CN106607975B - A kind of cold moudling production technology of heavy bamboo blanket - Google Patents
A kind of cold moudling production technology of heavy bamboo blanket Download PDFInfo
- Publication number
- CN106607975B CN106607975B CN201710139029.1A CN201710139029A CN106607975B CN 106607975 B CN106607975 B CN 106607975B CN 201710139029 A CN201710139029 A CN 201710139029A CN 106607975 B CN106607975 B CN 106607975B
- Authority
- CN
- China
- Prior art keywords
- bamboo
- silk
- mold
- press
- blanket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27J—MECHANICAL WORKING OF CANE, CORK, OR SIMILAR MATERIALS
- B27J1/00—Mechanical working of cane or the like
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27K—PROCESSES, APPARATUS OR SELECTION OF SUBSTANCES FOR IMPREGNATING, STAINING, DYEING, BLEACHING OF WOOD OR SIMILAR MATERIALS, OR TREATING OF WOOD OR SIMILAR MATERIALS WITH PERMEANT LIQUIDS, NOT OTHERWISE PROVIDED FOR; CHEMICAL OR PHYSICAL TREATMENT OF CORK, CANE, REED, STRAW OR SIMILAR MATERIALS
- B27K3/00—Impregnating wood, e.g. impregnation pretreatment, for example puncturing; Wood impregnation aids not directly involved in the impregnation process
- B27K3/02—Processes; Apparatus
- B27K3/04—Impregnating in open tanks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27K—PROCESSES, APPARATUS OR SELECTION OF SUBSTANCES FOR IMPREGNATING, STAINING, DYEING, BLEACHING OF WOOD OR SIMILAR MATERIALS, OR TREATING OF WOOD OR SIMILAR MATERIALS WITH PERMEANT LIQUIDS, NOT OTHERWISE PROVIDED FOR; CHEMICAL OR PHYSICAL TREATMENT OF CORK, CANE, REED, STRAW OR SIMILAR MATERIALS
- B27K5/00—Treating of wood not provided for in groups B27K1/00, B27K3/00
- B27K5/001—Heating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27K—PROCESSES, APPARATUS OR SELECTION OF SUBSTANCES FOR IMPREGNATING, STAINING, DYEING, BLEACHING OF WOOD OR SIMILAR MATERIALS, OR TREATING OF WOOD OR SIMILAR MATERIALS WITH PERMEANT LIQUIDS, NOT OTHERWISE PROVIDED FOR; CHEMICAL OR PHYSICAL TREATMENT OF CORK, CANE, REED, STRAW OR SIMILAR MATERIALS
- B27K5/00—Treating of wood not provided for in groups B27K1/00, B27K3/00
- B27K5/04—Combined bleaching or impregnating and drying of wood
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27K—PROCESSES, APPARATUS OR SELECTION OF SUBSTANCES FOR IMPREGNATING, STAINING, DYEING, BLEACHING OF WOOD OR SIMILAR MATERIALS, OR TREATING OF WOOD OR SIMILAR MATERIALS WITH PERMEANT LIQUIDS, NOT OTHERWISE PROVIDED FOR; CHEMICAL OR PHYSICAL TREATMENT OF CORK, CANE, REED, STRAW OR SIMILAR MATERIALS
- B27K9/00—Chemical or physical treatment of reed, straw, or similar material
- B27K9/002—Cane, bamboo
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27M—WORKING OF WOOD NOT PROVIDED FOR IN SUBCLASSES B27B - B27L; MANUFACTURE OF SPECIFIC WOODEN ARTICLES
- B27M1/00—Working of wood not provided for in subclasses B27B - B27L, e.g. by stretching
- B27M1/06—Working of wood not provided for in subclasses B27B - B27L, e.g. by stretching by burning or charring, e.g. cutting with hot wire
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27N—MANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
- B27N1/00—Pretreatment of moulding material
- B27N1/02—Mixing the material with binding agent
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27N—MANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
- B27N3/00—Manufacture of substantially flat articles, e.g. boards, from particles or fibres
- B27N3/08—Moulding or pressing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27N—MANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
- B27N3/00—Manufacture of substantially flat articles, e.g. boards, from particles or fibres
- B27N3/08—Moulding or pressing
- B27N3/10—Moulding of mats
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27N—MANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
- B27N3/00—Manufacture of substantially flat articles, e.g. boards, from particles or fibres
- B27N3/08—Moulding or pressing
- B27N3/18—Auxiliary operations, e.g. preheating, humidifying, cutting-off
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Forests & Forestry (AREA)
- Wood Science & Technology (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Chemical And Physical Treatments For Wood And The Like (AREA)
Abstract
The invention belongs to the technical fields of heavy bamboo floor production, and the invention discloses a kind of cold moudling production technologies of heavy bamboo blanket.The technical problem to be solved in the present invention is to provide a kind of processing uniformitys that can guarantee heavy bamboo blanket in process to prevent paralysed side, thus the cold moudling production technology for reducing cracking, jumping the bad phenomenons such as silk and deformation.The technique is pressed into heavy bamboo blanket by processes such as hacking, force plane, carbonization and impregnations by step a-f.Exist the present invention overcomes the cold moudling production technology of existing heavy bamboo blanket and is easy to appear paralysed side, so as to cause cracking, jump the shortcomings that bad phenomenons such as silk and deformation, pass through scientific and reasonable process, solves the appearance of the above problem to the greatest extent, to ensure that manufactured blanket is not susceptible to go mouldy and damage by worms, and the surface hardness of blanket is increased, and while not wasting raw material, guarantee that manufacturing procedure quickly and effectively carries out the quality for going out blanket with pressing mold.
