CN106592556B - A kind of high intensity octagon spud leg section and use its offshore work platform - Google Patents
A kind of high intensity octagon spud leg section and use its offshore work platform Download PDFInfo
- Publication number
- CN106592556B CN106592556B CN201710024479.6A CN201710024479A CN106592556B CN 106592556 B CN106592556 B CN 106592556B CN 201710024479 A CN201710024479 A CN 201710024479A CN 106592556 B CN106592556 B CN 106592556B
- Authority
- CN
- China
- Prior art keywords
- coaming plate
- floating platform
- leg section
- spud leg
- rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0065—Monopile structures
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of high intensity octagon spud leg section and use its offshore work platform, including platform partition board, coaming plate and guide plate, the shell of the coaming plate and guide plate assembling combination pile leg section;The platform partition board is set to the inside of the shell of spud leg section.The high intensity octagon spud leg section is convenient for assembly, space availability ratio higher;The platform partition board is equipped with landing slab main rib and multiple landing slabs time rib, increases the integral strength of platform partition board, makes the even intensity of platform partition board everywhere.The coaming plate fixing rib is connected in coaming plate installation groove, to increase the contact area between coaming plate and platform partition board, convenient for welding, so that coaming plate is more securely mounted at platform partition board, avoids coaming plate stress concentration at one, stress is more uniformly distributed.
Description
Technical field
The present invention relates to field of ocean engineering more particularly to a kind of high intensity octagon spud leg section and use its sea
Upper job platform.
Background technology
Spud leg is the important component of offshore work platform, be used to support the weight of upper hull and bear wind, wave,
Environmental loads, the structure types such as stream are mainly cylindrical leg and truss framed leg, and the lifting system of spud leg mainly has hydraulic pressure
Two kinds of bolt-type and pinion and-rack.In bolt-type offshore work platform, promoted using cylindrical leg and hydraulic bolt formula
The lifting for cooperating to realize spud leg of system.Existing cylindrical leg is not easy to assemble, low space utilization, whole strong
Spend relatively low, there are problem of stress concentration, during use, there are cracking or breaking security risks.
Invention content
A kind of convenient for assembly it is an object of the invention to propose, space availability ratio higher, integral strength is high, effectively avoids answering
Power concentration problem, the big and reliable and stable high intensity octagon spud leg section of load capacity and use its offshore work platform.
For this purpose, the present invention uses following technical scheme:
A kind of high intensity octagon spud leg section, including platform partition board, coaming plate and guide plate, the coaming plate and guide plate are assembled
It is combined into the shell of spud leg section;
The platform partition board is set to the inside of the shell of spud leg section;
The platform partition board includes landing slab, landing slab main rib and multiple landing slabs time rib, and the side of the landing slab is
The middle part of octagon, the landing slab is equipped with pipeline receiving opening;The landing slab main rib is set to the side of pipeline receiving opening
Edge;Side of multiple landing slabs time rib in dispersion shape from pipeline receiving opening to landing slab extends, and landing slab time rib
One end connected with landing slab main rib;
The landing slab further includes multiple coaming plate position levels edge and multiple guide plates positioning bevelled edge edge, the coaming plate
Position level edge and guide plate positioning bevelled edge edge are spaced apart in the side of the landing slab;
The inside of the coaming plate and the welding of coaming plate position level edge, the inside of the guide plate and guide plate positioning beveling
It welds at edge;The guide plate includes multiple pin holes, and the pin hole is longitudinally disposed at evenly and at intervals on the guide plate;
The coaming plate includes coaming plate fixing rib, and the coaming plate fixing rib is longitudinally disposed in the inside of coaming plate;Accordingly, institute
It further includes coaming plate installation groove to state landing slab, and the coaming plate installation groove is set to coaming plate position level edge, and the coaming plate is solid
Determine rib and is connected in coaming plate installation groove.
Preferably, the coaming plate fixing rib is bar shaped rib, and accordingly the coaming plate installation groove is bar-shaped trough;
Alternatively, the coaming plate fixing rib is T-type rib, accordingly the coaming plate installation groove is T-slot.
Preferably, the coaming plate installation groove is connected by the landing slab time rib with landing slab main rib;
Spacing of the two neighboring landing slab time rib in one end towards landing slab main rib is more than towards coaming plate installation groove
The spacing of the other end.
Preferably, the pipeline receiving opening is square hole, and accordingly, the landing slab main rib is square rib;
The other end of the landing slab time rib is in hook-shaped shape;
The thickness of the guide plate is more than the thickness of coaming plate.
Preferably, further include protective layer, the protective layer includes water barrier, the freeze proof layer of anti-corrosion and lubricant layer, the coaming plate
Outside and the outside of guide plate set gradually the freeze proof layer of water barrier, anti-corrosion and lubricant layer inside-out.
Preferably, further include that cleaning device is installed on installation floating platform with floating platform, the cleaning device is installed, the installation is floating
Platform is socketed on the outside of the shell of spud leg section, and the installation floating platform includes floating platform locking device, and the installation floating platform passes through floating platform
Locking device is connected with the shell of spud leg section.
