Cited By
View all- Cheng QKan HRen JLiu ZZhang YCheng C(2024)Multi-objective optimization method for cross-workshop linkage production of partially flexible free-forging with forward single-machine schedulingComputers and Industrial Engineering10.1016/j.cie.2024.110508196:COnline publication date: 1-Oct-2024
- Akram KBhutta MButt SJaffery SKhan MKhan AFaraz Z(2024)A Pareto-optimality based black widow spider algorithm for energy efficient flexible job shop scheduling problem considering new job insertionApplied Soft Computing10.1016/j.asoc.2024.111937164:COnline publication date: 1-Oct-2024
- Wocker MOstermeier FWanninger TZwinkau RDeuse J(2024)Flexible job shop scheduling with preventive maintenance considerationJournal of Intelligent Manufacturing10.1007/s10845-023-02114-335:4(1517-1539)Online publication date: 1-Apr-2024
- Show More Cited By