Description
Technical field
The invention belongs to the technical fields of heavy bamboo floor production, and in particular to a kind of cold moudling production work of heavy bamboo blanket
Skill.
Background technique
Heavy bamboo floor is commonly called as bamboo filament plate, is one of bamboo flooring, it is further complete on the basis of general bamboo flooring
It is kind, so that its is more attractive and more practical.The selection of this bamboo flooring is finer than general bamboo flooring selection, its general selection
Local 4 years or more the high-quality moso bamboos in bamboo age or other bamboo kinds with similar material do material, through selection, carbonization (or boiling),
A series of strict technology processes such as drying and cold pressing (or hot pressing) produce.Heavy bamboo floor density is high, more than common bamboo flooring
It is wear-resisting, and it is smooth it is smooth, moth, indeformable and color be not graceful, while texture is clearly pleasing, is other any floor institute nothings
As method ratio, it is practically applicable to high-end residential, office, bedroom, hotel, sport place and outdoor leisure.
Heavy bamboo floor is divided into hot pressing heavy bamboo floor and cold pressing heavy bamboo floor.Hot pressing heavy bamboo floor is by bamboo wood drying, impregnation
And drying, and be heating and curing primary completion being not required to die-filling lower direct tiling pressure, it breaks and cuts after blank molding, do water balance
Complete blanket, then japanning.Cold pressing heavy bamboo floor is then to do suitable bamboo silk drying again to the following impregnation of lower moisture content
Dry, die-filling and assembly pressure puts to heat cure in constant temperature space after locking, breaks and cut after blank molding, do water balance, thus
Blanket is completed, the line that can paint does finished product.It can be seen that hot pressing heavy bamboo floor and cold pressing heavy bamboo floor are only being suppressed
Have larger difference during at blanket, the process being further processed on it after blanket is made is almost the same, be hacking,
Sanding, fluting and japanning and etc..So the processing of existing many producers transport and later period differentiation for convenience, it all can be with
Blanket is bought and sold as intermediate products, i.e., produces heavy bamboo blanket by way of hot pressing or cold pressing and sold, i.e. hot pressing
Heavy bamboo blanket and cold pressing heavy bamboo blanket, are processed after buyer buys heavy bamboo blanket, again thus according to the design scheme of oneself
Carry out differentiation production.
Meanwhile the mode of hot pressing and cold pressing respectively has the advantages of advantage and disadvantage, cold pressing to be: curing time is long, and plate face color difference is smaller,
Broken cutting process is simple;The shortcomings that cold pressing, is: since cold pressing is heating and curing using die-filling, in heating process grinding tool also therewith by
The requirement of anticipation is often not achieved in the density at the edge of thermally expandable sheet, is easy paralysis side, be easy to cause the density unevenness of plate.To produce
It is higher to occur cracking, the probability of the jump bad phenomenons such as silk and deformation after raw plate face japanning.The advantages of hot pressing is: hot pressing is with reference to cold
Certain deficiencies of pressure, in conjunction with the improved technique of production technology of bamboo slab rubber maturation, press the primary completion that is heating and curing, blank at
Type process is to complete to be heating and curing under the pressure of a few kiloton, even density, is not easy paralysed side and jumps silk, solves the inherence of slab
Quality problems have further raising;The shortcomings that hot pressing is: the opposite cold pressing of the density of hot pressing heavy bamboo floor wants high, broken to cut difficulty
Larger, consumables cost is also relatively high, and the opposite cold pressing of the time that hot pressing heavy bamboo is heating and curing shorter color difference is much bigger.
Under the prior art because the difficulty of hot pressing processing is greatly and high lossy, while again because cold-press process simple and
It is readily achieved, so, more and more producers tend to the processing technology of selection cold pressing, but the cold moudling of existing heavy bamboo blanket
Exist in production technology and be easy to appear paralysed side, is i.e. cold presswork is uneven, so as to cause cracking, jumps the bad phenomenons such as silk and deformation
The shortcomings that, this significantly limits the rapid processing of heavy bamboo floor, therefore major heavy bamboo blanket manufacturing enterprise assistant officer need to obtain technique
It improves.