Preferably, the installation floating platform further includes that floating platform ontology, floating platform water injection pipe, floating platform outlet pipe, floating platform water filling are automatically controlled
Valve and floating platform are discharged electrically-controlled valve;
The cross section of the floating platform ontology is octagon, and the floating platform ontology is socketed on the outside of the shell of spud leg section, institute
The inside for stating floating platform ontology is hollow;
The floating platform water injection pipe is connected to the side of floating platform ontology, and the other side of the floating platform outlet pipe and floating platform ontology connects
It is logical;
The floating platform water filling electrically-controlled valve is installed on floating platform water injection pipe, and the floating platform water outlet electrically-controlled valve is installed on floating platform water outlet
Pipe;
The floating platform locking device is set to the side towards guide plate of floating platform ontology,
The floating platform locking device includes floating platform locking pin and locking pin actuator, the floating platform locking pin and the locking
Actuator connection is sold, the locking pin actuator drives the pin hole of floating platform locking pin insertion guide plate.
Preferably, the cleaning device includes cleaning jet pipe, water inlet pipe, current deflecting connecting tube and water inlet electrically-controlled valve, institute
It states cleaning jet pipe to be connected to the top of current deflecting connecting tube, the water inlet pipe is connected to the side of current deflecting connecting tube;
The water inlet electrically-controlled valve is installed on water inlet pipe, the cleaning shell of the jet pipe towards spud leg section;
Further include anticollision cushion pad, the inside setting of the shell towards spud leg section of the current deflecting connecting tube is described anti-
Hit cushion pad.
Preferably, a kind of offshore work platform including the high intensity octagon spud leg section.
The high intensity octagon spud leg section is convenient for assembly, space availability ratio higher;The platform partition board is equipped with landing slab
Main rib and multiple landing slabs time rib, increase the integral strength of platform partition board, and be effectively prevented from the middle part stress collection of platform partition board
The problems in, make the even intensity of platform partition board everywhere.The coaming plate fixing rib is connected in coaming plate installation groove, is enclosed to increase
Contact area between plate and platform partition board makes coaming plate more be securely mounted at platform partition board, coaming plate is avoided to answer convenient for welding
Power concentrates at one, and stress is more uniformly distributed.The other end of the landing slab time rib is in hook-shaped shape, to increase landing slab time rib and enclose
Forced area between plate fixing rib effectively disperses stress herein, improves structural strength, extends the service life of coaming plate.
Description of the drawings
The present invention will be further described for attached drawing, but the content in attached drawing does not constitute any limitation of the invention.
Fig. 1 is the octagon pile leg structure schematic diagram of the one of embodiment of the present invention;
Fig. 2 is the housing interior structure schematic diagram of the spud leg section of the one of embodiment of the present invention;
Fig. 3 is the platform diaphragm structure schematic diagram of the one of embodiment of the present invention;
Fig. 4 is the shell horizontal profile structure schematic diagram of the spud leg section of the one of embodiment of the present invention;
Fig. 5 is the coaming plate structural schematic diagram of the one of embodiment of the present invention;
Fig. 6 is the protective layer structure schematic diagram of the one of embodiment of the present invention;
Fig. 7 is the installation floating platform structural schematic diagram of the one of embodiment of the present invention.
Wherein:Platform partition board 1;Coaming plate 2;Guide plate 3;Coaming plate position level edge 11;Guide plate positions bevelled edge along 12;
Pin hole 31;Pipeline receiving opening 13;Landing slab 101;Landing slab main rib 15;Landing slab time rib 16;Coaming plate fixing rib 21;Coaming plate is pacified
Fill groove 14;Protective layer 4;Water barrier 41;The freeze proof layer of anti-corrosion 42;Lubricant layer 43;Cleaning device 5;Floating platform 7 is installed;Floating platform locks
Device 73;Floating platform ontology 71;Floating platform water injection pipe 72;Floating platform outlet pipe 74;Floating platform water filling electrically-controlled valve 75;Floating platform is discharged electrically-controlled valve
76;Heating device 6;Air inlet pipe 61;Escape pipe 62;Heat exchanger tube 63;Air inlet is oriented to connecting tube 64;Outlet is oriented to connecting tube 65;Into
Gas electrically-controlled valve 66;Gas outlet electrically-controlled valve 67;Clean jet pipe 51;Water inlet pipe 52;Current deflecting connecting tube 53;Water inlet electrically-controlled valve 54;It is anti-
Hit cushion pad 8.
Specific implementation mode
Technical solution to further illustrate the present invention below with reference to the accompanying drawings and specific embodiments.
