CN104790977A - Tunnel primary lining formwork trolley and construction method thereof - Google Patents

Tunnel primary lining formwork trolley and construction method thereof Download PDF

Info

Publication number
CN104790977A
CN104790977A CN201510092535.0A CN201510092535A CN104790977A CN 104790977 A CN104790977 A CN 104790977A CN 201510092535 A CN201510092535 A CN 201510092535A CN 104790977 A CN104790977 A CN 104790977A
Authority
CN
China
Prior art keywords
door frame
template
bow member
concrete
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510092535.0A
Other languages
Chinese (zh)
Other versions
CN104790977B (en
Inventor
陈建民
岳永和
唐桂芳
崔建文
张訸
崔鹏
宋卫忠
金明亮
晏社刚
罗宏涛
田过勤
刘斌
郝东
张海强
李永忠
张常安
于澍江
余波
谢永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Road And Bridge 4th Highway Engineering Co Ltd
Gansu Road and Bridge Construction Group Co Ltd
Original Assignee
Gansu Road And Bridge 4th Highway Engineering Co Ltd
Gansu Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Road And Bridge 4th Highway Engineering Co Ltd, Gansu Road and Bridge Construction Group Co Ltd filed Critical Gansu Road And Bridge 4th Highway Engineering Co Ltd
Priority to CN201510092535.0A priority Critical patent/CN104790977B/en
Publication of CN104790977A publication Critical patent/CN104790977A/en
Application granted granted Critical
Publication of CN104790977B publication Critical patent/CN104790977B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a tunnel primary lining formwork trolley and a construction method thereof. The tunnel primary lining formwork trolley comprises a formwork mechanism and a portal assembly. When concrete is pumped, a rigid arch frame is formed at the lining position through the formwork mechanism, and the rigid arch frame is supported on the portal assembly. When the pumped concrete is in the maintaining period, the pumped concrete is supported on the rigid arch frame, and the rigid arch frame is separated from the portal assembly. By means of the tunnel primary lining formwork trolley and the construction method thereof, the excavating operation can be carried out in the concrete maintaining period.