Summary of the invention
(1) technical problems to be solved
Exist in cold moudling production technology of the present invention in order to overcome existing heavy bamboo blanket and be easy to appear paralysed side, to lead
Cause cracking, jump the bad phenomenons such as silk and deformation the shortcomings that, the technical problem to be solved in the present invention is to provide it is a kind of can be processed
Guarantee that the processing uniformity of heavy bamboo blanket prevents paralysed side in journey, to reduce cracking, jump the bad phenomenons such as silk and deformation
Cold moudling production technology.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides the cold moudling production technology of such a heavy bamboo blanket,
Specifically comprise the following steps:
A. it chooses the diameter of a cross-section of a tree trunk 1.3 meters above the ground and is greater than or equal to 6cm, wall thickness more than or equal to 3mm, the mouldy and unabroken fresh hair of free from insect pests
Bamboo, clip bamboo root fell when formed skew end face, keep its end face smooth, then using port as positioning surface, from root to
Successively intercepted length is the fixed length thick bamboo tube of 1.8-2.2m to taper, and carries out out item to fixed length thick bamboo tube by raw bamboo stripping-cutting machine, obtains
Bamboo chip;
B. force plane is carried out by rough planing machine to bamboo chip obtained in step a, shoots off the bamboo blueness and the bamboo of inner layer on bamboo chip surface layer
Huang carries out hacking to bamboo chip by slicer again thereafter, the thin shape bamboo chip for being divided into thickness to be less than or equal to 2mm bamboo chip, then
Silk pressing is carried out to thin shape bamboo chip by sand blueness thread press, thin shape bamboo chip is pressed into bamboo silk;
C. the mixed solution of water, oxidative bleaching agent and Vermins-proof mildew-proof agent, the body of water and oxidative bleaching agent are added in a reservoir
For product than being 1:0.06-0.1, the volume ratio of water and Vermins-proof mildew-proof agent is 1:0.04-0.06, and the silk of bamboo obtained in step b is added
In mixed solution, solid-to-liquid ratio 1:2-2.5, and mixed solution is heated, heating makes its boiling, and keeps fluidized state
15-25 minutes, bamboo silk is taken out after cooling and is placed in carbide furnace be carbonized, be passed through water steaming in carbonisation into carbide furnace
Vapour makes the pressure in carbide furnace reach 0.35-0.37MPa, and keeps the pressure 80-100 minutes;
D. the silk of bamboo obtained in step c is put into dry kiln and is dried, drying time is 24-36 hours, makes bamboo silk
Moisture content be less than or equal to 10%, bamboo silk is put into glue cage and carries out impregnation thereafter, glue cage is put into the impregnation time in glue pond
It is 8-9 minutes, then glue cage is sling, kept for 1-2 minutes, then glue cage is overturn, revolving speed 90-110r/min, overturns 3-5
Minute, drop glue 7-9 minutes is stood after overturning again;
E. the silk of bamboo obtained in step d is put into drying machine and is dried, first controlling drying temperature is 68-70 DEG C,
So that the moisture content of bamboo silk is reached 20-30%, after control drying temperature be 66-68 DEG C, so that the moisture content of bamboo thread is reached 15-
20%, then it is 64-66 DEG C that drying temperature, which is controlled, and the moisture content of bamboo silk is made to reach 12-15%, thereafter stores bamboo silk,
The temperature of storage area is 21-25 DEG C, and the humidity of storage area is 45-55%, and the resting period is 5-7 days, then will be after storage
Bamboo silk puts into a press carry out pressing mold, and a pressing mold squeezes bamboo silk by pressing mold and be locked in mould using bamboo silk 46-46.4kg
In tool, during pressing mold, the master cylinder pressure control of press is 16-18MPa, and the central cylinder pressure control of press is 5.8-
7MPa, the rising pressure control of press are 7.8-9.8MPa, and the valve opening pressure control of press is 1.7-2.3MPa;
F. the mold in step e is placed in curing room, first controlling solidification temperature is 120-125 DEG C, curing time
Be 3-5 hours, after to control solidification temperature be 125-130 DEG C, curing time is 4-6 hour, then solidification temperature is controlled and is
130-135 DEG C, curing time is 5-7 hours, and mold is placed in cooling chamber thereafter, first controls cooling temperature for 18-22
DEG C, cooling time is 0.5-1.5 hour, after to control cooling temperature be 22-24 DEG C, cooling time is 1-2 hours, then will be cooled down
Temperature control is 24-28 DEG C, and cooling time is 1.5-2.5 hours, so that it is cooled to the temperature of mold less than or equal to 40 DEG C,
Mold is opened after the completion of cooling, obtains the heavy bamboo blanket in mold.
Preferably, in step c, the volume ratio of water and oxidative bleaching agent is 1:0.08, the volume of water and Vermins-proof mildew-proof agent
Than being kept for fluidized state 20 minutes, so that the pressure in carbide furnace is reached 0.36MPa, and protect for 1:0.05, solid-to-liquid ratio 1:2.3
Hold the pressure 90 minutes.
Preferably, in step d, it is 8.5 minutes that glue cage, which is put into the impregnation time in glue pond, then glue cage is sling, is kept
1.5 minutes, then glue cage is overturn, revolving speed 100r/min, it overturns 4 minutes, stands drop glue 8 minutes after overturning again.
Preferably, in step e, first by drying temperature control be 69 DEG C, make bamboo silk moisture content reach 25%, after will do
Dry temperature control is 67 DEG C, so that the moisture content of bamboo silk is reached 17%, then it is 65 DEG C that drying temperature, which is controlled, makes the moisture content of bamboo silk
Reach 13%, thereafter store bamboo silk, the temperature of storage area is 23 DEG C, and the humidity of storage area is 20%, when storage
Between be 6 days, then the bamboo silk after storage is put into a press into carry out pressing mold, a pressing mold is made using bamboo silk 46.2kg by pressing mold
Bamboo silk is squeezed and is locked in mold, and during pressing mold, the master cylinder pressure control of press is 17MPa, the central cylinder pressure of press
Strong control is 6.5MPa, and the rising pressure control of press is 8.8MPa, and the valve opening pressure control of press is 2MPa.
Preferably, be first 123 DEG C by solidification temperature control in step f, curing time is 4 hours, after by solidification temperature
Control is 128 DEG C, and curing time is 5 hours, then it is 132 DEG C that solidification temperature, which is controlled, and curing time is 6 hours, thereafter by mould
Tool be placed in cooling chamber, first by cooling temperature control be 20 DEG C, cooling time be 1 hour, after by cooling temperature control be 23
DEG C, cooling time is 1.5 hours, then it is 26 DEG C that cooling temperature, which is controlled, and cooling time is 2 hours, to make the temperature of mold
It is cooled to 35 DEG C.
