CN104805793A - High-efficiency snow sweeper and manufacturing method thereof - Google Patents
High-efficiency snow sweeper and manufacturing method thereof Download PDFInfo
- Publication number
- CN104805793A CN104805793A CN201510219587.XA CN201510219587A CN104805793A CN 104805793 A CN104805793 A CN 104805793A CN 201510219587 A CN201510219587 A CN 201510219587A CN 104805793 A CN104805793 A CN 104805793A
- Authority
- CN
- China
- Prior art keywords
- snow
- shaft
- spring
- screw
- snow removing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H5/00—Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
- E01H5/04—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material
- E01H5/08—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by driven elements
- E01H5/09—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by driven elements the elements being rotary or moving along a closed circular path, e.g. rotary cutter, digging wheels
- E01H5/092—Brushing elements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H5/00—Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
- E01H5/04—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H5/00—Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
- E01H5/04—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material
- E01H5/045—Means per se for conveying or discharging the dislodged material, e.g. rotary impellers, discharge chutes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H5/00—Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
- E01H5/04—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material
- E01H5/06—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by non-driven elements, e.g. scraper blades, snow-plough blades, scoop blades
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H5/00—Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
- E01H5/04—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material
- E01H5/06—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by non-driven elements, e.g. scraper blades, snow-plough blades, scoop blades
- E01H5/07—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by non-driven elements, e.g. scraper blades, snow-plough blades, scoop blades and conveying dislodged material by driven or pneumatic means
- E01H5/076—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by non-driven elements, e.g. scraper blades, snow-plough blades, scoop blades and conveying dislodged material by driven or pneumatic means by rotary or pneumatic conveying means, e.g. impeller wheels
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H5/00—Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
- E01H5/04—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material
- E01H5/08—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by driven elements
- E01H5/09—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by driven elements the elements being rotary or moving along a closed circular path, e.g. rotary cutter, digging wheels
- E01H5/098—Apparatus propelled by animal or engine power; Apparatus propelled by hand with driven dislodging or conveying levelling elements, conveying pneumatically for the dislodged material dislodging essentially by driven elements the elements being rotary or moving along a closed circular path, e.g. rotary cutter, digging wheels about horizontal or substantially horizontal axises perpendicular or substantially perpendicular to the direction of clearing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Cleaning Of Streets, Tracks, Or Beaches (AREA)
Abstract
The invention discloses a high-efficiency snow sweeper and a manufacturing method thereof. A snow collecting and sweeping shovel assembly is mounted at the front end of a special chassis truck; a chain bucket elevator, a combined frame, an auger assembly and a rolling brush are assembled into a overall body which is connected with the special chassis truck; the rolling brush is mounted behind the auger assembly; a carriage is assembled on the special chassis truck and has a self-unloading function. The special chassis truck is used for driving all structures to run forwards in order to sweep snow; at the moment, various types of snow on the road surface are lifted to the inside of the carriage. When a protruding object with a certain height is on the road surface, a shovel blade turns over backwards to surpass the protruding object and then continuous snow sweeping operation is started again under the effect of a spring. The residual snow on the road surface is enabled to enter a bucket type lifting chain and conveyed to the inside of the carriage by the rolling brush by utilizing rotational inertia-force sweeping. After the carriage is full of the accumulated snow, the snow sweeper is used for conveying the accumulated snow to a specified place and self-unloading the snow. The overall snow sweeping process can be independently finished, the snow sweeping efficiency is improved and the snow sweeping cost is greatly lowered.
Description
Technical field
The present invention relates to a kind of winter city road snow removing machinery equipment technical field, especially a kind of high efficiency snow removing vehicle and manufacture method.
Background technology
The urban road in northern China snowfall area all needs snow removing in the winter time, the accumulated snow removed needs to be transported to appointed place and can not be deposited in urban district, but domestic and international existing snow removing machinery is just the side of Snowremoval to road, re-use Other Engineering machinery or manually the snow removed piled up, and then use special-purpose loading machine that accumulated snow is loaded on haulage vehicle to be transported to given place, multiple stage plant equipment is same place snow removing simultaneously on road, just be easy to cause road congestion and there is potential safety hazard, in removing compacting snow, also need spreading Snow Agent could remove compacting snow, and Snow Agent is polluted environment and is destroyed.These existing road snow removing machinery equipment, can not complete independently snow removing because not being integrate snow removing, transport, and more effectively can not remove compacting snow, result in unit area and repeats snow removing and very low with operating efficiency, add a lot of snow removing cost.
