-09-25 中交一公局集团有限公司 Tunnel anchor rod drilling construction method
CN112983507A (en) * 2021-04-01 2021-06-18 中国人民解放军军事科学院国防工程研究院工程防护研究所 Novel mechanical device for roadway assembled support and operation method thereof
CN113738407A (en) * 2021-09-28 2021-12-03 中交第二航务工程局有限公司 Assembling equipment and assembling method suitable for three-step arch center of tunnel
CN114233304A (en) * 2021-12-20 2022-03-25 西南交通大学 Full-mechanized construction method for soft rock tunnel
CN114352325A (en) * 2021-12-20 2022-04-15 安徽佳乐建设机械有限公司 Multifunctional arch drill prying and anchoring trolley
CN114352195A (en) * 2021-12-20 2022-04-15 安徽佳乐建设机械有限公司 Arch and bore sled anchor platform truck rock drilling sled anchor integration cantilever crane
CN114352324A (en) * 2021-11-25 2022-04-15 中国煤炭科工集团太原研究院有限公司 Anchor robot
CN115434729A (en) * 2022-08-25 2022-12-06 四川蓝海智能装备制造有限公司 Combined mechanical arm and multifunctional trolley
CN115875075A (en) * 2022-12-20 2023-03-31 王鹏腾 Grouting sealing equipment for underground support of coal mine and working method of grouting sealing equipment
CN117738585A (en) * 2024-01-11 2024-03-22 云南途腾智能装备有限公司 Novel double-crank arm drilling trolley

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201714392U (en) * 2010-05-31 2011-01-19 三一重型装备有限公司 Rock drilling device
CN102996063A (en) * 2012-12-26 2013-03-27 张家口宣化华泰矿冶机械有限公司 Drilling mechanism for mine rock drilling and tunneling
CN205805429U (en) * 2016-07-01 2016-12-14 浙江开山重工股份有限公司 Driving drill carriage concertina type forward beam
CN106401476A (en) * 2016-12-01 2017-02-15 长沙科达智能装备股份有限公司 Multifunctional arching drill jambo
CN106437795A (en) * 2016-11-25 2017-02-22 中铁隧道集团第五建筑有限公司 Tunnel vehicle-mounted folding type multifunctional work rack
CN207739940U (en) * 2017-12-22 2018-08-17 长沙科达智能装备股份有限公司 A kind of multifunctional tunnel rock drilling arching all-in-one machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201714392U (en) * 2010-05-31 2011-01-19 三一重型装备有限公司 Rock drilling device
CN102996063A (en) * 2012-12-26 2013-03-27 张家口宣化华泰矿冶机械有限公司 Drilling mechanism for mine rock drilling and tunneling
CN205805429U (en) * 2016-07-01 2016-12-14 浙江开山重工股份有限公司 Driving drill carriage concertina type forward beam
CN106437795A (en) * 2016-11-25 2017-02-22 中铁隧道集团第五建筑有限公司 Tunnel vehicle-mounted folding type multifunctional work rack
CN106401476A (en) * 2016-12-01 2017-02-15 长沙科达智能装备股份有限公司 Multifunctional arching drill jambo
CN207739940U (en) * 2017-12-22 2018-08-17 长沙科达智能装备股份有限公司 A kind of multifunctional tunnel rock drilling arching all-in-one machine

