CN106592556A - High-strength octagonal pile leg section and offshore work platform using same - Google Patents
High-strength octagonal pile leg section and offshore work platform using same Download PDFInfo
- Publication number
- CN106592556A CN106592556A CN201710024479.6A CN201710024479A CN106592556A CN 106592556 A CN106592556 A CN 106592556A CN 201710024479 A CN201710024479 A CN 201710024479A CN 106592556 A CN106592556 A CN 106592556A
- Authority
- CN
- China
- Prior art keywords
- floating platform
- coaming plate
- leg section
- spud leg
- landing slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0065—Monopile structures
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a high-strength octagonal pile leg section and an offshore work platform using the same. The high-strength octagonal pile leg section comprises a platform partition, an enclosure plate and a guide plate, wherein the enclosure plate and the guide plate are assembled and combined into a shell of the pile leg section; and the platform partition is arranged in the shell of the pile leg section. The high-strength octagonal pile leg section is convenient to assemble and high in space utilization rate; and the platform partition is provided with a platform plate main rib and a plurality of platform plate secondary ribs, the integral strength of the platform partition is improved, and strengths of various parts of the platform partition are uniform. Enclosure plate fixing ribs are clamped in enclosure plate mounting grooves, so that the area of a part, which is in contact with the platform partition, of the enclosure plate is increased; welding is facilitated; the enclosure plate is firmly mounted on the platform partition; stress of the enclosure plate is prevented from being concentrated at a position; and the enclosure plate is stressed evenly.
Description
Technical field
The present invention relates to field of ocean engineering, more particularly to a kind of high intensity octagon spud leg section and the sea using which
Upper job platform.
Background technology
Spud leg is the important component part of offshore work platform, for support upper hull weight and bear wind, wave,
The environmental loads such as stream, its version are mainly cylindrical leg and truss framed leg, and the lift system of spud leg mainly has hydraulic pressure
Two kinds of bolt-type and pinion and-rack.In bolt-type offshore work platform, lifted using cylindrical leg and hydraulic bolt formula
The cooperating to of system realizes the lifting of spud leg.Existing cylindrical leg is not easy assembling, and low space utilization is overall strong
Degree is relatively low, there is problem of stress concentration, there is cracking or breaking potential safety hazard during use.
The content of the invention
It is an object of the invention to propose that one kind is easy to assembling, space availability ratio is higher, and bulk strength is high, and being prevented effectively from should
Power concentration problem, the big and reliable and stable high intensity octagon spud leg section of load capacity and the offshore work platform using which.
It is that, up to this purpose, the present invention is employed the following technical solutions:
A kind of high intensity octagon spud leg section, including platform dividing plate, coaming plate and guide plate, the coaming plate and guide plate are assembled
It is combined into the housing of spud leg section;
The platform dividing plate is arranged at the inside of the housing of spud leg section;
The platform dividing plate includes landing slab, landing slab main rib and multiple landing slabs time rib, and the side of the landing slab is
Octagon, is provided with pipeline receiving opening in the middle part of the landing slab;The landing slab main rib is arranged at the side of pipeline receiving opening
Edge;Side of multiple landing slabs time rib in dispersion shape from pipeline receiving opening to landing slab extends, and landing slab time rib
One end and landing slab main rib connection;
The landing slab also includes multiple coaming plate position level edges and multiple guide plates positioning bevelled edge edge, the coaming plate
Position level edge and guide plate positioning bevelled edge edge are spaced apart in the side of the landing slab;
The inner side of the coaming plate and the welding of coaming plate position level edge, the inner side of the guide plate and guide plate positioning beveling
Weld at edge;The guide plate includes multiple pin-and-holes, and the pin-and-hole is longitudinally disposed on the guide plate evenly and at intervals;
The coaming plate includes coaming plate fixing rib, and the coaming plate fixing rib is longitudinally disposed in the inner side of coaming plate;Accordingly, institute
Stating landing slab also includes that coaming plate installs groove, and the coaming plate is installed groove and is arranged at coaming plate position level edge, and the coaming plate is solid
Determine rib and be connected in coaming plate installation groove.
Preferably, the coaming plate fixing rib is bar shaped rib, and it is bar-shaped trough that accordingly the coaming plate installs groove;
Or, the coaming plate fixing rib is T-shaped rib, and it is T-slot that accordingly the coaming plate installs groove.
Preferably, the coaming plate installs groove by the landing slab time rib and the connection of landing slab main rib;
Two neighboring landing slab time rib installs groove more than towards coaming plate in the spacing towards one end of landing slab main rib
The spacing of the other end.
Preferably, the pipeline receiving opening is square opening, and accordingly, the landing slab main rib is square rib;
The other end of the landing slab time rib is in hook-shaped shape;
Thickness of the thickness of the guide plate more than coaming plate.
Preferably, also including overcoat, the overcoat includes the freeze proof layer of water barrier, anti-corrosion and lubricating layer, the coaming plate
Outside and the outside of guide plate set gradually the freeze proof layer of water barrier, anti-corrosion and lubricating layer inside-out.
Preferably, also including cleaning device and installation floating platform, the cleaning device is installed on installation floating platform, and the installation is floated
Platform is socketed on the outside of the housing of spud leg section, and the installation floating platform includes floating platform locking device, and the installation floating platform passes through floating platform
The housing connection of locking device and spud leg section.