Summary of the invention
In order to overcome existing road snow removing machinery equipment because not being collection snow removing, transport in one, can not complete independently snow removing, more effectively can not remove compacting snow, result in unit area and repeat snow removing and operating efficiency is very low, add the deficiency of a lot of snow removing cost, the invention provides a kind of high efficiency snow removing vehicle and manufacture method, its performance is that this snow removing vehicle collection removes the snow, transport in one, the various accumulated snow on road and compacting snow can be removed, and the accumulated snow removed is transported directly to appointed place, whole snow removing process does not need Other Engineering machinery or artificial next defeated helping can complete snow removing alone, improve snow removing efficiency, decrease a lot of snow removing cost.
The technical solution adopted for the present invention to solve the technical problems is: first vehicle with chassis special is Special vehicle chassis, collection snow snow removing shovel assembly is arranged on the front end of vehicle with chassis special, the upper end of the transmission base plate inside collection snow snow removing shovel assembly is connected with vehicle with chassis special by fixed axis, lower end is connected with snow measuring plate, motor cylinder is arranged on the upper end of transmission base plate, transmission base plate is connected with deflector, the two ends of conveyor chain are connected with collection snow screw-conveyer-shaft, motor cylinder respectively, and several scraper plates are connected on conveyor chain.Collection want auger sheet divide left-right rotary be arranged on collect snow be twisted on axle, collection snow screw-conveyer-shaft is connected with snow measuring plate by a watt seat, spring bracing inside collection snow snow removing shovel assembly respectively and snow measuring plate, turnbuckle connects, cap nut and turnbuckle are threaded, the upper end of central spindle of the spring slides through cap nut, lower end is fixedly connected with spring base, spring is assemblied between cap nut and spring base, obstacle detouring synchronizing shaft is connected with snow measuring plate by synchronous axle bed, the two ends of obstacle detouring limiting bracket respectively with obstacle detouring synchronizing shaft, spring base connects, the edge of shovel is fixed on the edge of shovel and connects, edge of shovel connecting plate turns on support after being fixed on again obstacle detouring, turn over support after obstacle detouring to be connected with obstacle detouring limiting bracket pivot pin, obstacle detouring limiting bracket has certain spacing to turning over support upset backward after obstacle detouring.Because there is certain acute angle on the edge of shovel and road surface, so be well suited for removing compacting snow.Suspension plate is connected with snow measuring plate, and the two ends of lifting hydraulic cylinder are connected with suspension plate, vehicle with chassis special respectively, the length of adjustment lifting hydraulic cylinder, and collection snow snow removing shovel total performance can be fixed point oscilaltion with fixed axis.
Chapelet and group frame, auger assembly, round brush are assembled into an entirety and are connected with vehicle with chassis special, and round brush is arranged on after auger assembly.Lifting auger sheet inside auger assembly divides left-right rotary to be fixed on lifting screw-conveyer-shaft, promoting screw-conveyer-shaft is assemblied on group frame, elevator chain motor cylinder is arranged on the upper end of chapelet, and bucket lifting chain upper end is connected with elevator chain motor cylinder, lower end is connected with lifting screw-conveyer-shaft.The upper end of sliding panel is connected with round brush motor, lower end is connected with round brush by roller brush shaft bearing, and sliding clamp is fixed on group frame, and sliding panel to be assemblied between sliding clamp and group frame and to have certain interval to slide up and down.Compensating synchronizing shaft rotation is assemblied on group frame, and one end of synchronous connecting lever is connected with compensation synchronizing shaft axle key, and the other end is connected with synchronising (connecting) rod pivot pin, and synchronising (connecting) rod is connected with sliding panel pivot pin.Compensate connecting lever to be connected with compensation synchronizing shaft axle key, spring supporting frame is welded on group frame, compensate screw mandrel, compensation screw slippage is assemblied in spring supporting frame, compensate on connecting lever, counterbalance spring is assemblied in below spring supporting frame, like this by regulating compensation screw to make counterbalance spring play round brush by machine-operated support structure completely, in the range of pressure values making round brush road pavement keep certain, when after the wearing and tearing of round brush snow removing, adjustable compensation screw carries out wear-compensating to round brush.The both sides of vehicle with chassis special and the upper and lower corresponding position of group frame, every side is installed with two pulleys and a telescopic hydraulic cylinder respectively, and two two ends promoting hinge ropes are connected with telescopic hydraulic cylinder, group frame by pulley.The length of the telescopic hydraulic cylinder of synchronous adjustment vehicle with chassis special both sides, chapelet, group frame just related auger assembly, round brush under lifting hinge rope band is dynamic with regard to oscilaltion.Compartment to be assemblied on vehicle with chassis special and to have self-unloading function.
