FICHA TECNICA
►ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DEL DORADO
1 01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1 26970.23 S/26,970.23 0.00 0.00 0.00 0.00 0.00 0.00
2 01.02 TRAZO NIVEL Y REPLANTEO km 22.42 828.81 S/18,581.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 02 PAVIMENTOS
4 02.01 CAPA NIVELANTE E= 0.05 M m3 1702.98 28.47 S/48,483.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 02.02. MATERIAL GRANULAR DE CANTERA E= 0.15M m3 13454.4 31.25 S/420,450.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 03 TRANSPORTE
7 03.01 TRANSPORTE DE MATERAIL GRANULAR HASTA 1 KM m3k 13,602.33 5.95 S/80,933.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 03.02 TRANSPORTE DE MATERAIL GRANULAR MAYOR HASTA 1 KM m3k 59,589.62 6.41 S/381,969.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 03.03 TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1 KM m3k 2,281.03 5.72 S/13,047.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 03.04 TRANSPORTE DE MATERIAL EXCEDENTE MAYOR HASTA 1 KM m3k 3,600.37 2.03 S/7,308.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 04 OBRAS DE ARTE Y DRENAJE.
12 04.01 RECONFORMACION DE CUNETAS m 25303 1.91 S/48,328.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13 05. SEÑALIZACION
14 05.01 INSTALACION DE POSTES KILOMETRICOS. und. 26 200 S/5,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15 05.02 SEÑALES PREVENTIVAS und. 18.00 416.51 S/7,497.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16 05.03 SEÑALES REGLAMENTARIAS und. 4 545.75 S/2,183.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17 05.04 SEÑALES INFORMATIVAS und. 6 2883.29 S/17,299.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18 06 IMPACTO AMBIENTAL
19 06.01 RECUPERACION AMBIENTAL DE LAS AREAS OCUPADAS ha. 4.38 9,416.85 S/41,245.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20 07 EMERGENCIA SANITARIA.
21 07.01 EMERGENCIA SANITARIA COVID 19. glb. 1.00 17,668.80 S/17,668.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#REF!
VALORIZACION DE OBRA N° 02
FORMULAS POLINOMICAS
►ENTIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DEL DORADO
►OBRA : "SERVICIO PARA LA EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO EMP. SM-100 (SHATOJA)-LA UNION -LA FLORIDA-AMIÑ
►CONTRATISTA : CONSORCIO UNION
►JEFE DE SUPERVISION : ING. JOSE LUIS NORIEGA DAVILA.
►MODALIDA DE EJECUCION : SUMA ALZADA.
FORMULA N° 01 "SERVICIO PARA LA EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO EMP. SM-100 (SHATOJA)-LA UNION -LA FLORIDA-AMIÑIO-HUANCABAMBA-EM
Mr Cr Ar Mr Ir
K= 0.186 x Mo + 0.084 x Co + 0.203 x Ao + 0.081 x Mo + 0.446 x Io
FORMULA N° 04 #REF!
Mr DTr AIr
K= 0.245 x Mo + 0.146 x DTo + 0.609 x AIo
FORMULA N° 05 #REF!
Mr Cr Ar AIr
K= 0.243 x + 0.168 x + 0.062 x + 0.527 x
Mo Co Ao AIo
FORMULA N° 06 #REF!
Mr Cr Ir AMr
K= 0.234 x + 0.184 x + 0.486 x + 0.096 x
Mo Co Io AMo
FORMULA N° 07 #REF!
Mr Tr Ir
K= 0.155 x + 0.377 x + 0.468 x
Mo To Io
FORMULA N° 08 #REF!
Mr Ir APr Cr Mr
K= 0.278 x + 0.436 x + 0.127 x + 0.107 x + 0.052 x
Mo Io APo Co Mo
FORMULA N° 09 #REF!
Fr Ir
K= 0.669 x + 0.331 x
Fo Io
FORMULA N° 01 "SERVICIO PARA LA EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO EMP. SM-100 (SHATOJA)-LA UNION -LA FLORIDA-AMIÑIO
Mr Cr Ar Mr Ir
K= 0.186 x Mo + 0.084 x Co + 0.203 x Ao + 0.081 x Mo + 0.446 x Io
VAL N° 05 ABR 09
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(MAR )=
IU INCIDENCIA INCIDENCIA Material MAY 09 MAR 10 MAR 10
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.186 100.000% 0.186000 397.23 415.58 0.195
2 C 21 CEMENTO PORTLAND TIPO I 0.084 100.000% 0.084000 350.43 357.75 0.086
3 A 03 ACERO DE CONSTRUCCION CORRUGADO 0.203 100.000% 0.203000 453.81 446.16 0.200
4 M 43 MADERA NACIONAL PARA ENCOFRADO Y CARP. 0.081 100.000% 0.081000 670.87 687.92 0.083
5 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.446 100.000% 0.446000 347.88 350.59 0.449
Ʃ 1.000000 Ʃ 1.013
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.350 100.000% 0.350000 397.23 415.58 0.366
2 C 21 CEMENTO PORTLAND TIPO I 0.051 100.000% 0.051000 350.43 357.75 0.052
3 A 02 ACERO DE CONSTRUCCION LISO 0.078 100.000% 0.078000 458.01 452.81 0.077
4 M 43 MADERA NACIONAL PARA ENCOFRADO Y CARP. 0.118 100.000% 0.118000 670.87 687.92 0.121
5 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.403 100.000% 0.403000 347.88 350.59 0.406
Ʃ 1.000000 Ʃ 1.022
FORMULA N° 03 #REF!
