Cited By
View all- Suresh PWassick JFerrio J(2011)Real time performance measurement for batch chemical plantsProceedings of the Winter Simulation Conference10.5555/2431518.2431796(2330-2340)Online publication date: 11-Dec-2011
- Altuger GChassapis CYücesan E(2010)Manual assembly line operator scheduling using hierarchical preference aggregationProceedings of the Winter Simulation Conference10.5555/2433508.2433707(1613-1623)Online publication date: 5-Dec-2010
- Altuger GChassapis CDunkin AIngalls R(2009)Multi criteria preventive maintenance scheduling through arena based simulation modelingWinter Simulation Conference10.5555/1995456.1995747(2123-2134)Online publication date: 13-Dec-2009
- Show More Cited By