During road snow removing operation, motor cylinder, elevator chain motor, round brush motor all provide hydraulic power by vehicle with chassis special, and rotate by the direction of setting, motor cylinder drives collection snow screw-conveyer-shaft by conveyor chain, collection snow auger sheet rotates, elevator chain motor is driven by bucket lifting chain and promotes screw-conveyer-shaft, promote auger sheet rotates, and round brush motor driving round brush rotates.The length of adjustment telescopic hydraulic cylinder, lifting hydraulic cylinder, collection snow snow removing shovel assembly and auger assembly, round brush is made to be reduced to snow removing position, vehicle with chassis special drives all structures to move forward snow removing, at this moment the various accumulated snow on road surface, compacting snow are just disposed from road surface by the edge of shovel, the accumulated snow disposed is collected snow auger sheet, scraper plate delivers into chapelet by deflector, and the accumulated snow entering chapelet is just sent to passenger compartment by lifting.When running into the protrusion object of road surface certain altitude, the edge of shovel is just turned over by the pressure turning over support after edge of shovel connecting plate, obstacle detouring, obstacle detouring limiting bracket overcomes spring and is crossed, and recovers again under the action of the spring to continue snow removing after crossing.The remaining residual accumulated snow in road surface is utilized the inertia force of rotary cleaning to clean by round brush and enters inside auger assembly, and the accumulated snow entered inside auger assembly is just delivered into passenger compartment by lifting auger sheet, bucket lifting chain.After the accumulated snow of passenger compartment is filled, the length of adjustment telescopic hydraulic cylinder, lifting hydraulic cylinder, makes collection avenge snow removing shovel assembly and auger assembly, round brush bring up to certain altitude, and this snow removing vehicle is just transported to given place accumulated snow and lays down voluntarily.Whole snow removing process does not need Other Engineering machinery or artificial next assisting can complete snow removing alone, improves snow removing efficiency, decreases a lot of snow removing cost.
The invention has the beneficial effects as follows, this snow removing vehicle integrates snow removing, transports, the various accumulated snow on road and compacting snow can be removed, and the accumulated snow eliminated is transported directly to appointed place, whole snow removing process does not need Other Engineering machinery or artificial next assisting can complete snow removing alone, improve snow removing efficiency, decrease a lot of snow removing cost, structure is simple.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further described.
Fig. 1 is schematic diagram of the present invention.
Fig. 2 is Figure 1A direction view.
Fig. 3 is Figure 1B enlarged drawing.
Fig. 4 is Fig. 1 C portion view.
Fig. 5 is Fig. 1 D enlarged drawing.
In Fig. 11, vehicle with chassis special; 2, chapelet; 3, elevator chain motor cylinder; 4, bucket lifting chain; 5, compartment; 6, telescopic hydraulic cylinder; 7, round brush; 8, a group framework; 9, hinge rope is promoted; 10, auger assembly; 11, pulley; 12, deflector; 13, because of dead axle; 14, motor cylinder; 15, collection snow snow removing shovel assembly.
In Fig. 2 16, collection snow auger sheet; 17, collection snow screw-conveyer-shaft; 18, scraper plate; 19, conveyor chain; 20, snow measuring plate; 21, the edge of shovel; 22, watt seat.
In Fig. 3 23, spring bracing; 24, central spindle of the spring; 25, cap nut; 26, turnbuckle; 27, base plate is transmitted; 28, lifting hydraulic cylinder; 29, suspension plate; 30, spring; 31, spring base; 32, obstacle detouring limiting bracket; 33, support is turned over after obstacle detouring; 34, obstacle detouring synchronizing shaft; 35, edge of shovel connecting plate; 36, the edge of shovel; 37, synchronous axle bed.
In Fig. 4 38, promote auger sheet; 39, screw-conveyer-shaft is promoted.