(3) beneficial effect
It is easy to appear compared with prior art, the present invention the cold moudling production technology for overcoming existing heavy bamboo blanket exists
The shortcomings that bad phenomenons such as silk and deformation, so as to cause cracking, is jumped in paralysed side.
Firstly, being suitble to the moso bamboo of size by choosing in step a-c, carrying out out item, force plane, tabletting and pressure to moso bamboo
The preliminary treatments such as silk, and boiling, bleaching and carbonization are carried out, the sugar for being allowed to remove in raw material and pest, and pass through reconciliation oxygen
The optimal proportion ratio for changing bleaching agent and Vermins-proof mildew-proof agent has haved the function that remove sugar and pest to greatest extent, then has tied
The carbonization air pressure of present invention specificity and dwell time thereafter are closed, has completely achieved the purpose that carbonization, has been made to ensure that
Blanket be not susceptible to go mouldy and damage by worms, and increase the surface hardness of blanket.
Secondly, in the case where moisture content is less than or equal to 10% after guaranteeing drying, precisely adjusting leaching in step d
The glue time is 8-9 minutes, slings and removes photoresist 1-2 minutes, then overturns to glue cage, revolving speed 90-110r/min, 3-5 points of overturning
Clock stands drop glue 7-9 minutes again after overturning, reasonable procedural arrangements accurate so both can make impregnation more abundant, by bamboo silk
The phenomenon that gluing uniformly, guarantees the uniformity of subsequent pressing mold, prevents cracking and jumps silk, and do not waste raw material, guarantee to add
Work process quickly and effectively carries out.
Again, in step e, by by different level stage by stage to bamboo silk be dried, make bamboo silk moisture content reach 12-
15%, and carried out by being stored 5-7 days in suitable region, so that bamboo silk is spent preserving period, be allowed to be more suitable for for carrying out pressing mold,
It is placed on press after spending preserving period, in conjunction with each position pressure with specificity determined through repeatedly practice, makes pressing mold
While more uniform effective, moreover it is possible to prevent the bad phenomenons such as deformation, guarantee that pressing mold goes out the quality of blanket.
Finally, in step f, further through optimum specific temperature and time, by different level stage by stage to pressing mold after
Mold solidified and cooled down, be distributed heavy bamboo blanket in mold more uniform, structure more it is complete securely, thus into one
Step ensure that the processing uniformity of heavy bamboo blanket prevents paralysed side, and it is bad to reduce cracking, jump silk and deformation etc. again
The possibility of phenomenon.
In summary advantage, to realize the processing uniformity that can guarantee heavy bamboo blanket in process on the whole
Paralysed side is prevented, and then achieved the effect that reduce cracking, jumped the bad phenomenons such as silk and deformation.
Specific embodiment
Below with reference to embodiment, the present invention is further illustrated.
Embodiment 1
A kind of cold moudling production technology of heavy bamboo blanket, specifically comprises the following steps:
A. it chooses the diameter of a cross-section of a tree trunk 1.3 meters above the ground and is greater than or equal to 6cm, wall thickness more than or equal to 3mm, the mouldy and unabroken fresh hair of free from insect pests
Bamboo, clip bamboo root fell when formed skew end face, keep its end face smooth, then using port as positioning surface, from root to
Successively intercepted length is the fixed length thick bamboo tube of 1.8m to taper, and carries out out item to fixed length thick bamboo tube by raw bamboo stripping-cutting machine, obtains bamboo chip;
B. force plane is carried out by rough planing machine to bamboo chip obtained in step a, shoots off the bamboo blueness and the bamboo of inner layer on bamboo chip surface layer
Huang carries out hacking to bamboo chip by slicer again thereafter, the thin shape bamboo chip for being divided into thickness to be less than or equal to 2mm bamboo chip, then
Silk pressing is carried out to thin shape bamboo chip by sand blueness thread press, thin shape bamboo chip is pressed into bamboo silk;
C. the mixed solution of water, oxidative bleaching agent and Vermins-proof mildew-proof agent, the body of water and oxidative bleaching agent are added in a reservoir
For product than being 1:0.06, the volume ratio of water and Vermins-proof mildew-proof agent is 1:0.04, and mixed solution is added in the silk of bamboo obtained in step b
In, solid-to-liquid ratio 1:2.5, and mixed solution is heated, heating makes its boiling, and keeps fluidized state 25 minutes, cooling
Bamboo silk is taken out afterwards and is placed in carbide furnace and is carbonized, and is passed through water vapour in carbonisation into carbide furnace, is made in carbide furnace
Pressure reach 0.35MPa, and keep the pressure 80 minutes;
D. the silk of bamboo obtained in step c is put into dry kiln and is dried, drying time is 24 hours, makes containing for bamboo silk
Water rate is less than or equal to 10%, is thereafter put into glue cage and carries out impregnation bamboo silk, and it is 9 points that glue cage, which is put into the impregnation time in glue pond,
Clock, then glue cage is sling, it is kept for 2 minutes, then glue cage is overturn, revolving speed 110r/min, overturning 3 minutes, after overturning again
Stand drop glue 7 minutes;
E. the silk of bamboo obtained in step d is put into drying machine and is dried, be first 68 DEG C by drying temperature control, make bamboo
The moisture content of silk reaches 20%, after by drying temperature control be 66 DEG C, so that the moisture content of bamboo silk is reached 15%, then by drying temperature
Control is 66 DEG C, and the moisture content of bamboo silk is made to reach 12%, thereafter stores bamboo silk, and the temperature of storage area is 21 DEG C, is deposited
The humidity for putting region is 45%, and the resting period is 7 days, then the bamboo silk after storage is put into a press carry out pressing mold, a pressing mold
Using bamboo silk 46kg, bamboo silk being squeezed by pressing mold and is locked in mold, during pressing mold, the master cylinder pressure of press is controlled
For 16MPa, the central cylinder pressure control of press is 5.8MPa, and the rising pressure control of press is 7.8MPa, the valve opening pressure of press
Strong control is 1.7MPa;
F. the mold in step e is placed in curing room, is first 120 DEG C by solidification temperature control, curing time is 5 small
When, after by solidification temperature control be 125 DEG C, curing time is 6 hours, then by solidification temperature control is 130 DEG C, and curing time is
7 hours, mold is placed in cooling chamber thereafter, first by cooling temperature control be 18 DEG C, cooling time be 1.5 hours, after will
Cooling temperature control is 22 DEG C, and cooling time is 2 hours, then it is 24 DEG C that cooling temperature, which is controlled, and cooling time is 2.5 hours,
To make the temperature of mold be cooled to less than or equal to 40 DEG C, mold is opened after the completion of cooling, obtains the heavy bamboo blanket in mold.
