CN105499818A - Segmental manufacturing method for deck - Google Patents

Segmental manufacturing method for deck Download PDF

Info

Publication number
CN105499818A
CN105499818A CN201511015882.XA CN201511015882A CN105499818A CN 105499818 A CN105499818 A CN 105499818A CN 201511015882 A CN201511015882 A CN 201511015882A CN 105499818 A CN105499818 A CN 105499818A
Authority
CN
China
Prior art keywords
deck
component
welding
transverse
segmental
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511015882.XA
Other languages
Chinese (zh)
Inventor
刘贵红
黄红星
叶彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN201511015882.XA priority Critical patent/CN105499818A/en
Publication of CN105499818A publication Critical patent/CN105499818A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
    • B23K37/04Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Tyre Moulding (AREA)

Abstract

The invention discloses a segmental manufacturing method for a deck and relates to the technical field of shipbuilding. A deck web beam comprises a first part and a second part. The segmental manufacturing method for the deck comprises the following steps: firstly, docking the first part and the second part; secondly, performing tire loading, positioning and mounting on a web beam formed by the first part and the second part. According to the segmental manufacturing method for the deck, provided by the invention, respective positioning of the first part and the second part is eliminated, segmental manufacturing processes are reduced, a welding form is changed into a plain docking form, the welding difficulty is reduced, and the welding quality is guaranteed.

Description

A kind of method that deck panel is built
Technical field
The present invention relates to shipbuilding technical field, particularly relate to a kind of method that deck panel is built.
Background technology
50000 tons (A/B/C) the serial ships main deck segmentation of building at present, as shown in Figure 1, is all provided with a CO when structural design to deck transverse web Y=-1100 position 2vertical butt weld 3, deck transverse to be divided into first component 1 and second component 2 by designing requirement and go up tire respectively and to locate by site operation, then carries out vertical welding.
In sectional construction process, there is following defect in the construction of above-mentioned design: 1) need to locate respectively deck transverse two parts, operation is more, consuming time longer; 2) on deck transverse web, tire docking belongs to cross joint, and difficulty of construction is comparatively large, and efficiency of construction is lower, and quality of weld seam molding is difficult to ensure simultaneously.Therefore, prior art adds construction welding difficulty, and operation is more, needs to expend more manpower, extends in segmentation and closes up construction period.
Based on above problem, the invention provides a kind of method that deck panel is built, cancel the location respectively of two parts, reduce sectional making operation, Type of Welding is changed into flat docking, reduce welding difficulty, ensure welding quality.
Summary of the invention
The object of the invention is to the method proposing the construction of a kind of deck panel, sectional making operation can be reduced, welding difficulty can be reduced, ensure welding quality.
For reaching this object, the present invention by the following technical solutions:
The method that deck panel is built, deck deck transverse comprises first component and second component, and described first component and second component dock by the first step, tire location and installation on the deck transverse that described first component and second component are formed by second step.
Further technical scheme, described first component and second component adopt downhand welding mode to dock.
Further technical scheme, described deck transverse is by the upper tire of lifting.
Further technical scheme, described second step deck transverse needs to carry out assembling is applied for checking and examination, is welded and fixed, firer corrects, installs loose mail, measurement and mark draws associated mark and segmentation is applied for checking and examination behind tire location.
Beneficial effect of the present invention:
The method that the deck panel that the present invention proposes is built, first by the first component of deck transverse and second component docking, then entirety positions installation, decrease the operation of sectional making, first component and second component adopt downhand welding docking, replace original vertical position welding mode, reduce welding difficulty, ensure that welding quality, improve efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the deck panel construction that prior art provides;
Fig. 2 is the structural representation that deck panel provided by the invention is built.
Wherein, 1, first component; 2, second component; 3, weld seam.
Detailed description of the invention
Technical scheme of the present invention is further illustrated by detailed description of the invention below in conjunction with accompanying drawing.
As shown in Figure 2, a kind of method that deck panel is built, deck deck transverse comprises first component 1 and second component 2, and first component 1 and second component 2 dock by the first step, tire location and installation on the deck transverse that first component 1 and second component 2 are formed by second step.First component 1 and second component 2 are docked, then location and installation, under the prerequisite ensureing sectional construction precision, decrease the positioning process of deck transverse, improve sectional making efficiency.
First component 1 and second component 2 adopt downhand welding mode to dock, and the welding position of downhand welding belongs in welding position, a position of the most easily welding, and reduce welding operation difficulty, welding quality is secure.
Deck transverse by the upper tire of lifting, upper tire order with identical before, just first by first component 1 and second component 2 integrally.
Steps such as in second step, deck transverse needing to carry out that assembling is applied for checking and examination, is welded and fixed, firer corrects behind tire location, install loose mail, measurement and mark draw associated mark and segmentation is applied for checking and examination, ensures that deck makes quality.
Applicant states, the above embodiment of the present invention is only to clearly demonstrate example of the present invention, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without the need to also giving all embodiments.All any amendments done within the spirit and principles in the present invention, equivalent to replace and improvement etc., within the protection domain that all should be included in the claims in the present invention.