Preferably, the installation floating platform also includes that floating platform body, floating platform water injection pipe, floating platform outlet pipe, floating platform water filling are automatically controlled
Valve and floating platform water outlet electrically-controlled valve;
The cross section of the floating platform body is octagon, and the floating platform body is socketed on the outside of the housing of spud leg section, institute
The inside for stating floating platform body is hollow;
The floating platform water injection pipe is connected with the side of floating platform body, and the opposite side of the floating platform outlet pipe and floating platform body connects
It is logical;
The floating platform water filling electrically-controlled valve is installed on floating platform water injection pipe, and the floating platform water outlet electrically-controlled valve is installed on floating platform water outlet
Pipe;
The floating platform locking device is arranged at the side towards guide plate of floating platform body,
The floating platform locking device includes floating platform stop pin and stop pin actuator, the floating platform stop pin and the locking
Pin actuator connection, the stop pin actuator drive floating platform stop pin to insert the pin-and-hole of guide plate.
Preferably, the cleaning device includes cleaning jet pipe, water inlet pipe, current deflecting connecting tube and water inlet electrically-controlled valve, institute
State cleaning jet pipe to connect with the top of current deflecting connecting tube, the water inlet pipe is connected with the side of current deflecting connecting tube;
The water inlet electrically-controlled valve is installed on water inlet pipe, housing of the cleaning jet pipe towards spud leg section;
Also include anticollision cushion pad, the inner side of the housing towards spud leg section of the current deflecting connecting tube arranges described anti-
Hit cushion pad.
Preferably, a kind of offshore work platform including the high intensity octagon spud leg section.
The high intensity octagon spud leg section is easy to assembling, and space availability ratio is higher;The platform dividing plate is provided with landing slab
Main rib and multiple landing slabs time rib, increase the bulk strength of platform dividing plate, and are effectively prevented from the middle part stress collection of platform dividing plate
In problem, make platform dividing plate even intensity everywhere.The coaming plate fixing rib is connected in coaming plate and installs groove, encloses so as to increase
Contact area between plate and platform dividing plate, is easy to welding, makes coaming plate more be securely mounted at platform dividing plate, it is to avoid coaming plate should
Power is concentrated at one, and stress is more uniformly distributed.The other end of the landing slab time rib is in hook-shaped shape, to increase landing slab time rib and enclose
Lifting surface area between plate fixing rib, effectively disperses stress herein, improves structural strength, extends the service life of coaming plate.
Description of the drawings
The present invention will be further described for accompanying drawing, but the content in accompanying drawing does not constitute any limitation of the invention.
Fig. 1 is the octagon pile leg structure schematic diagram of one of embodiment of the invention;
Fig. 2 is the housing interior structure schematic diagram of the spud leg section of one of embodiment of the invention;
Fig. 3 is the platform diaphragm structure schematic diagram of one of embodiment of the invention;
Fig. 4 is the housing horizontal profile structure schematic diagram of the spud leg section of one of embodiment of the invention;
Fig. 5 is the coaming plate structural representation of one of embodiment of the invention;
Fig. 6 is the protective layer structure schematic diagram of one of embodiment of the invention;
Fig. 7 is the installation floating platform structural representation of one of embodiment of the invention.
Wherein:Platform dividing plate 1;Coaming plate 2;Guide plate 3;Coaming plate position level edge 11;Guide plate positions bevelled edge along 12;
Pin-and-hole 31;Pipeline receiving opening 13;Landing slab 101;Landing slab main rib 15;Landing slab time rib 16;Coaming plate fixing rib 21;Coaming plate is pacified
Dress groove 14;Overcoat 4;Water barrier 41;The freeze proof layer of anti-corrosion 42;Lubricating layer 43;Cleaning device 5;Floating platform 7 is installed;Floating platform is locked
Device 73;Floating platform body 71;Floating platform water injection pipe 72;Floating platform outlet pipe 74;Floating platform water filling electrically-controlled valve 75;Floating platform water outlet electrically-controlled valve
76;Heater 6;Air inlet pipe 61;Escape pipe 62;Heat exchanger tube 63;Air inlet is oriented to connecting tube 64;Outlet is oriented to connecting tube 65;Enter
Gas electrically-controlled valve 66;Gas outlet electrically-controlled valve 67;Cleaning jet pipe 51;Water inlet pipe 52;Current deflecting connecting tube 53;Water inlet electrically-controlled valve 54;It is anti-
Hit cushion pad 8.
Specific embodiment
Technical scheme is further illustrated below in conjunction with the accompanying drawings and by specific embodiment.
The high intensity octagon spud leg section of the present embodiment, as shown in figure 1, including platform dividing plate 1, coaming plate 2 and guide plate 3,
The housing of 3 assembling combination pile leg section of the coaming plate 2 and guide plate;
The platform dividing plate 1 is arranged at the inside of the housing of spud leg section;
The platform dividing plate 1 includes landing slab 101, landing slab main rib 15 and multiple landing slabs time rib 16, such as Fig. 3, Fig. 4 institute
Show, the side of the landing slab 101 is octagon, and the middle part of the landing slab 101 is provided with pipeline receiving opening 13;The platform
Plate main rib 15 is arranged at the edge of pipeline receiving opening 13;Multiple landing slabs time rib 16 is in dispersion shape from pipeline receiving opening
13 extend to the side of landing slab 101, and landing slab time rib 16 one end and landing slab main rib 15 connect;
The landing slab 101 also includes that multiple coaming plate position level edges 11 and multiple guide plates position bevelled edge along 12,
The coaming plate position level edge 11 and guide plate positioning bevelled edge are spaced apart in the side of the landing slab 101 along 12;
The inner side and coaming plate position level edge 11 of the coaming plate 2 is welded, and the inner side of the guide plate 3 and guide plate are positioned
Bevelled edge is along 12 welding;The guide plate 3 includes multiple pin-and-holes 31, and the pin-and-hole 31 is longitudinally disposed at described leading evenly and at intervals
To on plate 3;
The coaming plate 2 includes coaming plate fixing rib 21, as shown in Fig. 2, Fig. 5, the coaming plate fixing rib 21 be longitudinally disposed in
The inner side of coaming plate 2;Accordingly, the landing slab 101 also includes that coaming plate installs groove 14, and the coaming plate is installed groove 14 and is arranged at
Coaming plate position level edge 11, the coaming plate fixing rib 21 are connected in coaming plate and install groove 14.