Embodiment 2
A kind of cold moudling production technology of heavy bamboo blanket, specifically comprises the following steps:
A. it chooses the diameter of a cross-section of a tree trunk 1.3 meters above the ground and is greater than or equal to 6cm, wall thickness more than or equal to 3mm, the mouldy and unabroken fresh hair of free from insect pests
Bamboo, clip bamboo root fell when formed skew end face, keep its end face smooth, then using port as positioning surface, from root to
Successively intercepted length is the fixed length thick bamboo tube of 2.2m to taper, and carries out out item to fixed length thick bamboo tube by raw bamboo stripping-cutting machine, obtains bamboo chip;
B. force plane is carried out by rough planing machine to bamboo chip obtained in step a, shoots off the bamboo blueness and the bamboo of inner layer on bamboo chip surface layer
Huang carries out hacking to bamboo chip by slicer again thereafter, the thin shape bamboo chip for being divided into thickness to be less than or equal to 2mm bamboo chip, then
Silk pressing is carried out to thin shape bamboo chip by sand blueness thread press, thin shape bamboo chip is pressed into bamboo silk;
C. the mixed solution of water, oxidative bleaching agent and Vermins-proof mildew-proof agent, the body of water and oxidative bleaching agent are added in a reservoir
For product than being 1:0.1, the volume ratio of water and Vermins-proof mildew-proof agent is 1:0.06, and the silk of bamboo obtained in step b is added in mixed solution,
Solid-to-liquid ratio is 1:2, and heats to mixed solution that heating makes its boiling, and keeps fluidized state 15 minutes, is taken out after cooling
Bamboo silk is simultaneously placed in carbide furnace and is carbonized, and is passed through water vapour in carbonisation into carbide furnace, makes the pressure in carbide furnace
Reach 0.37MPa, and keeps the pressure 100 minutes;
D. the silk of bamboo obtained in step c is put into dry kiln and is dried, drying time is 36 hours, makes containing for bamboo silk
Water rate is less than or equal to 10%, is thereafter put into glue cage and carries out impregnation bamboo silk, and it is 8 points that glue cage, which is put into the impregnation time in glue pond,
Clock, then glue cage is sling, it is kept for 1 minute, then glue cage is overturn, revolving speed 90r/min, is overturn 5 minutes, it is quiet again after overturning
Set drop glue 9 minutes;
E. the silk of bamboo obtained in step d is put into drying machine and is dried, be first 70 DEG C by drying temperature control, make bamboo
The moisture content of silk reaches 30%, after by drying temperature control be 68 DEG C, so that the moisture content of bamboo silk is reached 20%, then by drying temperature
Control is 64 DEG C, and the moisture content of bamboo silk is made to reach 15%, thereafter stores bamboo silk, and the temperature of storage area is 25 DEG C, is deposited
The humidity for putting region is 55%, and the resting period is 5 days, then the bamboo silk after storage is put into a press carry out pressing mold, a pressing mold
Using bamboo silk 46.4kg, bamboo silk is squeezed by pressing mold and is locked in mold, during pressing mold, the master cylinder pressure control of press
It is made as 18MPa, the central cylinder pressure control of press is 7MPa, and the rising pressure control of press is 9.8MPa, the valve opening pressure of press
Strong control is 2.3MPa;
F. the mold in step e is placed in curing room, is first 125 DEG C by solidification temperature control, curing time is 3 small
When, after by solidification temperature control be 130 DEG C, curing time is 4 hours, then by solidification temperature control is 135 DEG C, and curing time is
5 hours, mold is placed in cooling chamber thereafter, first by cooling temperature control be 22 DEG C, cooling time be 0.5 hour, after will
Cooling temperature control is 24 DEG C, and cooling time is 1 hour, then it is 28 DEG C that cooling temperature, which is controlled, and cooling time is 1.5 hours,
To make the temperature of mold be cooled to less than or equal to 40 DEG C, mold is opened after the completion of cooling, obtains the heavy bamboo blanket in mold.