Mr Ar Ar ITr
K= 0.249 x Mo + 0.074 x Ao + 0.245 x Ao + 0.432 x ITo
VAL N° 05 ABR 09
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(MAR )=
IU INCIDENCIA INCIDENCIA Material MAY 09 MAR 10 MAR 10
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.249 100.000% 0.249000 397.23 415.58 0.261
2 A 07 ALAMBRE Y CABLE TIPO TW Y THW 0.074 100.000% 0.074000 472.62 567.88 0.089
3 A 12 ARTEFACTO DE ALUMBRADO INTERIOR 0.245 100.000% 0.245000 281.54 268.21 0.233
4 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.432 88.889% 0.384000 347.88 350.59 0.387
T 75 ÍNDICE DE PRECIOS DE TUBERÍA DE PVC 0.432 11.111% 0.048000 338.58 328.49 0.047
Ʃ 1.000000 Ʃ 1.017
FORMULA N° 04 #REF!
Mr DTr AIr
K= 0.245 x + 0.146 x + 0.609 x
Mo DTo AIo
VAL N° 05 ABR 09
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(MAR )=
IU INCIDENCIA INCIDENCIA Material MAY 09 MAR 10 MAR 10
FORMULA N° 05 #REF!
Mr Cr Ar AIr
K= 0.243 x + 0.168 x + 0.062 x + 0.527 x
Mo Co Ao AIo
VAL N° 05 ABR 09
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(MAR )=
IU INCIDENCIA INCIDENCIA Material MAY 09 MAR 10 MAR 10
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.243 100.000% 0.243000 397.23 415.58 0.254
2 C 21 CEMENTO PORTLAND TIPO I 0.168 100.000% 0.168000 350.43 357.75 0.172
3 A 03 ACERO DE CONSTRUCCION CORRUGADO 0.062 100.000% 0.062000 453.81 446.16 0.061
4 A 13 ASFALTO 0.527 15.750% 0.083003 966.59 1,265.36 0.109
CALCULO DEL COEFICIENTE REAJUSTE DE LA VALORIZACION DE OBRA N° 02
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.527 84.250% 0.443998 347.88 350.59 0.447
Ʃ 1.000000 Ʃ 1.043
FORMULA N° 06 #REF!
Mr Cr Ir AMr
K= 0.234 x + 0.184 x + 0.486 x + 0.096 x
Mo Co Io AMo
VAL N° 05 ABR 09
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(MAR )=
IU INCIDENCIA INCIDENCIA Material MAY 09 MAR 10 MAR 10
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.234 100.000% 0.234000 397.23 415.58 0.245
2 C 21 CEMENTO PORTLAND TIPO I 0.184 100.000% 0.184000 350.43 357.75 0.188
3 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.486 100.000% 0.486000 347.88 350.59 0.490
4 A 03 ACERO DE CONSTRUCCION CORRUGADO 0.096 60.417% 0.058000 453.81 446.16 0.057
M 45 MADERA TERCIADA PARA ENCOFRADO 0.096 39.583% 0.038000 327.07 314.71 0.037
Ʃ 1.000000 Ʃ 1.017
FORMULA N° 07 #REF!
Mr Tr Ir
K= 0.155 x + 0.377 x + 0.468 x
Mo To Io
VAL N° 05 ABR 09
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(MAR )=
IU INCIDENCIA INCIDENCIA Material MAY 09 MAR 10 MAR 10
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.155 100.000% 0.155000 397.23 415.58 0.162
2 T 65 TUBERIA DE ACERO NEGRO Y/O GALVANIZADO 0.377 100.000% 0.377000 328.40 335.53 0.385
3 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.468 100.000% 0.468000 347.88 350.59 0.472
Ʃ 1.000000 Ʃ 1.019
FORMULA N° 08 #REF!
