Mangla Dam

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 37

"A reservoir is a mans triumph over nature and the sight of a vast sheet of water brings an inner satisfaction

to those who behold."

MANGLA DAM

GROUP MEMBERS
y Bilal Ali Syed y Omer Zafar y Waqas Anwar y Ali Sumair

(07-C-88) (07-C-79) (07-C-78) (07-C-47)

Bird s Eye View of River Jhelum

Parties Of The Project


y Funding from World Bank y Designed and supervised by Binnie & Partners of London y Built by Mangla Dam Contractors, a consortium of 8 U.S.

construction firms y Sponsored by Guy F. Atkinson Company of South San Francisco y Contractors employed Pakistanis, Americans, British, Canadians, Germans, and Irish

THE MANGLA DAM


y

The worlds largest dam at the time of its completion. Total fill was 140 million cubic yards. (in all the four dams, main dam, Jari dam, intake dam and Sukian dam.) Previous largest dam was fort peck dam on the Missouri river in Usa.
7

PRIMARY FUNCTION
y To increase the amount of water that could be used

for irrigation

y To generate electrical power from the irrigation

releases at the artificial head of the reservoir

STRUCTURES
y Main Structures Of The Mangla Dam

Include
y 4 Embankment Dams y 2 Spillways y 5 Irrigation Tunnels y A Power Station
9

THE MAIN DAM


y The main dam is 10300 feet long

y Height of the main dam above core trench is 454

ft.

y Width is 41 ft

10

THE MAIN DAM


y 83 million cubic

yard earth fill was used in main dam and the main dam was the worlds 3rd largest dam.

11

INTAKE EMBANKMENT DAM


y Height of the intake embankment dam

above core trench is 262 ft.

y Length 1900 ft.

Width 147 ft.

12

JARI DAM
y

43 million cubic yards earth fill used in Jari dam Maximum height above core trench 274 ft. Length 6800 ft. Width 40 ft.
13

y y

SUKIAN DAM
y

Maximum height above core trench 144 ft.

Length 16900 ft.

Width varies 30 ft. To 40 ft.


14

General View of Main Spillway

15

MAIN SPILLWAY

16

GENERAL INFORMATION
y

50 million dollar earth moving machinery worlds largest peace time collection of construction equipment. Average rate of fill was 3 million per month. cubic yard

With max. Rate 4 million cubic yard per month.

17

GENERAL INFORMATION
y

Aggregate plant capacity 3000 cubic yards of concrete per hour. worlds biggest plant at that time. Mole to drive tunnels, specially designed. 36 ft. diameter to excavate 1650 ft. long five tunnels. at a rate 105 ft. per day. operated by Pakistani operators.
18

EFFECTIVES
y Over 280 villages and the towns of Mirpur and Dadyal

were submerged

y Over 110,000 people were displaced from the area

y People had to leave their ancestral homes

19

COMPENSATION
y Pay royalties to the Government of AJK(Azad Jamu

and Kashmir)
y Work permits for Britain by the Government of

Pakistan
y In many cities in the UK the majority of the

'Pakistani' community actually originated from the dadyal Mirpur area of Disputed region Jamuu Kashmir.
20

Acknowledgement from The Government

21

SETBACKS

y Due to an Indian Air Force raid during the Indo-

Pakistani War of 1971

y Due to failure of turbines on 29th of June,2009

22

Mangla Dam Water Flow

23

MANGLA RAISING

24

THE PROPOSAL
y 30ft raising of dam y Increment in storage capacity by 2.9 million acre

feet

y Average annual energy output estimated to

increase by 772 GWH

y 14% of the present energy yields from Mangla y 8023 households y An area of 15783 acres will be submerged in water
25

26

27

PARTIES OF THE PROJECT


y Water and Power Development Authority

(WAPDA)
y Chinese Company China International Water and

Electric Corporation for the construction of main works of Mangla Dam Raising Project
y Descon Engineering, Interconstruct Gammon

Pakistan and Sachal Engineering Works


y Mangla Joint Venture (MJV) NESPAK, ACE,

Barqaab, Binnie Black, Veatch & Harza

28

29

30

31

MAIN COMPONENTS
y Main Dam & Intake Embankment Sukian Dyke y Jari Dam & Rimworks y Main Spillway y Emergency Spillway y Gate Equipment y Mirpur Bypass Road

32

Salient Aspect of Raising Project


Feature Present Projected

Reservoir

1202 ft. (366.5m)

1242 ft. (378.7 m) 1040 ft. (317.1 m)

Minimum Operation 1040 ft. (317.1 m) Level Gross Storage Capacity Crest Elevation of Erodible Bund

4.5 MAF (5,553 MCM) 7.4 MAF (9,132 MCM) in in year 2007 year 2007 1216 ft (initial 1208 ft) Replaced by Concrete Control Weir, Crest elevation. 1243 ft. (379 m) 1266 ft. (386 m)

Elevation of Control 1234 ft. (376.2 m) Structure Main and Intake 454 ft. (138.5 m) Embankment Height

484 ft. (147.6 m)

Additional Average Annual Water Availability 2.88 MAF (3,550 MCM) Additional Average Annual Hydropower 644 GWh
33

COMPENSATION PACKAGE
y New City y Four towns with modern facilities y Infrastructure of high standard y Owners of land & built up property would be

adequately compensated
34

OTHER ADVANTAGES
y Generation of employment opportunities y fillip to socio-economic activities y Fishermen

35

36

REFERENCES
y Wikipedia y Pakpaedia y MDRP. Resettlement Organization goAJK