In Fig. 5 40, compensate synchronizing shaft; 41, synchronous connecting lever; 42, round brush motor; 43, synchronising (connecting) rod; 44, roller brush shaft bearing; 45 sliding panels; 46, sliding clamp; 47, counterbalance spring; 48, spring supporting frame; 49, connecting lever is compensated; 50, screw is compensated; 51, screw mandrel is compensated.
Detailed description of the invention
First Fig. 1 vehicle with chassis special (1) is special-purpose vehicle main frame, collection snow snow removing shovel assembly (15) is arranged on the front end of vehicle with chassis special (1), the upper end that Fig. 3 inside collection snow snow removing shovel assembly (15) transmits base plate (27) is connected with vehicle with chassis special (1) by Fig. 1 fixed axis (13), lower end and Fig. 2 snow measuring plate (20) connect to be pressed, motor cylinder (14) is arranged on the upper end that Fig. 3 transmits base plate (27), transmission base plate (27) is connected with deflector (12), screw-conveyer-shaft (17) is avenged with collection respectively in the two ends of Fig. 2 conveyor chain (19), motor cylinder (14) connects, several scraper plates (18) are connected on conveyor chain (19).Collection snow auger sheet (16) point left-right rotary is arranged on collection snow screw-conveyer-shaft (17), collection snow screw-conveyer-shaft (17) is connected with snow measuring plate (20) by watt seat (22), Fig. 1 collect snow snow removing shovel assembly (15) the inside Fig. 3 spring bracing (23) respectively with Fig. 2 snow measuring plate (20), Fig. 3 turnbuckle (26) connects, cap nut (25) and turnbuckle (26) are threaded, the upper end of central spindle of the spring (24) slides through cap nut (25), lower end is fixedly connected with spring base (31), spring (30) is assemblied between cap nut (25) and spring base (31), obstacle detouring synchronizing shaft (34) is connected with Fig. 2 snow measuring plate (20) by synchronous axle bed (37), the two ends of Fig. 3 obstacle detouring limiting bracket (32) respectively with obstacle detouring synchronizing shaft (34), spring base (31) connects, the edge of shovel (36) is fixed on edge of shovel connecting plate (35), turn on support (33) after edge of shovel connecting plate (35) is fixed on again obstacle detouring, turn over support (33) after obstacle detouring to be connected with obstacle detouring limiting bracket (32) pivot pin, obstacle detouring limiting bracket (32) has certain spacing to turning over support (33) upset backward after obstacle detouring.Because there is certain acute angle on the edge of shovel (36) and road surface, so be well suited for removing compacting snow.Suspension plate (29) is connected with Fig. 2 snow measuring plate (20), the two ends of Fig. 3 lifting hydraulic cylinder (28) are connected with suspension plate (29), Fig. 1 vehicle with chassis special (1) respectively, the length of adjustment Fig. 3 lifting hydraulic cylinder (28), Fig. 1 collects snow snow removing shovel assembly (15) just can with fixed axis (13) for fixed point oscilaltion.
Fig. 1 chapelet (2) and group frame (8), auger assembly (10), round brush (7) are assembled into an entirety and special low jiggering (1) is even pressed, and round brush (7) is arranged on after auger assembly (10).Fig. 4 of auger assembly (10) the inside promotes auger sheet (38) point left-right rotary and is fixed in lifting screw-conveyer-shaft (39), promoting screw-conveyer-shaft (39) is assemblied on Fig. 1 group frame (8), elevator chain motor cylinder (3) is arranged on the upper end of chapelet (2), and bucket lifting chain (4) upper end and elevator chain motor cylinder (3) connect and promote screw-conveyer-shaft (39) with Fig. 4 be connected by, lower end.The upper end of Fig. 5 sliding panel (45) is connected with round brush motor (42), lower end is connected with Fig. 1 round brush (7) by roller brush shaft bearing (44), Fig. 5 sliding clamp (46) is fixed on Fig. 1 group frame (8), and Fig. 5 sliding panel (45) to be assemblied between sliding clamp (46) and Fig. 1 group frame (8) and to have certain interval to slide up and down.Compensating synchronizing shaft (40) rotation is assemblied on Fig. 1 group frame (8), one end of the synchronous connecting lever of Fig. 5 (41) is connected with compensation synchronizing shaft (40) axle key, the other end is connected with synchronising (connecting) rod (43) pivot pin, and synchronising (connecting) rod (43) is connected with sliding panel (45) pivot pin.Compensate connecting lever (49) to be connected with compensation synchronizing shaft (40) axle key, spring supporting frame (48) is welded on Fig. 1 group frame (8), Fig. 5 compensates screw mandrel (51), compensate screw (50) and be slidedly assemblied in spring supporting frame (48), compensate on connecting lever (49), counterbalance spring (47) is assemblied in below spring supporting frame (48), like this by regulating compensation screw (50) to make counterbalance spring (47) support Fig. 1 round brush (7) by dependency structure completely, round brush (7) road pavement is made to keep in certain range of pressure values, when after the wearing and tearing of round brush (7) snow removing, adjustable Fig. 5 compensates screw (50) and carries out wear-compensating to Fig. 1 round brush (7).The both sides of vehicle with chassis special (1) and the upper and lower corresponding position of group frame (8), every side is installed with two pulleys (11) and a telescopic hydraulic cylinder (6) respectively, and two two ends promoting hinge rope (9) are even pressed by pulley (11) and telescopic hydraulic cylinder (6), group frame (8).The length of the telescopic hydraulic cylinder (6) of synchronous adjustment vehicle with chassis special (1) both sides, chapelet (2), group frame (8) just related auger assembly (10), round brush (7) are promoting under hinge rope (9) drive with regard to oscilaltion.Compartment (5) is assemblied in vehicle with chassis special (1) and goes up and have self-unloading function.
