Khurmala Field Field Department Drilling Deve. Oil Wells Project TU Location
Khurmala Field Field Department Drilling Deve. Oil Wells Project TU Location
Khurmala Field Field Department Drilling Deve. Oil Wells Project TU Location
Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location
References RTKB
Well KDN-21(K-448)
Depth (mMD) 914
Lower fars formation
Current Formation
Circulation prior to POOH to surface.POO
Current Operation at 24:00
N/U 13 5/8'' x 10K Annular BOP, tighten
Pressure test of 13 5/8" 10 M Pipe Ram 6
13 3/8'' Csg w/ 1700 psi hydrostatic pres
for RIH, M/U and RIH w/ BHA#5 + 77 ea
Operations last 24 hours(00:00 to 24:00) 898m. t/ 910m.Circulation prior to POOH
Totco
400
432
643
842.5
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
Interval m. MD
Background Gas
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6 N/A
R7 N/A
R8 N/A
R9 N/A
Seepage Beds 802
ENTRY DATA
318 GL 309 Rig
Date 8/9/2018 day spud 10/8/2018
Depth (mTVD RT 914 Progress
wer fars formation
U 13 5/8'' x 10K Annular BOP, tighten bolts btwn Annular BOP and Double Ram, Pressure test of 13 5/8" 10M Annular BOP 6
ssure test of 13 5/8" 10 M Pipe Ram 600 psi f/ 5 min & 2000 psi f/ 20 min. OK, B/O and L/D 13 3/8'' Cup Type Tester, Test Bli
3/8'' Csg w/ 1700 psi hydrostatic pressure + 600 psi, OK, Install 13 3/8'' Bell Nipple on Annular BOP tightened all bolts and w
RIH, M/U and RIH w/ BHA#5 + 77 ea 5'' DP to 897m.Drill out cement f/ 897m. t/ 898m. Found top plug @898m. Drill out to
8m. t/ 910m.Circulation prior to POOH to surface.POOH f/ 910m. t/ 765m.
Shows
Description
GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm
735 -417
735 -417
735 -417
740 -422
755 -437
764 -446
778 -460
792 -474
06:00 UPDATE
Depth (mTVD RT) 914 Current Activity
er , CBL Logging.
-910)Depth (mMD).
Team Crew
Days on Akram Maqsud
Days on Dlnya Hoshyar
Days on Ahmed Adnan
Ram, Pressure test of 13 5/8" 10M Annular BOP 600 psi f/ 5 min & 2000 psi f/ 20 min. OK,
OK, B/O and L/D 13 3/8'' Cup Type Tester, Test Blind Ram 600 psi, OK at the same time test
l Nipple on Annular BOP tightened all bolts and weld flow line to Bell Nipple,Preparation
7m. t/ 898m. Found top plug @898m. Drill out top & bottom plugs + FC + cement f/
Basis of Pick