Description

Tunnel just serves as a contrast formwork jumbo and construction method thereof
Technical field
The present invention relates to a kind of working jumbo for tunnel lining, particularly relate to a kind of tunnel and just serve as a contrast formwork jumbo and construction method thereof, tunnel initial stage lining cutting on tunnel.
Background technology
Because country rock is poor from load in loess tunnel construction, can not excavate by progress chi, general each excavation is no more than 3 linear meter(lin.m.)s and just needs to carry out preliminary bracing to tunnel immediately.Preliminary bracing generally has two kinds, and a kind of is hang steel mesh reinforcement to carry out jet-anchor execution, another kind of for carrying out form concrete construction.
Carrying out in form concrete construction, need remaining core soil in advance, construction space is little.Current employing be manually set up steel arch-shelf, and carry out concreting after gang form.There is the large shortcoming of hand labor intensity in this kind of form of construction work.Simultaneously because steel arch-shelf needs artificial erection thus to adopt lighter section steel manufacture, mechanical strength is low, and can not adopt in crown part and build the large pumping of concrete mode concreting of pressure, thus crown concrete is owed to water, formation large area cavity, construction quality extreme difference.
In prior art, the formwork jumbo for tunnel lining is more, such as, the disclosed a kind of tunnel lining trolley of China Patent No. " 201410596838.1 ", publication date is 2015-02-18; For another example the disclosed a kind of portal frame tunnel lining form trolley of China Patent No. " 200520120695.3 ", publication date is 2007-02-14; And for example the disclosed one of China Patent No. " 201320088500.6 " is worked continuously and is turned over mould dock working jumbo for tunnel lining, and publication date is 2013-09-25.These formwork jumbos are all for the operation of Tunnel Second Lining concrete pouring construction, owing to can not affect excavation during concrete curing simultaneously, if adopt existing formwork jumbo to carry out tunnel just to serve as a contrast, then can not carry out excavation operation between solidifying soil curing time, thus existing formwork jumbo cannot be used for tunnel and just serves as a contrast.
Summary of the invention
The object of the invention is to the problems referred to above overcoming prior art existence, provide a kind of tunnel just to serve as a contrast formwork jumbo and construction method thereof.Adopt the present invention, achieve can carry out excavation operation simultaneously during concrete curing.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of tunnel just serves as a contrast formwork jumbo, it is characterized in that: comprise template mechanism and door frame assembly, and when pumping liquid concrete, template mechanism forms rigidity bow member in lining cutting position, and rigidity bow member is supported on door frame assembly; When the concrete of infusion was between curing time, the concrete support of infusion is on rigidity bow member, and rigidity bow member is separated with door frame assembly.
Described template mechanism comprises foundation forms and bow member template, and foundation forms is set in advance in treats lining cutting position, and bow member template is transported to coordinate with foundation forms by door frame assembly and forms rigidity bow member.
Described bow member template comprises crown template and limit arch template, and crown template both sides encircle template respectively with limit hinged, and limit arch template is connected with foundation forms bolt.
Described door frame assembly comprises door frame, walking mechanism, lifting body and translation mechanism, walking mechanism is arranged on door frame and drives door frame assembly to move, lifting body is arranged on door frame and drives door frame assembly to be elevated, and translation mechanism is arranged on door frame and drives door frame assembly to align tunnel center line.
Described door frame comprises door frame crossbeam, door frame column, door frame articulated beam and door frame longeron, and two door frame crossbeams are fixedly connected with by door frame articulated beam, and door frame column is fixedly connected with door frame crossbeam, and door frame longeron is fixedly connected with door frame column.
Described walking mechanism comprises road wheel and by the drive unit driving road wheel to move, road wheel and drive unit are all arranged on door frame longeron.
Described lifting body comprises jacking cylinder seat, longeron slide and jacking cylinder, and jacking cylinder seat is arranged in longeron slide, and jacking cylinder one end connects with jacking cylinder seat, and the other end connects with longeron slide, and longeron slide is fixedly installed on door frame longeron.