The high intensity octagon spud leg section of the present embodiment, as shown in Figure 1, including platform partition board 1, coaming plate 2 and guide plate 3,
The shell of 3 assembling combination pile leg section of the coaming plate 2 and guide plate;
The platform partition board 1 is set to the inside of the shell of spud leg section;
The platform partition board 1 includes landing slab 101, landing slab main rib 15 and multiple landing slabs time rib 16, such as Fig. 3, Fig. 4 institute
Show, the side of the landing slab 101 is octagon, and the middle part of the landing slab 101 is equipped with pipeline receiving opening 13;The platform
Plate main rib 15 is set to the edge of pipeline receiving opening 13;Multiple landing slabs time rib 16 is in dispersion shape from pipeline receiving opening
13 extend to the side of landing slab 101, and one end of landing slab time rib 16 and landing slab main rib 15 connect;
The landing slab 101 further includes multiple coaming plate position levels edge 11 and multiple guide plates positioning bevelled edge along 12,
Coaming plate position level edge 11 and guide plate positioning bevelled edge are spaced apart along 12 in the side of the landing slab 101;
The inside of the coaming plate 2 and coaming plate position level edge 11 weld, the inside of the guide plate 3 and guide plate positioning
Bevelled edge is along 12 welding;The guide plate 3 includes multiple pin holes 31, and the pin hole 31 is longitudinally disposed at described lead evenly and at intervals
To on plate 3;
The coaming plate 2 include coaming plate fixing rib 21, as shown in Fig. 2, Fig. 5, the coaming plate fixing rib 21 be longitudinally disposed in
The inside of coaming plate 2;Accordingly, the landing slab 101 further includes coaming plate installation groove 14, and the coaming plate installation groove 14 is set to
Coaming plate position level edge 11, the coaming plate fixing rib 21 are connected in coaming plate installation groove 14.
The cross section of the high intensity octagon spud leg section is octagon, and multiple high intensity octagon spud leg sections close up
It is assembled into high intensity octagon spud leg, compared with existing cylindrical leg, the high intensity octagon spud leg section is convenient for assembly,
Space availability ratio higher.The high intensity octagon spud leg section is formed by platform partition board 1, coaming plate 2 and 3 assembling combination of guide plate,
The side of the landing slab 101 is octagon, is set there are four coaming plate position level edge 11 and four in the side of landing slab 101
One guide plate be arranged between 12, two coaming plate position level edges 11 and positions bevelled edge along 12 for guide plate positioning bevelled edge,
That is four coaming plate position level edges 11 are opposite two-by-two, and four guide plate positioning bevelled edges are opposite two-by-two along 12.It can be equipped with multiple
The coaming plate position level edge 11 of platform partition board 1, the inside of the coaming plate 2 and multiple platform partition boards 1 connects, the guide plate 3
Inside and multiple platform partition boards 1 guide plate positioning bevelled edge along 12 connection, the platform partition board 1 play one support be coupled
Effect, in order to assemble the shell of spud leg section;And staff can be movable on platform partition board 1, to realize that staff arrives
The inside of the shell of spud leg section carries out operation and repair.Guide plate 3 with pin hole 31 is set to four bevelings of platform partition board 1
On angle, to avoid stress concentration in the shell lifting process of spud leg section, stress is more uniformly distributed, the reliable essence of spud leg lifting
It is accurate.
The middle part of the landing slab 101 is equipped with pipeline receiving opening 13, and the pipeline receiving opening 13 is inside spud leg
Setting pipeline provides space and gos deep into carrying out operation and repair inside spud leg convenient for staff.Also, pipeline receiving opening 13
The circumferentially disposed landing slab main rib 15 in edge reduce pipeline and accommodate with the intensity at the edge of reinforced pipe road receiving opening 13
The gouging abrasion etc. of through-hole 13;And landing slab main rib 15 protrudes upward, can play baffle effect, when stopping staff's operation
Tool falls to the bottom of the shell of spud leg section from pipeline receiving opening 13.Multiple landing slabs time rib 16 is arranged in dispersion shape
In landing slab 101, increase the integral strength of landing slab 101, and the middle part stress concentration for being effectively prevented from landing slab 101 is asked
Topic, makes the even intensity of landing slab 101 everywhere.
Multiple coaming plate fixing ribs 21 can be set, and longitudinally interval is uniformly distributed in the inside of the coaming plate 2, the coaming plate
Fixing rib 21 plays the role of enhancing 2 intensity of coaming plate.Accordingly, multiple coaming plate installation grooves 14 can be set, and the coaming plate is fixed
Rib 21 is connected in coaming plate installation groove 14, to increase the contact area between coaming plate 2 and platform partition board 1, convenient for welding, makes to enclose
Plate 2 is more securely mounted at platform partition board 1, avoids 2 stress concentration of coaming plate at one, stress is more uniformly distributed.
Preferably, the coaming plate fixing rib 21 is bar shaped rib, and accordingly the coaming plate installation groove 14 is bar-shaped trough, is both risen
To the effect of enhancing 2 intensity of coaming plate, and convenient for assembled welding.Alternatively, the coaming plate fixing rib 21 is T-type rib, it is accordingly described
Coaming plate installation groove 14 is T-slot, and T-type structure can increase the contact area between coaming plate 2 and platform partition board 1, greatly improve
The intensity of coaming plate 2.
Preferably, as shown in figure 4, the coaming plate installation groove 14 passes through the landing slab time rib 16 and landing slab main rib 15
Connection;Spacing of the two neighboring landing slab time rib 16 in one end towards landing slab main rib 15 is more than towards coaming plate installation groove 14
The other end spacing.Coaming plate installation groove 14 is connected by the landing slab time rib 16 and landing slab main rib 15, the platform
Plate time rib 16 can be integrally welded with coaming plate fixing rib 21, to make coaming plate fixing rib 21, landing slab time rib 16 and landing slab master
Rib 15 is connected, and the integral strength of high intensity octagon spud leg section is significantly enhanced, stress is made more to disperse.Since coaming plate is fixed
The coaming plate installation groove 14 of position horizontal edge 11 is distributed the length for being smaller than 15 corresponding sides of landing slab main rib, in order to make intensity point
Cloth is uniform, and spacing of the two neighboring landing slab time rib 16 in one end towards landing slab main rib 15, which is more than towards coaming plate, to be installed
The spacing of the other end of groove 14, to avoid problem of stress concentration;Wherein each 11 end of coaming plate position level edge
The coaming plate installation groove 14 at end is connected by landing slab time rib 16 with 15 corresponding corner side of landing slab main rib, landing slab herein
Secondary rib 16 is inclined, can enhance buckling strength.
