KONTRAK AWAL
NO URAIAN PEKERJAAN SAT
VOLUME HARGA SAT
DIVISI 1. U M U M
1.2 Mobilisasi Ls 1.00 106,651,000.00
DIVISI 7. STRUKTUR
7.1 (5) Beton K-350 M3 135.14 3,062,533.01
7.1 (6) Beton K-300 M3 19.63 2,733,781.77
7.1 (7) Beton K-250 M3 174.91 2,551,897.50
7.1 (8) Beton K-175 M3 8.64 1,995,590.86
7.1 (9) Beton Siklop K-175 M3 58.88 1,767,914.04
7.1 (10) Beton K-125 M3 4.52 1,618,353.34
7.3 (1) Baja Tulangan U-24 Polos Kg 25,201.73 23,699.50
7.3 (3) Baja Tulangan U-32 Ulir Kg 20,310.97 24,178.78
7.7.(2) Penyediaan Dinding Sumuran Silinder, Diameter 300 cm M1 20.00 7,508,042.49
7.7.(6) Penurunan Dinding Sumuran Silinder, Diameter 300 cm M1 20.00 544,069.35
7.9 Pasangan Batu M3 414.64 1,362,770.06
7.10.(3) Bronjong M3 15.00 1,209,725.00
7.11 (6) Expansion Joint Tipe Baja Bersudut M1 28.00 260,000.00
7.12 (4) Perletakan Elastomerik Jenis 3 (400 x 450 x 45) Buah 16.00 1,700,000.00
7.13 Sandaran (Realling) M1 80.00 295,000.00
7.15 (2) Pembongkaran Beton M3 42.00 731,289.21
7.16 Pipa Cucuran Baja M1 3.20 180,000.00
:Disetujui Oleh
SKPD Dinas Pekerjaan Umum Prov. Papua Barat
Direksi Teknis
ROBERT A. MANIAGASI, ST
NIP. 19831001 201104 1001
KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG RENCANA KONTRAK ADDEN
JUMLAH JUMLAH
JUMLAH HARGA VOLUME VOLUME VOLUME
HARGA (Rp) HARGA (Rp)
106,651,000.00 - - - - 1.00
117,267,228.46 - - 3,188.97
29,298,475.99 - - 126.14
33,554,834.54 - - 246.77
76,456,527.84 - - - 336.00
291,275,058.38 - - 388.50
359,680,526.10 - - 518.00
39,338,111.40 - - 2,590.00
170,004,947.99 - - 231.03
177,408,000.00 - - 13.86
3,659,920.00 - - 41.59
7,700,976.00 - - 3,208.74
13,887,848.10 - - - - 62.00
:Diperiksa Oleh
Konsultan Supervisi
ARIOSTAR, ST. MT
Quantity Engineer
RENCANA KONTRAK ADDENDUM
JUMLAH BOBOT KET.
HARGA (Rp) %
:Dibuat Oleh
Kontraktor Pelaksana
BAB. I UMUM
1.2 Mobilisasi Ls 106,651,000.00 1.00
Total
SKPD DINAS PEKERJAAN UMUM PROV. PAPUA BARAT
DIREKSI TEKNIS
NAJAMUDDIN BENNU, ST
NIP. 19740609 200605 1 002
REKAPITULASI HITUNGAN MC 0%
TETAP
TETAP
TETAP
20.31 BERKURANG
132.00 BERKURANG
15.75 BERKURANG
21.00 BERKURANG
245.00 BERKURANG
20.23 BERKURANG
1.31 BERKURANG
3.93 BERKURANG
303.53 BERKURANG
TETAP
TETAP
BERTAMBAH
TETAP
TETAP
TETAP
0.00 TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
TETAP
DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : DINAS PEKERJAAN UMUM PROV. PAPUA BARAT
NAMA PAKET : PEMBANGUNAN JEMBATAN BIMYOU
PROV/KABUPATEN : KAB. MANOKWARI, PROV. PAPUA BARAT
DIVISI 1. - MOBILISASI
1.2 Mobilisasi Ls 1.00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1. (5) Beton K350 M3 135.14
7.1 (6) Beton K300 M3 19.63
7.1 (7) Beton K250 M3 174.91
7.1.(8) Beton K175 M3 8.64
7.1 (9) Beton Siklop K175 M3 58.88
7.1.(10) Beton K125 M3 4.52
7.3 (1) Baja Tulangan U24 Polos Kg 25,201.73
7.3 (3) Baja Tulangan U32 Ulir Kg 20,310.97
7.7 (2) Penyediaan Dinding Sumuran Silinder Diameter 300 cm M1 20.00
7.7 (6) Penurunan Dinding Sumuran Silinder Diameter 300 cm M1 20.00
7.9 Pasangan Batu M3 414.64
7.10.(3) Bronjong M3 15.00
7.11 (6) Expansion Joint Tipe Baja Bersudut M1 28.00
7.12 (4) Perletakan Elastomerik Jenis 3 (400 x 450 x 45) Buah 16.00
7.13 Sandaran (Realling) M1 80.00
7.15 (2) Pembongkaran Beton M3 42.00
7.16 Pipa Cucuran Baja M1 3.20
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Manokw
PT. T
MER
FTAR KUANTITAS DAN HARGA
Harga Jumlah
Satuan Harga-Harga
(Rupiah) (Rupiah)
e f = (d x e)
106,651,000.00 106,651,000.00
106,651,000.00
36,772.76 117,267,228.46
232,269.51 29,298,475.99
135,976.15 33,554,834.54
227,549.19 76,456,527.84
256,577,066.82
749,742.75 291,275,058.38
694,363.95 359,680,526.10
650,955,584.48
15,188.46 39,338,111.40