The cross section of the high intensity octagon spud leg section is octagon, and multiple high intensity octagon spud leg sections close up
High intensity octagon spud leg is assembled into, compared with existing cylindrical leg, the high intensity octagon spud leg section is easy to assembling,
Space availability ratio is higher.The high intensity octagon spud leg section is formed by platform dividing plate 1, coaming plate 2 and 3 assembling combination of guide plate,
The side of the landing slab 101 is octagon, is provided with four coaming plate position level edges 11 and four in the side of landing slab 101
Guide plate positions bevelled edge along 12, arranges a guide plate and position bevelled edge along 12 between two coaming plate position level edges 11,
I.e. four coaming plate position level edges 11 are relative two-by-two, and four guide plate positioning bevelled edges are relative two-by-two along 12.Can be provided with multiple
The coaming plate position level edge 11 of platform dividing plate 1, the inner side of the coaming plate 2 and multiple platform dividing plates 1 connects, the guide plate 3
Inner side and multiple platform dividing plates 1 guide plate positioning bevelled edge along 12 connection, the platform dividing plate 1 play one support be coupled
Effect, in order to assemble the housing of spud leg section;And staff can be movable on platform dividing plate 1, to realize that staff arrives
The inside of the housing of spud leg section carries out operation and maintenance.Guide plate 3 with pin-and-hole 31 is arranged at four bevelings of platform dividing plate 1
On angle, so as to stress concentration is avoided in the housing lifting process of spud leg section, stress is more uniformly distributed, the reliable essence of spud leg lifting
It is accurate.
The middle part of the landing slab 101 is provided with pipeline receiving opening 13, and the pipeline receiving opening 13 is inside spud leg
Arrange pipeline space to be provided and is easy to staff to go deep into inside spud leg, carrying out operation and maintenance.Also, pipeline receiving opening 13
The circumferentially disposed landing slab main rib 15 in edge, with the intensity at the edge of reinforced pipe road receiving opening 13, reduce pipeline and accommodate
Gouging abrasion of through hole 13 etc.;And landing slab main rib 15 is projected upward, baffle effect can be played, when stopping staff's operation
Instrument falls to the bottom of the housing of spud leg section from pipeline receiving opening 13.Multiple landing slabs time rib 16 is arranged in dispersion shape
In landing slab 101, increase the bulk strength of landing slab 101, and be effectively prevented from asking for the middle part stress concentration of landing slab 101
Topic, makes the even intensity everywhere of landing slab 101.
Multiple coaming plate fixing ribs 21 can be set, and longitudinally interval is uniformly distributed in the inner side of the coaming plate 2, the coaming plate
Fixing rib 21 plays a part of to strengthen 2 intensity of coaming plate.Accordingly, multiple coaming plates can be set groove 14 is installed, the coaming plate is fixed
Rib 21 is connected in coaming plate and installs groove 14, so as to increase the contact area between coaming plate 2 and platform dividing plate 1, is easy to welding, makes to enclose
Plate 2 is more securely mounted at platform dividing plate 1, it is to avoid at one, stress is more uniformly distributed 2 stress concentration of coaming plate.
Preferably, the coaming plate fixing rib 21 is bar shaped rib, and it is bar-shaped trough that accordingly the coaming plate installs groove 14, is both risen
To the effect for strengthening 2 intensity of coaming plate, it is easy to assembled welding again.Or, the coaming plate fixing rib 21 is T-shaped rib, accordingly described
Coaming plate installs groove 14 for T-slot, and T-type structure can increase the contact area between coaming plate 2 and platform dividing plate 1, greatly improve
The intensity of coaming plate 2.
Preferably, as shown in figure 4, the coaming plate installs groove 14 by the landing slab time rib 16 and landing slab main rib 15
Connection;Two neighboring landing slab time rib 16 installs groove 14 more than towards coaming plate in the spacing towards one end of landing slab main rib 15
The other end spacing.Coaming plate is installed groove 14 and is connected by the landing slab time rib 16 and landing slab main rib 15, the platform
Plate time rib 16 can be integrally welded with coaming plate fixing rib 21, so that coaming plate fixing rib 21, landing slab time rib 16 and landing slab master
Rib 15 is connected, and the bulk strength of high intensity octagon spud leg section is significantly enhanced, stress is more disperseed.As coaming plate is determined
The coaming plate of position horizontal edge 11 installs the length that the distribution of groove 14 is smaller than 15 corresponding sides of landing slab main rib, in order that intensity point
Cloth is uniform, and the two neighboring landing slab time rib 16 is in the spacing towards one end of landing slab main rib 15 more than installing towards coaming plate
The spacing of the other end of groove 14, so as to avoid problem of stress concentration;Described in each of which, coaming plate position level edge 11 is last
The coaming plate at end installs groove 14 by landing slab time rib 16 and the connection of 15 corresponding corner side of landing slab main rib, landing slab herein
Secondary rib 16 is inclined, can strengthen buckling strength.