Motor cylinder (14) during road snow removing operation, elevator chain motor (3), Fig. 5 round brush motor (42) all provides hydraulic power by Fig. 1 vehicle with chassis special (1), and rotate by the direction of setting, motor cylinder (14) drives collection snow screw-conveyer-shaft (17) by Fig. 2 conveyor chain (19), collection snow auger sheet (16) rotates, Fig. 1 elevator chain motor (3) drives Fig. 4 to promote screw-conveyer-shaft (39) by bucket lifting chain (4), promote auger sheet (38) to rotate, Fig. 5 round brush motor (42) drives Fig. 1 round brush (7) to rotate.Adjustment telescopic hydraulic cylinder (6), the length of Fig. 3 lifting hydraulic cylinder (28), Fig. 1 is made to collect snow snow removing shovel assembly (15) and auger assembly (10), round brush (7) is reduced to snow removing position, vehicle with chassis special (1) drives all structures to move forward snow removing, at this moment the various accumulated snow on road surface, compacting snow is just disposed from road surface by Fig. 3 edge of shovel (36), the accumulated snow disposed is collected snow auger sheet (16) by Fig. 2, scraper plate (18) delivers into chapelet (3) by Fig. 1 deflector (12), the accumulated snow entering chapelet (3) is just sent to the inside, compartment (5) by lifting.When running into the protrusion object of road surface certain altitude, Fig. 3 edge of shovel (36) is crossed with regard to being turned over by the pressure turning over support (33) after edge of shovel connecting plate (35), obstacle detouring, obstacle detouring limiting bracket (32) overcomes spring (30), recovers again to continue snow removing after crossing under spring (30) effect.The remaining residual accumulated snow in road surface is utilized the inertia force of rotary cleaning to clean by round brush (7) and enters auger assembly (10) the inside, and the accumulated snow entering auger assembly (10) the inside is just promoted auger sheet (38) by Fig. 4, Fig. 1 bucket lifting chain (4) is delivered into the inside, compartment (5).After accumulated snow inside compartment (5) is filled, the length of adjustment telescopic hydraulic cylinder (6), Fig. 3 lifting hydraulic cylinder (28), make Fig. 1 collect snow snow removing shovel assembly (15) and auger assembly (10), round brush (7) bring up to certain altitude, this snowfall car is just transported to given place accumulated snow and lays down voluntarily.
Claims (5)
1. a high efficiency snow removing vehicle and manufacture method, it is characterized in that: collection snow snow removing shovel assembly is arranged on the front end of vehicle with chassis special, chapelet and group frame, auger assembly, round brush are assembled into an entirety and are connected with vehicle with chassis special, and round brush is arranged on after auger assembly.
2. a kind of high efficiency snow removing vehicle according to claim 1 and manufacture method, it is characterized in that: the upper end of the transmission base plate inside collection snow snow removing shovel assembly is connected with vehicle with chassis special by fixed axis, lower end is connected with snow measuring plate, motor cylinder is arranged on the upper end of transmission base plate, transmission base plate is connected with deflector, the two ends of conveyor chain are connected with collection snow screw-conveyer-shaft, motor cylinder respectively, and several scraper plates are connected on conveyor chain.Collection snow auger sheet divides left-right rotary to be arranged on collection snow screw-conveyer-shaft, and collection snow screw-conveyer-shaft is connected with snow measuring plate by a watt seat.
