Caisson Piles Design & Construction

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 57
At a glance
Powered by AI
The document discusses the design and construction of caisson piles used as foundations for a mixed development project. Caisson piles are constructed by manually excavating the ground and retaining temporary concrete linings as excavation continues to the required depth. Foundation construction can be challenging due to issues with accessibility, limited working space, and high imposed loads.

Caisson piles are constructed by manually excavating the ground in lifts and retaining each lift with a temporary cast-in-situ concrete lining. Excavation continues through each lift until the required founding depth is reached, at which point steel reinforcement and final concreting of the pile is done.

The document mentions that foundation construction can be challenging due to issues with difficult accessibility, limited or non-flat working spaces, and high imposed loads on the foundations.

CAISSON PILES

DESIGN & CONSTRUCTION


2.34 Acres Mixed Development,
Damansara Perdana

By : BRYAN LEE
Date: 20TH NOV 2008
G&P Professionals Sdn Bhd (www.gnpgroup.com.my)
How are these
foundation being
constructed?
G&P Professionals Sdn Bhd Quality Services - Our Commitment
G&P Professionals Sdn Bhd Quality Services - Our Commitment
G&P Professionals Sdn Bhd Quality Services - Our Commitment
G&P Professionals Sdn Bhd Quality Services - Our Commitment
G&P Professionals Sdn Bhd Quality Services - Our Commitment
Foundation Construction Challenging
Difficult in accessibility

Limited / Non-Flat
Working Space

High impose loads

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site & SI Layout Plan
Service Apartment
Block A2: 8 Floors
Service Apartment
Block A1: 13 Floors

Podium: Service Apartment


Commercial: 2 Floors Block B: 10 Floors
Car Park: 6 Floors
G&P Professionals Sdn Bhd Quality Services - Our Commitment
SI Borelog Profiles

8 Boreholes
7 Additional
Boreholes
G&P Professionals Sdn Bhd Quality Services - Our Commitment
Foundation Layout

Shallow Bedrock:
Deep Bedrock: Footing
Caisson + Micropiles

G&P Professionals Sdn Bhd


RL 78 Quality Services - Our Commitment
Why using Caisson Piles?

Most of the deep foundation are on


slope (flat piling platforms are needed)

Site congested (big piling rigs; site is only


2.34 Acres)

Expensive of piling rigs mobilisation


(quantity of deep foundation not much)

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Introduction of Caisson Pile
150 Apron

Technology from Hong Kong 250

Lift 1= 1.25m

Manual earth digging


75
75

Lift 2= 1.425m

Retained temporary with


Dowel
Bars
Pile
Diameter

cast in-situ concrete linings


Lift 3= 1.425m

Concrete

Continue excavate to
Linings
Lift 4= 1.425m

required founding level Lift 5= 1.425m

Steel reinforcing & concreting Lift 6= 1.425m

Dia. 1m 4m, max. 45m long


400 7000 ton capacity Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 1a
150 Apron

250
Placing of Steel Mould
Lift 1= 1.25m
75
75
Lift 1
Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 1b
150 Apron

250
Placing of BRC A6
Lift 1= 1.25m
75
75
Lift 1
Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 1c
150 Apron

250
Linings Concreting
Lift 1= 1.25m
75
75
Lift 1
Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 1c
150 Apron

250
Install Hoist Frame
Lift 1= 1.25m
75
75
Lift 1
Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 1c
150 Apron

250
Ventilation & Lifting Bucket
Lift 1= 1.25m
75
75
Lift 1
Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 2a
150 Apron