735,856.59 170,004,947.99
12,800,000.00 177,408,000.00
88,000.00 3,659,920.00
2,400.00 7,700,976.00
398,111,955.39
3,062,533.01 413,870,710.97
2,733,781.77 53,664,136.15
2,551,897.50 446,352,391.73
1,995,590.86 17,241,905.03
1,767,914.04 104,094,778.68
1,618,353.34 7,314,957.10
23,699.50 597,268,400.14
24,178.78 491,094,475.22
7,508,042.49 150,160,849.80
544,069.35 10,881,387.00
1,362,770.06 565,058,977.68
1,209,725.00 18,145,875.00
260,000.00 7,280,000.00
1,700,000.00 27,200,000.00
295,000.00 23,600,000.00
731,289.21 30,714,146.82
180,000.00 576,000.00
2,964,518,991.29
223,997.55 13,887,848.10
13,887,848.10
MERRY GOSAL
Direktur
VOLUME MUTUAL CHECK AWAL (MC "O")
SATUAN KERJA : DINAS PEKERJAAN UMUM
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
PROVINSI / KAB. : PAPUA BARAT/ MANOKWARI
PENYEDIA JASA : PT. TUNAS IRJA
KONSULTAN SUPERVISI : CV. TRITAN KARYA KONSULTINDO
VOLUME MC "0"
No. URAIAN PEKERJAAN SAT Uraian CCO
Item pekerjaan
DIVISI 1. MOBILISASI
1.2 Mobilisasi Ls 1.00
DIVISI 7. STRUKTUR
7. 1 (5) Beton K-350 M3 139.75
1x Plat Lantai M 3
41.46
8x Gelagar M3 93.12
35x Diafragma M3 5.17
7.1 (9) Beton Siklop K-175 Beton Siklop 4 sumuran M3 58.88 58.88
Volume
Kontrak KET
Awal
1.00 TETAP
3,188.97
126.14 BERKURANG
246.77
336.00
388.50
518.00
2,590.00
231.03
13.86
41.59
3,208.74
135.14 BERTAMBAH
19.63 TETAP
174.91 BERTAMBAH
8.64 TETAP
58.88 TETAP
4.52 TETAP
Lanjutan
Volume
Kontrak KET
Awal
25,201.73 BERKURANG
20,310.97 BERTAMBAH
20.00 TETAP
20.00 TETAP
414.64 BERTAMBAH
15.00 TETAP
28.00 TETAP
16.00 TETAP
80.00 TETAP
42.00 TETAP
3.20 TETAP
:Dibuat Oleh
Kontraktor Pelaksana
BACKUP DATA
100%
PENYEDIA JASA
CV. TRITAN
Alam
Ema
CV. WAMSRIR MAN
KONSULTAN PENGAWAS :
PEMERINTAH PROVINSI PAPUA BARAT
DINAS PEKERJAAN UMUM
Jalan Reremi Puncak Amban,Manokwari-Papua Barat
BACKUP DATA
MUTUAL CHECK 100 (MC-
100%)
PENYEDIA JASA
KONSULTAN PENGAWAS
PEMBANGUNAN JALAN POROS
DESA KELURAHAN AMBAN
PAKET 2
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BAR
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
Volume
1.00
1.00
10.00
10.00
:Dibuat Oleh
Kontraktor Pelaksana
CV. WAMSRIR
Firman,ST
Site Manager
PEMBANGUNAN JALAN POROS
DESA KELURAHAN AMBAN
PAKET 2
DASAR PERHITUNGAN
- - - -
5.08 2.96 15.03 24.02
8.12 2.96 - 19.97
6.75 - - -
- - - -
- - - -
- - - -
0+000.000 0+000.000 14.48
- - - -
- - - -
- - - -
- - - -
- - - -
14.02
- - - -
4.50 2.74 12.87 20.85
7.61 2.86 - 19.13
6.69 - - -
- - - -
- - - -
- - - -
0+025.000 0+025.000 - - - - 13.56
14.02
DASAR PERHITUNGAN
- - - -
4.50 2.74 12.87 20.85
7.61 2.86 - 19.13
6.69 - - -
- - - -
- - - -
- - - -
0+025.000 0+025.000 - - - - 13.56
- - - -
- - - -
- - - -
- - - -
- - - -
20.61
- - - -
5.18 2.94 15.23 24.17
8.22 2.94 21.13 26.02
8.85 2.57 34.52 33.13
12.89 3.90 - 42.90
11.00 - - -
- -
- -
0+050.000 0+050.000 27.67
- -
- -
- -
- -
DASAR PERHITUNGAN
- - - -
5.18 2.94 15.23 24.17
8.22 2.94 21.13 26.02
8.85 2.57 34.52 33.13
12.89 3.90 - 42.90
11.00 - - -
- - - -
- - - -
0+050.000 0+050.000 27.67
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- -
- -
0+075.000 0+075.000 51.40
- -
- -
- -
- -
DASAR PERHITUNGAN
- - - -
2.60 4.76 12.38 36.70
7.71 4.76 31.61 42.32
8.89 4.10 52.36 55.35
13.50 5.89 - 64.79
0+075.000 0+075.000 51.40
11.00 - - -
- -
DASAR PERHITUNGAN
- - - -
3.50 4.10 14.35 37.72
9.20 4.10 35.51 52.85
12.89 3.86 - 42.46
11.00 - - -
0+100.000 0+100.000 41.58
- -
DASAR PERHITUNGAN
- - - -
1.40 1.98 3.58 10.04
5.07 2.56 12.98 20.48
8.00 2.56 16.80 21.53
8.41 2.10 - 23.10
0+125.000 0+125.000 20.89
11.00
DASAR PERHITUNGAN
- - - -
5.20 0.05 0.26 0.47
9.34 0.05 - 0.55
11.00 - -
- - -
0+218.000 0+218.000 0.38
- -
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
