Objective of Project
Studying the existing system
Understanding the
Recommendation Cause of auxiliary Analysis
Power consumption
Final conclusion
and project report
Overview of Processes in PH#3
Auxiliary Power Consumption
Frequent change of filters are done to prevent any clogging which may lead tlo
pressure drop.
High Consumption of
Auxiliary Power in
Power House #3
Data Collection
Data acquisition
Power consumption
Auxiliary Power Consumption Report
PARETO ANALYSIS
Cause and Effect Relationship
Materials Method
No proper Wrong
strength Installation
Manufacturing
defect
Auxiliary Power
Consumption
No proper
Do not care the lubrication
system
Vibration of machine
Do not do proper
inspection Misalignment of
component
Do not operate
No proper design