250
2nd Lift Excavation
Lift 1= 1.25m
75
75

Lift 2= 1.425m Lift 2


Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 2b
150 Apron

250
Dismantle of Steel Mould
Lift 1= 1.25m
75
75

Lift 2= 1.425m Lift 2


Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 2c
150 Apron

250
Placing of Steel Mould
Lift 1= 1.25m
75
75

Lift 2= 1.425m Lift 2


Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 2d
150 Apron

250
Placing of Steel BRC A6
Lift 1= 1.25m
75
75

Lift 2= 1.425m Lift 2


Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 2d
150 Apron

250
Lining Concreting
Lift 1= 1.25m
75
75

Lift 2= 1.425m Lift 2


Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 3
150 Apron

50
Continue of Sequence 2
Lift 1= 1.25m
75
75

Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 4
150 Apron

50
Rock Excavation
Lift 1= 1.25m
75
75

Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 5
150 Apron

50
Rock Inspection
Lift 1= 1.25m
75
75

Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 5
150 Apron

50 Rock Inspection Log


Lift 1= 1.25m
75
75

Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 6
150 Apron

50
Steel Reinforcement
Lift 1= 1.25m
75
75

Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Sequence 6
150 Apron

50
Concreting
Lift 1= 1.25m
75
75

Lift 2= 1.425m
Dowel
Bars
Pile
Diameter
Lift 3= 1.425m

Concrete
Linings
Lift 4= 1.425m

Lift 5= 1.425m

Lift 6= 1.425m

Bedrock

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Monitoring 1

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Construction Monitoring 2

Sample of Caisson Monitoring:


refer to G\ 05G404\ Excel\ Caisson Pile Monitoring
G&P Professionals Sdn Bhd Quality Services - Our Commitment
Design of Caisson 1
All. Struc. Capacity, Qall
= 1/4 fcu Ac
= 1/4(35)(p*15002/4)
= 15,563kN say 15,000kN (Ft)

Econ = Ko+0.2fcu
= 20+0.2(35)
= 27GPa
Erock / qu = 200 (conservatively)
Erock = 200*20MPa
= 4000MPa= 4GPa
Econ/Erock = 27/4 = 6.75
G&P Professionals Sdn Bhd Quality Services - Our Commitment
Design of Caisson 2
All. Rock End Bearing Capacity, qa
= Ksp*qu (Canadian Foundation Engineering Manual)

= 0.1*20MPa
= 2000kPa qu=20MPa

Force, Fb = 2000*(p*1.52/4)
= 3534kN

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Design of Caisson 3

Ft = 15,000kN
Fb = 3534kN Fb/Ft = 24%

From graph,
dr/ro = 2.3
ro = 1.5/2 = 0.75
Min rock socket required, dr = 1.73m

Ep/Er=6.75

dr/ro=2.3

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Design of Caisson 4
Check:
Load taken by shaft friction
= (100-24%)*15,000kN = 11,400kN

Allow. Skin Resistance for Granite


= 5%qu = 0.05*20MPa = 1MPa

Fskin available = p*1.5*1.73*1000kPa


= 8152kN < 11,400kN
(rock socket length inadequate!)

Ep/Er=6.75

dr/ro=2.3

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Design of Caisson 5
Try Rock Socket Length of 2.75m:
dr/ro = 2.75/0.75 = 3.67

From graph,
Fb/Ft = 16%
Load taken by shaft friction
= (100-16%)*15,000kN = 12,600kN

Fskin available = p*1.5*2.75*1000kPa


= 12,959kN < 12,600kN
(rock socket length adequate!)
So, adopt rock socket length of 2.75m for
f1500 caisson with working capacity of
15,000kN
Fb/Ft = 16 Ep/Er=6.75

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Testing of Caisson 1
Instrumented Pile Testing

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Testing of Caisson 2
Instrumented Pile Testing

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Testing of Caisson 3a
1 2

Arrangement for pile testing:

3 4

5 6

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Testing of Caisson 3b
1 2

Arrangement for pile testing:

3 4

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Testing of Caisson 4
Instrumented Pile Testing

d1WL=3.11mm d2WL=6.84mm

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Testing of Caisson 5
Instrumented Pile Testing

Results Conclusion:
1) Total Pile displacement = 6.84mm
a) Pile Shortening = 4.71mm
b) Base Settlement = 2.13mm

2) Soil Mobilised Unit Shaft friction = 268kPa


(Ignore during design)

3) Rock Mobilised Unit Shaft Friction:


a) 1st m = 1037kPa
b) Subsequent 1.5m = 1738kPa
(Design fs = 1000kPa)

4) Rock Mobilised End Bearing = 3666kPa


(Design fb = 2000kPa)

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Testing of Caisson 6
Caisson Plate Bearing Test

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Testing of Caisson 7
Caisson Plate Bearing Test

d =1.6mm

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 1

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 2

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 3

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 4

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 5

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 6

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Definition of Rock Excavation

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 7

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 8

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 9

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 10

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 11

G&P Professionals Sdn Bhd Quality Services - Our Commitment


Site Photos Caisson 12