25.00 350.46
25.00 350.46
350.46
350.46
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
25.00 515.36
25.00 515.36
515.36
865.82
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
25.00 988.44
25.00 988.44
988.44
1,854.26
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
25.00 1,162.34
1,162.34
3,016.60
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
25.00 780.95
780.95
3,797.55
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
8.00 116.55
116.55
3,914.10
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
25.00 17.10
17.10
3,931.20
BACK UP DATA
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
PERHITUNGAN
No. SKETSA
Uraian Panjang Luas Jumlah Volume
(m') (m2) (m3)
Abutmen 1
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
PERHITUNGAN
No. SKETSA
Uraian Panjang Tinggi Lebar Volume
(m') (m') (m') (m3)
ABUTMENT 1
Abutment 1
1,72
3,50
1 abutment 63.07
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
Dimensi
Jarak Luasan
No. STA Lebar Lbr rata2 Tebal D E F
m m m m m m2
1 0 + 0 0.50
25 0.50 0.20
2 0 + 25 0.50
25 0.50 0.20
3 0 + 50 0.50
25 0.50 0.20
4 0 + 75 0.50
25 0.50 0.20
5 0 + 100 0.50
25 0.50 0.20
6 0 + 125 0.50
25 0.50 0.20
7 0 + 150 0.50
20 0.50 0.20
8 0 + 170 0.50
JUMLAH 170.00
CKUP QUANTITY
Volume
Keterangan
m 3
5.00
KIRI
5.00
5.00
5.00
5.00
5.00
4.00
34.00
BACKUP QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
Dimensi
Jarak Luasan
No. STA Lebar Lbr rata2 Tebal D E F
m m m m m m2
1 0 + 0 0.50
25 0.50 0.20
2 0 + 25 0.50
25 0.50 0.20
3 0 + 50 0.50
25 0.50 0.20
4 0 + 75 0.50
25 0.50 0.20
5 0 + 100 0.50
25 0.50 0.20
6 0 + 125 0.50
25 0.50 0.20
7 0 + 150 0.50
20 0.50 0.20
8 0 + 170 0.50
JUMLAH 170.00
Volume
Keterangan
m 3
5.00
KANAN 5.00
5.00
5.00
5.00
5.00
4.00
34.00
:Dibuat Oleh
Kontraktor Pelaksana
CV. WAMSRIR
Firman,ST
Site Manager
Site Manager
BACKUP QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
Dimensi
Jarak Luasan
No. STA Lebar Lbr rata2 Tebal D E F
m m m m m m2
1 0 + 0 0.50
25 0.50 0.30 0.15
2 0 + 25 0.50
25 0.50 0.30 0.15
3 0 + 50 0.50
25 0.50 0.30 0.15
4 0 + 75 0.50
25 0.50 0.30 0.15
5 0 + 100 0.50
25 0.50 0.30 0.15
6 0 + 125 0.50
25 0.50 0.30 0.15
7 0 + 150 0.50
20 0.50 0.30 0.15
8 0 + 170 0.50
JUMLAH 170.00
CKUP QUANTITY
Volume
Keterangan
m 3
3.75
KIRI
3.75
3.75
3.75
3.75
3.75
3.00
25.50
BACKUP QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
Dimensi
Jarak Luasan
No. STA Lebar Lbr rata2 Tebal D E F
m m m m m m2
1 0 + 0 0.50
25 0.50 0.30 0.15
2 0 + 25 0.50
25 0.50 0.30 0.15
3 0 + 50 0.50
25 0.50 0.30 0.15
4 0 + 75 0.50
25 0.50 0.30 0.15
5 0 + 100 0.50
25 0.50 0.30 0.15
6 0 + 125 0.50
25 0.50 0.30 0.15
7 0 + 150 0.50
20 0.50 0.30 0.15
8 0 + 170 0.50
JUMLAH 170.00
Volume
Keterangan
m 3
3.75
KANAN 3.75
3.75
3.75
3.75
3.75
3.00
25.50
:Dibuat Oleh
Kontraktor Pelaksana
CV. WAMSRIR
Firman,ST
Site Manager
Site Manager
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
- - - -
- 0.50 - 0.67
1.33 0.50 - -
- - - -
- - - -
- - - -
- - - -
0+133.000 0+133.000 0.33
- - - -
- - - -
- - - -
- - - -
- - - -
JUMLAH - 0.67
6.08
- - - -
- 1.70 - 17.00
10.00 1.70 2.50 17.00
10.00 0.25 2.50 2.06
8.23 0.25 10.21 1.41
5.62 1.24 6.97 5.79
4.67 1.24 - 2.58
0+143.000 0+143.000 2.08 - - - 11.83
6.08
DASAR PERHITUNGAN
- - - -
- 1.70 - 17.00
10.00 1.70 2.50 17.00
10.00 0.25 2.50 1.81
7.23 0.25 8.97 1.41
5.62 1.24 6.97 5.79
4.67 1.24 - 2.58
0+143.000 0+143.000 2.08 - - - 12.32
- - - -
- - - -
- - - -
- - - -
- - - -
15.41
- - - -
- - - -
- 3.60 - 36.00
10.00 3.60 8.00 36.00
10.00 0.80 25.50 5.79
7.24 2.55 18.46 11.17
4.38 2.55 - -
- - - -
0+155.049 0+155.049 18.50
- - - -
- - - -
- - - -
- - - -
DASAR PERHITUNGAN
- - - -
