Nothing Special   »   [go: up one dir, main page]

Wolf, 2020 - Google Patents

The Development of a Site Plan and Flatwork Design for Good Rest Orphanage

Wolf, 2020

View PDF
Document ID
10861259254434377959
Author
Wolf P
Publication year

External Links

Snippet

Abstract/Summary Good Rest Orphanage, located in Croix Des Bouquets, Haiti, has been supported by Children's Heritage Foundation (CHF) for over 15 years and was in need of basic site plans and a flatwork design. Proper in field data was collected on a trip to Haiti …
Continue reading at digitalcommons.calpoly.edu (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
    • G06Q50/08Construction

Similar Documents

Publication Publication Date Title
Holm et al. Construction cost estimating
Dagostino Estimating in building construction
Hills et al. Willis's elements of quantity surveying
Seeley et al. Building quantities explained
JP5114528B2 (en) Design and management support system for buried pipe work and civil engineering work
Del Pico Estimating Building Costs for the Residential and Light Commercial Construction Professional
Lee et al. Willis's elements of quantity surveying
Wolf The Development of a Site Plan and Flatwork Design for Good Rest Orphanage
Benge NRM1 cost management handbook
Maier et al. Utilizing 3D Digital Design Data in Highway Construction-Case Studies
Farah Review of current estimating capabilities of the 3D Building Information Model software to support design for production/construction
Rapp et al. Construction Site Planning and Logistical Operations: Site-Focused Management for Builders
JP4565494B2 (en) Design and management support system for buried pipe work and civil engineering work
Hartmann et al. Fulton street transit center project: 3D/4D model application report
Chan Estimating and measurement for simple building works in Hong Kong
AECOM Spon's External Works and Landscape Price Book 2019
Vonderohe et al. 3D Design Terrain Models for construction plans and GPS control of highway construction equipment
Kayima Construction of an administration block for Kiwoko Town Council (phase one).
Falk Microcomputer software for civil engineers
RSMeans RSMeans Cost Data
DEVELOPER ENGINEERED SOLUTION
Ogunfunmi et al. SCU Faculty & Staff Housing Development
Yusuf et al. Adoption of Standard Based Pricing Method for the Procurement of Mechanical and Electrical Engineering Services in Malaysia
Flaten Predicting production rates in the wisconsin highway construction industry using computer tools
Myers Principle of Design Sufficiency: As-Builts and their Relationship to Efficiency in Commercial Renovations