3. a kind of high efficiency snow removing vehicle according to claim 1 and manufacture method, it is characterized in that: the spring bracing inside collection snow snow removing shovel assembly respectively and snow measuring plate, turnbuckle connects, cap nut and turnbuckle are threaded, the upper end of central spindle of the spring slides through cap nut, lower end is fixedly connected with spring base, spring is assemblied between cap nut and spring base, obstacle detouring synchronizing shaft is connected with snow measuring plate by synchronous axle bed, the two ends of obstacle detouring limiting bracket respectively with obstacle detouring synchronizing shaft, spring base connects, the edge of shovel is fixed on edge of shovel connecting plate, edge of shovel connecting plate turns on support after being fixed on again obstacle detouring, turn over support after obstacle detouring to be connected with obstacle detouring limiting bracket pivot pin, obstacle detouring limiting bracket has certain spacing to turning over support upset backward after obstacle detouring.
4. a kind of high efficiency snow removing vehicle according to claim 1 and manufacture method, it is characterized in that: the lifting auger sheet inside auger assembly divides left-right rotary to be fixed on lifting screw-conveyer-shaft, promoting screw-conveyer-shaft is assemblied on group frame, elevator chain motor cylinder is arranged on the upper end of chapelet, and bucket lifting chain upper end is connected with elevator chain motor cylinder, lower end is connected with lifting screw-conveyer-shaft.
5. a kind of high efficiency snow removing vehicle according to claim 1 and manufacture method, it is characterized in that: the upper end of sliding panel is connected with round brush motor, lower end is connected with round brush by roller brush shaft bearing, sliding clamp is fixed on group frame, and sliding panel to be assemblied between sliding clamp and group frame and to have certain interval to slide up and down.Compensating synchronizing shaft rotation is assemblied on group frame, one end of synchronous connecting lever is connected with compensation synchronizing shaft axle key, the other end is connected with synchronising (connecting) rod pivot pin, synchronising (connecting) rod is connected with sliding panel pivot pin, compensate connecting lever to be connected with compensation synchronizing shaft axle key, spring supporting frame is welded on group frame, and compensate screw mandrel, compensation screw slippage is assemblied in spring supporting frame, compensates on connecting lever, counterbalance spring is assemblied in below spring supporting frame.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510219587.XA CN104805793A (en) | 2015-04-27 | 2015-04-27 | High-efficiency snow sweeper and manufacturing method thereof |
CN201610289958.6A CN105821793B (en) | 2015-04-27 | 2016-04-21 | A kind of snow breaker and manufacturing method |
CN201620399459.8U CN205604156U (en) | 2015-04-27 | 2016-04-21 | Snowplough |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510219587.XA CN104805793A (en) | 2015-04-27 | 2015-04-27 | High-efficiency snow sweeper and manufacturing method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104805793A true CN104805793A (en) | 2015-07-29 |
Family
ID=53690963
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510219587.XA Pending CN104805793A (en) | 2015-04-27 | 2015-04-27 | High-efficiency snow sweeper and manufacturing method thereof |
CN201620399459.8U Expired - Fee Related CN205604156U (en) | 2015-04-27 | 2016-04-21 | Snowplough |
CN201610289958.6A Active CN105821793B (en) | 2015-04-27 | 2016-04-21 | A kind of snow breaker and manufacturing method |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620399459.8U Expired - Fee Related CN205604156U (en) | 2015-04-27 | 2016-04-21 | Snowplough |
CN201610289958.6A Active CN105821793B (en) | 2015-04-27 | 2016-04-21 | A kind of snow breaker and manufacturing method |
Country Status (1)
Country | Link |
---|---|
CN (3) | CN104805793A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110666815A (en) * | 2019-11-05 | 2020-01-10 | 新疆大学 | A snow sweeping robot based on a compressed snow block collecting device |
