MECH5255 2018 Lecture 13
MECH5255 2018 Lecture 13
MECH5255 2018 Lecture 13
Semester 2, 2018
i) Determine the flow rate and the developed pressure the fan delivers when
connected to the ductwork system.
Q (m3/s) 0 1 2 3 4 5 6 7 8
Δp (Pa) 800 780 750 710 660 600 500 320 50
Revision: Fans and ductwork
Revision: Fans and ductwork
Q (m3/s) 0 1 2 3 4 5 6 7 8
Δp (Pa) 800 780 750 710 660 600 500 320 50
System 0 31.25 125 281.25 500 781.25
Revision: Fans and ductwork
II) Now consider the case when the fan is connected to the ductwork system the
fan operates at 1200rpm.
Revision: Additional areas
i) Review all of Simon’s lecture notes: Loads, zoning, duct design, system
selection and scheduling.
-Strategies to select rooms and zones
-Impact of loads, sensible and latent, fresh air requirements, solar vs. internal.
-Examples of high and low latent loads
-Scheduling vs. utlisation factors
-Strategies for design and layout of ductwork
-pros and cons of different systems (e.g. chilled water, direct expansion,
unitary/package units, CV vs. VAV)
Revision: Additional areas
HVAC IS important
https://student-surveys.sydney.edu.au/students/
18
Some parting thoughts
HVAC IS important
Thank you!