Described translation mechanism comprises chassis base and translation oil cylinder, translation oil cylinder one end and jacking cylinder seat hinged, the other end and chassis base hinged, jacking cylinder seat is slidably arranged on chassis base.
Described door frame column is also provided with stripper apparatus, and stripper apparatus one end is connected with door frame column, and the other end and limit are encircleed template and be connected.Described stripper apparatus is demoulding oil jar.
Described door frame column is also provided with bracing or strutting arrangement, and bracing or strutting arrangement one end is connected with door frame column, and the other end is connected with foundation forms.Described bracing or strutting arrangement is very heavy for supporting.
Tunnel just serves as a contrast a construction method for formwork jumbo, it is characterized in that, comprises the steps:
A, elder generation are treating that both sides, lining cutting position are by manually laying foundation forms;
B, by door frame assembly, bow member template is transported to lining cutting position;
C, lifting body move, and door frame is risen to correct position;
D, translation mechanism move, and make door frame assembly align tunnel center line;
E, stripper apparatus move, and strut bow member template alignment foundation forms;
F, installation form mechanism locking, and fittable slackening device;
G, pumping of concrete are complete to building, and after concrete is certainly steady, remove bracing or strutting arrangement and stripper apparatus, fall door frame, leave template mechanism and support the concrete of just having built, and carry out excavation operation after the door frame assembly that drives away, transport next group template mechanism after excavation operation completes again and repeat above-mentioned work.
Employing the invention has the advantages that:
One, the present invention includes template mechanism and door frame assembly, when pumping liquid concrete, template mechanism forms rigidity bow member in lining cutting position, and rigidity bow member is supported on door frame assembly; When the concrete of infusion was between curing time, the concrete support of infusion is on rigidity bow member, and rigidity bow member is separated with door frame assembly; Adopt this structure, compared with existing secondary lining chassis, template mechanism of the present invention and door frame assembly are split-type structural, achieve can carry out excavation operation simultaneously during concrete curing.
Two, in the present invention, described template mechanism comprises foundation forms and bow member template, and foundation forms is set in advance in treats lining cutting position, and bow member template is transported to coordinate with foundation forms by door frame assembly and forms rigidity bow member; Adopt this structure, adopt self-propelled door frame erection template, mechanization degree is high, and safety is high, labour intensity is low, construction speed also significantly improves.
Three, in the present invention, described bow member template comprises crown template and limit arch template, and crown template both sides encircle template respectively with limit hinged, and limit arch template is connected with foundation forms bolt; Adopt the combined type bow member template of this structure, be not only convenient to transport and install, and be easy to change.
Four, in the present invention, described door frame assembly comprises door frame, walking mechanism, lifting body and translation mechanism, walking mechanism is arranged on door frame and drives door frame assembly to move, lifting body is arranged on door frame and drives door frame assembly to be elevated, translation mechanism is arranged on door frame and drives door frame assembly to align tunnel center line, this structure, achieve chassis in tunnel front, back, left, right, up and under motion, can up and down and left and right adjustment chassis, also can correct chassis direction when chassis wanders off, improve efficiency of construction.
Five, in the present invention, described door frame comprises door frame crossbeam, door frame column, door frame articulated beam and door frame longeron, two door frame crossbeams are fixedly connected with by door frame articulated beam, door frame column is fixedly connected with door frame crossbeam, door frame longeron is fixedly connected with door frame column, adopt this structure, achieve combination type door shelf structure, be convenient to adjust door frame according to tunnel size.
Six, in the present invention, described walking mechanism comprises road wheel and by the drive unit driving road wheel to move, road wheel and drive unit are all arranged on door frame longeron, adopt this structure, and the mechanization achieving chassis is moved, and is convenient to transport template.
