UNIVERSIDAD NACIONAL AGRARIA

LA MOLINA
ESCUELA DE POSGRADO MAESTRÍA EN RIEGO Y
DRENAJE

Cosecha de Agua
“LAGUNA TSUTSUCOCHA”
DOCENTE: ING. LUIS EDUARDO MORA MORA
PRESENTADO POR:
 Elizabeth Ortiz Camones
 Yeni Granados Aguedo
LLUVIA DE DISEÑO

 DATOS
PRECIPITACION MENSUAL:
ESTACION : CHAVIN (1998 – 2018)
LONGITUD: 77° 1’ “w”
LATITUD : 9° 35’ “S”
ALTITUD : 3140 msnm
DPTO : ANCASH
PORVINCIA: HUARI
DISTRITO : CHAVIN
Precipitación al 75%
AÑO PRECIPOITACION Pp al 75 %
1998 160.9 127.4 151.8 41.2 12.2 4.6 0 4.2 10.9 58.2 66.7 38.9 677 MES
(2007)
1999 118.3 239.2 113.8 98.3 34.8 13.7 5.7 3.6 70.1 51 92.5 93.5 934.5
2000 75.4 124.1 112.7 100.3 34.8 11.3 6.3 34.4 24.1 13.4 40.8 85.5 663.1 ENE 88.80
2001 124.6 63.6 133.4 37.1 38.3 5.5 5.1 6.9 35.1 76.6 99.1 90.4 715.7 FEB 30.00
2002 56.7 82.5 132.4 69.6 17.1 1.8 27.7 2.6 18.5 87.3 96.8 85 678
2003 44.5 63 104.6 51.8 25.8 7.1 1.9 15.3 15.2 29.9 57.9 147 564
MAR 132.10
2004 33.3 80.7 53.8 22.5 12.2 12.2 21.2 5 38.2 89.4 87 93.2 548.7 ABR 103.80
2005 57.8 69.3 123 37.4 21.6 1.9 0.8 4.1 15.4 80.6 39.8 95.5 547.2 MAY 22.20
2006 77.9 95.5 147.3 83.5 9.3 48.1 6.8 7.1 26.2 67.4 104 119.1 792.2 JUN 0.90
2007 88.8 30 132.1 103.8 22.2 0.9 6 6.9 18.5 111.1 65.3 72.7 658.3
2008 100.7 96.2 105.7 89.9 28.8 16.9 2.3 13.1 27.7 108.5 84.1 61.1 735
JUL 6.00
2009 170.2 100.1 195.4 93.1 40.4 18.6 14.3 9.8 6.7 93.7 40.9 110.9 894.1 AGO 6.90
2010 97.7 103.6 128.9 33.3 22.6 2.9 12 2.5 32.1 57.4 83.7 96.1 672.8 SEP 18.50
2011 102.6 91.5 126.7 129.3 10.4 0 8.7 2.2 30.7 49.7 80.5 117.1 749.4
OCT 111.10
2012 87.9 121.3 90 120.3 21.6 7.8 0 5.3 20.5 56.2 62.8 123.5 717.2
2013 78.2 120 117.7 55 37.2 2.8 8 29.4 18.5 71.8 61.9 87.4 687.9 NOV 65.30
2014 76.4 129.4 130.8 70.4 42.1 2.6 1.1 0 35.6 79.5 63.9 97.8 729.6 DIC 72.70
2015 132.4 73 120.6 61 83.8 9.3 1.4 6.7 32.9 56.6 108.4 88 774.1
2016 45 114.3 82.4 63.5 10 4.7 2.3 5.9 27.4 74.1 23.5 105.3 558.4
2017 132.3 88.2 156.9 98.8 29.8 10.4 0.9 8.1 16.1 54.7 64.6 72.8 733.6 Media 704.44 mm
2018 131.3 63.9 128.3 102.5 42 13.2 6.6 6.2 30 100.8 54.7 82.9 762.4
Desviacion 101.5 mm
CEDULA DE CULTIVO

SUPERFICIES
MESES
Cultivos referencia Campaña Princ. Campaña Rotac.
Area (ha) % Area Area (ha) % Area Ene Feb Mar Abr May Jun Jul Ago Sep Oct Nov Dic
Maiz 0.60 11% 0.00 0% 1.00 1.10 1.00 0.75 0.25 0.40 0.65 24.00

Papa 1.20 21% 0.00 0% 0.95 0.85 0.55 0.45 0.75 0.95 1.00

Papa * 0.00 0% 0.50 9% 0.50 0.84 0.99 0.90 0.75

Trigo 0.40 7% 0.00 0% 0.70 0.45 0.80 0.94 0.99 1.00

Haba verde 0.00 0% 0.50 9% 0.50 0.84 0.99 0.90 0.75

Cebada 0.80 14% 0.00 0% 0.65 0.90 1.00 1.10 0.52

Arveja * 0.00 0% 0.80 14% 0.35 0.80 0.93 0.60 0.41

Alfalfa 0.80 14% 0.00 0% 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10

Area total Cultivada 3.80 68% 1.80 32% 3.80 3.40 3.90 3.20 3.20 2.60 2.60 2.50 3.20 3.80 3.00 3.00
Area fisico total 5.60 Ha
Indice Uso de tierra cult.transitorio 32%
Kc ponderado 0.90 0.96 0.80 0.89 0.73 0.75 0.84 0.87 0.69 0.72 0.94 1.03
Fuente: Elaboración del Equipo de Trabajo
Cultivo Base Cultivo Rotacion
DEMANDA DE AGUA
Descripción ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
Area cultivada por mes Has (A) 3.80 3.40 3.90 3.20 3.20 2.60 2.60 2.50 3.20 3.80 3.00 3.00
Coeficiente Uso Consuntivo Ponderado Kc (B) 0.90 0.96 0.80 0.89 0.73 0.75 0.84 0.87 0.69 0.72 0.94 1.03
Evapotranspiración Potencial (EPT) mm/mes (C) 138.0 116.4 108.6 101.6 107.1 102.5 109.9 125.6 137.3 150.1 147.4 142.0
Evapotranspiración Real (ETR=ETP*Kc) mm/mes (D) 124.2 112.3 86.8 90.8 78.0 77.1 92.4 109.5 95.2 107.6 137.8 145.8
Evapotranspiración Real (ETR) mm/dia (E) 4.45 4.16 3.50 3.39 3.45 3.42 3.55 4.05 4.58 4.84 4.91 4.58
Demanda Neta (DN=ETR-PE) mm/mes (G) 68.43 52.79 43.57 52.21 68.82 77.10 92.39 109.45 83.56 60.95 90.52 76.48
Demanda Neta (DN) mm/dia (H) 2.21 1.89 1.41 1.74 2.22 2.57 2.98 3.53 2.79 1.97 3.02 2.47
Eficiencia de riego del proyecto en % Ef (I) 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Demanda Bruta (DB=DN/Ef) mm/mes (J) 136.86 105.57 87.14 104.42 137.65 154.20 184.78 218.90 167.11 121.90 181.05 152.97
Demanda Bruta (DB) mm/dia (K) 4.41 3.77 2.81 3.48 4.44 5.14 5.96 7.06 5.57 3.93 6.03 4.93
Módulo de Riego (MR=Q/Ha) lt/seg/ha (L) 0.51 0.44 0.33 0.40 0.51 0.59 0.69 0.82 0.64 0.46 0.70 0.57
Caudal Requerido (Q=Mr*Ha) l/s (M) 1.94 1.48 1.27 1.29 1.64 1.55 1.79 2.04 2.06 1.73 2.10 1.71

N° De Horas de Jornada Diaria de Riego (Ñ) 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
3
Volumen Requerido (mm /mes) (O) 5.20 3.59 3.40 3.34 4.40 4.01 4.80 5.47 5.35 4.63 5.43 4.59
Eficiencia de riego: 50%
Caudal de diseño (Lts/seg): 2.1
Modulo de riego (Lt/seg/Ha): 0.82
BALANCE DE MASAS

Coef. de escorrentia 0.25


Area 470316 m2 Area lag. 19248.4 m2 Eficiencia 0.5
Area 47.0316 Ha Infil. 0.1 mm/d ha a regar 3.8

Demanda de
Pp media Infiltracion Evaporacion Evaporacion Demanda de Demanda total Vol Acum.
Mes Ce Pe (mm) Vol (m3) Vol acum (m3) Dias Cultivos _ Vol Balance
(mm) (m3) (mm) (m3) Cultivos (l/s) (vol. Mes m3) mes (m3)
(m3)
ENE 88.8 0.25 22.20 10441.02 10441.02 31 59.67004 94.00 1809.3496 1.94 5200.53 7069.55 7069.55 3371.47
FEB 30 0.25 7.50 3527.37 13968.39 28 53.89552 71.10 1368.56124 1.48 3589.52 5011.97 12081.52 1886.86
MAR 132.1 0.25 33.03 15532.19 29500.57 31 59.67004 77.50 1491.751 1.27 3398.46 4949.88 17031.40 12469.17
ABR 103.8 0.25 25.95 12204.70 41705.27 30 57.7452 77.10 1484.05164 1.29 3341.44 4883.24 21914.64 19790.63
MAY 22.2 0.25 5.55 2610.25 44315.53 31 59.67004 89.50 1722.7318 1.64 4404.64 6187.04 28101.68 16213.84
JUN 0.9 0.25 0.23 105.82 44421.35 30 57.7452 96.30 1853.62092 1.55 4009.20 5920.57 34022.25 10399.10
JUL 6 0.25 1.50 705.47 45126.82 31 59.67004 107.80 2074.97752 1.79 4804.28 6938.93 40961.17 4165.65
AGO 6.9 0.25 1.73 811.30 45938.12 31 59.67004 119.80 2305.95832 2.04 5472.50 7838.13 48799.30 -2861.19
SEP 18.5 0.25 4.63 2175.21 48113.33 30 57.7452 117.10 2253.98764 2.06 5347.52 7659.25 56458.56 -8345.23
OCT 111.1 0.25 27.78 13063.03 61176.35 31 59.67004 110.20 2121.17368 1.73 4632.28 6813.12 63271.67 -2095.32
NOV 65.3 0.25 16.33 7677.91 68854.26 30 57.7452 103.90 1999.90876 2.10 5431.44 7489.09 70760.77 -1906.51
DIC 72.7 0.25 18.18 8547.99 77402.26 31 59.67004 103.50 1992.2094 1.71 4588.95 6640.83 77401.60 0.66
BALANCE DE MASAS
MES OFERTA DEMANDA

ENE 10441.02 7069.55


FEB 13968.39 12081.52
MAR 29500.57 17031.40
ABR 41705.27 21914.64
MAY 44315.53 28101.68
JUN 44421.35 34022.25
JUL 45126.82 40961.17
AGO 45938.12 48799.30
SEP 48113.33 56458.56
OCT 61176.35 63271.67
NOV 68854.26 70760.77
DIC 77402.26 77401.60

Max = 19790.63 m3
Min = -8345.23 m3
Volumen = 28135.86 m3
28.136 mm3
h= 1.4 m
Area = 20097.04 m2
Area = 2.01 Ha
Diametro = 159.96 m
CURVA AREA – ALTURA – VOLUMEN

Area Volumen Volumen


Volumen
COTA Area (m2) Area Media (m2) Area (ha) Acumulado acomulado acomulado Altura (m)
parcial (m3)
(ha) (m3) (Hm3)

4532.435 17916.02 17916.02 1.79 1.79 0.00 0.00 0.000 0.000

4533.000 28347.612 23131.82 2.31 4.10 30869.84 30869.84 0.031 0.565

4534.000 37328.88 32838.25 3.28 7.39 55970.06 86839.90 0.087 1.565

4535.000 41783.151 39556.02 3.96 11.34 72394.26 159234.16 0.159 2.565

4536.000 44203.734 42993.44 4.30 15.64 82549.46 241783.62 0.242 3.565

4537.000 47102.419 45653.08 4.57 20.21 88646.52 330430.14 0.330 4.565

4538.000 45810.658 46456.54 4.65 24.85 92109.62 422539.75 0.423 5.565

4539.000 48560.725 47185.69 4.72 29.57 93642.23 516181.98 0.516 6.565

4540.000 50849.496 49705.11 4.97 34.54 96890.80 613072.78 0.613 7.565


CURVA AREA – ALTURA – VOLUMEN

Volumen util del embalse


207.3928875 mm3
TRANSITO DE AVENIDAS
DATOS:
ESTACION : CHAVIN - 445
PARAMETRO : Pp
DESCARGAS MAXIMAS MEDIAS MENSUAL (m/s)
Max 24 hr (mm)
ANÁLISIS ESTADÍSTICO DE LOS DATOS PLUVIOMETRICOS (24 hr)
LONG. 261249 "W"
LAT. 8939602 "S"
a. Analisis de frecuencias b. Prueba de ajuste de bondad

Año MAX. v alor


valor estadistico ∆ L os datos s e
23.20 Funcion de Distrubucion es tadis tic o ∆ ∆o (Delta
1990 (Delta teórico) F unc ion de Dis trubuc ion ∆ < ∆o ajus tan a la
(De lta Tabular)
1991 19.90 Normal 0.1188 dis tribuc ion
c alc ulado)
1992 19.70
Log Normal de 2 parametros 0.1016 Normal 0.1 0.4 0.1 < 0.4 Si
1993 31.70 L og Normal de 2 parametros 0.1 0.4 0.1 < 0.4 Si
Log Normal de 3 parametros 0.0766
1994 24.40 L og Normal de 3 parametros 0.1 0.4 0.1 < 0.4 Si
27.40 Gamma de 2 parametros 0.1136
1995 G amma de 2 parametros 0.1 0.4 0.1 < 0.4 Si
27.50 Gamma de 3 parametros 0.0832
1996 G amma de 3 parametros 0.1 0.4 0.1 < 0.4 Si
1997 21.00 Log Pearson tipo III 0.0776 L og P earson tipo III 0.1 0.4 0.1 < 0.4 Si
1998 32.60 Gumbel 0.0796 G umbel 0.1 0.4 0.1 < 0.4 Si
1999 26.10 Log Gumbel 0.0886 L og G umbel 0.1 0.4 0.1 < 0.4 Si
2000 19.30
Se concluye que los datos se ajustan a las diferentes distrubuciones, con un nivel de significancia del 5%
2001 22.50
Se considera la distribucion Log Normal 3 Parametros debido a que es el menor valor estadistico.
2002 21.50
2003 20.40
2004 17.50
Promedio 23.65
TRANSITO DE AVENIDAS
PARÁMETROS DE FORMA DE LA CUENCA
TSUTSUCOCHA
N° PARAMETROS DE FORMA VALOR
A. Área de la cuenca (A) 0.47 km2
B. Perímetro de la cuenca (P) 3.10 km
C. Longitud del cauce principal (L) 0.50 km
D. Ancho promedio de la cuenca (Ap) 0.41 km2
E. Coeficiente de compacidad o Índice de gravelius 1.277
F. (Kc)
Factor de forma(Ff) 0.352
G. Rectángulo equivalente 1.16 km
0.41 km
I. Radio de circularidad (Rc) 0.614
H. Pendiente de la cuenca 16.27 %
TRANSITO DE AVENIDAS

SOFTWARE HEC - HMS


TRANSITO DE AVENIDAS
TRANSITO DE AVENIDAS