Marbun et al., 2021 - Google Patents
Improvement of borehole and casing assessment of CO2-EOR/CCUS injection and production well candidates in Sukowati Field, Indonesia in a well-based scaleMarbun et al., 2021
View HTML- Document ID
- 9346705512802179569
- Author
- Marbun B
- Santoso D
- Kadir W
- Wibowo A
- Suardana P
- Prabowo H
- Susilo D
- Sasongko D
- Sinaga S
- Purbantanu B
- Palilu J
- Sule R
- Publication year
- Publication venue
- Energy Reports
External Links
Snippet
Based on the health, safety, and environment (HSE) aspect, specific regulations of CO 2 injection wells for enhanced oil recovery (EOR) and carbon capture, utilization, and storage (CCUS) must be carefully prepared before its implementation. In 2019, the Asian …
- 238000002347 injection 0 title abstract description 91
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Marbun et al. | Improvement of borehole and casing assessment of CO2-EOR/CCUS injection and production well candidates in Sukowati Field, Indonesia in a well-based scale | |
Bai et al. | A review on well integrity issues for CO2 geological storage and enhanced gas recovery | |
Bai et al. | Well completion and integrity evaluation for CO2 injection wells | |
da Costa et al. | Experimental salt cavern in offshore ultra-deep water and well design evaluation for CO2 abatement | |
Iyer et al. | A review of well integrity based on field experience at carbon utilization and storage sites | |
Bradford et al. | When rock mechanics met drilling: effective implementation of real-time wellbore stability control | |
Marbun et al. | Casing setting depth and design of production well in water-dominated geothermal system with 330 C reservoir temperature | |
Marbun et al. | Review of directional drilling design and operation of geothermal wells in Indonesia | |
Omojuwa et al. | Properties of salt formations essential for modeling instabilities while drilling | |
Ceyhan et al. | Design of Carbon Capture and Sequestration CCS Wells | |
Marbun et al. | Improvement of loads calculation of the perforated liner in a geothermal production well | |
Marbun et al. | Energy Reports | |
Liu et al. | Well Engineering Aspects and Risk Analysis of Carbon Capture and Storage (CCS) Wells | |
Ruzhnikov et al. | Operational Performance Improvement Plan: How to Boost the Performance and Reduce the Cost During well Construction | |
Iyer et al. | A review of international field experience with well integrity at carbon utilization and storage sites | |
Haigh | Well design differentiators for CO2 sequestration in depleted reservoirs | |
Fragachan et al. | Mitigating Risks from Waste Subsurface Pressure Injection and Decline Analysis | |
Gaurina-Medjimurec | The underground injection of drilling waste | |
Ovwigho et al. | Well Integrity Challenges while Drilling in High Pressure and Narrow Window Environment: A Case Study of a Deep Gas Field in the Middle East | |
Seymour et al. | Bespoke Casing Design to Reduce ECD and Enable MPD for HPHT Culzean Project in the North Sea | |
Benesch et al. | Optimization of High-Pressure, High-Rate (HP/HR) Gas wells in a Giant Offshore Field | |
Sminchak | Final Technical Report: Integrated Wellbore Integrity Analysis Program for CO2 Storage Applications | |
Wahshi et al. | Innovative Solutions to Subsurface Challenges in Deep Hard Rock High Temperature Slim Wells | |
Al Marzouqi et al. | The Added Value of Piloting Maximum Reservoir Contact Wells Prior to Large Scale Application to a Giant Offshore Carbonate Field | |
Mody et al. | Application of geomechanics technology in borehole stability reduces well construction costs |