Wahshi et al., 2022 - Google Patents
Innovative Solutions to Subsurface Challenges in Deep Hard Rock High Temperature Slim WellsWahshi et al., 2022
- Document ID
- 14938920376293317507
- Author
- Wahshi K
- Thomas B
- Khaldi S
- Haji Y
- Salehi Y
- Yuan R
- Mahrooqi A
- Harthy K
- Habsi F
- Publication year
- Publication venue
- Abu Dhabi International Petroleum Exhibition and Conference
External Links
Snippet
In this paper we present the challenges faced in one of PDO's onshore a deep (5200 mTVD) field. Among these challenges were hardness of the rocks, 40 ksi and a high temperature of 155ºC. Further, well bore instability, tectonic stresses and depletion. The time consumed to …
- 238000005553 drilling 0 abstract description 31
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Andrade Sierra et al. | Shifting the Stimulation Approach in Carbonate Fields Towards the Use of Single-Phase Retarded Acid: Case Study | |
Ladmia et al. | Underbalance Coiled Tubing Drilling in Tight Gas Reservoir Study Case Onshore Field, Abu Dhabi | |
Garg et al. | De-Risking Alaskan Viscous Oil: Study, Field Trial Plans and Challenges for Improving Recovery via IOR/EOR | |
Wahshi et al. | Innovative Solutions to Subsurface Challenges in Deep Hard Rock High Temperature Slim Wells | |
Pooniwala et al. | Adding a New Lease of Life to a Sub-Hydrostatic Hydraulically Fractured Gas Well Using Coiled Tubing with Real-Time Telemetry | |
Ruzhnikov et al. | Operational Performance Improvement Plan: How to Boost the Performance and Reduce the Cost During well Construction | |
Boscan et al. | Successful Well Testing Operations in High-Pressure/High-Temperature Environment: Case Histories | |
Krivolapov et al. | A New Era in Multilateral Drilling in High Fractured Abnormal Reservoirs-Multiphase MPD | |
Alabed et al. | Longest Extended Reach Drilling Well Worldwide drilled in Middle East, Offshore Abu Dhabi, UAE | |
Guest et al. | Korolev waterflood pilot completion design for water supply and injection wells | |
Ramalho | Underbalanced Drilling In The Reservoir, An Integrated Technology Approach | |
Dobrokhleb et al. | High Technologies–New Opportunities for Horizontal Drilling on Jurassic Formations in Complex Conditions of HTHP and Narrow Safe Mud Window | |
Al Mutawa et al. | Managed Pressure Drilling and Underbalanced Drilling Compounded Role in Solving the Exploration and Appraisal Challenges of Biogenetic Gas Resources in the United Arab Emirates-Case Study | |
Ong et al. | Successful Drilling of the Deepest and Hottest HPHT Carbonate Well in Central Luconia, Off the Coast of Sarawak, Offshore Malaysia | |
Ruiz et al. | Procedure to Complete, Running, Testing, Cementing, Hanging and Cleaning out the Frac String to Complete Unconventional HP/HT Wells to Guarantee the Future Frac Operations in the Wells of Unconventional Project at Abu Dhabi UAE | |
Ladmia et al. | Case Study of Underbalance Coiled Tubing Drilling to Increase Well Productivity and Ultimate Recovery in Tight Gas Reservoir Onshore Field, Abu Dhabi | |
Ong et al. | Successful Drilling of the Deepest and Hottest HPHT Carbonate Well in Offshore Malaysia, its Lesson Learnt and Way Forward | |
Chatar et al. | Drilling deep in deep water: what it takes to drill past 30,000 ft | |
Ragaglia et al. | Industry First Subsea Reentry Multilateral Wells: Case Study | |
Pinzon et al. | Automated MPD System for Drilling Optimization and Formation Characterization in an Exploratory Well | |
Peña et al. | Angola Ultra-Deepwater Development: Pinnacle Completion Designs Deliver Prolific Production | |
Akong et al. | Managing Wellbore Stability Window and Well Integrity by Adjusting the Tight Margin to Successfully Drill through Naturally Fractured Zone Onshore Niger Delta | |
Al-Matar et al. | Novel Plug and Perf Technique in Monobore Completion of Jurassic Gas Well in Kuwait | |
Al-Saeedi et al. | Drilling and Testing of an HP/HT Deep Gas Prospect from an Existing Well: Case History of Kra Al Maru 3 Deepening | |
Kvalo PE et al. | Reservoir Characterization in Transient Wellbore Conditions Resulting from Unintended Hydraulic Fracture Communications Utilizing MPD |