- 1.80 - 18.00
10.00 1.80 (22.00) 18.00
10.00 (2.20) (20.50) (19.95)
9.07 (2.05) 2.81 (16.09)
7.85 0.31 4.40 1.85
5.96 0.56 (4.17) 2.62
4.67 (0.70) 1.82 (3.16)
0+175.000 0+175.000 18.78
4.52 0.39 1.45 1.65
4.24 0.32 2.20 1.08
3.39 0.52 0.54 0.12
0.24 0.16 - -
- - - -
- - - -
DASAR PERHITUNGAN
- - - -
- 1.15 - 11.50
10.00 1.15 (11.00) 11.50
10.00 (1.10) (10.00) (10.93)
9.94 (1.00) (8.95) (7.40)
0+187.049 0+187.049 13.25
7.40 (0.90) 3.11 (4.41)
4.90 0.42 1.85 1.26
3.00 0.38
JUMLAH (0.88) -
TOTAL HALAMAN 4
TOTAL S/D HALAMAN INI
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
10.00 60.81
10.00 60.81
60.81
60.81
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
12.05 185.70
12.05 185.70
185.70
246.51
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
12.05 190.93
12.05 190.93
190.93
437.44
INAL QUANTITY
NAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
UNAN JEMBATAN BIMYOU
DASAR PERHITUNGAN
KETERANGAN
PANJANG VOLUME
m³ m³
30.89 211.41
211.41
648.85
BACKUP QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
DISKRIPSI : PEKER
MATA PEMBAYARAN
JENIS PEKERJAAN : Timbun
Dimensi
Jarak Luasan Volume
No. STA Lebar Lbr rata2 Tebal Keterangan
m m m m m 2
m 3
1 0 + 0 4.00
25 4.00 0.10 0.40 10.00
2 0 + 25 4.00
25 4.00 0.10 0.40 10.00
3 0 + 50 4.00
25 4.00 0.10 0.40 10.00
4 0 + 75 4.00
25 4.00 0.10 0.40 10.00
5 0 + 100 4.00
25 4.00 0.09 0.37 9.20
6 0 + 125 4.00
25 4.00 0.10 0.40 10.00
7 0 + 150 4.00
20 4.00 0.09 0.36 7.20
8 0 + 170 4.00
JUMLAH 170.00 66.40
:Disetujui Oleh :Diperiksa Oleh :Dibuat Oleh
SKPD Dinas Pekerjaan Umum Prov. Papua Barat Konsultan Supervisi Kontraktor Pelaksana
Direksi Teknis PT.POLA SARANA DIMENSI CV. WAMSRIR
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
T = 20 cm
7m
Dimensi
Panjang Luasan Volume
No. STA Lebar Lbr rata - rata Tebal D E F
m m m m m m2 m3
1 0 + 0 7.00
25 7.00 0.2 175.00 35.00
2 0 + 25 7.00
25 7.00 0.2 175.00 35.00
3 0 + 50 7.00
25 7.00 0.2 175.00 35.00
4 0 + 75 7.00
25 7.00 0.2 175.00 35.00
5 0 + 100 7.00
25 7.00 0.2 175.00 35.00
6 0 + 125 7.00
25 7.00 0.2 175.00 35.00
7 0 + 150 7.00
5 7.00 0.2 35.00 7.00
8 0 + 155 7.00
JEMBATAN BIMYOU
9 0 + 175 7.00
25 7.00 0.2 175.00 35.00
10 0 + 200 7.00
15 7.00 0.2 105.00 21.00
11 0 + 215 7.00
12
13
14
15
16
JUMLAH 273.00
UP FINAL QUANTITY
Keterangan
273.00
PEMBANGUNAN JEMBATAN
BIMYOU
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
L/m2 1
7m
Dimensi
Panjang Luasan
No. STA Lebar Lbr rata - rata vol D E F
m m m ltr/m2 m m2
1 0 + 0 3.00
25 3.00 1.00 75.00
2 0 + 25 3.00
25 3.00 1.00 75.00
3 0 + 50 3.00
25 3.00 1.00 75.00
4 0 + 75 3.00
25 3.00 1.00 75.00
5 0 + 100 3.00
25 3.00 1.00 75.00
6 0 + 125 3.00
25 3.00 1.00 75.00
7 0 + 150 3.00
5 3.00 1.00 15.00
8 0 + 155 3.00
JEMBATAN BIMYOU
9 0 + 175 3.00
25 3.00 1.00 75.00
10 0 + 200 3.00
15 3.00 1.00 45.00
11 0 + 215 3.00
12
13
JUMLAH
CKUP FINAL QUANTITY
Volume
Keterangan
ltr
75.00
75.00
75.00
75.00
75.00
75.00
15.00
JEMBATAN BIMYOU
75.00
45.00
585.00 585.00
BACKUP QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
DISKRIPSI : PEKERJAAN TA
MATA PEMBAYARAN :
JENIS PEKERJAAN :Pembersihan dan
Dimensi
Jarak Volume
No. STA Lebar Lbr rata2 Keterangan
m m m m 3
1 0 + 0 5.00
25 5.00 125.00
2 0 + 25 5.00
25 5.00 125.00
3 0 + 50 5.00
25 5.00 125.00
4 0 + 75 5.00
25 5.00 125.00
5 0 + 100 5.00
25 5.00 125.00
6 0 + 125 5.00
25 5.00 125.00
7 0 + 150 5.00
20 5.00 100.00
8 0 + 170 5.00
JUMLAH 170.00 850.00
:Diperiksa Oleh :Dibuat Oleh
:Disetujui Oleh
Konsultan Supervisi Kontraktor Pelaksana
SKPD Dinas Pekerjaan Umum Prov. Papua Barat
PT.POLA SARANA DIMENSI CV. WAMSRIR
Direksi Teknis
Keterangan
:Dibuat Oleh
Kontraktor Pelaksana
CV. WAMSRIR
Firman,ST
Site Manager