Seven, in the present invention, described lifting body comprises jacking cylinder seat, longeron slide and jacking cylinder, jacking cylinder seat is arranged in longeron slide, jacking cylinder one end connects with jacking cylinder seat, and the other end connects with longeron slide, and longeron slide is fixedly installed on door frame longeron, adopt this structure, drive door frame lifting by oil cylinder is flexible, be convenient to adjust mast height flexibly, thus improve the installation joint efficiency of template.
Eight, in the present invention, described translation mechanism comprises chassis base and translation oil cylinder, translation oil cylinder one end and jacking cylinder seat hinged, the other end and chassis base hinged, jacking cylinder seat is slidably arranged on chassis base, adopt this structure, drive door frame slip horizontal relative to chassis base by translation oil cylinder is flexible, be convenient to adjustment door frame and align tunnel center line.
Nine, in the present invention, described door frame column is also provided with stripper apparatus, and stripper apparatus one end is connected with door frame column, and the other end and limit are encircleed template and be connected, and adopt this structure, the demoulding achieves mechanized operation equally, does not need artificial, reduces working strength.
Ten, in the present invention, described door frame column is also provided with bracing or strutting arrangement, bracing or strutting arrangement one end is connected with door frame column, the other end is connected with foundation forms, adopt this structure, add the stability of rigidity bow member, concrete warehousing adopts pumping mode, because the fast concrete lateral pressure of speed of perfusion is huge, this structure can avoid template to run mould.
To sum up, after adopting the present invention, large rigidity, the greatly large form of intensity can be adopted to carry out lining construction, and adopt pumping of concrete concreting, make concrete more closely knit, quality is significantly leaped.
Accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of the present invention
Fig. 2 is side-looking structural representation of the present invention
Fig. 3 is operating diagram of the present invention
Fig. 4 is door frame assembly of the present invention and template mechanism disengaged position schematic diagram
Fig. 5 is concrete curing view of the present invention
Be labeled as in figure: 1, crown template, 2, template pin, 3, template lock(ing) bolt, 4, limit arch template, 5, door frame longeron, 6, foundation forms, 7, door frame articulated beam, 8, door frame crossbeam, 9, door frame column, 10, demoulding oil jar, 11, support very heavy, 12, chassis base, 13, translation oil cylinder, 14, jacking cylinder seat, 15, jacking cylinder, 16, road wheel.
Detailed description of the invention
Embodiment 1
A kind of tunnel just serves as a contrast formwork jumbo, comprises template mechanism and door frame assembly, and when pumping liquid concrete, template mechanism forms rigidity bow member in lining cutting position, and rigidity bow member is supported on door frame assembly; When the concrete of infusion was between curing time, the concrete support of infusion is on rigidity bow member, and rigidity bow member is separated with door frame assembly.
Described template mechanism comprises foundation forms 6 and bow member template, and foundation forms 6 is set in advance in treats lining cutting position, and bow member template is transported to coordinate with foundation forms 6 by door frame assembly and forms rigidity bow member.
Described bow member template comprises crown template 1 and limit arch template 4, and crown template 1 both sides encircle template 4 respectively with limit hinged, and limit arch template 4 is connected with foundation forms 6 bolt.
Described door frame assembly comprises door frame, walking mechanism, lifting body and translation mechanism, walking mechanism is arranged on door frame and drives door frame assembly to move, lifting body is arranged on door frame and drives door frame assembly to be elevated, and translation mechanism is arranged on door frame and drives door frame assembly to align tunnel center line.
Described door frame is comprised door frame crossbeam 8, door frame column 9, door frame articulated beam 7 and door frame longeron 5, two door frame crossbeams 8 and is fixedly connected with by door frame articulated beam 7, and door frame column 9 is fixedly connected with door frame crossbeam 8, and door frame longeron 5 is fixedly connected with door frame column 9.
Described walking mechanism comprises road wheel 16 and by the drive unit driving road wheel 16 to move, road wheel 16 and drive unit are all arranged on door frame longeron 5.
Described lifting body comprises jacking cylinder seat 14, longeron slide and jacking cylinder 15, jacking cylinder seat 14 is arranged in longeron slide, jacking cylinder 15 one end connects with jacking cylinder seat 14, and the other end connects with longeron slide, and longeron slide is fixedly installed on door frame longeron 5.