Preferably, as shown in figure 3, the pipeline receiving opening 13 is square opening, accordingly, the landing slab main rib 15 is
Square rib;The other end of the landing slab time rib 16 is in hook-shaped shape;As shown in figure 4, the thickness of the guide plate 3 is more than coaming plate 2
Thickness.The pipeline receiving opening 13 is square opening, is compared with circular port, and the pipeline receiving opening 13 being square can be greatly
Improve receiving space;Accordingly, the landing slab main rib 15 is square rib, makes landing slab main rib 15 and pipeline receiving opening 13 more
For laminating, the intensity at the edge of reinforced pipe road receiving opening 13.As actually used middle coaming plate 2 can be subject to high wind, sea laps
Deng impact, the stress that the stress ratio platform dividing plate 1 that coaming plate 2 is subject to is subject to is much greater, thus landing slab time rib 16 and coaming plate
The other end of the connection of fixing rib 21 is in hook-shaped shape so that the other end of landing slab time rib 16 is compared with the one end of its own and wants high by one
A bit, to increase lifting surface area of the landing slab time between rib 16 and coaming plate fixing rib 21, effectively disperse stress herein, improve structure
Intensity, extends the service life of coaming plate 2.As high intensity octagon spud leg section is that the pin-and-hole 31 by guide plate 3 and ocean are flat
The hydraulic bolt formula lift system connection of platform, to complete the lifting of spud leg, therefore guide plate 3 is whole high intensity octagon spud leg
In section, stress is maximum, arranges the thickness of the thickness more than coaming plate 2 of the guide plate 3, to improve the rigidity of guide plate 3 and strong
Degree, it is ensured that the security reliability of guide plate 3.Existing cylindrical leg is formed by monoblock steel plate press process, therefore is
The intensity and rigidity of cylindrical leg are improved, the thickness of whole cylindrical leg is larger, but this steel material for needing is big, increases
Production cost, waste of resource.And the high intensity octagon spud leg section then only has the guide plate 3 and needs thickness big, rigidity is strong
Steel plate making, greatly reduce production cost, economize on resources;And the guide plate 3 is strip, compared to cylinder
Spud leg, it is easier to which processing is installed, improves manufacture efficiency.
Preferably, as shown in figure 4, the edge of the guide plate 3 outwardly.The outer surface light of existing cylindrical leg
It is sliding, without any prominent structure, in the presence of stormy waves it is susceptible to rotate and rocks, easily collide with main hull, there is pole
Big potential safety hazard.And in the high intensity octagon spud leg section, the edge of the guide plate 3 outwardly, the high intensity
Octagon spud leg section can be by guide plate 3 and main hull clamping, it is to avoid the high intensity octagon spud leg in the presence of stormy waves
Section rotates and rocks, and improves safety in utilization.
Preferably, as shown in fig. 6, also including overcoat 4, the overcoat 4 includes freeze proof 42 and of layer of water barrier 41, anti-corrosion
Lubricating layer 43, the outside of the coaming plate 2 and the outside of guide plate 3 set gradually the freeze proof layer of water barrier 41, anti-corrosion inside-out
42 and lubricating layer 43.The water barrier 41 is arranged at innermost layer, with impermeable role, so as to prevent sea water from penetrating into the shell of spud leg section
The inside of body, the thickness of the water barrier 41 is 0.4mm~1.5mm, preferably 0.8mm;The freeze proof layer of the anti-corrosion 42 plays anti-
Rotten freeze proof effect, prevents corrosion of the sea water to coaming plate 2 and guide plate 3, and impact of the low temperature environment to coaming plate 2 and guide plate 3,
The thickness of the freeze proof layer of the anti-corrosion 42 is 3.5mm~6mm, preferably 4.5mm;The lubricating layer 43 is arranged at outermost layer, plays
Lubrication, is effectively reduced halobiontic attachment, and the thickness of lubricating layer 43 is 0.4mm~2mm, preferably 1.6mm;Protection
Layer 4 arranges this thickness range and combines, and has both ensured the protective effect of the housing to spud leg section, reduces 4 pairs of stakes of overcoat as far as possible again
The load of the housing of leg section, saves input cost.The freeze proof layer 42 of the water barrier 41, anti-corrosion and lubricating layer 43 can for apply oil reservoir or
Colloid layer, lighter in weight reduce load.
Preferably, as shown in fig. 7, also including cleaning device 5 and installing floating platform 7, it is floating that the cleaning device 5 is installed on installation
Platform 7, described to install the outside that floating platform 7 is socketed on the housing of spud leg section, the installation floating platform 7 includes floating platform locking device 73, institute
State and housing connection of the floating platform 7 by floating platform locking device 73 and spud leg section is installed.It is described that the shell that floating platform 7 is socketed on spud leg section is installed
The outside of body, for carrying cleaning device 5, the cleaning device 5 is for carrying out clearly to the housing of the spud leg section when stake is received
Wash, due to containing a large amount of salinities in sea water, corrosion is produced to the housing of the spud leg section under the collective effect of sunlight and air
Act on, therefore the cleaning device 5 is set and avoid corrosiveness of the sea water to the housing of the spud leg section, extend the spud leg section
Housing service life.The installation floating platform 7 is provided with floating platform locking device 73, so as to off working state or marine stormy waves compared with
When big, the installation floating platform 7 is locked on the housing of spud leg section by floating platform locking device 73, to avoid installing because of wind wave action
There is abrasion collision between the housing of floating platform 7 and spud leg section, improve safety in utilization.
