Gazette
Gazette
Gazette
SPP DOC 201 – Pre-Design Services – ranging from initial problem identification to activities
that would allow the Architect to initially conceptualize an array of architectural & allied
solutions.
Ex. Consultation, pre-feasibility studies, feasibility studies, site selection and analysis, site
utilization and land-use studies, architectural research, architectural programming, space
planning, space management studies, value management, design brief preparation, promotional
services and other related activities.
Method of Compensation -MDPE, PFPE, LS/FF, pe rdiem/ Honorarium, or mixed methods.
SPP DOC 203 – Specialized Architectural Services – working in dual capacity as Architect-
of-record and as Consulting Architect for specialized architectural services or as consulting
architect only.
Architectural Interior (AI) – RPF
Architectural Interior (AI) RPF is 10% to 15% of the cost of work
depending on the complexity required.
SPP DOC 204-A – Full-time Supervision Services – includes quality control, evaluation of
Construction work, Preparation of Daily Inspection Reports, Filing of documents.
RPF is 1% to 1.5% of Project Construction Cost (PCC).
SPP DOC 204-B – Construction Management Services – includes coordination and
supervision, cost and time control, quality control of work and keeping of records.
RPF is 1.5% to 3% of Project Construction Cost (PCC).
SPP DOC 205 – Post Construction Services
SPP DOC 206 – Comprehensive Architectural Services – (Project Management)
RPF is 2% to 5% of Project Construction Cost (PCC).
SPP DOC 207 – Design-Build Services
Design-Build Services by Administration – 7% of PCC
Design-Build Services on a Guaranteed Maximum Cost – 10% of PCC
SPP DOC 208 – Architectural Design Competition
SPP DOC 209 – Professional Architectural Consulting Services (PACS)