Mr Ir APr Cr Mr
K= 0.278 x + 0.436 x + 0.127 x + 0.107 x + 0.052 x
Mo Io APo Co Mo
VAL N° 05 ABR 09
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(MAR )=
IU INCIDENCIA INCIDENCIA Material MAY 09 MAR 10 MAR 10
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.278 100.000% 0.278000 397.23 415.58 0.291
2 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.436 100.000% 0.436000 347.88 350.59 0.439
3 A 03 ACERO DE CONSTRUCCION CORRUGADO 0.127 74.803% 0.095000 453.81 446.16 0.093
P 51 PERFIL DE ACERO LIVIANO 0.127 25.197% 0.032000 314.53 310.84 0.032
4 C 21 CEMENTO PORTLAND TIPO I 0.107 100.000% 0.107000 350.43 357.75 0.109
5 M 48 MAQUINARIA Y EQUIPO NACIONAL 0.052 100.000% 0.052000 338.98 334.22 0.051
Ʃ 1.000000 Ʃ 1.015
FORMULA N° 09 #REF!
Fr Ir
K= 0.669 x + 0.331 x
Fo Io
VAL N° 05 ABR 09
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(MAR )=
IU INCIDENCIA INCIDENCIA Material MAY 09 MAR 10 MAR 10
FORMULA N° 03 #REF!
Mr Ar Ar ITr
K= 0.249 x + 0.074 x + 0.245 x + 0.432 x
Mo Ao Ao ITo
VAL 01 VAL 02
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL.EFECT. (Ia) IND. ADEL.MAT. (Ia) DIC 2009 (Ir) ENE 2010 (Ir)
IU INCIDENCIA INCIDENCIA Material MAY 09 COEFIC. DIC 09 COEFIC. ENE 08 COEFIC. NOV 09 COEFIC. DIC 09 COEFIC.
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.249 100.00% 0.249000 397.23 0.249 413.41 0.259 413.41 0.259 413.41 0.259 413.41 0.259
2 A 07 ALAMBRE Y CABLE TIPO TW Y THW 0.074 100.00% 0.074000 472.62 0.074 543.27 0.085 528.24 0.083 528.24 0.083 543.27 0.085
3 A 12 ARTEFACTO DE ALUMBRADO INTERIOR 0.245 100.00% 0.245000 281.54 0.245 270.97 0.236 271.54 0.236 271.54 0.236 270.97 0.236
4 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.432 88.889% 0.384000 347.88 0.384 347.45 0.384 346.35 0.382 346.35 0.382 347.45 0.384
T 75 ÍNDICE DE PRECIOS DE TUBERÍA DE PVC 0.432 11.111% 0.048000 338.58 0.048 339.61 0.048 340.04 0.048 340.04 0.048 339.61 0.048
Ko(MAY )= 1.000 Ka(NOV )= 1.012 Ka(ENE )= 1.008 Kr(NOV )= 1.008 Kr(DIC )= 1.012
FORMULA N° 04 #REF!
Mr DTr AIr
K= 0.245 x + 0.146 x + 0.609 x
Mo DTo AIo
VAL 01 VAL 02
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL.EFECT. (Ia) IND. ADEL.MAT. (Ia) DIC 2009 (Ir) ENE 2010 (Ir)
IU INCIDENCIA INCIDENCIA Material MAY 09 COEFIC. DIC 09 COEFIC. ENE 08 COEFIC. NOV 09 COEFIC. DIC 09 COEFIC.
1 M 47 FLETE TERRESTRE 0.245 100.000% 0.245000 397.23 0.245 413.41 0.255 413.41 0.255 413.41 0.255 413.41 0.255
2 D 30 PETROLEO DIESEL 0.146 13.699% 0.020001 371.94 0.020 362.71 0.020 363.47 0.020 363.47 0.020 362.71 0.020
T 72 MAQUINARIA Y EQUIPO NACIONAL 0.146 86.301% 0.125999 338.58 0.126 339.61 0.126 340.04 0.127 340.04 0.127 339.61 0.126
3 A 10 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.609 3.284% 0.020000 321.79 0.020 321.44 0.020 321.48 0.020 321.48 0.020 321.44 0.020
I 39 MADERA NACIONAL PARA ENCOFRADO Y CARP. 0.609 96.716% 0.589000 347.88 0.589 347.45 0.588 346.35 0.586 346.35 0.586 347.45 0.588
Ko(MAY )= 1.000 Ka(NOV )= 1.009 Ka(ENE )= 1.008 Kr(NOV )= 1.008 Kr(DIC )= 1.009
FORMULA N° 05 #REF!
Mr Cr Ar AIr
K= 0.243 x + 0.168 x + 0.062 x + 0.527 x
Mo Co Ao AIo
VAL 01 VAL 02
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL.EFECT. (Ia) IND. ADEL.MAT. (Ia) DIC 2009 (Ir) ENE 2010 (Ir)
IU INCIDENCIA INCIDENCIA Material MAY 09 COEFIC. DIC 09 COEFIC. ENE 08 COEFIC. NOV 09 COEFIC. DIC 09 COEFIC.