PEMBANGUNAN JALAN POROS
DESA KELURAHAN AMBAN
PAKET 2
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
KONTRAK NO. :
TANGGAL : 23 AGUSTUS 2016
KONTRAKTOR : CV. DEDY JAYA ABADI
KONSULTAN : CV.PRAMADHANI CIPTA KONSULINDO
T = 4 cm
7m
Dimensi Total
Panjang
Lebar Berat Isi Kadar Kadar Anti Kadar Campuran
No. STA Lebar Tebal
rata2 Campuran Aspal Stripping Semen
m Ton
m m m % % %
1 0 + 0 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
2 0 + 25 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
3 0 + 50 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
4 0 + 75 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
5 0 + 100 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
6 0 + 125 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
7 0 + 150 7.00
5 7.00 0.04 2.23 6.00 0.30 1.50 3.12
8 0 + 155 7.00
JEMBATAN BIMYOU
9 0 + 175 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
10 0 + 200 7.00
15 7.00 0.04 2.23 6.00 0.30 1.50 9.37
11 0 + 215 7.00
12
13
14
15
16
JUMLAH
Volume
Keterangan
Ton
14.45
14.45
14.45
14.45
14.45
14.45
2.89
EMBATAN BIMYOU
14.45
8.67
112.74
:Dibuat Oleh
Kontraktor Pelaksana
PT. Tunas Irja
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
T = 4 cm
7m
Dimensi Total
Panjang
Lbr rata - Berat Isi Kadar Campuran
No. STA Lebar Tebal F G
rata Campuran Aspal
m Ton
m m m %
1 0 + 0 7.00
25 7.00 0.04 2.23 6.00 15.61
2 0 + 25 7.00
25 7.00 0.04 2.23 6.00 15.61
3 0 + 50 7.00
25 7.00 0.04 2.23 6.00 15.61
4 0 + 75 7.00
25 7.00 0.04 2.23 6.00 15.61
5 0 + 100 7.00
25 7.00 0.04 2.23 6.00 15.61
6 0 + 125 7.00
25 7.00 0.04 2.23 6.00 15.61
7 0 + 150 7.00
5 7.00 0.04 2.23 6.00 3.12
8 0 + 155 7.00
JEMBATAN BIMYOU
9 0 + 175 7.00
25 7.00 0.04 2.23 6.00 15.61
10 0 + 200 7.00
15 7.00 0.04 2.23 6.00 9.37
11 0 + 215 7.00
12
13
14
15
16
JUMLAH
KUP FINAL QUANTITY
Volume
Keterangan
Ton
0.94
0.94
0.94
0.94
0.94
0.94
0.19
JEMBATAN BIMYOU
0.94
0.56
7.31 7.31
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
T = 4 cm
7m
Dimensi Total
Panjang
Lebar Berat Isi Kadar Kadar Anti Campuran
No. STA Lebar Tebal
rata2 Campuran Aspal Stripping
m Ton
m m m % %
1 0 + 0 7.00
25 7.00 0.04 2.23 6.00 0.30 15.61
2 0 + 25 7.00
25 7.00 0.04 2.23 6.00 0.30 15.61
3 0 + 50 7.00
25 7.00 0.04 2.23 6.00 0.30 15.61
4 0 + 75 7.00
25 7.00 0.04 2.23 6.00 0.30 15.61
5 0 + 100 7.00
25 7.00 0.04 2.23 6.00 0.30 15.61
6 0 + 125 7.00
25 7.00 0.04 2.23 6.00 0.30 15.61
7 0 + 150 7.00
5 7.00 0.04 2.23 6.00 0.30 3.12
8 0 + 155 7.00
JEMBATAN BIMYOU
9 0 + 175 7.00
25 7.00 0.04 2.23 6.00 0.30 15.61
10 0 + 200 7.00
15 7.00 0.04 2.23 6.00 0.30 9.37
11 0 + 215 7.00
12
13
14
15
16
JUMLAH
UP FINAL QUANTITY
Volume
Keterangan
Ton
2.81
2.81
2.81
2.81
2.81
2.81
0.56
EMBATAN BIMYOU
2.81
1.69
21.92
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
T = 4 cm
7m
Dimensi Total
Panjang
Lebar Berat Isi Kadar Kadar Anti Kadar Campuran
No. STA Lebar Tebal
rata2 Campuran Aspal Stripping Semen
m Ton
m m m % % %
1 0 + 0 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
2 0 + 25 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
3 0 + 50 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
4 0 + 75 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
5 0 + 100 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
6 0 + 125 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
7 0 + 150 7.00
5 7.00 0.04 2.23 6.00 0.30 1.50 3.12
8 0 + 155 7.00
JEMBATAN BIMYOU
9 0 + 175 7.00
25 7.00 0.04 2.23 6.00 0.30 1.50 15.61
10 0 + 200 7.00
15 7.00 0.04 2.23 6.00 0.30 1.50 9.37
11 0 + 215 7.00
12
13
14
15
16
JUMLAH
UP FINAL QUANTITY
Volume
Keterangan
Ton
216.81
216.81
216.81
216.81
216.81
216.81
43.36
EMBATAN BIMYOU
216.81
130.08