Preferably, as shown in fig. 7, the installation floating platform 7 also includes floating platform body 71, floating platform water injection pipe 72, floating platform water outlet
Pipe 74, floating platform water filling electrically-controlled valve 75 and floating platform water outlet electrically-controlled valve 76;The cross section of the floating platform body 71 is octagon, described floating
Playscript with stage directions body 71 is socketed on the outside of the housing of spud leg section, and the inside of the floating platform body 71 is hollow;The floating platform water injection pipe 72
Connect with the side of floating platform body 71, the floating platform outlet pipe 74 is connected with the opposite side of floating platform body 71;The floating platform water filling
Electrically-controlled valve 75 is installed on floating platform water injection pipe 72, and the floating platform water outlet electrically-controlled valve 76 is installed on floating platform outlet pipe 74;The floating platform lock
Determine the side towards guide plate 3 that device 73 is arranged at floating platform body 71, the floating platform locking device 73 includes floating platform stop pin
With stop pin actuator, the floating platform stop pin and stop pin actuator connection, the stop pin actuator drive floating platform
Stop pin inserts the pin-and-hole 31 of guide plate 3.
, by internal water flooding of the floating platform water injection pipe 72 to floating platform body 71, floating platform body 71 is by floating for the installation floating platform 7
74 water outlet of platform outlet pipe, controls the water storage of floating platform body 71 by the floating platform water filling electrically-controlled valve 75 and floating platform water outlet electrically-controlled valve 76
Amount, controls the buoyancy size and fording depth of floating platform body 71 then.The cross section of the floating platform body 71 is octagon, more preferably
Ground is fitted with the housing of spud leg section in eight side bar shapes, effectively prevents floating platform body 71 from rotating in the case where wave is acted on shifting
Position.The floating platform locking device 73 drives floating platform stop pin to insert the pin-and-hole 31 of guide plate 3 by stop pin actuator, to realize
Locking action to installing floating platform 7.The stop pin actuator can be hydraulic jack, the stop pin actuator drive floating platform lock
Rationed marketing carries out stretching motion, can also arrange stop pin position sensor in one end towards pin-and-hole 31 of floating platform stop pin, be used for
The position of detection pin-and-hole 31, to ensure that the floating platform stop pin is properly inserted corresponding pin-and-hole 31, prevents because aligning improper causing
Floating platform stop pin cannot insert corresponding pin-and-hole 31 and the housing of floating platform stop pin and spud leg section is caused to damage.Can arrange multiple
Floating platform locking device 73, is distributed in four angles of chamfer of floating platform body 71, with each guide plate 3 of the housing of correspondence spud leg section,
So as to ensure being uniformly distributed for load.
Preferably, as shown in fig. 7, the cleaning device 5 includes cleaning jet pipe 51, water inlet pipe 52, current deflecting connecting tube
53 and water inlet electrically-controlled valve 54, the cleaning jet pipe 51 is connected with the top of current deflecting connecting tube 53, the water inlet pipe 52 and water
Conductance is connected to the side of connecting tube 53;The water inlet electrically-controlled valve 54 is installed on water inlet pipe 52, and the cleaning jet pipe 51 is towards stake
The housing of leg section;Also include anticollision cushion pad 8, the inner side of the housing towards spud leg section of the current deflecting connecting tube 53 is arranged
The anticollision cushion pad 8.
The cleaning device 5 pours into heat that clear water or diesel engine discharge to current deflecting connecting tube 53 by water inlet pipe 52
Water, then the water of current deflecting connecting tube 53 from cleaning jet pipe 51 spray, it is described cleaning housing of the jet pipe 51 towards spud leg section, spray
Go out current to clean the housing of spud leg section.The water inlet electrically-controlled valve 54 is used to control the inflow of water inlet pipe 52, to control
Spray the pressure of current, i.e. cleaning dynamics.The current deflecting connecting tube 53 may be configured as loop pipe, be surrounded on the shell of spud leg section
The surrounding of body;Accordingly, multiple cleaning jet pipes 51 can be set, and multiple cleaning jet pipes 51 are surrounded on the four of the housing of spud leg section
In week, so as to expand clean range, strengthen cleaning quality.The inner side of the housing towards spud leg section of the current deflecting connecting tube 53
The anticollision cushion pad 8 is set, and the anticollision cushion pad 8 plays cushioning effect, can reduce because of wind wave action cleaning device 5 and stake
The gouging abrasion that the housing of leg section occurs.
Preferably, as shown in fig. 7, also including heater 6, the heater 6 is installed on installation floating platform 7 and cleaning dress
Put between 5;The heater 6 includes that air inlet pipe 61, escape pipe 62, heat exchanger tube 63, air inlet are oriented to connecting tube 64, outlet and are oriented to
Connecting tube 65, air inlet electrically-controlled valve 66 and gas outlet electrically-controlled valve 67;
The air inlet is oriented to connecting tube 64 and is connected by heat exchanger tube 63 with outlet guiding connecting tube 65,61 He of the air inlet pipe
Air inlet is oriented to connecting tube 64 and connects, and the escape pipe 62 is oriented to connecting tube 65 with outlet and connects;
The air inlet electrically-controlled valve 66 is installed on air inlet pipe 61, and the gas outlet electrically-controlled valve 67 is installed on escape pipe 62.