Embodiment 3
A kind of cold moudling production technology of heavy bamboo blanket, specifically comprises the following steps:
A. it chooses the diameter of a cross-section of a tree trunk 1.3 meters above the ground and is greater than or equal to 6cm, wall thickness more than or equal to 3mm, the mouldy and unabroken fresh hair of free from insect pests
Bamboo, clip bamboo root fell when formed skew end face, keep its end face smooth, then using port as positioning surface, from root to
Successively intercepted length is the fixed length thick bamboo tube of 2m to taper, and carries out out item to fixed length thick bamboo tube by raw bamboo stripping-cutting machine, obtains bamboo chip;
B. force plane is carried out by rough planing machine to bamboo chip obtained in step a, shoots off the bamboo blueness and the bamboo of inner layer on bamboo chip surface layer
Huang carries out hacking to bamboo chip by slicer again thereafter, the thin shape bamboo chip for being divided into thickness to be less than or equal to 2mm bamboo chip, then
Silk pressing is carried out to thin shape bamboo chip by sand blueness thread press, thin shape bamboo chip is pressed into bamboo silk;
C. the mixed solution of water, oxidative bleaching agent and Vermins-proof mildew-proof agent, the body of water and oxidative bleaching agent are added in a reservoir
For product than being 1:0.08, the volume ratio of water and Vermins-proof mildew-proof agent is 1:0.05, and mixed solution is added in the silk of bamboo obtained in step b
In, solid-to-liquid ratio 1:2.3, and mixed solution is heated, heating makes its boiling, and keeps fluidized state 20 minutes, cooling
Bamboo silk is taken out afterwards and is placed in carbide furnace and is carbonized, and is passed through water vapour in carbonisation into carbide furnace, is made in carbide furnace
Pressure reach 0.36MPa, and keep the pressure 90 minutes;
D. the silk of bamboo obtained in step c is put into dry kiln and is dried, drying time is 30 hours, makes containing for bamboo silk
Water rate is less than or equal to 10%, is thereafter put into glue cage and carries out impregnation bamboo silk, and it is 8.5 that glue cage, which is put into the impregnation time in glue pond,
Minute, then glue cage is sling, it is kept for 1.5 minutes, then glue cage is overturn, revolving speed 100r/min, is overturn 4 minutes, overturning
Stand drop glue 8 minutes again afterwards;
E. the silk of bamboo obtained in step d is put into drying machine and is dried, be first 69 DEG C by drying temperature control, make bamboo
The moisture content of silk reaches 25%, after by drying temperature control be 67 DEG C, so that the moisture content of bamboo silk is reached 17%, then by drying temperature
Control is 65 DEG C, and the moisture content of bamboo silk is made to reach 13%, thereafter stores bamboo silk, and the temperature of storage area is 23 DEG C, is deposited
The humidity for putting region is 50%, and the resting period is 6 days, then the bamboo silk after storage is put into a press carry out pressing mold, a pressing mold
Using bamboo silk 46.2kg, bamboo silk is squeezed by pressing mold and is locked in mold, during pressing mold, the master cylinder pressure control of press
It is made as 17MPa, the central cylinder pressure control of press is 6.6MPa, and the rising pressure control of press is 8.8MPa, the valve opening of press
Pressure control is 2MPa;
F. the mold in step e is placed in curing room, is first 123 DEG C by solidification temperature control, curing time is 4 small
When, after by solidification temperature control be 127 DEG C, curing time is 5 hours, then by solidification temperature control is 132 DEG C, and curing time is
6 hours, mold is placed in cooling chamber thereafter, first by cooling temperature control be 20 DEG C, cooling time be 1 hour, after will be cold
But temperature control is 23 DEG C, and cooling time is 1.5 hours, then it is 26 DEG C that cooling temperature, which is controlled, and cooling time is 2 hours, from
And it is cooled to the temperature of mold less than or equal to 40 DEG C, mold is opened after the completion of cooling, obtains the heavy bamboo blanket in mold.
Sample 1, sample 2 and sample 3, and and the prior art are respectively produced by the implementation condition of above three embodiments
The sample 4 of lower production is compared, and by detection, it is 3.5% that the probability on booth side, which occurs, in sample 4 in batch of sample, and
It is 1.8%, 1.7% and 1.5% respectively in sample 1, sample 2 and sample 3, it can thus be seen that cold moudling of the invention is raw
Production. art can greatly reduce the appearance on heavy bamboo blanket booth side;And again respectively to sample 1, sample 2, sample 3 and sample 4 into
Row life experiment, there is cracking in sample 4 in test, the probability of jumping the bad phenomenons such as silk and deformation is much larger than sample 1,2 and of sample
The probability occurred in sample 3, and the time of these bad phenomenons occur, sample 4 also far earlier than sample 1, sample 2 and sample 3,
It can be seen that cold moudling production technology of the invention has achieved the effect that reduce cracking, has jumped the bad phenomenons such as silk and deformation.