1,691.09
BACKUP QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
Dimensi
Panjang Luasan
No. STA Lebar Lbr rata - rata Tebal D E F
m m m m m m2
1 0 + 0 4.00
25 4.00 0.2 100.00
2 0 + 25 4.00
25 4.00 0.2 100.00
3 0 + 50 4.00
25 4.00 0.2 100.00
4 0 + 75 4.00
25 4.00 0.2 100.00
5 0 + 100 4.00
9.8 4.00 0.2 39.20
6 0 + 109.8 4.00
JUMLAH
Volume
Keterangan
m3
20.00
20.00
20.00
20.00
7.84
87.84 87.84
:Dibuat Oleh
Kontraktor Pelaksana
CV. DEDY JAYA ABADI
:Dibuat Oleh
Kontraktor Pelaksana
CV. DEDY JAYA ABADI
Dimensi
Panjang Luasan
No. STA Lebar Lbr rata - rata Tebal D E F
m m m m m m2
1 0 + 0 3.90
25 3.90 0.2 97.50
2 0 + 25 3.90
25 3.95 0.2 98.75
3 0 + 50 4.00
25 3.45 0.2 86.25
4 0 + 75 2.90
8 2.90 0.2 23.20
5 0 + 83 2.90
JUMLAH
TOTAL VOLUME BETON K-250 148.98
:Diperiksa Oleh :Dibua
:Disetujui Oleh Konsultan Supervisi Kontraktor
SKPD Dinas Pekerjaan Umum Prov. Papua Barat CV.PRAMADHANI CIPTA KONSULINDO CV. DEDY J
KORWASLAP
Volume
Keterangan
m3
19.50
19.75
17.25
4.64
61.14 61.14
:Dibuat Oleh
Kontraktor Pelaksana
CV. DEDY JAYA ABADI
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
PERHITUNGAN
No. SKETSA Luas Panjang Volume
Uraian
m2
m' m3
140 60
120
50
1x 11.64
50
Gelagar 8x 93.12
3
TOTAL K-350 M3 139.75
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
PERHITUNGAN
No. SKETSA
Uraian Luas Tinggi Volume
m2 m' m3
`
100 Beton K-250
2 sumuran 9.81
300
K-175
Beton K-300 75
100
25 25
15 270 15
No. SKETSA
Kode
1 Abutment a
20 35 63 40 b
90 h 90 d
400 e
f
g 85
30 f
50 g
d
e 35 h
c
273 i
173
30 b 30
60 a
138 75 138
2 WINGWALL
250 a
kepala wing
113 a'
a 30
300
K-175
Beton K-300 75
100
25 25
15 270 15
4 PLAT INJAK
a
500
b
30 20
20
5 BAHU JALAN
1.50
0.20
TOTAL K-250
KUP FINAL QUANTITY
ERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PEMBANGUNAN JEMBATAN BIMYOU
Err:509
Err:509
PERHITUNGAN
-
1 abutment 64.38
2 abutment 128.76
37.50
L K-250 M3 213.48
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
PERHITUNGAN
No. SKETSA
Uraian Luas Lebar Volume
m2 m' m3
1 Trotoar 1x 4.32
100
20
27
Beton K-175 1 Trotoar 4.32
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
PERHITUNGAN
No. SKETSA
Uraian Luas Tinggi Volume
m2 m' m3
300
K-175
Beton K-300 75
100
25 25
15 270 15
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JEMBATAN BIMYOU
PERHITUNGAN
No. SKETSA
Luas Tinggi Volume
Uraian
m2 m' m3
50 50
300 350 300
24,961.49
BACKUP FINAL QUAN
URAIAN PEKERJAAN : BAJA TULANGAN U-24 POLOS KONTRAKTOR : PT. TUNAS IRJA
NO. MATA PEMBAYARAN : 7.3 (1) KONSULTAN : CV. TRITAN KA
No Kode Type batang Diameter Jarak Panjang Batang (cm) Jumlah Jumlah
ABUTMENT PERTAMA cm a b c d e f Panjang (m') Batang
a
1 ANGKER
2 BACK WALL
A2 a a 12.00 20.00 4.80 1,045.00 10.55 10.00
b
BAC
3 PLAT INJAK
a b a
P3 12.00 20.00 4.80 685.00 6.95 104.00
PLA
d
4 WINGWALL
W1 a 16.00 6.40 282.00 316.00 260.00 8.71 2.00
c
c
b a
b
W2 a 12.00 12.00 4.80 24.00 260.00 260.00 5.54 5.00
aa 12.00 12.00 4.80 34.00 260.00 260.00 5.64 2.00
b 12.00 12.00 4.80 24.00 300.00 300.00 6.34 9.00
c 12.00 12.00 4.80 24.00 276.00 276.00 5.86 1.00
c d d 12.00 12.00 4.80 24.00 256.00 256.00 5.46 1.00
e 12.00 12.00 4.80 24.00 236.00 236.00 5.06 1.00
f 12.00 12.00 4.80 24.00 216.00 216.00 4.66 1.00
g 12.00 12.00 4.80 24.00 196.00 196.00 4.26 1.00
h 12.00 12.00 4.80 24.00 176.00 176.00 3.86 1.00
a b d
W3 a 12.00 12.00 4.80 19.00 25.00 34.00 316.00 4.04 1.00
c b 12.00 12.00 4.80 19.00 25.00 34.00 336.00 4.24 1.00
c 12.00 12.00 4.80 19.00 25.00 34.00 356.00 4.44 1.00
e b d 12.00 12.00 4.80 19.00 25.00 34.00 376.00 4.64 1.00
a e 12.00 12.00 4.80 19.00 25.00 34.00 396.00 4.84 1.00
f 12.00 12.00 4.80 19.00 25.00 34.00 416.00 5.04 1.00
g 12.00 12.00 4.80 19.00 25.00 34.00 436.00 5.19 1.00
