Zarei et al., 2024 - Google Patents
Markov-chain-driven optimization of inspection-based maintenance, Part II: Numerical analysis and practical insightsZarei et al., 2024
- Document ID
- 12294581197810583843
- Author
- Zarei M
- Bagheri M
- Dehghanian P
- Publication year
- Publication venue
- Electric Power Systems Research
External Links
Snippet
These two-part paper series aim to optimize the rates of inspection-based maintenance or routine-test on power system equipment. Part I introduced a novel probabilistic model using Markov chains for the inspection-based maintenance and derived the relationships between …
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/008—Reliability or availability analysis
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
- G01R31/3271—Testing of circuit interrupters, switches or circuit-breakers of high voltage or medium voltage devices
- G01R31/3272—Apparatus, systems or circuits therefor
- G01R31/3274—Details related to measuring, e.g. sensing, displaying or computing; Measuring of variables related to the contact pieces, e.g. wear, position or resistance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/08—Insurance, e.g. risk analysis or pensions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
- G06Q30/02—Marketing, e.g. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards; Price estimation or determination
- G06Q30/0202—Market predictions or demand forecasting
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Stanković et al. | Methods for analysis and quantification of power system resilience | |
Castillo | Risk analysis and management in power outage and restoration: A literature survey | |
US8924033B2 (en) | Generalized grid security framework | |
Goyal et al. | Asset health management using predictive and prescriptive analytics for the electric power grid | |
Ross | Reliability analysis for asset management of electric power grids | |
Catterson et al. | Online conditional anomaly detection in multivariate data for transformer monitoring | |
Schmitz et al. | Operational vulnerability indicator for prioritization and replacement of power transformers in substation | |
Vasquez et al. | Risk‐based approach for power transformer replacement considering temperature, apparent age, and expected capacity | |
Honarmand et al. | Reliability modeling of process-oriented smart monitoring in the distribution systems | |
Zarei et al. | Markov-chain-driven optimization of inspection-based maintenance, Part II: Numerical analysis and practical insights | |
Ramere et al. | Improving the efficiency of medium voltage (MV) distribution lines using risk matrix for optimized maintenance | |
Ibrahim et al. | Incipient fault detection in power distribution networks: review, analysis, challenges and future directions | |
Hock et al. | Predictive analysis in energy management system | |
Soto et al. | Applying Data Science to Improve Solar Power Production and Reliability | |
Silva et al. | Electricity distribution network: seasonality and the dynamics of equipment failures related network faults | |
Zarei et al. | Markov-chain-driven optimization of inspection-based maintenance, Part I: Models and methods | |
Zarei et al. | Markov-Chain-Driven Optimization of Inspection-Based Maintenance—Part I: Models and Methods | |
Shai et al. | Prognostics for the Power Industry | |
Vasquez Guerrero | Maintenance and retirement of ageing power system assets and reinforcement of transmission systems with seismic risk | |
Wang et al. | RETRACTED ARTICLE: Research on reliability evolutionary optimization of relays device based on Multi-Markov model | |
Camillo et al. | Vulnerability and Recovery Capacity Assessment of Real Distribution Systems | |
Feng | Electric distribution system risk assessment using actual utility reliability data | |
JP7570553B1 (en) | Electric power equipment management system, electric power equipment management method, and electric power equipment management program | |
JP7570552B1 (en) | Electric power equipment management system, electric power equipment management method, and electric power equipment management program | |
Mamillapalli et al. | Optimizing Transmission System Performance through Predictive Maintenance Strategies |