In summary Experimental comparison is it is found that a kind of cold moudling production technology of heavy bamboo blanket of the invention is real on the whole
Having showed can guarantee that the processing uniformity of heavy bamboo blanket prevents paralysed side in process, and then has reached reduction cracking, jumped
The effect of the bad phenomenons such as silk and deformation.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (1)
1. a kind of cold moudling production technology of heavy bamboo blanket, which is characterized in that specifically comprise the following steps:
A. it chooses the diameter of a cross-section of a tree trunk 1.3 meters above the ground and is greater than or equal to 6cm, wall thickness more than or equal to 3mm, the mouldy and unabroken fresh bamboo of free from insect pests, cut
Go bamboo root fell when formed skew end face, keep its end face smooth, then using port as positioning surface, from root to taper according to
Secondary intercepted length is the fixed length thick bamboo tube of 1.8-2.2m, and carries out out item to fixed length thick bamboo tube by raw bamboo stripping-cutting machine, obtains bamboo chip;
B. force plane is carried out by rough planing machine to bamboo chip obtained in step a, shoots off bamboo blueness and the tabasheer of inner layer on bamboo chip surface layer,
Hacking is carried out to bamboo chip by slicer again afterwards, is divided into thickness to be less than or equal to the thin shape bamboo chip of 2mm bamboo chip, then pass through sand
Green thread press carries out silk pressing to thin shape bamboo chip, and thin shape bamboo chip is pressed into bamboo silk;
C. the mixed solution of water, oxidative bleaching agent and Vermins-proof mildew-proof agent, the volume ratio of water and oxidative bleaching agent are added in a reservoir
For 1:0.06-0.1, the volume ratio of water and Vermins-proof mildew-proof agent is 1:0.04-0.06, and the silk of bamboo obtained in step b is added and is mixed
In solution, solid-to-liquid ratio 1:2-2.5, and mixed solution is heated, heating makes its boiling, and keeps fluidized state 15-25
Minute, bamboo silk is taken out after cooling and is placed in carbide furnace be carbonized, be passed through water vapour in carbonisation into carbide furnace, make
Pressure in carbide furnace reaches 0.35-0.37MPa, and keeps the pressure 80-100 minutes;Wherein, the body of water and oxidative bleaching agent
For product than being 1:0.08, the volume ratio of water and Vermins-proof mildew-proof agent is 1:0.05, solid-to-liquid ratio 1:2.3, is kept for fluidized state 20 minutes,
So that the pressure in carbide furnace is reached 0.36MPa, and keeps the pressure 90 minutes;
D. the silk of bamboo obtained in step c is put into dry kiln and is dried, drying time is 24-36 hours, makes containing for bamboo silk
Water rate is less than or equal to 10%, bamboo silk is put into glue cage carries out impregnation thereafter, and glue cage is put into the impregnation time in glue pond as 8-9
Minute, then glue cage is sling, it is kept for 1-2 minutes, then glue cage is overturn, revolving speed 90-110r/min, is overturn 3-5 minutes,
Drop glue 7-9 minutes is stood after overturning again;Wherein, it is 8.5 minutes that glue cage, which is put into the impregnation time in glue pond, then glue cage is sling,
It is kept for 1.5 minutes, then glue cage is overturn, revolving speed 100r/min, overturn 4 minutes, stand drop glue 8 minutes after overturning again;
E. the silk of bamboo obtained in step d is put into drying machine and is dried, first controlling drying temperature is 68-70 DEG C, makes bamboo
The moisture content of silk reaches 20-30%, after control drying temperature be 66-68 DEG C, so that the moisture content of bamboo thread is reached 15-20%, then
It is 64-66 DEG C that drying temperature, which is controlled, and the moisture content of bamboo silk is made to reach 12-15%, is thereafter stored bamboo silk, storage area
Temperature be 21-25 DEG C, the humidity of storage area is 45-55%, and the resting period is 5-7 days, then the bamboo thread after storage is put into
Pressing mold is carried out in press, a pressing mold squeezes bamboo silk by pressing mold and is locked in mold using bamboo silk 46-46.4kg,
During pressing mold, the master cylinder pressure control of press is 16-18MPa, and the central cylinder pressure control of press is 5.8-7MPa, press
Rising pressure control is 7.8-9.8MPa, and the valve opening pressure control of press is 1.7-2.3MPa;Wherein, first drying temperature is controlled
Be 69 DEG C, make bamboo silk moisture content reach 25%, after by drying temperature control be 67 DEG C, make bamboo silk moisture content reach 17%,
It is again 65 DEG C by drying temperature control, the moisture content of bamboo silk is made to reach 13%, thereafter stores bamboo silk, the temperature of storage area
Degree is 23 DEG C, and the humidity of storage area is 20%, and the resting period is 6 days, then the bamboo silk after storage is put into a press and is pressed
Mould, a pressing mold squeezes bamboo silk by pressing mold and is locked in mold using bamboo silk 46.2kg, during pressing mold, press
Master cylinder pressure control be 17MPa, press central cylinder pressure control be 6.5MPa, press rising pressure control is
The valve opening pressure control of 8.8MPa, press are 2MPa;
F. the mold in step e is placed in curing room, first controlling solidification temperature is 120-125 DEG C, curing time 3-5
Hour, after control solidification temperature be 125-130 DEG C, curing time is 4-6 hours, then solidification temperature is controlled as 130-135
DEG C, curing time is 5-7 hours, and mold is placed in cooling chamber thereafter, and first controlling cooling temperature is 18-22 DEG C, cooling
Time is 0.5-1.5 hour, after to control cooling temperature be 22-24 DEG C, cooling time is 1-2 hours, then by cooling temperature control