Preferably, as shown in figure 3, the pipeline receiving opening 13 is square hole, accordingly, the landing slab main rib 15 is
Square rib;The other end of the landing slab time rib 16 is in hook-shaped shape;As shown in figure 4, the thickness of the guide plate 3 is more than coaming plate 2
Thickness.The pipeline receiving opening 13 is that square hole is compared with round hole, and the pipeline receiving opening 13 being square can be greatly
Improve accommodation space;Accordingly, the landing slab main rib 15 is square rib, makes landing slab main rib 15 and pipeline receiving opening 13 more
For fitting, the intensity at the edge of reinforced pipe road receiving opening 13.Since coaming plate 2 can be by high wind, sea laps in actual use
Deng impact, the stress that the stress ratio platform partition board 1 that coaming plate 2 is subject to is subject to is much greater, thus landing slab time rib 16 and coaming plate
The other end that fixing rib 21 connects is in hook-shaped shape so that the other end of landing slab time rib 16 is compared with the one end of its own wants high by one
A bit, to increase forced area of the landing slab time between rib 16 and coaming plate fixing rib 21, effectively disperse stress herein, improve structure
Intensity extends the service life of coaming plate 2.Since high intensity octagon spud leg section is flat by the pin hole 31 of guide plate 3 and ocean
The hydraulic bolt formula lifting system of platform connects, and to complete the lifting of spud leg, therefore guide plate 3 is entire high intensity octagon spud leg
Stress is maximum in section, and the thickness that the guide plate 3 is arranged is more than the thickness of coaming plate 2, to improve the rigidity of guide plate 3 and strong
Degree, it is ensured that the security reliability of guide plate 3.Existing cylindrical leg is
The intensity and rigidity of cylindrical leg are improved, the thickness of entire cylindrical leg is larger, but this steel material needed is big, increases
Production cost, waste of resource.And the high intensity octagon spud leg section then only has the guide plate 3 and needs thickness big, rigidity is strong
Steel plate be made, greatly reduce production cost, economize on resources;And the guide plate 3 is strip, compared to cylinder
Spud leg, it is easier to which processing installation improves manufacture efficiency.
Preferably, as shown in figure 4, the edge of the guide plate 3 protrudes outward.The outer surface light of existing cylindrical leg
It is sliding, without any prominent structure, it is easy to happen rotation under the action of stormy waves and rocks, easily collides with main hull, there are poles
Big security risk.And in the high intensity octagon spud leg section, the edge of the guide plate 3 protrudes outward, the high intensity
Octagon spud leg section can be clamped by guide plate 3 and main hull, avoid high intensity octagon spud leg under the action of stormy waves
Section rotates and rocks, and improves safety in utilization.
Preferably, as shown in fig. 6, further including protective layer 4, the protective layer 4 includes water barrier 41, freeze proof 42 and of layer of anti-corrosion
Lubricant layer 43, the outside of the coaming plate 2 and the outside of guide plate 3 set gradually the freeze proof layer of water barrier 41, anti-corrosion inside-out
42 and lubricant layer 43.The water barrier 41 is set to innermost layer, has impermeable role, to prevent seawater from penetrating into the shell of spud leg section
The thickness of the inside of body, the water barrier 41 is 0.4mm~1.5mm, preferably 0.8mm;The freeze proof layer of the anti-corrosion 42 plays anti-
Rotten freeze proof effect, prevents influence of the seawater to the corrosion and low temperature environment of coaming plate 2 and guide plate 3 to coaming plate 2 and guide plate 3,
The thickness of the freeze proof layer of the anti-corrosion 42 is 3.5mm~6mm, preferably 4.5mm;The lubricant layer 43 is set to outermost layer, plays
Lubricating action can effectively reduce the attachment of marine organisms, and the thickness of lubricant layer 43 is 0.4mm~2mm, preferably 1.6mm;Protection
Layer 4 is arranged this thickness range and combines, and has not only ensured the protective effect of the shell to spud leg section, but also reduced protective layer 4 to the greatest extent to stake
The load of the shell of leg section saves input cost.The freeze proof layer 42 of the water barrier 41, anti-corrosion and lubricant layer 43 can be apply oil reservoir or
Colloid layer, lighter in weight reduce load.