Described translation mechanism comprises chassis base 12 and translation oil cylinder 13, translation oil cylinder 13 one end and jacking cylinder seat 14 hinged, the other end and chassis base 12 hinged, jacking cylinder seat 14 is slidably arranged on chassis base 12.
Described door frame column 9 is also provided with stripper apparatus, and stripper apparatus one end is connected with door frame column 9, and the other end and limit are encircleed template 4 and be connected.Preferably, described stripper apparatus is demoulding oil jar 10.
Described door frame column 9 is also provided with bracing or strutting arrangement, and bracing or strutting arrangement one end is connected with door frame column 9, and the other end is connected with foundation forms 6.Preferably, described bracing or strutting arrangement is for supporting very heavy 11.
Tunnel just serves as a contrast a construction method for formwork jumbo, comprises the steps:
A, elder generation are treating that both sides, lining cutting position are by manually laying foundation forms;
B, by door frame assembly, bow member template is transported to lining cutting position;
C, lifting body move, and door frame is risen to correct position;
D, translation mechanism move, and make door frame assembly align tunnel center line;
E, stripper apparatus move, and strut bow member template alignment foundation forms;
F, installation form mechanism locking, and fittable slackening device;
G, pumping of concrete are complete to building, and after concrete is certainly steady, remove bracing or strutting arrangement and stripper apparatus, fall door frame, leave template mechanism and support the concrete of just having built, and carry out excavation operation after the door frame assembly that drives away, transport next group template mechanism after excavation operation completes again and repeat above-mentioned work.
Embodiment 2
The present invention is designed for tunnel initial stage lining cutting on tunnel, can join many cover templates and use.As shown in Figure 1, the present invention is in pouring concrete state.Chassis list group template length 3 meters, can join and organize template construction more.Chassis door frame moves and in place, and template drives away after pouring concrete terminates 3 hours, and self-supported formwork bears alone concrete load.First lay foundation forms 6 when template is in place and fix, then laying limit arch template 4 and crown template 1, lock with template lock(ing) bolt 3 after adjusting to the right place.
The present invention is designed with lifting body and translation mechanism, can up and down and left and right adjustment chassis, also can correct chassis direction when chassis wanders off.
Concrete warehousing adopts pumping mode, and because the fast concrete lateral pressure of speed of perfusion is huge, for avoiding template to run mould, adopt low slump to add the concrete formulation of early strength admixture, poring rate is not more than as far as possible: 2 meters (highly)/hour.
Both sides of the present invention foundation forms 6 is manually installed, and manually flattens.Chassis adopts rubber-tyred automatic traveling mechanism.
Embodiment 3
Jacking cylinder seat 14 of the present invention is installed in longeron slide, and jacking cylinder 15 one end connects with jacking cylinder seat 14, and the other end connects with longeron slide, and oil cylinder is flexible drives door frame lifting.
Jacking cylinder seat 14 is slidably mounted on chassis base 12 simultaneously, translation oil cylinder 13 one end and jacking cylinder seat 14 hinged, the other end and chassis base 12 hinged.Translation oil cylinder 13 is flexible drives door frame slip horizontal relative to chassis base 12.Tire and driving mechanism are installed on door frame longeron 5.
Crown template 1 both sides encircle template 4 respectively with dual-side hinged, are also fixedly connected with by bolt simultaneously, or are connected by template pin 2.After crown template 1, limit arch template 4, foundation forms 6 connect, form a rigidity bow member.
Construction method of the present invention is as follows:
First pass through in both sides, lining cutting position manually to lay foundation forms;
Bear one group of 3 meters of long template by door frame assembly, start driving mechanism to lining cutting position;
Operation jacking cylinder rises door frame to correct position;
Operation translation oil cylinder is to median line;
Operation demoulding oil jar struts template alignment foundation forms;
Attachment bolt on installation form is also locked;
Support is installed very heavy;
Starting pumping of concrete complete to building, after waiting concrete certainly steady, removing and supporting very heavy, demoulding oil jar, fall door frame, leave the concrete that shuttering supporting has just been built, and carry out excavation operation after the chassis that drives away, bear next group template after excavation operation completes again and repeat above-mentioned work.