Claims (4)

1. the method for a deck panel construction, it is characterized in that, deck deck transverse comprises first component (1) and second component (2), described first component (1) and second component (2) dock by the first step, tire location and installation on the deck transverse that described first component (1) and second component (2) are formed by second step.
2. the method for deck panel construction according to claim 1, is characterized in that, described first component (1) and second component (2) adopt downhand welding mode to dock.
3. the method for deck panel construction according to claim 1, is characterized in that, described deck transverse is by the upper tire of lifting.
4. the deck panel according to claim 1 method of building, is characterized in that, in described second step, deck transverse needs behind tire location to carry out that assembling is applied for checking and examination, is welded and fixed, firer corrects, installs loose mail, measurement and mark draws associated mark and segmentation is applied for checking and examination.
CN201511015882.XA 2015-12-28 2015-12-28 Segmental manufacturing method for deck Pending CN105499818A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511015882.XA CN105499818A (en) 2015-12-28 2015-12-28 Segmental manufacturing method for deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511015882.XA CN105499818A (en) 2015-12-28 2015-12-28 Segmental manufacturing method for deck

Publications (1)

Publication Number Publication Date
CN105499818A true CN105499818A (en) 2016-04-20

Family

ID=55708323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511015882.XA Pending CN105499818A (en) 2015-12-28 2015-12-28 Segmental manufacturing method for deck

Country Status (1)

Country Link
CN (1) CN105499818A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107398649A (en) * 2017-07-26 2017-11-28 南通振华重型装备制造有限公司 A kind of booster stations upper module structure bed board processing technology
CN108098174A (en) * 2017-12-27 2018-06-01 广船国际有限公司 A kind of ship slab segment carrying assembly method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0714727A1 (en) * 1994-11-29 1996-06-05 Finnyards Oy Assembly in the vehicle carrying deck of a ship
CN101758332A (en) * 2009-12-17 2010-06-30 浙江东海岸船业有限公司 Splicing, assembling and folding method of thin plate
CN102248985A (en) * 2011-06-01 2011-11-23 扬帆集团股份有限公司 Ship body assembling method
KR20120117082A (en) * 2011-04-14 2012-10-24 삼성중공업 주식회사 Method for support member assembling and support member for ship
CN102848053A (en) * 2012-08-03 2013-01-02 扬帆集团股份有限公司 Assembly and flame process for trunk bulkhead deck
CN103321296A (en) * 2013-05-23 2013-09-25 江苏沪宁钢机股份有限公司 Annular double-layer truss and manufacture method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0714727A1 (en) * 1994-11-29 1996-06-05 Finnyards Oy Assembly in the vehicle carrying deck of a ship
CN101758332A (en) * 2009-12-17 2010-06-30 浙江东海岸船业有限公司 Splicing, assembling and folding method of thin plate
KR20120117082A (en) * 2011-04-14 2012-10-24 삼성중공업 주식회사 Method for support member assembling and support member for ship
CN102248985A (en) * 2011-06-01 2011-11-23 扬帆集团股份有限公司 Ship body assembling method
CN102848053A (en) * 2012-08-03 2013-01-02 扬帆集团股份有限公司 Assembly and flame process for trunk bulkhead deck
CN103321296A (en) * 2013-05-23 2013-09-25 江苏沪宁钢机股份有限公司 Annular double-layer truss and manufacture method thereof

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘林: "球鼻艏分段建造精度控制", 《广船科技》 *
王正: "罗经甲板不锈钢板区域变形控制", 《广船科技》 *
陆建等: "4300辆汽车滚装船薄板分段建造工艺", 《江苏船舶》 *
陈昌骏: "船体分段装配焊接工艺流程以及变形的预防与矫正", 《中国水运》 *
陈祖德: "浅谈铝合金甲板室的建造工艺与焊接方法", 《广东造船》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107398649A (en) * 2017-07-26 2017-11-28 南通振华重型装备制造有限公司 A kind of booster stations upper module structure bed board processing technology
CN108098174A (en) * 2017-12-27 2018-06-01 广船国际有限公司 A kind of ship slab segment carrying assembly method
CN108098174B (en) * 2017-12-27 2020-11-10 广船国际有限公司 Ship thick plate segmented carrying and assembling method

Similar Documents

Publication Publication Date Title
CN105539724B (en) A kind of preparation method of ship hull surface segmentation
CN103523168B (en) CSS platform connecting bridge area segmentation manufacturing process and special skew moulding bed
CN105383643B (en) Stainless steel groove profile compartment alignment schemes
CN102756790B (en) Ten thousand tons of box ship hatch cover manufacturing process peculiar to vessel
CN105015703A (en) Ship bottom segment assembly technology
CN108995764B (en) Method for installing rudder sleeve of LNG (liquefied Natural gas) transport ship
CN103711066B (en) Novel steel box girder top plate unit structure and preparation method
CN104760662A (en) Process for manufacturing ice zone bulbous bow reinforcing structure by sections
CN102874378B (en) Cabin basin fitting-out process
CN105129019A (en) Ship cabin outfitting integrity inspection method
CN110948183B (en) Manufacturing method of upper support leg of tire crane
CN103612712A (en) Method for manufacturing bed-jig with aluminum alloy in segmented mode
CN102887220B (en) Electric thruster pedestal and welding method thereof
CN105416523B (en) A kind of double plate bilge keelsons and its installation method
CN105499818A (en) Segmental manufacturing method for deck
CN202541781U (en) Novel hatch coaming
CN103661807A (en) Positioning method for broadside block assembling of pre-mounting pressure guide rail bracket
CN110254623A (en) A kind of production method of submerged body segmentation
US20190263050A1 (en) Method for producing a tubular body with reduced internal stress by using 3d printing, and a tubular body with reduced internal stress
CN207255510U (en) A kind of watertight floor of ultra-large type crude oil carrier and the watertight structure of T rows
KR20150021703A (en) Jig for maintaining turret circularity and Method for turret installation using the same
CN203700931U (en) Novel steel box beam top plate unit structure
CN204199830U (en) Combined type electric pole
CN104759799A (en) Engineering packing box bottom board set assembling and welding method
KR20130046760A (en) Ship construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160420

RJ01 Rejection of invention patent application after publication