Preferably, as shown in fig. 7, further including cleaning device 5 and installation floating platform 7, it is floating that the cleaning device 5 is installed on installation
Platform 7, the installation floating platform 7 are socketed on the outside of the shell of spud leg section, and the installation floating platform 7 includes floating platform locking device 73, institute
Installation floating platform 7 is stated to connect with the shell of spud leg section by floating platform locking device 73.The installation floating platform 7 is socketed on the shell of spud leg section
The outside of body, for carrying cleaning device 5, the cleaning device 5 is used to carry out the shell of the spud leg section when receiving stake clear
It washes, due to containing a large amount of salt in seawater, corrosion is generated to the shell of the spud leg section under the collective effect of sunlight and air
Effect, therefore the cleaning device 5 is set, seawater is avoided to extend the spud leg section to the corrosiveness of the shell of the spud leg section
Shell service life.The installation floating platform 7 is equipped with floating platform locking device 73, to off working state or marine stormy waves compared with
When big, the installation floating platform 7 is locked in by floating platform locking device 73 on the shell of spud leg section, is installed to avoid because of wind wave action
Abrasion collision occurs between floating platform 7 and the shell of spud leg section, improves safety in utilization.
Preferably, as shown in fig. 7, the installation floating platform 7 further includes floating platform ontology 71, floating platform water injection pipe 72, floating platform water outlet
Pipe 74, floating platform water filling electrically-controlled valve 75 and floating platform are discharged electrically-controlled valve 76;The cross section of the floating platform ontology 71 is octagon, described floating
Playscript with stage directions body 71 is socketed on the outside of the shell of spud leg section, and the inside of the floating platform ontology 71 is hollow;The floating platform water injection pipe 72
It is connected to the side of floating platform ontology 71, the floating platform outlet pipe 74 is connected to the other side of floating platform ontology 71;The floating platform water filling
Electrically-controlled valve 75 is installed on floating platform water injection pipe 72, and the floating platform water outlet electrically-controlled valve 76 is installed on floating platform outlet pipe 74;The floating platform lock
Determine the side towards guide plate 3 that device 73 is set to floating platform ontology 71, the floating platform locking device 73 includes floating platform locking pin
With locking pin actuator, the floating platform locking pin is connected with the locking pin actuator, and the locking pin actuator drives floating platform
Locking pin is inserted into the pin hole 31 of guide plate 3.
Internal water flooding of the installation floating platform 7 by floating platform water injection pipe 72 to floating platform ontology 71, floating platform ontology 71 passes through floating
Platform outlet pipe 74 is discharged, and the water storage of floating platform ontology 71 is controlled by the floating platform water filling electrically-controlled valve 75 and floating platform water outlet electrically-controlled valve 76
Amount then controls the buoyancy size and fording depth of floating platform ontology 71.The cross section of the floating platform ontology 71 is octagon, more preferably
Ground be bonded in the shell of spud leg section of eight side bar shapes, and floating platform ontology 71 is effectively prevent to rotate in the case where wave acts on shifting
Position.The floating platform locking device 73 drives the pin hole 31 of floating platform locking pin insertion guide plate 3 by locking pin actuator, to realize
To installing the locking effect of floating platform 7.The locking pin actuator can be hydraulic cylinder, and the locking pin actuator drives floating platform lock
Rationed marketing carries out stretching motion, also locking pin position sensor can be arranged in one end towards pin hole 31 of floating platform locking pin, be used for
The position of detection pin hole 31 is prevented with ensureing that the floating platform locking pin is properly inserted corresponding pin hole 31 because causing to just improper
Floating platform locking pin can not be inserted into corresponding pin hole 31 and be damaged to the shell of floating platform locking pin and spud leg section.It can be arranged multiple
Floating platform locking device 73 is distributed in four angles of chamfer of floating platform ontology 71, to correspond to each guide plate 3 of the shell of spud leg section,
To ensure being uniformly distributed for load.
Preferably, as shown in fig. 7, the cleaning device 5 includes cleaning jet pipe 51, water inlet pipe 52, current deflecting connecting tube
53 are connected to water inlet electrically-controlled valve 54, the cleaning jet pipe 51 with the top of current deflecting connecting tube 53, the water inlet pipe 52 and water
Conductance is connected to the side of connecting tube 53;The water inlet electrically-controlled valve 54 is installed on water inlet pipe 52, and the cleaning jet pipe 51 is towards stake
The shell of leg section;Further include anticollision cushion pad 8, the inside setting of the shell towards spud leg section of the current deflecting connecting tube 53
The anticollision cushion pad 8.
The cleaning device 5 pours into the heat that clear water or diesel engine are discharged by water inlet pipe 52 to current deflecting connecting tube 53
Water, then the water of current deflecting connecting tube 53 from cleaning jet pipe 51 spray, the cleaning shell of the jet pipe 51 towards spud leg section, spray
Go out flow to clean the shell of spud leg section.The water inlet electrically-controlled valve 54 is used to control the inflow of water inlet pipe 52, with control
Spray the pressure of flow, i.e. cleaning dynamics.The current deflecting connecting tube 53 may be configured as loop pipe, be surrounded on the shell of spud leg section
The surrounding of body;Accordingly, multiple cleaning jet pipes 51 can be set, and multiple cleaning jet pipes 51 are surrounded on the four of the shell of spud leg section
Week enhances cleaning quality to expand clean range.The inside of the shell towards spud leg section of the current deflecting connecting tube 53
The anticollision cushion pad 8 is set, and the anticollision cushion pad 8 plays cushioning effect, can reduce because of wind wave action cleaning device 5 and stake
The gouging abrasion that the shell of leg section occurs.