Claims (10)

1. tunnel just serves as a contrast a formwork jumbo, it is characterized in that: comprise template mechanism and door frame assembly, and when pumping liquid concrete, template mechanism forms rigidity bow member in lining cutting position, and rigidity bow member is supported on door frame assembly; When the concrete of infusion was between curing time, the concrete support of infusion is on rigidity bow member, and rigidity bow member is separated with door frame assembly.
2. tunnel according to claim 1 just serves as a contrast formwork jumbo, it is characterized in that: described template mechanism comprises foundation forms (6) and bow member template, foundation forms (6) is set in advance in treats lining cutting position, and bow member template is transported to coordinate with foundation forms (6) by door frame assembly and forms rigidity bow member.
3. tunnel according to claim 2 just serves as a contrast formwork jumbo, it is characterized in that: described bow member template comprises crown template (1) and limit arch template (4), crown template (1) both sides are encircleed template (4) respectively and are connected with limit, limit arch template (4) is connected with foundation forms (6).
4. tunnel according to claim 3 just serves as a contrast formwork jumbo, it is characterized in that: described door frame assembly comprises door frame, walking mechanism, lifting body and translation mechanism, walking mechanism is arranged on door frame and drives door frame assembly to move, lifting body is arranged on door frame and drives door frame assembly to be elevated, and translation mechanism is arranged on door frame and drives door frame assembly to align tunnel center line.
5. tunnel according to claim 4 just serves as a contrast formwork jumbo, it is characterized in that: described door frame comprises door frame crossbeam (8), door frame column (9), door frame articulated beam (7) and door frame longeron (5), two door frame crossbeams (8) are fixedly connected with by door frame articulated beam (7), door frame column (9) is fixedly connected with door frame crossbeam (8), and door frame longeron (5) is fixedly connected with door frame column (9).
6. tunnel according to claim 5 just serves as a contrast formwork jumbo, it is characterized in that: described walking mechanism comprises road wheel (16) and by the drive unit driving road wheel (16) to move, road wheel (16) and drive unit are all arranged on door frame longeron (5).
7. tunnel according to claim 6 just serves as a contrast formwork jumbo, it is characterized in that: described lifting body comprises jacking cylinder seat (14), longeron slide and jacking cylinder (15), jacking cylinder seat (14) is arranged in longeron slide, jacking cylinder (15) one end connects with jacking cylinder seat (14), the other end connects with longeron slide, and longeron slide is fixedly installed on door frame longeron 5.
8. tunnel according to claim 7 just serves as a contrast formwork jumbo, it is characterized in that: described translation mechanism comprises chassis base (12) and translation oil cylinder (13), translation oil cylinder (13) one end and jacking cylinder seat (14) hinged, the other end and chassis base (12) hinged, jacking cylinder seat (14) is slidably arranged on chassis base (12).
9. tunnel according to claim 8 just serves as a contrast formwork jumbo, it is characterized in that: described door frame column (9) is also provided with stripper apparatus, and stripper apparatus one end is connected with door frame column (9), and the other end and limit are encircleed template (4) and be connected.
10. a kind of tunnel just serves as a contrast the construction method of formwork jumbo according to claim 1, it is characterized in that, comprises the steps:
A, elder generation are treating that both sides, lining cutting position are by manually laying foundation forms;
B, by door frame assembly, bow member template is transported to lining cutting position;
C, lifting body move, and door frame is risen to correct position;
D, translation mechanism move, and make door frame assembly align tunnel center line;
E, stripper apparatus move, and strut bow member template alignment foundation forms;
F, installation form mechanism locking, and fittable slackening device;
G, pumping of concrete are complete to building, and after concrete is certainly steady, remove bracing or strutting arrangement and stripper apparatus, fall door frame, leave template mechanism and support the concrete of just having built, and carry out excavation operation after the door frame assembly that drives away, transport next group template mechanism after excavation operation completes again and repeat above-mentioned work.
CN201510092535.0A 2015-03-02 2015-03-02 Tunnel just serves as a contrast formwork jumbo and its construction method Expired - Fee Related CN104790977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510092535.0A CN104790977B (en) 2015-03-02 2015-03-02 Tunnel just serves as a contrast formwork jumbo and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510092535.0A CN104790977B (en) 2015-03-02 2015-03-02 Tunnel just serves as a contrast formwork jumbo and its construction method