RU197784U1 (en) * | 2020-02-07 | 2020-05-28 | Евгений Борисевич | Mounted screw loader |
CN111232670A (en) * | 2020-01-16 | 2020-06-05 | 淄博翔宇机械有限公司 | Large-width pneumatic suction type residual material recovery device |
CN113174896A (en) * | 2021-03-18 | 2021-07-27 | 山东高速股份有限公司 | Cleaning and transporting integrated multifunctional snow removing vehicle and snow removing method thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108774991A (en) * | 2018-08-31 | 2018-11-09 | 上海应用技术大学 | A kind of highway snow-removing device |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AR246573A1 (en) * | 1991-03-10 | 1994-08-31 | Frederick Miramda | Vehicle for removing snow drifts on road surfaces. |
CN2546497Y (en) * | 2001-04-13 | 2003-04-23 | 赵瑞国 | Road snow removing machine |
CN2570322Y (en) * | 2002-08-30 | 2003-09-03 | 董少伟 | Multifunctional road surface,land ice and snow sweeping vehicle |
CN2591090Y (en) * | 2002-10-31 | 2003-12-10 | 毕彦波 | Machine for removing ice & Snow from road |
CN100467720C (en) * | 2005-10-27 | 2009-03-11 | 王海维 | Multifunction snow removing machine |
CN2892957Y (en) * | 2006-05-24 | 2007-04-25 | 杨孔友 | General-purpose snow-removing machine |
CN100494580C (en) * | 2006-06-16 | 2009-06-03 | 朱保中 | Novel snow shoveling and thawing vehicle |
CN201678971U (en) * | 2010-03-11 | 2010-12-22 | 迟树廷 | Snow removing-loading machine |
CN104032701B (en) * | 2014-06-23 | 2016-05-11 | 张瑞仁 | A kind of snow remover for city road device |
-
2015
- 2015-04-27 CN CN201510219587.XA patent/CN104805793A/en active Pending
-
2016
- 2016-04-21 CN CN201620399459.8U patent/CN205604156U/en not_active Expired - Fee Related
- 2016-04-21 CN CN201610289958.6A patent/CN105821793B/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110666815A (en) * | 2019-11-05 | 2020-01-10 | 新疆大学 | A snow sweeping robot based on a compressed snow block collecting device |
CN111232670A (en) * | 2020-01-16 | 2020-06-05 | 淄博翔宇机械有限公司 | Large-width pneumatic suction type residual material recovery device |
RU197784U1 (en) * | 2020-02-07 | 2020-05-28 | Евгений Борисевич | Mounted screw loader |
CN113174896A (en) * | 2021-03-18 | 2021-07-27 | 山东高速股份有限公司 | Cleaning and transporting integrated multifunctional snow removing vehicle and snow removing method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN105821793B (en) | 2018-07-06 |
CN105821793A (en) | 2016-08-03 |
CN205604156U (en) | 2016-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104805793A (en) | High-efficiency snow sweeper and manufacturing method thereof | |
CN102433853B (en) | Trailer type sand elimination machine for railway | |
CN104805791A (en) | Full-time urban road cleaning vehicle and manufacturing method | |
CN202247782U (en) | Trailer type railway sand-removing machine | |
CN204982765U (en) | Snow sweeper | |
CN204825767U (en) | Whole snow breaker | |
CN201141127Y (en) | Snow clearing car | |
CN206873362U (en) | A kind of roller brush is swept the floor head | |
CN111041957A (en) | Road surface crack patching device is used in traffic engineering construction | |
CN212562213U (en) | A roof snow removal machine | |
CN104762913A (en) | Combined snow remover for roads and manufacturing method thereof | |
CN204825747U (en) | Four seasons road sweeper | |
CN204059271U (en) | Snow and ice clear away machine | |
CN2934349Y (en) | Snow-removing ice-shoveling device | |
CN114941277A (en) | Crack repairing device for bridge construction and using method | |
CN204238169U (en) | Vertical shaft rotary-cutting type ice-breaking snow-removing apparatus | |
CN205676824U (en) | A kind of snow throwing snow breaker | |
CN204690664U (en) | A kind of snow blower | |
CN202754715U (en) | Electric crane | |
CN201574377U (en) | Snow cleaning machine | |
CN219908465U (en) | Road engineering pavement pressing practical road roller | |
CN2603113Y (en) | snow-removnig cleaning-vehicle | |
CN201027310Y (en) | Automatic smoothing reshaping complete plant for soil surface of water canal | |
CN216606250U (en) | Cleaning device for road roller gyro wheel is used | |
CN216338866U (en) | Compaction device is used in asphalt road construction with clearance mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150729 |