h 12.00 12.00 4.80 19.00 25.00 34.00 456.00 5.44 1.00
a i 12.00 12.00 4.80 19.00 25.00 34.00 515.00 6.03 6.00
a WIN
###
13.86 0.888 12.31 13.86
-
-
-
1 wing 272.68 - 276.09 17.42 - - -
WING WALL 2 wing 545.35 - 552.18 34.83 - - -
URAIAN PEKERJAAN : BAJA TULANGAN U-24 POLOS KONTRAKTOR : PT. TUNAS IRJA
NO. MATA PEMBAYARAN : 7.3 (1) KONSULTAN : CV. TRITAN KA
No Kode Type batang Diameter Jarak Panjang Batang (cm) Jumlah Jumlah
ABUTMENT PERTAMA cm a b c d e f Panjang (m') Batang
1 BALOK INDUK d
a c
B1 b 25.00 7.50 49.00 57.00 150.00 2.71 7.00
e 25.00 7.50 1,874.00 18.89 7.00
25.00 7.50 49.00 57.00 150.00 2.71 7.00
d
a c
B2 25.00 7.50 49.00 57.00 150.00 2.71 2.00
b
25.00 7.50 1,874.00 18.89 2.00
e
25.00 7.50 49.00 57.00 150.00 2.71 2.00
d
a
B4 a 25.00 7.50 40.00 175.00 37.50 2.68 8.00
c
b
B5 a - POT IV - IV 12.00 9.00 3.60 79.00 44.00 79.00 44.00 2.53 14.00
b - POT III - III 12.00 9.00 3.60 134.00 44.00 134.00 44.00 3.63 8.00
b 12.00 9.00 3.60 134.00 24.00 134.00 24.00 3.23 23.00
c - POT II - II 12.00 20.00 3.60 134.00 24.00 134.00 24.00 3.23 20.00
d 12.00 25.00 3.60 134.00 24.00 134.00 24.00 3.23 16.00
e - POT I - I 12.00 30.00 3.60 134.00 24.00 134.00 24.00 3.23 28.00
b c
B6 12.00 3.60 24.00 12.00 34.00 44.00 1.67 87.00
a
d
d
2 DIAFRAGMA
D1 a b a 16.00 4.80 840.00 8.50 8.00
DIAF
FINAL QUANTITY
URAIAN PEKERJAAN : BAJA TULANGAN U-24 POLOS KONTRAKTOR : PT. TUNAS IRJA
NO. MATA PEMBAYARAN : 7.3 (1) KONSULTAN : CV. TRITAN KA
No Kode Type batang Diameter Jarak Panjang Batang (cm) Jumlah Jumlah
ABUTMENT PERTAMA cm a b c d e f Panjang (m') Batang
LANTAI
a b a
H1 12.00 10.00 4.80 1,994.00 20.04 94.00
c
H2 b 12.00 10.00 4.80 14.00 1,994.00 20.18 94.00
b
a a
a b a
H3 12.00 20.00 4.80 938.00 9.48 50.00
c
H4 12.00 20.00 4.80 14.00 938.00 9.62 50.00
b b
a a
REALLING
c
S3 a a 12.00 3.60 1,994.00 150.00 23.16 9.00
DIAFRAGMA 5x - - - -
GELAGAR 4x - - - -
LANTAI 1x - - - -
REALLING 18 x - - - -
Volume besi untuk - - - -
Lantai+Diaf+Gelagar+Real
- - -
- - -
- - -
- - -
- - -
563.02 4,618.65 -
1,253.44 13,785.87 -
20,893.89
BACKUP
a
2 LEHER a
A15 22.00 15.00 8.80
A15
A15a a 22.00 15.00 8.80
A15b 22.00 15.00 8.80
A17 b A17 22.00 15.00 8.80
b
a a
a
c
3 PERLETAKAN
a
A16 22.00 15.00 8.80
a
b
A14 a a 16.00 30.00 6.40
b
A10 22.00 15.00 8.80
a c
a d
A9 a b a 16.00 6.40
b
A8 a a 16.00 30.00 6.40
b
A4 a 22.00 15.00 8.80
c
d a
4 BACKWALL
A1 b 16.00 15.00 6.40
c d
5 PLAT INJAK
b
P1 16.00 20.00 6.40
c a
e
d
e
d
FOOTING
LEHER
64.00 0.82 70.00 57.12
PERLETAKAN
BACKWALL
PLAT INJAK
SUMURAN
FOOTING
LEHER
PERLETAKAN
BACKWALL
PLAT INJAK
WINGWALL
2x - - - - - -
1x 2,384.30 - - - 281.51 588.84
1x 4,133.24 - - 231.84 - 1,262.12
1x 2,612.76 - - 788.37 - 458.36
1x 290.43 - - 183.96 - -
1x 1,026.21 - - 650.02 - -
2x - - - - - -
-
-
-
-
-
-
-
-
-
-
-
-
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
7 cm
2m
9 cm
5m 5 cm
40 cm
92.60 5.00 7.00
15 m
15,5 cm
2,47 m
9 cm 8.74 0.90 72.00
7.5 cm
BERAT (KG)
PENAMBAHAN 10% (BAUT DAN MUR) (KG)
TOTAL BERAT (KG)
KUP FINAL QUANTITY
RAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
ALAN POROS DESA KELURAHAN AMBAN PAKET 2
Berat (Kg)
176.00
558.36
233.76
636.00
3,241.00
2,383.06
566.35
7,794.53
779.45
8,573.98
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
PERHITUNGAN
No. SKETSA
Uraian Panjang Jumlah Total
(m') (m')
ABUTMEN 1
25 25
250
Abutment 1
300
K-175
Beton K-300 75
100
25 25
15 270 15
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
PERHITUNGAN
No. SKETSA
Panjang Total
Uraian Jumlah
(m') (m')
ABUTMENT 1
25 25
250
Abutment 1
Beton K-250
100
Penurunan Dinding Sumuran 5.00 2.00 10.00
300
K-175
Beton K-300 75
100
25 25
15 270 15
KONTRAK NO.