The heater 6 is for being heated to reach deicing effect to the housing of spud leg section.In the relatively low ring of temperature
Under border, the housing of spud leg section freezes serious, and ice sheet brings very big load to the housing of spud leg section, easily makes the housing of spud leg section
Fracture or damage, therefore the heater 6 is set, the heater 6 can utilize the remaining of offshore work platform diesel engine unit
Heat carries out heating ice-melt to the housing of spud leg section, eliminates load of the ice sheet to the housing of spud leg section, greatly improves the spud leg
Save the service life in severe cold area.The heater 6 meets the offgas duct of diesel engine unit, used heat tail gas Jing by air inlet pipe 61
Air inlet pipe 61 is entered as air inlet guiding connecting tube 64, heat exchanger tube 63, outlet guiding connecting tube 65 are sequentially passed through after heater 6, most
Discharge by escape pipe 62, during this, used heat tail gas carries out heat exchange in heat exchanger tube 63 and external environment, so as to spud leg section
Housing carry out heating ice-melt.The air inlet electrically-controlled valve 66 and gas outlet electrically-controlled valve 67 are respectively used to the input quantity for controlling used heat tail gas
And output, to control the degree of heat of heater 6.The air inlet is oriented to connecting tube 64 and outlet is oriented to connecting tube 65 and can set
Loop pipe is set to, the surrounding of the housing of spud leg section is surrounded on;Accordingly, many heat exchanger tubes 63, many 63 rings of heat exchanger tube can be set
The surrounding of the housing of spud leg section is around in, so as to expand deicing scope, strengthens deicing quality.
Preferably, a kind of offshore work platform including the high intensity octagon spud leg section.The offshore work platform
Including main hull and the high intensity octagon spud leg section, the corresponding high intensity octagon spud leg section of the main hull is provided with liquid
Pressure bolt-type lift system, by hydraulic bolt formula lift system and the high intensity octagon spud leg section with the use of causing
The high intensity octagon spud leg section and main hull are capable of achieving relative oscilaltion, and the high intensity octagon spud leg section is easy to
Assembling, space availability ratio are higher, and bulk strength is high, is prevented effectively from problem of stress concentration, and load capacity is big and reliable and stable, using the longevity
Life length.
The high intensity octagon spud leg section of the present embodiment has the advantages that:1. high intensity octagon spud leg section described in
It is provided with the housing that cross section is octagonal spud leg section, multiple high intensity octagon spud leg sections close up and are assembled into high intensity eight
Side shape spud leg, compared with existing cylindrical leg, the high intensity octagon spud leg section is easy to assembling, and space availability ratio is more
It is high;2. the landing slab main rib 15 and multiple landing slabs time rib 16 is set, increases the bulk strength of landing slab 101, and effectively
The problem of the middle part stress concentration of landing slab 101 is avoided, the even intensity everywhere of landing slab 101 is made;3. coaming plate fixing rib described in
21 play a part of to strengthen 2 intensity of coaming plate, and the coaming plate fixing rib 21 is connected in coaming plate and installs groove 14, encloses so as to increase
Contact area between plate 2 and platform dividing plate 1, is easy to welding, makes coaming plate 2 more be securely mounted at platform dividing plate 1, it is to avoid to enclose
At one, stress is more uniformly distributed 2 stress concentration of plate.
The know-why of the present invention is described above in association with specific embodiment.These descriptions are intended merely to explain the present invention's
Principle, and limiting the scope of the invention can not be construed to by any way.Based on explanation herein, the technology of this area
Personnel associate other specific embodiments of the present invention by need not paying performing creative labour, these modes fall within
Within protection scope of the present invention.
Claims (9)
1. a kind of high intensity octagon spud leg section, it is characterised in that:Including platform dividing plate, coaming plate and guide plate, the coaming plate and
The housing of guide plate assembling combination pile leg section;
The platform dividing plate is arranged at the inside of the housing of spud leg section;
The platform dividing plate includes landing slab, landing slab main rib and multiple landing slabs time rib, and the side of the landing slab is eight sides
Shape, is provided with pipeline receiving opening in the middle part of the landing slab;The landing slab main rib is arranged at the edge of pipeline receiving opening;It is many
Side of the individual landing slab time rib in dispersion shape from pipeline receiving opening to landing slab extends, and one end of landing slab time rib
Connect with landing slab main rib;
The landing slab also includes multiple coaming plate position level edges and multiple guide plates positioning bevelled edge edge, the coaming plate positioning
Horizontal edge and guide plate positioning bevelled edge edge are spaced apart in the side of the landing slab;
The inner side of the coaming plate and the welding of coaming plate position level edge, the inner side of the guide plate and guide plate positioning bevelled edge edge
Welding;The guide plate includes multiple pin-and-holes, and the pin-and-hole is longitudinally disposed on the guide plate evenly and at intervals;
The coaming plate includes coaming plate fixing rib, and the coaming plate fixing rib is longitudinally disposed in the inner side of coaming plate;Accordingly, it is described flat
Platen also includes that coaming plate installs groove, and the coaming plate is installed groove and is arranged at coaming plate position level edge, the coaming plate fixing rib
It is connected in coaming plate and groove is installed.