Preferably, as shown in fig. 7, further including heating device 6, the heating device 6 is installed on installation floating platform 7 and cleaning fills
It sets between 5;The heating device 6 includes air inlet pipe 61, escape pipe 62, heat exchanger tube 63, air inlet is oriented to connecting tube 64, outlet is oriented to
Connecting tube 65, air inlet electrically-controlled valve 66 and gas outlet electrically-controlled valve 67;
The air inlet is oriented to connecting tube 64 and is connected to by heat exchanger tube 63 with outlet guiding connecting tube 65,61 He of the air inlet pipe
Air inlet is oriented to connecting tube 64 and is connected to, and the escape pipe 62 is oriented to connecting tube 65 with outlet and is connected to;
The air inlet electrically-controlled valve 66 is installed on air inlet pipe 61, and the gas outlet electrically-controlled valve 67 is installed on escape pipe 62.
The heating device 6 is for heating the shell of spud leg section to reach deicing effect.In the lower ring of temperature
Under border, the shell of spud leg section freezes seriously, and ice sheet brings prodigious load to the shell of spud leg section, is easy to make the shell of spud leg section
It fractures or damages, therefore the heating device 6 is set, the heating device 6 can utilize the remaining of offshore work platform diesel engine unit
Heat carries out heating ice-melt to the shell of spud leg section, eliminates ice sheet to the load of the shell of spud leg section, greatly improves the spud leg
Save the service life in severe cold area.The heating device 6 connects the offgas duct of diesel engine unit, waste heat tail gas warp by air inlet pipe 61
Air inlet pipe 61 is oriented to connecting tube 65 into passing through air inlet after such as heating device 6 successively and be oriented to connecting tube 64, heat exchanger tube 63, outlet, most
It is discharged by escape pipe 62, waste heat tail gas carries out heat exchange in heat exchanger tube 63 and external environment during this, to spud leg section
Shell carry out heating ice-melt.The air inlet electrically-controlled valve 66 and gas outlet electrically-controlled valve 67 are respectively used to the input quantity of control waste heat tail gas
And output quantity, to control the degree of heat of heating device 6.The air inlet is oriented to connecting tube 64 and outlet is oriented to connecting tube 65 and can set
It is set to loop pipe, is surrounded on the surrounding of the shell of spud leg section;Accordingly, more heat exchanger tubes 63, more 63 rings of heat exchanger tube can be set
It is around in the surrounding of the shell of spud leg section, to expand deicing range, enhances deicing quality.
Preferably, a kind of offshore work platform including the high intensity octagon spud leg section.The offshore work platform
Including main hull and the high intensity octagon spud leg section, the main hull corresponds to the high intensity octagon spud leg section and is equipped with liquid
Bolt-type lifting system is pressed, is made by hydraulic bolt formula lifting system and being used cooperatively for the high intensity octagon spud leg section
The high intensity octagon spud leg section and main hull can realize that opposite oscilaltion, the high intensity octagon spud leg section are convenient for
Assembly, space availability ratio higher, integral strength is high, effectively avoids problem of stress concentration, load capacity is big and reliable and stable, uses the longevity
Life length.
The high intensity octagon spud leg section of the present embodiment has the advantages that:1. the high intensity octagon spud leg section
Equipped with the shell that cross section is octagonal spud leg section, multiple high intensity octagon spud leg sections, which close up, is assembled into high intensity eight
Side shape spud leg, compared with existing cylindrical leg, the high intensity octagon spud leg section is convenient for assembly, and space availability ratio is more
It is high;2. the landing slab main rib 15 and multiple landing slabs time rib 16 is arranged, increase the integral strength of landing slab 101, and effectively
The middle part stress concentration for avoiding the problem that landing slab 101 makes the even intensity of landing slab 101 everywhere;3. the coaming plate fixing rib
21 play the role of enhancing 2 intensity of coaming plate, and the coaming plate fixing rib 21 is connected in coaming plate installation groove 14, is enclosed to increase
Contact area between plate 2 and platform partition board 1 makes coaming plate 2 more be securely mounted at platform partition board 1, avoids enclosing convenient for welding
At one, stress is more uniformly distributed 2 stress concentration of plate.
The technical principle of the present invention is described above in association with specific embodiment.These descriptions are intended merely to explain the present invention's
Principle, and it cannot be construed to limiting the scope of the invention in any way.Based on the explanation herein, the technology of this field
Personnel would not require any inventive effort the other specific implementation modes that can associate the present invention, these modes are fallen within
Within protection scope of the present invention.
Claims (9)
1. a kind of high intensity octagon spud leg section, it is characterised in that:Including platform partition board, coaming plate and guide plate, the coaming plate and
The shell of guide plate assembling combination pile leg section;
The platform partition board is set to the inside of the shell of spud leg section;
The platform partition board includes landing slab, landing slab main rib and multiple landing slabs time rib, and the side of the landing slab is eight sides
The middle part of shape, the landing slab is equipped with pipeline receiving opening;The landing slab main rib is set to the edge of pipeline receiving opening;It is more
Side of a landing slab time rib in dispersion shape from pipeline receiving opening to landing slab extends, and one end of landing slab time rib
It is connected with landing slab main rib;
The landing slab further includes multiple coaming plate position levels edge and multiple guide plates positioning bevelled edge edge, the coaming plate positioning
Horizontal edge and guide plate positioning bevelled edge edge are spaced apart in the side of the landing slab;
The inside of the coaming plate and the welding of coaming plate position level edge, the inside of the guide plate and guide plate positioning bevelled edge edge
Welding;The guide plate includes multiple pin holes, and the pin hole is longitudinally disposed at evenly and at intervals on the guide plate;
The coaming plate includes coaming plate fixing rib, and the coaming plate fixing rib is longitudinally disposed in the inside of coaming plate;Accordingly, described flat
Platen further includes coaming plate installation groove, and the coaming plate installation groove is set to coaming plate position level edge, the coaming plate fixing rib
It is connected in coaming plate installation groove.
