Steel Manufacturing: Group Number - 10
Steel Manufacturing: Group Number - 10
Steel Manufacturing: Group Number - 10
• GROUP NUMBER – 10
The final products include, hot rolled coil and sheet, welded pipe, steel rail, steel bars, sheet pile
One of the key ingredients for successful project management in a steel project is having the right people on the job and
managing them appropriately. Both of the two elements ‘having the right people’ and ‘managing people appropriately’ are
important for the project's success.
PROJECT DELIVERABLES
The total cost estimate for the steel operations will be around Rs. 6.7 Crore.
PRECEDENCE TABLE
C (2.1) Blasting B 3
I (5.2) Transportation H 1
NETWORK DIAGRAMS
B 2 100 20
C 3 50 12
D 2 110 30
E 4 40 20
F 4 90 15
G 3 60 20
H 2 20 25
I 1 - 20
We assume the total available raw materials per day which need to be processed are 150 Units
Assuming the workers maximum available per day are 50 workers.
WORKERS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A 10 10 10
B 20 20
C 12 12 12
D 30 30 30 (s)
E 20 20 20 20
F 15 15 15 15 (s)
G 20 20 20
H 25 25
I 20
Tot 10 10 10 20 20 12 12 12 50 50 65 35 35 35 20 25 25 20
al
WORKERS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A 10 10 10
B 20 20
C 12 12 12
D 30 30 30 (s)
E 20 20 20 20
F 15 15 15 15
G 20 20 20
H 25 25
I 20
Tot 10 10 10 20 20 12 12 12 50 50 50 35 35 35 35 25 25 20
al
RAW MATERIALS
We assume the total available raw materials per day which need to be processed are 150 Units
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A - - -
B 100 100
C 50 50 50
E 40 40 40 40
F 90 90 90 90 (s)
G 60 60 60
H 20 20
I -
Total - - - 100 100 50 150 50 150 150 240 140 150 150 60 20 20 -
RAW MATERIALS
We assume the total available raw materials per day which need to be processed are 150 Units
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A - - -
B 100 100
C 50 50 50
E 40 40 40 40
F 90 90 90 90
G 60 60 60
H 20 20
I -
Total - - - 100 100 50 150 50 150 150 150 140 150 150 15 20 20 -
0
GANTT CHART
EARNED VALUE ANALYSIS