2. high intensity octagon spud leg section according to claim 1, it is characterised in that:The coaming plate fixing rib is bar shaped
Rib, it is bar-shaped trough that accordingly the coaming plate installs groove;
Or, the coaming plate fixing rib is T-shaped rib, and it is T-slot that accordingly the coaming plate installs groove.
3. high intensity octagon spud leg section according to claim 1, it is characterised in that:The coaming plate is installed groove and passes through institute
State landing slab time rib and the connection of landing slab main rib;
Two neighboring landing slab time rib installs groove another more than towards coaming plate in the spacing towards one end of landing slab main rib
The spacing at end.
4. high intensity octagon spud leg section according to claim 1, it is characterised in that:The pipeline receiving opening is square
Hole, accordingly, the landing slab main rib is square rib;
The other end of the landing slab time rib is in hook-shaped shape;
Thickness of the thickness of the guide plate more than coaming plate.
5. high intensity octagon spud leg section according to claim 1, it is characterised in that:Also include overcoat, the protection
Layer includes that water barrier, the freeze proof layer of anti-corrosion and lubricating layer, the outside of the coaming plate and the outside of guide plate are set inside-out successively
Put the freeze proof layer of water barrier, anti-corrosion and lubricating layer.
6. high intensity octagon spud leg section according to claim 1, it is characterised in that:Also include cleaning device and install floating
Platform, the cleaning device are installed on installation floating platform, and the installation floating platform is socketed on the outside of the housing of spud leg section, and the installation is floated
Platform includes floating platform locking device, and the installation floating platform passes through the housing connection of floating platform locking device and spud leg section.
7. high intensity octagon spud leg section according to claim 6, it is characterised in that:The installation floating platform also includes floating platform
Body, floating platform water injection pipe, floating platform outlet pipe, floating platform water filling electrically-controlled valve and floating platform water outlet electrically-controlled valve;
The cross section of the floating platform body is octagon, and the floating platform body is socketed on the outside of the housing of spud leg section, described floating
The inside of playscript with stage directions body is hollow;
The floating platform water injection pipe is connected with the side of floating platform body, and the floating platform outlet pipe is connected with the opposite side of floating platform body;
The floating platform water filling electrically-controlled valve is installed on floating platform water injection pipe, and the floating platform water outlet electrically-controlled valve is installed on floating platform outlet pipe;
The floating platform locking device is arranged at the side towards guide plate of floating platform body,
The floating platform locking device includes that floating platform stop pin and stop pin actuator, the floating platform stop pin and the stop pin drive
Moving part connects, and the stop pin actuator drives floating platform stop pin to insert the pin-and-hole of guide plate.
8. high intensity octagon spud leg section according to claim 6, it is characterised in that:The cleaning device includes cleaning spray
Pipe, water inlet pipe, current deflecting connecting tube and water inlet electrically-controlled valve, the cleaning jet pipe are connected with the top of current deflecting connecting tube,
The water inlet pipe is connected with the side of current deflecting connecting tube;
The water inlet electrically-controlled valve is installed on water inlet pipe, housing of the cleaning jet pipe towards spud leg section;
Also include anticollision cushion pad, the inner side of the housing towards spud leg section of the current deflecting connecting tube arranges the anticollision and delays
Punching pad.
9. a kind of offshore work platform of the high intensity octagon spud leg section including described in claim 1 to 8 any one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710024479.6A CN106592556B (en) | 2017-01-13 | 2017-01-13 | A kind of high intensity octagon spud leg section and use its offshore work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710024479.6A CN106592556B (en) | 2017-01-13 | 2017-01-13 | A kind of high intensity octagon spud leg section and use its offshore work platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106592556A true CN106592556A (en) | 2017-04-26 |
CN106592556B CN106592556B (en) | 2018-11-09 |
Family
ID=58584677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710024479.6A Active CN106592556B (en) | 2017-01-13 | 2017-01-13 | A kind of high intensity octagon spud leg section and use its offshore work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592556B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108609123A (en) * | 2018-05-18 | 2018-10-02 | 武汉船用机械有限责任公司 | Seawater lift device |
CN111373101A (en) * | 2017-12-07 | 2020-07-03 | Ihc荷兰Ie有限公司 | Coupling system, assembly of coupling system and vessel, and assembly of coupling system, jacket pile and foundation pile |
CN115217106A (en) * | 2022-06-17 | 2022-10-21 | 同济大学 | Folding wing plate |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2383119A1 (en) * | 1977-03-10 | 1978-10-06 | Metalliques Entrepr Cie Fse | Assembly for installation of offshore oil drilling rig - has screw jacks with locking nuts for positioning and securing piles relative to platform |
