Subject : Site Progress Report ( Internal, External, Ancillary Building )
Vendor : Powerconz
Service
1 : Fire Fighting & FAPA System
Resource Sheet – Manpower
Contractor Staff Contractor Labour
Sr.No Manpower No.s Sr.No Manpower Area No.s
6 Billing Engineer
7 Quality Engineer
8 Contracts
9 Admin
10 Store In charge
11 Purchase
12 Accounts
13 Safety Asst. 1
2
2
SITE TOOL BOX TALK (TBT) REPORT & PICTURES
3
SITE TOOL BOX TALK (TBT) REPORT & PICTURES
4
Ware House – Internal Sprinkler Below Mezzanine
Sl. No Activities Description Start Date End Date Current Status as on date
Electrical/FPS/HVAC Works
1 08-Aug-20 • Completed
14-Jul-20
Erection Activities 12-Aug-20
2 10-Aug-20 • Completed
09-Aug-20
Testing 14-Aug-20
3 10-Aug-20 • In Progress
09-Aug-20
Snag Work 16-Aug-20
4 10-Aug-20
09-Aug-20
Measurement 17-Aug-20
5 10-Aug-20
09-Aug-20
As Build 17-Aug-20
6 Handing Over Draft Copy Submision 09-Aug-20 10-Aug-20
7 Handing Over hot Copy Submision 09-Aug-20 10-Aug-20
8 System Commissioning 09-Aug-20 10-Aug-20
9 Completion Certificate
5
Ware House – Below Mezzanine
Progress till Date
Zone -4
Zone - 2
7
Progress Pictures - Below Mezzanine Sprinkler
Zone -4
Zone - 2
8
Progress Pictures - Below Mezzanine Sprinkler
9
Ware House – Internal Sprinkler Above Mezzanine
Sl. No Activities Description Start Date End Date Current Status as on date
FPS
10
Ware House – Internal
Progress till Date
2 Support fabrication & Fixing Zone 2&4 - 12/12 Nos 12/12 Erection Balance - Height
3 Header erection Not Planed
4 Branch Fabrication Zone 2&4 - 376 / 376 376 / 376 Completed
5 Branch pipe Erection Zone 2&4 - 290 / 376 290 / 376 InProgress
6 Tapping with header & Final Welding Not Started
7 Sprinkler Fixing & Final Painting Not Started
11
Progress Pictures - Above Mezzanine Sprinkler
12
Ware House – Ancillary Building
Sl. No Activities Description Start Date End Date Current Status as on date
FAPA
• Till 14th Bay Cabling & Device Installation Done
1
05-Aug-20 • Ancillary Building Rest Room- 3Set,UPS, Battery, Panel , Canteen
14-Jul-20
14-Aug-20
Erection Activities
13
Ware House – Internal FA & PA
Progress till Date
3
1 to 14 Bay 1 to 14 Bay Completed
1 to 14Bay Beam Device Fixing
5 Below Mezzanine Device & Speaker Fixing with Cabling Cable & Device Fixing Cable Completed Device Fixing On going
6 Above Mezzanine Cable Laying - -
7 Above Mezzanine Device & Speaker Fixing - -
8 Ancillary Building Cable Laying - -
9 Ancillary Building Device & Speaker Fixing - -
14
Progress Pictures – FA &PA
15
Progress Pictures – FA &PA
16
Ware House – Ancillary Building
Sl. No Activities Description Start Date End Date Current Status as on date
FPS
• Pipe Painting
• Pipe Erection
17
Ware House – Ancillary Building
Progress till Date
18
Progress Pictures – Ancillary Building
19
Quality Observation / Compliance Pictures
20
Quality Observation / Compliance Pictures
21
Quality Observation / Compliance Pictures
22
Quality Observation / Compliance Pictures
23
Handing Over Documents Submission Status
Sl. Description Submission Date of Submission Remarks
No Status
1 CONTRACT SPECIFICATIONS/PO COPY yes
Yes
2 WORK COMPLETION CERTIFICATE
5 GA DRAWINGS YES
6 OPERATIONAL MANUALS / DATASHEETS / CATALOGS OF ALL SUPPLIED AND INSTALLED ITEMS YES
8 WILL BE
ATTIC STOCK LIST SUBMITTED
9 RECOMMENDED SPARE PARTS & CONSUMABLES LIST N/A