2. high intensity octagon spud leg section according to claim 1, it is characterised in that:The coaming plate fixing rib is bar shaped
Rib, accordingly the coaming plate installation groove is bar-shaped trough;
Alternatively, the coaming plate fixing rib is T-type rib, accordingly the coaming plate installation groove is T-slot.
3. high intensity octagon spud leg section according to claim 1, it is characterised in that:The coaming plate installation groove passes through institute
Landing slab time rib is stated to connect with landing slab main rib;
Spacing of the two neighboring landing slab time rib in one end towards landing slab main rib is more than towards the another of coaming plate installation groove
The spacing at end.
4. high intensity octagon spud leg section according to claim 1, it is characterised in that:The pipeline receiving opening is rectangular
Hole, accordingly, the landing slab main rib are square rib;
The other end towards coaming plate installation groove of the landing slab time rib is in hook-shaped shape;
The thickness of the guide plate is more than the thickness of coaming plate.
5. high intensity octagon spud leg section according to claim 1, it is characterised in that:Further include protective layer, the protection
Layer includes water barrier, the freeze proof layer of anti-corrosion and lubricant layer, and the outside of the coaming plate and the outside of guide plate are set successively inside-out
Set the freeze proof layer of water barrier, anti-corrosion and lubricant layer.
6. high intensity octagon spud leg section according to claim 1, it is characterised in that:Further include that cleaning device and installation are floating
Platform, the cleaning device are installed on installation floating platform, and the installation floating platform is socketed on the outside of the shell of spud leg section, and the installation is floating
Platform includes floating platform locking device, and the installation floating platform is connected by floating platform locking device with the shell of spud leg section.
7. high intensity octagon spud leg section according to claim 6, it is characterised in that:The installation floating platform further includes floating platform
Ontology, floating platform water injection pipe, floating platform outlet pipe, floating platform water filling electrically-controlled valve and floating platform are discharged electrically-controlled valve;
The cross section of the floating platform ontology is octagon, and the floating platform ontology is socketed on the outside of the shell of spud leg section, described floating
The inside of playscript with stage directions body is hollow;
The floating platform water injection pipe is connected to the side of floating platform ontology, and the floating platform outlet pipe is connected to the other side of floating platform ontology;
The floating platform water filling electrically-controlled valve is installed on floating platform water injection pipe, and the floating platform water outlet electrically-controlled valve is installed on floating platform outlet pipe;
The floating platform locking device is set to the side towards guide plate of floating platform ontology,
The floating platform locking device includes floating platform locking pin and locking pin actuator, and the floating platform locking pin and the locking pin drive
Moving part connects, and the locking pin actuator drives the pin hole of floating platform locking pin insertion guide plate.
8. high intensity octagon spud leg section according to claim 6, it is characterised in that:The cleaning device includes that cleaning is sprayed
Pipe, water inlet pipe, current deflecting connecting tube and water inlet electrically-controlled valve, the cleaning jet pipe are connected to the top of current deflecting connecting tube,
The water inlet pipe is connected to the side of current deflecting connecting tube;
The water inlet electrically-controlled valve is installed on water inlet pipe, the cleaning shell of the jet pipe towards spud leg section;
Further include anticollision cushion pad, the inside of the shell towards spud leg section of the current deflecting connecting tube is arranged the anticollision and delays
Punching pad.