Publications (2)

Publication Number Publication Date
CN104790977A true CN104790977A (en) 2015-07-22
CN104790977B CN104790977B (en) 2018-04-10

Family

ID=53556111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510092535.0A Expired - Fee Related CN104790977B (en) 2015-03-02 2015-03-02 Tunnel just serves as a contrast formwork jumbo and its construction method

Country Status (1)

Country Link
CN (1) CN104790977B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050270A (en) * 2016-08-16 2016-10-26 北京康港工程技术有限公司 Open cut tunnel forming construction device
CN107355237A (en) * 2017-08-15 2017-11-17 中国路桥工程有限责任公司 Sliding formwork of going through the motions sprays concrete excavation multifunctional tunnel chassis
CN107956490A (en) * 2017-12-29 2018-04-24 中国铁道科学研究院铁道建筑研究所 A kind of intelligent tunnel lining trolley
CN108240228A (en) * 2016-12-26 2018-07-03 济南大学 A kind of assembly equipment and construction technology of confined concrete arch
CN109372547A (en) * 2018-11-02 2019-02-22 中铁工程装备集团有限公司 Narrow-bore tunnel rail-mounted lining trolley and lining methods
CN109519197A (en) * 2018-12-25 2019-03-26 中铁四局集团有限公司 Dual-purpose trolley for slip form primary lining excavation supporting and application thereof
CN109538250A (en) * 2019-01-28 2019-03-29 中南大学 Device and method for branch at the beginning of tunnel with mould gunite concrete rapid construction
CN110486052A (en) * 2019-09-04 2019-11-22 中交天和机械设备制造有限公司 A kind of press injecting type concrete support method and the supporting mechanism for implementing it
US10584502B2 (en) 2016-09-09 2020-03-10 Excel Project Management Ltd. Arch-support system
CN112709162A (en) * 2020-12-30 2021-04-27 中铁六局集团北京铁路建设有限公司 Large-span thin-wall concrete sound barrier pouring trolley
CN112726442A (en) * 2020-12-30 2021-04-30 中铁六局集团北京铁路建设有限公司 Construction method of large-span thin-wall concrete sound barrier pouring trolley
WO2024139250A1 (en) * 2022-12-26 2024-07-04 中铁七局集团有限公司 Inner and outer formwork trolley for buried culvert of concrete structure, and construction method using same

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285789A (en) * 2003-03-25 2004-10-14 Public Works Research Institute Tunnel widening apparatus
CN201258747Y (en) * 2008-08-26 2009-06-17 丁伟红 Bottom placed continuous conveyor construction tunnel synchronization lining trolley
CN201258746Y (en) * 2008-08-26 2009-06-17 张新泉 Overlapping type continuous conveyor construction tunnel synchronization lining trolley
CN201627587U (en) * 2010-03-25 2010-11-10 中国建筑第八工程局有限公司 Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
CN102536261A (en) * 2012-01-14 2012-07-04 湖南五新重型装备有限公司 Retractable emergency car avoidance belt tunnel lining trolley
CN103089278A (en) * 2013-02-27 2013-05-08 中交隧道工程局有限公司 Continuous operation rolling over docking type tunnel lining formwork trolley
CN103114862A (en) * 2013-02-27 2013-05-22 中交隧道工程局有限公司 Loop butting tunnel lining construction method
CN203050728U (en) * 2012-12-24 2013-07-10 重庆同展机械制造有限公司 Lining template trolley
CN204627623U (en) * 2015-03-02 2015-09-09 甘肃路桥建设集团有限公司 Tunnel just serves as a contrast formwork jumbo

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285789A (en) * 2003-03-25 2004-10-14 Public Works Research Institute Tunnel widening apparatus
CN201258747Y (en) * 2008-08-26 2009-06-17 丁伟红 Bottom placed continuous conveyor construction tunnel synchronization lining trolley
CN201258746Y (en) * 2008-08-26 2009-06-17 张新泉 Overlapping type continuous conveyor construction tunnel synchronization lining trolley
CN201627587U (en) * 2010-03-25 2010-11-10 中国建筑第八工程局有限公司 Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
CN102536261A (en) * 2012-01-14 2012-07-04 湖南五新重型装备有限公司 Retractable emergency car avoidance belt tunnel lining trolley
CN203050728U (en) * 2012-12-24 2013-07-10 重庆同展机械制造有限公司 Lining template trolley
CN103089278A (en) * 2013-02-27 2013-05-08 中交隧道工程局有限公司 Continuous operation rolling over docking type tunnel lining formwork trolley
CN103114862A (en) * 2013-02-27 2013-05-22 中交隧道工程局有限公司 Loop butting tunnel lining construction method
CN204627623U (en) * 2015-03-02 2015-09-09 甘肃路桥建设集团有限公司 Tunnel just serves as a contrast formwork jumbo