TANGGAL
KONTRAKTOR
KONSULTAN
DISKRIPSI
MATA PEMBAYARAN
JENIS PEKERJAAN
100
230
35
230
35
100
230
35
230
250
Bulk
100
Luas Bulk = 2.50 x 1.00
= 2.50
TOTAL
TOT
UP FINAL QUANTITY
AH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
BANGUNAN JEMBATAN BIMYOU
: 32/KONTR-P.32/BM/DPU-PB/2014
: 30 JUNI 2014
: PT. TUNAS IRJA
: CV. TRITAN KARYA KONSULTINDO
: PEKERJAAN STRUKTUR
: 7.9
: Pasangan Batu
VOLUME
DASAR PERHITUNGAN KETERANGAN
m³
= 5.74
= 2.30
= 3.95
= 2.30
11.50
= 4.19 m3 OPRIT ARAH
= 7.31 m3 PRAFI KIRI
Total = 11.50 m3
= 4.85
= 2.30
= 5.48
= 2.30
2.50 x 1.00
m2
1.00 x 4
4.00
I II
b
e 2,5
25
d
Panjang Dimensi Luasan
No. SECTION a b c d e
m m m m m m m2
opri
2.5
3 III - III 0.35 1.4 1.00 1.00 0.05 1.91
13.9
4 IV - IV 0.35 1.0 0.60 0.70 0.05 0.90
JUMLAH LEMBAR (I)
IV III
e 16 13
d
Panjang Dimensi Luasan
No. SECTION a b c d e
m m m m m m m2
op
op
16
2 II - II 0.35 1.70 1.00 1.20 0.05 2.48
13
3 III - III 0.35 1.00 0.60 0.60 0.05 0.81
16
4 IV - IV 0.35 0.40 0.30 0.70 0.05 0.41
JUMLAH LEMBAR II
JUMLAH LEMBAR (I +II)
II
b
e
21,4
c
d
Panjang Dimensi Luasan
No. SECTION a b c d e
m m m m m m m2
opri
21.4
2 II - II 0.35 2.8 1.00 1.20 0.05 3.30
JUMLAH LEMBAR III
JUMLAH LEMBAR (I+II+III)
a
I
22,35
e
d
Panjang Dimensi Luasan
No. SECTION a b c d e
m m m m m m m2
op
JUMLAH LEMBAR IV
JUMLAH LEMBAR (I+II+III+IV)
III IV
13,9
2,5
luasan Volume
rata-2 Keterangan
m2 m3
6.46 161.41
1.40 19.49
189.24
189.24
Penyedia Jasa
III II I
13
16
luasan Volume
rata-2 Keterangan
m2 m3
1.64 21.35
0.61 9.76
101.55
290.79
Penyedia Jasa
21,4
luasan Volume
rata-2 Keterangan
m2 m3
Penyedia Jasa
II
22,35
luasan Volume
rata-2 Keterangan
m2 m3
5.25 117.25
Penyedia Jasa
1 Bronjong
50
50
200
50
100
Panjang Pipa
No. Sketsa Jumlah (Bh) Volume (M')
Realling (M')
2m
15 m
Luas (M2)
30.00
60.00
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
5.00 7.00
5m
15 m
Total (M1)
30.00
35.00
65.00
BACKUP FINAL QUANTITY
SATUAN KERJA PERANGKAT DAERAH DINAS PEKERJAAN UMUM PROVINSI PAPUA BARAT
PAKET : PEMBANGUNAN JALAN POROS DESA KELURAHAN AMBAN PAKET 2
No. SKETSA
16
1 Tiang Sandaran
1
55
2
70
30
25 25
250 Beton Tutup Sumuran
3 Tutup Beton
`
Beton K-250
100
300
K-175
Beton K-300 75
100
25 25
15 270 15
Trotoar
5 Trotoar
0.25
0.55
6 PLAT LANTAI
7.70
0.30
0.20
0.35
5.55
T O T A L BETON K-250
CK UP DATA QUANTITY
ERANGKAT DAERAH PROVINSI
Ir. MANIGOR S.S PAPUA BARAT
Quantity
#REF! Engineer
KONTRAKTOR #REF!
KONSULTAN #REF!
PERHITUNGAN
volume
m3
1 Tiang 0.0496
18 Tiang 0.8928
1 sumuran 4.91
Tutup 4 sumuran 19.63
1 Trotoar 2.17
Kiri + Kanan 2 Trotoar 4.35
Luas Panjang volume