Failure
Failure
Failure
ON
Foundation Failures
by
Dr.S.R.Gandhi
Professor
srgandhi@iitm.ac.in
Sand Drains
Piles
TYPICAL SECTION OF CARGO BERTH
SLIP SURFACE
REMEDIAL MEASURES
Further fill to facilitate construction of piles was
stopped.
Further pile installation was done using end on
method.
Integrity tests were carried out on the displaced
piles to find the extent of damage.
About 80 replacement piles were installed adjacent
to the displaced piles wherever displacement
exceeded 30 cm.
Connecting beams suitably designed to take care of
the eccentricity.
Prof.V.S.Raju, IIT Madras
7th Cargo Berth (Contd.)
REMEDIAL MEASURES
BERTH
TRANSIT SHED
+9.83
+9.146
+3.049
5
: 1.
P E1
S LO
G
IN :3 500 DIA PILE
ST PE 1
E XI SLO
ED
IGN
DES
-14.94
-28.0
6100 9150 9150 9150 9150
22873
SOFT CLAY
C = 15 KN/m2
-5.0
FINE SAND
MEDIUM SAND
COARSE SAND
-20.325
STIFF CLAY
N.M.C = P L
-26.425
SANDY COARSE GRAVEL
-27.95 SANDY MEDIUM GRAVEL
-29.475
FINE SAND
-34.05
RESTORATION OF BERTH
500 PILE
1200 PILE
-14.9 PROPOSED
EXISTING
A B C D E F G H
28.0
-