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.243 100.000% 0.243000 397.23 0.243 413.41 0.253 413.41 0.253 413.41 0.253 413.41 0.253
2 C 21 CEMENTO PORTLAND TIPO I 0.168 100.000% 0.168000 350.43 0.168 346.98 0.166 346.98 0.166 346.98 0.166 346.98 0.166
3 A 03 ACERO DE CONSTRUCCION CORRUGADO 0.062 100.000% 0.062000 453.81 0.062 443.96 0.061 452.34 0.062 452.34 0.062 443.96 0.061
4 A 13 ASFALTO 0.527 15.750% 0.083003 966.59 0.083 1,265.36 0.109 1,253.01 0.108 1,253.01 0.108 1,265.36 0.109
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.527 84.250% 0.443998 347.88 0.444 347.45 0.443 346.35 0.442 346.35 0.442 347.45 0.443
Ko(MAY )= 1.000 Ka(NOV )= 1.032 Ka(ENE )= 1.031 Kr(NOV )= 1.031 Kr(DIC )= 1.032
FORMULA N° 06 #REF!
Mr Cr Ir AMr
K= 0.234 x + 0.184 x + 0.486 x + 0.096 x
Mo Co Io AMo
VAL 01 VAL 02
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL.EFECT. (Ia) IND. ADEL.MAT. (Ia) DIC 2009 (Ir) ENE 2010 (Ir)
IU INCIDENCIA INCIDENCIA Material MAY 09 COEFIC. DIC 09 COEFIC. ENE 08 COEFIC. NOV 09 COEFIC. DIC 09 COEFIC.
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.234 100.000% 0.234000 397.23 0.234 413.41 0.244 413.41 0.244 413.41 0.244 413.41 0.244
2 C 21 CEMENTO PORTLAND TIPO I 0.184 100.000% 0.184000 350.43 0.184 346.98 0.182 346.98 0.182 346.98 0.182 346.98 0.182
3 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.486 100.000% 0.486000 347.88 0.486 347.45 0.485 346.35 0.484 346.35 0.484 347.45 0.485
4 A 03 ACERO DE CONSTRUCCION CORRUGADO 0.096 60.417% 0.058000 453.81 0.058 443.96 0.057 452.34 0.058 452.34 0.058 443.96 0.057
M 45 MADERA TERCIADA PARA ENCOFRADO 0.096 39.583% 0.038000 327.07 0.038 314.70 0.037 314.88 0.037 314.88 0.037 314.70 0.037
Ko(MAY )= 1.000 Ka(NOV )= 1.005 Ka(ENE )= 1.005 Kr(NOV )= 1.005 Kr(DIC )= 1.005
FORMULA N° 07 #REF!
Mr Tr Ir
K= 0.155 x + 0.377 x + 0.468 x
Mo To Io
VAL 01 VAL 02
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL.EFECT. (Ia) IND. ADEL.MAT. (Ia) DIC 2009 (Ir) ENE 2010 (Ir)
CALCULO DE LOS COEFICIENTES DE REAJUSTES (K)
IU INCIDENCIA INCIDENCIA Material MAY 09 COEFIC. DIC 09 COEFIC. ENE 08 COEFIC. NOV 09 COEFIC. DIC 09 COEFIC.
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.155 100.000% 0.155000 397.23 0.155 413.41 0.161 413.41 0.161 413.41 0.161 413.41 0.161
2 T 65 TUBERIA DE ACERO NEGRO Y/O GALVANIZADO 0.377 100.000% 0.377000 328.40 0.377 338.64 0.389 339.74 0.390 339.74 0.390 338.64 0.389
3 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.468 100.000% 0.468000 347.88 0.468 347.45 0.467 346.35 0.466 346.35 0.466 347.45 0.467
Ko(MAY )= 1.000 Ka(NOV )= 1.017 Ka(ENE )= 1.017 Kr(NOV )= 1.017 Kr(DIC )= 1.017
FORMULA N° 08 #REF!
Mr Ir APr Cr Mr
K= 0.278 x + 0.436 x + 0.127 x + 0.107 x + 0.052 x
Mo Io APo Co Mo
VAL 01 VAL 02
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL.EFECT. (Ia) IND. ADEL.MAT. (Ia) DIC 2009 (Ir) ENE 2010 (Ir)
IU INCIDENCIA INCIDENCIA Material MAY 09 COEFIC. DIC 09 COEFIC. ENE 08 COEFIC. NOV 09 COEFIC. DIC 09 COEFIC.
1 M 47 MANO DE OBRA INC LEYES SOCIALES 0.278 100.000% 0.278000 397.23 0.278 413.41 0.289 413.41 0.289 413.41 0.289 413.41 0.289
2 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.436 100.000% 0.436000 347.88 0.436 347.45 0.435 346.35 0.434 346.35 0.434 347.45 0.435
3 A 03 ACERO DE CONSTRUCCION CORRUGADO 0.127 74.803% 0.095000 453.81 0.095 443.96 0.093 452.34 0.095 452.34 0.095 443.96 0.093
P 51 PERFIL DE ACERO LIVIANO 0.127 25.197% 0.032000 314.53 0.032 300.73 0.031 301.29 0.031 301.29 0.031 300.73 0.031
4 C 21 CEMENTO PORTLAND TIPO I 0.107 100.000% 0.107000 350.43 0.107 346.98 0.106 346.98 0.106 346.98 0.106 346.98 0.106
5 M 48 MAQUINARIA Y EQUIPO NACIONAL 0.052 100.000% 0.052000 338.98 0.052 329.98 0.051 330.19 0.051 330.19 0.051 329.98 0.051
Ko(MAY )= 1.000 Ka(NOV )= 1.005 Ka(ENE )= 1.006 Kr(NOV )= 1.006 Kr(DIC )= 1.005
FORMULA N° 09 #REF!
Fr Ir
K= 0.669 x + 0.331 x
Fo Io
VAL 01 VAL 02
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL.EFECT. (Ia) IND. ADEL.MAT. (Ia) DIC 2009 (Ir) ENE 2010 (Ir)
IU INCIDENCIA INCIDENCIA Material MAY 09 COEFIC. DIC 09 COEFIC. ENE 08 COEFIC. NOV 09 COEFIC. DIC 09 COEFIC.
1 F 32 FLETE TERRESTRE 0.669 100.000% 0.669000 425.75 0.669 418.25 0.657 418.41 0.657 418.41 0.657 418.25 0.657
2 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.331 100.000% 0.331000 347.88 0.331 347.45 0.331 346.35 0.330 346.35 0.330 347.45 0.331
Ko(MAY )= 1.000 Ka(NOV )= 0.988 Ka(ENE )= 0.987 Kr(NOV )= 0.987 Kr(DIC )= 0.988
VALORIZACION DE OBRA N° 02
INDICES UNIFICADOS DE PRECIOS AL CONSUMIDOR
CUADRO DE REAJUSTES
CALCULO DEL REAJUSTE DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N° 01 "SERVICIO PARA LA EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO EMP. SM-100 (SHATOJA)-LA UNION -LA F
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 Enero 19,193.33 25,995.16 1.001 19.19 26.00 26.00
2 Febrero 100,810.13 69,899.07 1.007 705.67 489.29 489.29
3 Marzo 24,955.43 30,175.15 1.008 199.64 241.40 241.40
4 Abril 10,748.56 14,916.20 1.013 139.73 193.91 193.91
5 Mayo 0.00 #REF! 1.013 0.00 #REF! #REF!
TOTALES 155,707.44 #REF! 1,064.23 #REF! #REF!
REINTEGRO ACUM. ANTERIOR 876.02
REINTEGRO DEL MES #REF!
REINTEGRO TOTAL #REF!
FORMULA N° 03 #REF!
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 Enero 0.00 0.00 1.012 0.00 0.00 0.00
2 Febrero 0.00 1,006.20 1.015 0.00 15.09 15.09
3 Marzo 6,189.69 1,839.90 1.016 99.04 29.44 29.44
4 Abril 4,667.07 0.00 1.017 79.34 0.00 0.00
5 Mayo 0.00 #REF! 1.017 0.00 #REF! #REF!
TOTALES 10,856.76 #REF! 178.38 #REF! #REF!
REINTEGRO ACUM. ANTERIOR 283.19
REINTEGRO DEL MES #REF!
REINTEGRO TOTAL #REF!
FORMULA N° 04 #REF!
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 Enero 0.00 0.00 1.009 0.00 0.00 0.00
2 Febrero 0.00 0.00 1.009 0.00 0.00 0.00
3 Marzo 0.00 0.00 1.010 0.00 0.00 0.00
4 Abril 2,196.65 0.00 1.011 24.16 0.00 0.00
5 Mayo 0.00 #REF! 1.011 0.00 #REF! #REF!
TOTALES 2,196.65 #REF! 24.16 #REF! #REF!
REINTEGRO ACUM. ANTERIOR 0.00
REINTEGRO DEL MES #REF!
REINTEGRO TOTAL #REF!
FORMULA N° 05 #REF!
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 Enero 0.00 0.00 1.032 0.00 0.00 0.00
VALORIZACION DE OBRA N° 02
►ENTIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DEL DORADO
►OBRA : "SERVICIO PARA LA EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO EMP. SM-100 (SHA
►CONTRATISTA : CONSORCIO UNION
►JEFE DE SUPERVISION : ING. JOSE LUIS NORIEGA DAVILA.
►MODALIDA DE EJECUCION : SUMA ALZADA.
2 Febrero 0.00 0.00 1.040 0.00 0.00 0.00
3 Marzo 18,999.97 5,568.97 1.041 779.00 228.33 228.33
4 Abril 4,574.20 12,185.10 1.043 196.69 523.96 523.96
5 Mayo 0.00 #REF! 1.043 0.00 #REF! #REF!
TOTALES 23,574.17 #REF! 975.69 #REF! #REF!
REINTEGRO ACUM. ANTERIOR 727.92
REINTEGRO DEL MES #REF!
REINTEGRO TOTAL #REF!
FORMULA N° 06 #REF!
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 Enero 0.00 0.00 1.005 0.00 0.00 0.00
2 Febrero 0.00 0.00 1.013 0.00 0.00 0.00
3 Marzo 29,794.15 5,506.79 1.014 417.12 77.10 77.10
4 Abril 14,937.56 30,720.52 1.017 253.94 522.25 522.25
5 Mayo 0.00 #REF! 1.017 0.00 #REF! #REF!
TOTALES 44,731.71 #REF! 671.06 #REF! #REF!
REINTEGRO ACUM. ANTERIOR 507.19
REINTEGRO DEL MES #REF!
REINTEGRO TOTAL #REF!
FORMULA N° 07 #REF!
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 Enero 1,714.89 1,414.45 1.017 29.15 24.05 24.05
2 Febrero 20,086.86 27,294.85 1.016 321.39 436.72 436.72
3 Marzo 41,619.07 46,865.20 1.016 665.91 749.84 749.84
4 Abril 21,487.40 2,524.86 1.019 408.26 47.97 47.97
5 Mayo 4,271.42 #REF! 1.019 81.16 #REF! #REF!
TOTALES 89,179.65 #REF! 1,505.87 #REF! #REF!
REINTEGRO ACUM. ANTERIOR 1,251.01
REINTEGRO DEL MES #REF!
REINTEGRO TOTAL #REF!
FORMULA N° 08 #REF!
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 Enero 0.00 0.00 1.005 0.00 0.00 0.00
2 Febrero 6,726.26 0.00 1.011 73.99 0.00 0.00
3 Marzo 5,618.04 675.17 1.012 67.42 8.10 8.10
4 Abril 0.00 2,939.35 1.015 0.00 44.09 44.09
5 Mayo 0.00 #REF! 1.015 0.00 #REF! #REF!
TOTALES 12,344.30 #REF! 141.41 #REF! #REF!
REINTEGRO ACUM. ANTERIOR 43.37
REINTEGRO DEL MES #REF!
REINTEGRO TOTAL #REF!
FORMULA N° 09 #REF!
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 Enero 29,926.40 14,167.95 0.988 -359.12 -170.02 -170.02
2 Febrero 13,742.43 15,758.45 0.989 -151.17 -173.34 -173.34
3 Marzo 13,742.43 17,955.84 0.989 -151.17 -197.51 -197.51
4 Abril 2,441.55 5,985.28 0.986 -34.18 -83.79 -83.79
5 Mayo 0.00 #REF! 0.986 0.00 #REF! #REF!
TOTALES 59,852.80 #REF! -695.64 #REF! #REF!
REINTEGRO ACUM. ANTERIOR -600.72
REINTEGRO DEL MES #REF!
REINTEGRO TOTAL #REF!
D.S. Nº 017-79-VC
FORMULA:
De = A x VAL / C x ( K / Ka - 1 )
DONDE:
FORMULA N° 01 "SERVICIO PARA LA EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO EMP. SM-100 (SHATOJA)-LA UNION -LA FLORIDA-AMIÑ
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL #REF!
TOTAL #REF!
FORMULA N° 03 #REF!
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL #N/A
FORMULA N° 04 #REF!
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL #N/A
FORMULA N° 05 #REF!
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL #N/A
FORMULA N° 06 #REF!
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL #N/A
FORMULA N° 07 #REF!
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL #N/A
FORMULA N° 08 #REF!
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL #N/A
FORMULA N° 09 #REF!
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL #N/A
AMORTIZACION DEL
ADELANTO EN EFECTIVO
D.S. Nº 017-79-VC
FORMULA:
AMORT = AxVAL/C
DONDE:
AMORTIZACION DEL
ADELANTO PARA MATERIALES
D.S. Nº 017-79-VC
FORMULA:
AMORT = AxVAL/C
DONDE:
PARTIDA DESCRIPCION UND METRADO PRECIO PRECIO AVANCE ANTERIOR AVANCE MENSUAL AVANCE ACUMULADO SALDO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
01 OBRAS PRELIMINARES
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1 26970.23 26970.23 50.00% 0.50 13,485.12 25.00% 0.25 6,742.56 75.00% 0.75 20,227.68 25.00% 0.25 6,742.55
01.02 TRAZO NIVEL Y REPLANTEO km 22.42 828.81 18581.92 50.00% 11.21 9,290.96 25.00% 5.61 4,645.48 75.00% 16.82 13,936.44 25.00% 5.61 4,645.48
02 PAVIMENTOS
02.01 CAPA NIVELANTE E= 0.05 M m3 1702.98 28.47 48483.84 46.98% 800.00 22,776.00 41.10% 700.00 19,929.00 88.08% 1,500.00 42,705.00 11.92% 202.98 5,778.84
02.02. MATERIAL GRANULAR DE CANTERA E= 0.15M m3 13454.4 31.25 420450.00 22.52% 3,030.00 94,687.50 16.35% 2,200.00 68,750.00 38.87% 5,230.00 163,437.50 61.13% 8,224.40 257,012.50
03 TRANSPORTE
03.01 TRANSPORTE DE MATERAIL GRANULAR HASTA 1 KM m3k 13602.33 5.95 80933.86 4.12% 560.00 3,332.00 8.82% 1,200.00 7,140.00 12.94% 1,760.00 10,472.00 87.06% 11,842.33 70,461.86
03.02 TRANSPORTE DE MATERAIL GRANULAR MAYOR HASTA 1 KM m3k 59589.62 6.41 381969.46 6.65% 3,960.00 25,383.60 4.70% 2,800.00 17,948.00 11.34% 6,760.00 43,331.60 88.66% 52,829.62 338,637.86
03.03 TRANSPORTE DE MATERIAL EXCEDENTE HASTA 1 KM m3k 2281.03 5.72 13047.49 28.50% 650.00 3,718.00 48.22% 1,100.00 6,292.00 76.72% 1,750.00 10,010.00 23.28% 531.03 3,037.49
03.04 TRANSPORTE DE MATERIAL EXCEDENTE MAYOR HASTA 1 KM m3k 3600.37 2.03 7308.75 49.99% 1,800.00 3,654.00 15.00% 540.00 1,096.20 64.99% 2,340.00 4,750.20 35.01% 1,260.37 2,558.55
04 OBRAS DE ARTE Y DRENAJE.
04.01 RECONFORMACION DE CUNETAS m 25303 1.91 48328.73 38.73% 9,800.00 18,718.00 7.90% 2,000.00 3,820.00 46.63% 11,800.00 22,538.00 53.37% 13,503.00 25,790.73
05. SEÑALIZACION
05.01 INSTALACION DE POSTES KILOMETRICOS. und. 26 200 5200.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 26.00 5,200.00
05.02 SEÑALES PREVENTIVAS und. 18 416.51 7497.18 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 18.00 7,497.18
05.03 SEÑALES REGLAMENTARIAS und. 4 545.75 2183.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 4.00 2,183.00
05.04 SEÑALES INFORMATIVAS und. 6 2883.29 17299.74 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 6.00 17,299.74
06 IMPACTO AMBIENTAL
06.01 RECUPERACION AMBIENTAL DE LAS AREAS OCUPADAS ha. 4.38 9416.85 41245.80 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 4.38 41,245.80
07 EMERGENCIA SANITARIA.
07.01 EMERGENCIA SANITARIA COVID 19. glb. 1 17668.8 17668.80 33.30% 0.33 5,883.71 33.30% 0.33 5,883.71 66.60% 0.67 11,767.42 33.40% 0.33 5,901.38
SUB TOTAL 1,137,168.80 17.67% 200,928.89 12.51% 142,246.95 30.18% 343,175.84 69.82% 793,992.97
FACTOR DE RELACION FR = 1.00000
COSTO DIRECTO TOTAL 1,137,168.80 17.67% 200,928.89 12.51% 142,246.95 30.18% 343,175.84 69.82% 793,992.96
GASTOS GENERALES (10.23%) 10% 10.23% 116,300.00 17.67% 20,555.03 12.51% 14,551.86 30.19% 35,106.89 69.81% 81,193.11
UTILIDAD (8) 8.50% 8.00% 90,973.50 17.67% 16,074.31 12.51% 11,379.76 30.18% 27,454.07 69.82% 63,519.43
SUB TOTAL 1,344,442.30 17.67% 237,558.23 12.51% 168,178.57 30.18% 405,736.80 69.82% 938,705.50
PRESUPUESTO REFERENCIAL 1,344,442.30 17.67% 237,558.23 12.51% 168,178.57 30.18% 405,736.80 69.82% 938,705.50
FACTOR DE RELACION FR = 1.00000
PRESUPUESTO CONTRATADO 1,344,442.30 17.67% 237,558.23 12.51% 168,178.57 30.18% 405,736.80 69.82% 938,705.50
VALORIZACION CONTRACTUAL INC IGV 1,344,442.30 237,558.23 168,178.57 405,736.80 938,705.50
VALORIZACION CONTRACTUAL IGV 1,344,442.30 201,320.53 168,178.57 405,736.80 938,705.50
RESUMEN DE PLANILLA DE METRADOS N° 02
"SERVICIO PARA LA EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO DEL CAMINO VECINAL TRAMO EMP. SM-100
OBRA
(SHATOJA)-LA UNION -LA FLORIDA-AMIÑIO-HUANCABAMBA-EMP.SM-100, EMP.SM-100 -PONCIANO NUEVO."