It is made as 24-28 DEG C, cooling time is 1.5-2.5 hours, so that the temperature of mold be made to be cooled to less than or equal to 40 DEG C, has been cooled down
At rear opening mold, the heavy bamboo blanket in mold is obtained;Wherein, first controlling solidification temperature is 123 DEG C, and curing time is 4 small
When, after by solidification temperature control be 128 DEG C, curing time is 5 hours, then by solidification temperature control is 132 DEG C, and curing time is
6 hours, mold is placed in cooling chamber thereafter, first by cooling temperature control be 20 DEG C, cooling time be 1 hour, after will be cold
But temperature control is 23 DEG C, and cooling time is 1.5 hours, then it is 26 DEG C that cooling temperature, which is controlled, and cooling time is 2 hours, from
And the temperature of mold is made to be cooled to 35 DEG C.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710139029.1A CN106607975B (en) | 2017-03-09 | 2017-03-09 | A kind of cold moudling production technology of heavy bamboo blanket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710139029.1A CN106607975B (en) | 2017-03-09 | 2017-03-09 | A kind of cold moudling production technology of heavy bamboo blanket |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106607975A CN106607975A (en) | 2017-05-03 |
CN106607975B true CN106607975B (en) | 2019-07-23 |
Family
ID=58637019
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710139029.1A Active CN106607975B (en) | 2017-03-09 | 2017-03-09 | A kind of cold moudling production technology of heavy bamboo blanket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106607975B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107379199A (en) * | 2017-08-30 | 2017-11-24 | 陈雪珍 | A kind of production technology of bamboo composite floor board |
CN107696230A (en) * | 2017-10-09 | 2018-02-16 | 柳州隆泰竹业有限公司 | A kind of production technology of heavy bamboo blanket |
CN113715124A (en) * | 2021-06-23 | 2021-11-30 | 安徽信达家居有限公司 | Production process method of household bamboo product raw material |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1693044A (en) * | 2005-04-07 | 2005-11-09 | 苏孝龙 | Art for preparing high density bamboo timber |
CN101172351B (en) * | 2007-11-01 | 2010-06-02 | 浙江腾龙竹木地板制造有限公司 | Method for producing non-glue adhesion bamboo-made artificial board or bamboo-made laminted material |
CN103112074A (en) * | 2011-12-09 | 2013-05-22 | 浙江龙泰木业有限公司 | Method for processing heavy bamboo into plates |
CN103240786B (en) * | 2013-05-03 | 2015-11-18 | 浙江华奔机械制造有限公司 | A kind of heavy bamboo square stock production technology |
CN103496024B (en) * | 2013-09-09 | 2015-08-12 | 浙江长兴森大竹木制品有限公司 | Recombined bamboo plate production technology |
CN104339435A (en) * | 2014-11-28 | 2015-02-11 | 云南司珈尔木业股份有限公司 | Hot pressing process for medium density fiberboards |
CN106272835A (en) * | 2015-06-01 | 2017-01-04 | 浙江成竹新材料科技股份有限公司 | A kind of outdoor decoration Recombined bamboo manufacturing process |
CN105437347B (en) * | 2015-08-31 | 2017-09-12 | 安徽尧龙竹木制品有限公司 | Bamboo flooring produces the manufacturing equipment of special dipping bar |
CN105171878B (en) * | 2015-08-31 | 2017-12-15 | 安徽尧龙竹木制品有限公司 | The production line of brave line bamboo flooring |
CN106003283B (en) * | 2016-07-11 | 2018-11-30 | 国家林业局竹子研究开发中心 | A kind of recombination bamboo and wood composite decoration veneer and its manufacturing method |
-
2017
- 2017-03-09 CN CN201710139029.1A patent/CN106607975B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106607975A (en) | 2017-05-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106607975B (en) | A kind of cold moudling production technology of heavy bamboo blanket | |
CN103737689B (en) | A kind of Reactive-dye-stainedbamboo bamboo composite material and manufacture method thereof | |
CN102837347B (en) | Poplar structural engineering material and manufacture method thereof | |
CN103211048B (en) | Making process of brick tea | |
US2189889A (en) | Molded article of synthetic resin | |
CN110936457A (en) | Eucalyptus aldehyde-free medium-high density fiberboard production method and fiberboard | |
US2145731A (en) | Method of making corrugated sponge rubber | |
CN106926330B (en) | A kind of manufacturing method of the heterochromatic lamination decoration material plate of bamboo matter | |
CN107379162A (en) | A kind of recombined bamboo plate production technology | |
CN104738231B (en) | A kind of method that No. 28 tea tree breed processing flat green teas are washed one's hair in river | |
CN104621272A (en) | Huoshan Huangya production process | |
CN107232768B (en) | Carbon fiber tea tray or tea table | |
CN103363284B (en) | Comb composite bamboo and manufacture method thereof | |
CN102825645B (en) | Poplar sawn timber and manufacturing method thereof | |
KR100417811B1 (en) | A precessing method from a ripe persimmon into a persimmon | |
CN109834790A (en) | The preliminary treatment of craftwork timber and drying process | |
CN108943548A (en) | A kind of carbon fibre composite manufacturing process | |
CN109382303A (en) | A kind of iron casting process of surface treatment | |
CN108931108A (en) | Solid wood ground heating floor timber microwave vacuum drying process | |
CN109454739A (en) | A kind of bamboo furniture processing technology | |
KR100602996B1 (en) | Placenta set using charcoal moldings and its manufacturing method | |
CN108115789A (en) | A kind of windmill palm vine material low-melting alloy enhances method of modifying | |
KR100602997B1 (en) | Tea set using charcoal moldings and its manufacturing method | |
CN108748561A (en) | A kind of high-quality colouring method of maize peel | |
KR100602995B1 (en) | Green tea mug using charcoal molding and its manufacturing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220914 Address after: 341399 Yuliang Industrial Park, Chongyi Industrial Park, Ganzhou City, Jiangxi Province Patentee after: Jiangxi Milai Bamboo Industry Co.,Ltd. Address before: Yuliang Village, Hengshui Town, Chongyi County, Ganzhou City, Jiangxi Province 341399 Patentee before: JIANGXI CHONGYI HUASEN BAMBOO INDUSTRY Co.,Ltd. |