Nothing Special   »   [go: up one dir, main page]

skip to main content
10.5555/1778240.1778307guideproceedingsArticle/Chapter ViewAbstractPublication PagesConference Proceedingsacm-pubtype
Article

Modeling and real-time scheduling of semiconductor manufacturing line based on simulation

Published: 14 September 2007 Publication History

Abstract

Due to the difficulties of establishing a model of semiconductor manufacturing line, a real-time scheduling system of semiconductor manufacturing line is established with discrete event simulation technique. By employing the object-oriented modeling method, this system is implemented by simulation. An actual system with 40 machines and 60 processing steps is employed to demonstrate the validity of this system. Experiments indicate that the modeling and real-time scheduling system is accurate and reliable.

References

[1]
Quirk, M., Serda, J.: Semiconductor manufacturing technology. Electronic industry publisher (2004).
[2]
Kumar, P.R.: Re-entrant lines. Queuing Systems 13(1-2) (1993).
[3]
Wang, Z., Wu, Q.: Multi-object optimal scheduling for semiconductor manufacturing line based on satisfactory control. In: Proceedings of the American Control Conference, vol. 2, pp. 1603-1608 (2002).
[4]
Sikora, R., Shaw, M.J.: Coordination mechanisms for multi-agent manufacturing systems: applications to integrated manufacturing scheduling. IEEE Transactions on Engineering Management 44(2), 175-187.
[5]
Wang, X.-r., Wu, T.-J.: Ant colony optimization for intelligent scheduling. Proceedings of the 4th World Congress on Intelligent Control and Automation 1, 66-70 (2002).
[6]
Zhongjie, W., Qidi, W.: Investigation of control and scheduling of semiconductor manufacturing line. Computer Integrated Manufacturing System-CIMS, pp. 607-611 (2003).
[7]
Zhongjie, W.: Research of optimal scheduling of semiconductor manufacturing line based on hierarchical control. Post Doctorate Report, Shanghai, Tongji University (2002).
[8]
Qi, L., Dali, L., Li, Z.: Optimal decision in production plan of semiconductor industry: linear programming. Semiconductor technology 7, 35-39 (2004).
[9]
Chong, C.S.: Simulation-based scheduling for dynamic discrete manufacturing. In: Proceedings of the 2003 Winter Simulation Conference, vol. 2, pp. 1465-1473 (2003).
[10]
Thompson, Michael: Simulation-based scheduling: meeting the semiconductor wafer fabrication challenge Industrial Engineer (May 1996).
[11]
Miller, D.J.: Simulation of a SML Communications of the ACM 33, 98-108 (1990).
[12]
Watt, D.G.: Integrating simulation based scheduling with MES in a semiconductor fabrication Winter Simulation Conference Proceedings. vol. 2, pp. 1713-1715 (1998).
[13]
Lu Steve, C.H., Ramaswamy, D., Kumar, P.R.: Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Trans. Semiconductor Manufacturing, 373-388 (1994).

Recommendations

Comments

Please enable JavaScript to view thecomments powered by Disqus.

Information & Contributors

Information

Published In

cover image Guide Proceedings
LSMS'07: Proceedings of the Life system modeling and simulation 2007 international conference on Bio-Inspired computational intelligence and applications
September 2007
805 pages
ISBN:3540747680
  • Editors:
  • Kang Li,
  • George William Irwin,
  • Minrui Fei,
  • Shiwei Ma

Sponsors

  • CASS: The Chinese Association for System Simulation

Publisher

Springer-Verlag

Berlin, Heidelberg

Publication History

Published: 14 September 2007

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • 0
    Total Citations
  • 0
    Total Downloads
  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 05 Mar 2025

Other Metrics

Citations

View Options

View options

Figures

Tables

Media

Share

Share

Share this Publication link

Share on social media