CONTRATISTA CONSORCIO UNION
CONTRATO 1,344,442.30
JEFE DE SUPERVISION ING. JOSE LUIS NORIEGA DAVILA.
RESIDENTE ING. JIM CORDOVA PINCHI
SIST. CONTRAT. SUMA ALZADA.
ENTIDAD MUNICIPALIDAD PROVINCIAL DEL DORADO
MONTO BASE S/. 1,344,442.30
MONTO CONTRATO S/. 1,344,442.30
PLAZO DE EJECUCICON 90
100% 0.4
90%
0.35
80%
0.3
70%
0.25
60%
50% 0.2
40%
0.15
30%
0.1
20%
12.51% 0.05
10%
0% 0 0
- 19
- 20
e- 18
r- 1 8
- 18
e- 19
r- 1 9
e- 20
y- 2 0
20
v- 2 0
y - 18
18
v- 18
y- 19
19
v- 1 9
r - 20
1 -jul-
1 -jul-
1 -jul-
1 -sep
1 -sep
1 -sep
1 -ma
1 -ma
1 -ma
1 -ma
1 -ma
1 -ma
1 -en
1 -en
1 -no
1 -no
1 -en
1 -no
NOVIEMBRE
NOVIEMBRE
VALORIZACION Nº 01 Nº 02 Nº 03 Nº 04 Nº 05 Nº 06 Nº 07 Nº 08 Nº 09 TOTAL
a) VALORIZACION
1.- Monto Valorizado (sin IGV) 146,843.41 302,117.67 168,178.57 0.00 0.00 #REF! #REF! #REF! #REF!
2.- Reintegros (sin IGV) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
b) TOTAL VALORIZADO (a.1+b.2) 146,843.41 302,117.67 168,178.57 0.00 0.00 #REF! #REF! #REF! #REF!
c) DEDUCCIONES
1.- Amort. Adelanto en Efectivo (sin IGV) 0.00 0.00 0.00 0.00 0.00 #REF! #REF! #REF! 0.00
2.- Amort. Adelanto de Materiales (sin IGV) 0.00 0.00 0.00 0.00 0.00 #REF! #REF! #REF! 0.00
d) TOTAL DE RETENCIONES (c.1+c.2) 0.00 0.00 0.00 0.00 0.00 #REF! #REF! #REF! 0.00
e) TOTAL A PAGAR POR LA VALORIZACION (b-d) 146,843.41 302,117.67 168,178.57 0.00 0.00 #REF! #REF! #REF! #REF!
f) I.G.V (18% ) 26,431.81 54,381.18 30,272.14 0.00 0.00 #REF! #REF! #REF! #REF!
g) TOTAL A RECIBIR POR EL CONTRATISTA (e+f) 173,275.22 356,498.85 198,450.71 0.00 0.00 #REF! #REF! #REF! #REF!
VALORIZACION DE OBRA N° 02
RESUMEN DE PAGO A EFECTUAR
►ENTIDAD EJECUTORA : MUNICIPALIDAD PROVINCIAL DEL DORADO
►OBRA : "SERVICIO PARA LA EJECUCION DEL MANTENIMIENTO PERIODICO Y RUTINARIO
DEL CAMINO VECINAL TRAMO EMP. SM-100 (SHATOJA)-LA UNION -LA FLORIDA-
AMIÑIO-HUANCABAMBA-EMP.SM-100, EMP.SM-100 -PONCIANO NUEVO."
►CONTRATISTA : CONSORCIO UNION
►SUPERVISOR : ING. JOSE LUIS NORIEGA DAVILA.
►SISTEMA DE CONTRATACIÓN : SUMA ALZADA.
NOVIEMBRE
REINTEGRO 0.00
VALORIZACION BRUTA (V.B.) S/. 168,178.57
AMORTIZACIONES
Amortización Adelantos Directos 0.00% 0.00
Amortización de Adelantos de materiales 0.00% 0.00
TOTAL 0.00
VALORIZACION NETA (V.N.) S/. 168,178.57
MONTO A FACTURAR Y PAGAR AL CONTRATISTA
TOTAL VN + IGV S/. 168,178.57
TOTAL A RECIBIR POR EL CONTRATISTA S/. 168,178.57