9. a kind of offshore work platform including the high intensity octagon spud leg section described in claim 1 to 8 any one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710024479.6A CN106592556B (en) | 2017-01-13 | 2017-01-13 | A kind of high intensity octagon spud leg section and use its offshore work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710024479.6A CN106592556B (en) | 2017-01-13 | 2017-01-13 | A kind of high intensity octagon spud leg section and use its offshore work platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106592556A CN106592556A (en) | 2017-04-26 |
CN106592556B true CN106592556B (en) | 2018-11-09 |
Family
ID=58584677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710024479.6A Active CN106592556B (en) | 2017-01-13 | 2017-01-13 | A kind of high intensity octagon spud leg section and use its offshore work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592556B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL2020037B1 (en) * | 2017-12-07 | 2019-06-19 | Ihc Holland Ie Bv | A coupling system, an assembly of a vessel and a coupling system, and an assembly of a coupling system, jacket pile and foundation pile |
CN108609123B (en) * | 2018-05-18 | 2019-11-22 | 武汉船用机械有限责任公司 | Seawater lift device |
CN115217106A (en) * | 2022-06-17 | 2022-10-21 | 同济大学 | Folding wing plate |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2383119A1 (en) * | 1977-03-10 | 1978-10-06 | Metalliques Entrepr Cie Fse | Assembly for installation of offshore oil drilling rig - has screw jacks with locking nuts for positioning and securing piles relative to platform |
CN102728980A (en) * | 2012-07-05 | 2012-10-17 | 南通中远船务工程有限公司 | Method for limiting and positioning octagonal spud leg in folding process |
CN103397623A (en) * | 2013-08-06 | 2013-11-20 | 宁波捷胜海洋开发有限公司 | Offshore platform |
CN203473217U (en) * | 2013-08-06 | 2014-03-12 | 宁波捷胜海洋开发有限公司 | Supporting rod of offshore platform positioning column |
CN104805858A (en) * | 2014-07-28 | 2015-07-29 | 中集海洋工程研究院有限公司 | Self-elevating platform pile leg and ocean platform with same |
KR101576504B1 (en) * | 2015-10-26 | 2015-12-21 | 에스앤에스이앤지 주식회사 | Barge having jackup device |
CN105862699A (en) * | 2016-06-13 | 2016-08-17 | 广东精铟海洋工程股份有限公司 | Pin type continuous lifting system for offshore platform and lifting method thereof |
CN205712038U (en) * | 2016-06-20 | 2016-11-23 | 烟台中集来福士海洋工程有限公司 | Jack-up unit and jetting pipeline support thereof |
-
2017
- 2017-01-13 CN CN201710024479.6A patent/CN106592556B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2383119A1 (en) * | 1977-03-10 | 1978-10-06 | Metalliques Entrepr Cie Fse | Assembly for installation of offshore oil drilling rig - has screw jacks with locking nuts for positioning and securing piles relative to platform |
CN102728980A (en) * | 2012-07-05 | 2012-10-17 | 南通中远船务工程有限公司 | Method for limiting and positioning octagonal spud leg in folding process |
CN103397623A (en) * | 2013-08-06 | 2013-11-20 | 宁波捷胜海洋开发有限公司 | Offshore platform |
CN203473217U (en) * | 2013-08-06 | 2014-03-12 | 宁波捷胜海洋开发有限公司 | Supporting rod of offshore platform positioning column |
CN104805858A (en) * | 2014-07-28 | 2015-07-29 | 中集海洋工程研究院有限公司 | Self-elevating platform pile leg and ocean platform with same |
KR101576504B1 (en) * | 2015-10-26 | 2015-12-21 | 에스앤에스이앤지 주식회사 | Barge having jackup device |
CN105862699A (en) * | 2016-06-13 | 2016-08-17 | 广东精铟海洋工程股份有限公司 | Pin type continuous lifting system for offshore platform and lifting method thereof |
CN205712038U (en) * | 2016-06-20 | 2016-11-23 | 烟台中集来福士海洋工程有限公司 | Jack-up unit and jetting pipeline support thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106592556A (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592556B (en) | A kind of high intensity octagon spud leg section and use its offshore work platform | |
CN102182203B (en) | A kind of steel row's formula anemometer tower foundation and anemometer tower structure | |
US20170144739A1 (en) | Retractable thruster, a swimming vessel and a method for retracting and ejecting a propeller of the retractable thruster | |
CN210592333U (en) | Prevent that living beings adhere to ocean buoy | |
KR20110110690A (en) | Air cavity vessel with rack and pinion actuated movable partition member | |
CN109356096A (en) | The floated anti-ship of one kind hits multilayer energy-consuming device | |
CN106759205B (en) | A kind of jack up octagon spud leg section and the offshore work platform using it | |
CN209211396U (en) | The floated anti-ship of one kind hits multilayer energy-consuming device | |
US20100014920A1 (en) | Turbine structure and gate structure having flexible joint and inside stuffing for tidal power plant | |
CN107416143A (en) | A kind of floating type water surface photovoltaic system | |
CN116873137A (en) | Offshore photovoltaic power generation platform and power generation system | |
CN106677149B (en) | A kind of hydraulic continuous jacking system with octagon spud leg | |
CN109098144B (en) | Water-permeable assembled breakwater with sand blocking function and construction method thereof | |
TW201702124A (en) | Floating support structure with horizontal section varying with depth | |
JP6721886B2 (en) | Axial structure of floating body support shaft and floating power generation apparatus having the axial structure of the floating body support shaft | |
CN219927936U (en) | Floating type photovoltaic platform with adjustable floating gravity center | |
JP2006283648A (en) | Wave energy-using device | |
CN209938869U (en) | Ice water tank structure of ship | |
CN201801883U (en) | Steel bar type wind measurement tower foundation and wind measurement tower structure | |
CN116292123A (en) | Offshore wind power and floating type photovoltaic combination system and construction method | |
CN206602481U (en) | A kind of float-type floating constraint truss | |
CN116280048A (en) | Ball-like type offshore floating type photovoltaic floating body structure and implementation method thereof | |
CN219524193U (en) | Wave-resistant type offshore floating type photovoltaic floating body structure in ice area | |
CN113053345B (en) | Water curtain/foamed aluminum composite noise reduction method and noise reduction device | |
CN111634369B (en) | Outboard protective pipe structure of FPSO anchor chain detection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: High-strength octagonal pile leg section and offshore work platform using same Effective date of registration: 20200320 Granted publication date: 20181109 Pledgee: China Co truction Bank Corp Foshan branch Pledgor: GUANGDONG JINGYIN MACHINERY Co.,Ltd. Registration number: Y2020440000045 |