CN102728980A (en) * | 2012-07-05 | 2012-10-17 | 南通中远船务工程有限公司 | Method for limiting and positioning octagonal spud leg in folding process |
CN103397623A (en) * | 2013-08-06 | 2013-11-20 | 宁波捷胜海洋开发有限公司 | Offshore platform |
CN203473217U (en) * | 2013-08-06 | 2014-03-12 | 宁波捷胜海洋开发有限公司 | Supporting rod of offshore platform positioning column |
CN104805858A (en) * | 2014-07-28 | 2015-07-29 | 中集海洋工程研究院有限公司 | Self-elevating platform pile leg and ocean platform with same |
KR101576504B1 (en) * | 2015-10-26 | 2015-12-21 | 에스앤에스이앤지 주식회사 | Barge having jackup device |
CN105862699A (en) * | 2016-06-13 | 2016-08-17 | 广东精铟海洋工程股份有限公司 | Pin type continuous lifting system for offshore platform and lifting method thereof |
CN205712038U (en) * | 2016-06-20 | 2016-11-23 | 烟台中集来福士海洋工程有限公司 | Jack-up unit and jetting pipeline support thereof |
-
2017
- 2017-01-13 CN CN201710024479.6A patent/CN106592556B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2383119A1 (en) * | 1977-03-10 | 1978-10-06 | Metalliques Entrepr Cie Fse | Assembly for installation of offshore oil drilling rig - has screw jacks with locking nuts for positioning and securing piles relative to platform |
CN102728980A (en) * | 2012-07-05 | 2012-10-17 | 南通中远船务工程有限公司 | Method for limiting and positioning octagonal spud leg in folding process |
CN103397623A (en) * | 2013-08-06 | 2013-11-20 | 宁波捷胜海洋开发有限公司 | Offshore platform |
CN203473217U (en) * | 2013-08-06 | 2014-03-12 | 宁波捷胜海洋开发有限公司 | Supporting rod of offshore platform positioning column |
CN104805858A (en) * | 2014-07-28 | 2015-07-29 | 中集海洋工程研究院有限公司 | Self-elevating platform pile leg and ocean platform with same |
KR101576504B1 (en) * | 2015-10-26 | 2015-12-21 | 에스앤에스이앤지 주식회사 | Barge having jackup device |
CN105862699A (en) * | 2016-06-13 | 2016-08-17 | 广东精铟海洋工程股份有限公司 | Pin type continuous lifting system for offshore platform and lifting method thereof |
CN205712038U (en) * | 2016-06-20 | 2016-11-23 | 烟台中集来福士海洋工程有限公司 | Jack-up unit and jetting pipeline support thereof |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111373101A (en) * | 2017-12-07 | 2020-07-03 | Ihc荷兰Ie有限公司 | Coupling system, assembly of coupling system and vessel, and assembly of coupling system, jacket pile and foundation pile |
CN111373101B (en) * | 2017-12-07 | 2023-08-29 | 机械设备控股有限公司 | Coupling system, assembly of coupling system and vessel, and assembly of coupling system, sheathing pile and foundation pile |
CN108609123A (en) * | 2018-05-18 | 2018-10-02 | 武汉船用机械有限责任公司 | Seawater lift device |
CN108609123B (en) * | 2018-05-18 | 2019-11-22 | 武汉船用机械有限责任公司 | Seawater lift device |
CN115217106A (en) * | 2022-06-17 | 2022-10-21 | 同济大学 | Folding wing plate |
Also Published As
Publication number | Publication date |
---|---|
CN106592556B (en) | 2018-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592556A (en) | High-strength octagonal pile leg section and offshore work platform using same | |
CN102182203B (en) | A kind of steel row's formula anemometer tower foundation and anemometer tower structure | |
KR20110110690A (en) | Air cavity vessel with rack and pinion actuated movable partition member | |
CN101225651A (en) | Self-lifting active ice-resistant damping device | |
CN106759205B (en) | A kind of jack up octagon spud leg section and the offshore work platform using it | |
WO2024011956A1 (en) | Multifunctional integrated platform | |
HRP20240515T1 (en) | Floating platform for high-power wind turbines | |
CN114718599B (en) | Concrete embedded inflation/liquid steel pipe intelligent duct piece | |
CN216533280U (en) | Semi-submersible type intelligent deep open sea aquaculture net cage | |
CN106677149B (en) | A kind of hydraulic continuous jacking system with octagon spud leg | |
CN114590365A (en) | UHPC pipe-rod grid structure floating airport module and floating airport | |
KR20230006911A (en) | Floating platform made of reinforced concrete applicable to the offshore wind industry | |
CN201801883U (en) | Steel bar type wind measurement tower foundation and wind measurement tower structure | |
CN109183851B (en) | Underwater installation method of shell type immersed tube | |
CN111119223A (en) | Oval multi-cylinder jacket foundation structure | |
CN203797624U (en) | Intensively heated tube bundle fixing device suitable for waste heat recovery of supercharged boiler | |
CN210882532U (en) | Float structure capable of adjusting direction | |
CN219524193U (en) | Wave-resistant type offshore floating type photovoltaic floating body structure in ice area | |
CN212104161U (en) | Oval multi-cylinder jacket foundation structure | |
CN112796368A (en) | Method for repairing large-diameter water intake head top cover | |
CN201461202U (en) | Circulating water cooling device of hydraulic turbine generator unit in hydropower station | |
CN206856951U (en) | A kind of floating type water surface photovoltaic system | |
CN203612173U (en) | Ship fuel oil bunker air head | |
CN116331426A (en) | Wave-resistant type offshore floating type photovoltaic floating body structure in ice area and installation method thereof | |
CN216131502U (en) | A sewage pipes for clearing up moist pipe mortar of high-rise building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: High-strength octagonal pile leg section and offshore work platform using same Effective date of registration: 20200320 Granted publication date: 20181109 Pledgee: China Co truction Bank Corp Foshan branch Pledgor: GUANGDONG JINGYIN MACHINERY Co.,Ltd. Registration number: Y2020440000045 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |