Comp. de Obras Exteriores
Comp. de Obras Exteriores
Comp. de Obras Exteriores
FECHA:
OBRA : NUEVA ASIA
CONTRATISTA : J.E. CONSTRUCCIONES GENERALES
LUGAR : ASIA - CAETE - LIMA
T/C :
6/15/2015
2.77
INSTALACIONES ELCTRICAS
S/. 69,015.20
S/. 69,015.20
S/. 69,015.20
S/. 69,015.20
S/. 69,015.20
S/. 69,015.20
S/. 69,015.20
S/. 0.00
0.00%
Contacto
WILMER ARBOLEDA
Forma de pago
VALORIZACION QUINCENAL
Observaciones y apreciaciones
Elaborado por:
Revisado por:
PROMOTOR
: IDEE JE INMOBILIARIA
GERENCIA
FECHA
ESPECIALIDAD
:INSTALACIONES ELCTRICAS
6/15/2015
FECHA:
PPT J E
UND
ITEM
DESCRIPCION
Presupuesto
P.UNIT.
(S/.)
CANT
SUBTOTAL S/.
Presupuesto
P.UNIT.
SUBTOTAL S/.
(S/.)
CANT
EDIFICIO BALI
INSTALACIONES ELCTRICAS
01 ADICIONAL - GRUPO ELECTROGENO
120.00
197.00
23,640.00
120.00
197.00
S/. 23,640.00
36.00
33.00
1,188.00
36.00
33.00
S/. 1,188.00
ML
5.20
35.00
182.00
5.20
35.00
S/. 182.00
ML
110.00
8.00
880.00
110.00
8.00
S/. 880.00
ML
44.00
23.00
1,012.00
44.00
23.00
S/. 1,012.00
UND.
1.00
2,300.00
2,300.00
1.00
2,300.00
S/. 2,300.00
PTO
25.00
45.00
1,125.00
25.00
45.00
S/. 1,125.00
UND.
25.00
18.00
450.00
25.00
18.00
S/. 450.00
02.00.03 PEINADO DE CABLE DEL TRANSFORMADOR MAS TUBERIA CONDUIT CORRUGADA DE 3/4"
ML
20.00
25.00
500.00
20.00
25.00
S/. 500.00
02.00.04 PEINADO DE CABLE DEL TRANSFORMADOR MAS TUBERIA CONDUIT CORRUGADA DE 1/2"
ML
10.00
12.00
120.00
10.00
12.00
S/. 120.00
PEINADO DE CABLE DEL TRANSFORMADOR AL TABLERO DE CONTROL MAS TUBERIA CONDUIT DE 3/4" Y CABLE DE 3-1x6mm2 NH80 +
02.00.05
ML
1-1x4 mm2 (T) NH80
35.00
43.00
1,505.00
35.00
43.00
S/. 1,505.00
UND.
18.00
225.00
4,050.00
18.00
225.00
S/. 4,050.00
PTO
125.00
64.00
8,000.00
125.00
64.00
S/. 8,000.00
04.00.02 ALIMENTADORES DE 3X4mm2 PARA CIRCUITOS DE ALUMBRADO EN EXTERIOR (INCLUYE TUBO DE 25mm )
ML
150.00
9.95
1,492.50
150.00
9.95
S/. 1,492.50
UND.
112.00
23.00
2,576.00
112.00
23.00
S/. 2,576.00
UND.
13.00
39.00
507.00
13.00
39.00
S/. 507.00
UND.
8.00
58.00
464.00
8.00
58.00
S/. 464.00
ML
162.20
6.00
973.20
162.20
6.00
S/. 973.20
ML
130.00
12.40
1,612.00
130.00
12.40
S/. 1,612.00
ML
110.00
4.20
462.00
110.00
4.20
S/. 462.00
ML
260.00
9.00
2,340.00
260.00
9.00
S/. 2,340.00
ML
85.00
5.90
501.50
85.00
5.90
S/. 501.50
ML
25.00
16.80
420.00
25.00
16.80
S/. 420.00
ML
60.00
8.50
510.00
60.00
8.50
S/. 510.00
ML
172.00
35.00
6,020.00
172.00
35.00
S/. 6,020.00
ML
86.00
20.00
1,720.00
86.00
20.00
S/. 1,720.00
GBL
1.00
2,000.00
2,000.00
1.00
2,000.00
S/. 2,000.00
GLB.
1.00
650.00
650.00
1.00
650.00
S/. 650.00
07.00.02 DADO DE CONCRETO PARA TUBO DE AGUA FRIA (POR EL CUARTO BOMBA SUMIDERO)
ML
7.00
45.00
315.00
7.00
45.00
S/. 315.00
GBL
1.00
1,500.00
1,500.00
1.00
1,500.00
ML
UND.
02 ADICIONAL - ASCENSORES
03 ADICIONAL EN MEDIDORES
06.00.01
07 OBRAS CIVILES
08 OTROS
08.00.01 TRANSPORTE
S/. 69,015.20
COSTO DIRECTO
S/.
69,015.20
S/. 1,500.00
S/. 69,015.20
S/.
69,015.20
MARGEN S/.
0.00
MARGEN %
0.00%
CONSIDERACIONES:
Forma de pago:
Tiempo de entrega:
Contacto
Segn valorizaciones
Segn cronograma de obra.
WILMER ARBOLEDA
Jokey Plaza
IDEE JE Inmobiliaria