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868600A (en) * 2018-08-15 2018-11-23 中铁工程装备集团有限公司 A kind of tunnel boring trolley being loaded with the more mechanisms that drill
CN109057835A (en) * 2018-09-27 2018-12-21 长沙科达智能装备股份有限公司 Multiple arch supporting trolley
CN109057835B (en) * 2018-09-27 2024-06-14 长沙科达智能装备股份有限公司 Multi-arch support trolley
CN109538252A (en) * 2018-11-20 2019-03-29 四川蓝海智能装备制造有限公司 The erection method of multi-functional arch trolley and more Pin arches
CN109538252B (en) * 2018-11-20 2023-10-27 四川蓝海智能装备制造有限公司 Multifunctional arch frame trolley and erection method of multiple arch frames
CN109209452A (en) * 2018-11-22 2019-01-15 长沙科达智能装备股份有限公司 A kind of multiple arch clamping manipulator
CN109209452B (en) * 2018-11-22 2024-06-14 长沙科达智能装备股份有限公司 Manipulator for multi-arch clamping
CN109882191A (en) * 2019-04-02 2019-06-14 许和翔 A kind of all-hydraulic cleave-cracking bench vehicle
CN109882191B (en) * 2019-04-02 2024-04-12 许和翔 Full-hydraulic splitting trolley
CN109869169A (en) * 2019-04-03 2019-06-11 蓝传雯 A kind of arch clamping cantilever crane
CN109882214A (en) * 2019-04-03 2019-06-14 蓝传雯 A kind of multi-functional arch installation trolley
CN109869169B (en) * 2019-04-03 2023-10-20 四川蓝海智能装备制造有限公司 Arch frame clamping arm support
CN109882214B (en) * 2019-04-03 2024-03-08 四川蓝海智能装备制造有限公司 Multifunctional arch centering installation trolley
CN110159322A (en) * 2019-06-05 2019-08-23 四川蓝海智能装备制造有限公司 A kind of clamping device and steel arch-shelf installation trolley for steel arch-shelf
CN110159322B (en) * 2019-06-05 2024-05-31 四川蓝海智能装备制造有限公司 Clamping device for steel arch and steel arch mounting trolley
CN110107302A (en) * 2019-06-14 2019-08-09 中铁工程服务有限公司 A kind of multi-functional trolley suitable for drill bursting construction
CN110630175A (en) * 2019-09-06 2019-12-31 河南铁福来装备制造股份有限公司 Foldable omnibearing drilling mechanism
CN110645028B (en) * 2019-10-21 2020-11-24 中铁五局集团第一工程有限责任公司 Multidirectional operation type arch mounting machine
CN110617089B (en) * 2019-10-21 2020-10-09 中铁五局集团第一工程有限责任公司 Stable clamping arch installing machine
CN110685725B (en) * 2019-10-21 2021-02-23 中铁五局集团第一工程有限责任公司 Take bow member mounting plate of integrated valve piece
CN110617089A (en) * 2019-10-21 2019-12-27 中铁五局集团第一工程有限责任公司 Stable clamping arch installing machine
CN110645028A (en) * 2019-10-21 2020-01-03 中铁五局集团第一工程有限责任公司 Multidirectional operation type arch mounting machine
CN110645027A (en) * 2019-10-21 2020-01-03 中铁五局集团第一工程有限责任公司 Construction method by arch installing machine
CN110685725A (en) * 2019-10-21 2020-01-14 中铁五局集团第一工程有限责任公司 Take bow member mounting plate of integrated valve piece
CN110645027B (en) * 2019-10-21 2020-11-24 中铁五局集团第一工程有限责任公司 Construction method by arch installing machine
CN111706253A (en) * 2020-05-27 2020-09-25 中交一公局集团有限公司 Tunnel anchor rod drilling construction method
CN111520081A (en) * 2020-05-28 2020-08-11 徐州徐工铁路装备有限公司 Advanced duct beating device for underground excavation trolley
CN112983507A (en) * 2021-04-01 2021-06-18 中国人民解放军军事科学院国防工程研究院工程防护研究所 Novel mechanical device for roadway assembled support and operation method thereof
CN113738407A (en) * 2021-09-28 2021-12-03 中交第二航务工程局有限公司 Assembling equipment and assembling method suitable for three-step arch center of tunnel
CN114352324B (en) * 2021-11-25 2023-08-08 中国煤炭科工集团太原研究院有限公司 Anchor robot
CN114352324A (en) * 2021-11-25 2022-04-15 中国煤炭科工集团太原研究院有限公司 Anchor robot
CN114352195A (en) * 2021-12-20 2022-04-15 安徽佳乐建设机械有限公司 Arch and bore sled anchor platform truck rock drilling sled anchor integration cantilever crane
CN114352325A (en) * 2021-12-20 2022-04-15 安徽佳乐建设机械有限公司 Multifunctional arch drill prying and anchoring trolley
CN114233304A (en) * 2021-12-20 2022-03-25 西南交通大学 Full-mechanized construction method for soft rock tunnel
CN115434729A (en) * 2022-08-25 2022-12-06 四川蓝海智能装备制造有限公司 Combined mechanical arm and multifunctional trolley
CN115875075A (en) * 2022-12-20 2023-03-31 王鹏腾 Grouting sealing equipment for underground support of coal mine and working method of grouting sealing equipment
CN117738585A (en) * 2024-01-11 2024-03-22 云南途腾智能装备有限公司 Novel double-crank arm drilling trolley
CN117738585B (en) * 2024-01-11 2024-07-23 云南途腾智能装备有限公司 Novel double-crank arm drilling trolley

Also Published As

Publication number Publication date
CN107842311B (en) 2024-06-21

Similar Documents

Publication Publication Date Title
CN107842311A (en) A kind of multifunctional tunnel rock drilling arching all-in-one
CN106401476B (en) A kind of multi-functional arching drill jumbo
CN107916897B (en) Working mechanism of multifunctional arch-erecting rock drilling trolley
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN105587328B (en) One kind suspension mining multi-arm roofboltier of beam type
CN207739940U (en) A kind of multifunctional tunnel rock drilling arching all-in-one machine
CN105502178B (en) A kind of telescopic arm crawler crane for possessing rotary digging function
CN113464155A (en) Drilling and loading vehicle for small-section roadway tunneling and working method
CN215520757U (en) Multifunctional engineering vehicle
CN216277899U (en) Novel multi-functional supporting platform truck
CN114575898A (en) Arch anchor integrated operation trolley and construction method thereof
CN207739946U (en) A kind of operating mechanism of multi-functional arching drill jumbo
CN205975721U (en) Foldable excavator
CN206360642U (en) A kind of multi-functional arching drill jumbo
CN112482996A (en) Supporting type double-arm anchor rod drill carriage device
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN216894470U (en) Double-rock-drilling arch anchor trolley
CN212716416U (en) Four-arm anchor rod drill carriage
CN110030012B (en) Foldable arch frame type tunnel milling and excavating machine
CN103774539B (en) Rigid pavement combined maintenance truck
JP2524537Y2 (en) Multifunctional tunnel construction equipment
CN212105727U (en) Anchor rod drill carriage
CN214035531U (en) Supporting device for double-arm anchor rod drill carriage
CN208137003U (en) Full-sleeve constructing device
CN117280097A (en) Underground engineering machinery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant