Industrial Training: Submitted By:-Amitesh Anand 05BEI003 Vitu, Vellore
Industrial Training: Submitted By:-Amitesh Anand 05BEI003 Vitu, Vellore
Industrial Training: Submitted By:-Amitesh Anand 05BEI003 Vitu, Vellore
Submitted By:-
AMITESH ANAND
05BEI003
VITU, VELLORE
INTRODUCTION
LAND REQUIREMENT:- 1267.3 acres
CAPACITY :- 3300 MW
WATER REQUIREMENT :- 9200 cum/hr
COAL REQUIREMENT:-10 millions/yr
COAL TRANSPORTATION:- Larger -437 kms
Rated Turbine Load - 660 MW
Number of Turbine Cylinders :-
HP Turbine – 1
LP Turbine – 2
IP Turbine – 1
Number of Stages in the Cylinders:-
(a) HPC - 17
(b) LPC - 11x2
(c) IPC - (5x2)x2
Total Number of Stages - 59
Heat Rate - 1889 kCal/kWh
CONSTRUCTION POWER (33/11 kV)
BRIEF DESCRIPTION OF SWITCHYARD
EQUIPMENTS :-
Circuit breakers
Isolators
Surge arrestor
Shunt Reactor
Post Insulators
Earthing
CIRCUIT BREAKER
ISOLATOR
CONTROL & RELAY PANELS
Bus – Coupler
Incomer Panel
Outgoing Panel
Chargers and Batteries
AC Distribution Board
DC Distribution Board
Incomer & Outgoing Panel
Rated Voltage 11 kV
Phase 3 phase
Frequency 50 Hz.
Ratio 300/1 A
Chargers and Batteries
Isolator Switches :-
Frequency 50 Hz.
Type of cooling ONAN
Conservator Tank
Buchholz Relay
Breather
Valves
Tap Changer
Drain Valve
THANKING YOU