MATERIALES
DESCRIPCIÓN UNIDAD CANTIDAD COSTO IMPORTE
BÁSICO
PINTURA COLOR AMARRILLA PZA 1 $299.99 $300.00
SELLADOR PZA 1 $259.00 $249.00
CONOS DE CONTRUCCION PZA 1 $199.00 $240.00
CINTAS DE POLIETILENO PZA 1 $350.00 $250.00
SUBTOTAL: (1) IMPORTE POR MATERIALES SUMA $ $1739.00
MANO DE OBRA
CATEGORÍA UNIDAD CANTIDAD SALARIO IMPORTE
REAL
SUPERVISOR DE OBRA JOR 1 $279.00 $29.00
PINTOR DE OBRA JOR 1 $169.99 $110.99
AYUDANTES DE PINTOR JOR 1 $120.00 $90.00
RECOGEDOR DE ESCOMBROS JOR 1 $100.00 $110.00
RENDIMIENTO: SUMA $ 339.99
SUBTOTAL: (2) IMPORTE POR MANO DE OBRA
MANO DE OBRA IMPORTE
(3) HERRAMIENTA MENOR %3 $750.00 $150.00
(4) EQUIPO DE SEGURIDAD %2 $1499.99 $350.00
M A Q U I N A R I A Y/ O E Q U I P O D E C O N S T R U C C I Ó N
DESCRIPCIÓN UNIDAD CANTIDAD COSTO IMPORTE
HORARIO
AXALTA KIT AMARILLO TRAFICO PARA PISO HORA 8 $1890.00 $3599.00
POLIURETANO 10P
RODILLLO HORA 8 $ $120.00 $100.00
ESCALERA HORA 8 $250.00 $150.00
CAMION DE CARGA HORA 8 $2899.00 $1999.99
RENDIMIENTO: SUMA $ 5848.99
SUBTOTAL: (5) IMPORTE POR MAQUINARIA Y/O EQUIPO
Notas: Cuando sea el caso, incluir los análisis de básicos o “auxiliares” e integración de cuadrillas (categorías y rendimientos)