Nothing Special   »   [go: up one dir, main page]

Rotor Active Clearance Control / Start Bleed

Download as pps, pdf, or txt
Download as pps, pdf, or txt
You are on page 1of 21

Rotor active clearance

control / start bleed


RAC heating HPC disks to
Improve the HPC
efficiency during
cruise operation

SB For HPC stability


during engine start
and rapid
acceleration
Located 7:30 o’clock ,HPC case
RAC
HPC 5th stage To HPC
inner cavity

ECU T/M

HMU HPC 9th stage

SB
Piston position
RAC SB

100%

62%

27%

5th 9th Air used


Fail safe Fully
position closed
HPT active clearance
control
•Maximize turbine
efficiency.

HPT ACC •Minimize the peak


EGT during throttle
burst.
•Reduce compressor
load during starting
and transient engine
conditions

By min. blade & shroud tip clearance.


3:00 o’clock HPC case.
HPC 9th stage
m
a
n
ECU T/M
f
i

HMU HPC 4th stage


o
l
d

To HPT shroud
Piston position

100%

95%

40%

37%

4th 9th Air used


LPT active clearance
control
•Controls LPT
rotor to stator
clearance
LPT ACC
•Protects the
turbine case
from over temp.
4:30 on HPC case
The butterfly valve determines the amount of fan discharge air
entering the manifold and cooling tube assembly.
Valve
Fail safe modulated
position (opened 30
degrees)

You might also like