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050270A (en) * 2016-08-16 2016-10-26 北京康港工程技术有限公司 Open cut tunnel forming construction device
US10584502B2 (en) 2016-09-09 2020-03-10 Excel Project Management Ltd. Arch-support system
CN108240228A (en) * 2016-12-26 2018-07-03 济南大学 A kind of assembly equipment and construction technology of confined concrete arch
CN108240228B (en) * 2016-12-26 2019-09-20 济南大学 A kind of assembly equipment and construction technology of confined concrete arch
CN107355237A (en) * 2017-08-15 2017-11-17 中国路桥工程有限责任公司 Sliding formwork of going through the motions sprays concrete excavation multifunctional tunnel chassis
CN107355237B (en) * 2017-08-15 2023-06-30 中国路桥工程有限责任公司 Walking type sliding mode concrete spraying and excavating multifunctional tunnel trolley
CN107956490A (en) * 2017-12-29 2018-04-24 中国铁道科学研究院铁道建筑研究所 A kind of intelligent tunnel lining trolley
CN109372547A (en) * 2018-11-02 2019-02-22 中铁工程装备集团有限公司 Narrow-bore tunnel rail-mounted lining trolley and lining methods
CN109519197A (en) * 2018-12-25 2019-03-26 中铁四局集团有限公司 Dual-purpose trolley for slip form primary lining excavation supporting and application thereof
CN109538250A (en) * 2019-01-28 2019-03-29 中南大学 Device and method for branch at the beginning of tunnel with mould gunite concrete rapid construction
CN109538250B (en) * 2019-01-28 2023-09-15 中南大学 Device and method for quick construction of tunnel primary support with mould sprayed concrete
CN110486052A (en) * 2019-09-04 2019-11-22 中交天和机械设备制造有限公司 A kind of press injecting type concrete support method and the supporting mechanism for implementing it
CN112709162A (en) * 2020-12-30 2021-04-27 中铁六局集团北京铁路建设有限公司 Large-span thin-wall concrete sound barrier pouring trolley
CN112726442A (en) * 2020-12-30 2021-04-30 中铁六局集团北京铁路建设有限公司 Construction method of large-span thin-wall concrete sound barrier pouring trolley
WO2024139250A1 (en) * 2022-12-26 2024-07-04 中铁七局集团有限公司 Inner and outer formwork trolley for buried culvert of concrete structure, and construction method using same

Also Published As

Publication number Publication date
CN104790977B (en) 2018-04-10

Similar Documents

Publication Publication Date Title
CN104790977A (en) Tunnel primary lining formwork trolley and construction method thereof
CN204627623U (en) Tunnel just serves as a contrast formwork jumbo
CN105952482B (en) Self-propelled tunnel inverted arch lining trolley
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN201695321U (en) Multifunctional propelled tunnel inverted arch trestle
CN104695984A (en) Multifunctional tunnel construction trolley
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN109519197B (en) Sliding-mode primary lining excavation and support dual-purpose trolley and application thereof
CN103470272B (en) A kind of chassis for the multiple section concrete construction of Mining Method and construction method thereof
CN104533460B (en) Support replacement formula formwork jumbo and the construction method of underpass concreting
CN110513126A (en) Recyclable tunnel secondary lining trolley with variable cross section
CN110185476A (en) A kind of casting system for circular tunnel tunneling boring concrete
CN110076889A (en) A kind of integral prefabricated immersed tube template system of dry-docking sequential method tunneling boring
CN110513125A (en) Inside and outside mould trolley shoring system for open cut closed conduit
CN204851287U (en) Big section moving as a whole formula formwork support
CN205778918U (en) Loess tunnel excavation and just formwork build concrete construction combined type chassis
CN110863855A (en) Self-walking hydraulic trestle
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN203499697U (en) Trolley used for concrete construction of various cross sections through mining method
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN204492846U (en) Movable type with inverted arch lining device crosses car trestle
CN204002842U (en) In full section, slide rail moves steel form carrier
CN105604580A (en) Tunnel inverted arch construction movable formwork
CN202250105U (en) Integral hydraulic steel formwork trolley
CN107060831A (en) One kind is used for tunnel groove constructing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20210302