Soni CV
Soni CV
Soni CV
Key Attributes
Bachelor of Science in Mechanical Engineering. Specialized knowledge in rotating
equipments maintenance ( Minor and Major overhaul, troubleshooting, analysis ).
28 years of experience working continuously in the LNG and LPG Plants.
Multifaceted hands on experience in Maintenance, Engineering and Projects of
Major Rotating Equipments:
- CI, HGPI and MI of Frame 5, 6, 7 and 9 Gas Turbines.
- Major overhaul Rotor replacements of Centrifugal Compressor
- Disassembly and assembly single and multi stages Centrifugal Pumps, all types
of submersible LNG Cryogenic Pumps, Reciprocating Pumps, Blowers, Steam
Turbines, Turbine expander, Mechanical and Dry Gas seal replacements.
- Formulate rotating equipments spare parts requirements and ensure availability.
Managed execution of Minor Major scheduled and unscheduled shutdown jobs.
Managed installation of Rotating equipments in LNG and LPG Plant Projects.
Managed installation of Rotating equipments in LNG and LPG Plant Projects.
Mentored staff ( Qatary NDP ) to develop their capabilities.
Trainings
Dec. 02 ~ Dec. 03, 2012
Understanding Emotional Intelligence
Conducted by HNI
Sponsored by RasGas Company Ltd.
1
Feb. 07 ~ Feb. 08, 2011
Project Execution Management
Conducted by RasGas Company Ltd.
2
April 04 ~ April 06, 2006
Alimak Elevator Maintenance.
Conducted by Alimak Co. Ltd.
Sponsored by RasGas Company Ltd.
3
Oct. 10 ~ Oct. 11, 2000
General Report Writing.
Conducted by QatarGas Operating Company Ltd.
4
March 03 ~ April02, 1991
Gas Turbine, Operation and Maintenance.
Conducted by General Electric Co. USA.
Sponsored by PT Arun NGL Company Ltd.
5
March 17 ~ March 21, 1988
LNG Cryogenic Pumps.
Conducted by Nikkiso Co. Ltd. Japan.
Sponsored by PT Arun NGL Company Ltd.
EMPLOYMENT HISTORIES
Present
RasGas Liquefied Natural Gas Company Limited, Qatar.
Position: Sr. Maintenance Coordinator / Shutdown Maintenance Specialist.
Maintenance Department.
6
Provide input for tendering & contract development as vendor is required.
Provide technical guidance and direction to the respective team based on a
detailed scope and understanding.
Supervised and managed the activities undertaked by vendors ( CI HGPI and
MI of Frame 5, 6, 7 and 9 Gas Turbines, Gas centrifugal compressor overhaul
and Steam turbines overhaul ).
Involved in cold eye review meeting for readiness shutdown.
Review SHE requirement and liase with EMS Dept. to prepare rescue plan for
incase of emergency or any accident happens.
Liase with operation and safety officer to assure the jobs start safely and
establish permitting plan based on the job priority.
Keep communicating with turnaround planning to review the plan and schedule
which maybe changed or the job on the look a head schedule can not be
executed.
Lead shutdown execution. Ensure the quality requirements are met performance
standards, taking corrective action when necessary.
Liase with field maintenance, operation and engineering departments to close
punch list items A categories prior to starting up the plant.
Interact regularly with staff in other group and department for the purpose of
providing advice and guidance ( Field Maintenance and Material Dept. )
Mentored staff ( Qatary NDP ) to develop their capabilities.
Report to shutdown project manager.
2008 ~ 2012
RasGas Liquefied Natural Gas Company Limited, Qatar.
Position: Maintenance Shutdown Coordinator, Maintenance Department.
7
Keep communicating with turnaround planning to review the plan and schedule
which maybe changed or the job on the look a head schedule can not be
executed.
Provide timely and accurate the work progress reports to maintenance
superintendent.
Worked along with other team (safety, operation, and engineering groups) to
carry out PSSR to confirm readiness of the equipment after completion of jobs
prior to handing over the equipment to operation department for commissioning
- start up.
Supporting plant start up activies
Worked with material coordinator to return surplus materials to store and
prepare documents for machine parts to be refurbished.
Consolidate lessons learned.
2007 ~ 2008
RasGas Liquefied Natural Gas Company Limited, Qatar.
Position Held: Sr. Rotating Machinery & Reliability Supervisor
Maintenance Department, AKG, LNG Plant, Helium Plant and Sulfur
Recovery Unit.
Supervise the team carrying out daily maintenance activities. Preventive and
breakdown maintenances for all machinery rotating equipments.
Participate in weekly planning meeting to release of associated 14 / 28 / 90 days
schedule of work.
Coordinate activities with machinery & reliability engineer, operation shift
supervisor and planner to establish priority of work according to maintenance
plans, detail assesment of resources, materials, logistic requirements and liase
with other maintenance support staff as required.
Lead discussion on the problem, lead the work execution and manage resource
allocation to focus on repair work
Involved in developing and establishing policies and procedure, criticality,
equipment strategy, ensuring consistency with company strategies and business
objectives.
Review equipment history and performance contribute to plant failures
investigation and make recommendations for improvement. Liase with operation
and integrity engineer to ensure equipment is retained in good functional order
all times.
Participated in HAZOP reviews and develop SIMOPS procedures
Keep abreast of new developments, work practices, engineering standards and
codes of practice.
Daily meeting with operation representative and machinery reliability engineer
to discuss work status and to monitor equipment performance.
Review maintenance procedures regularly to ensure cost effectiveness and
operation efficiency.
Provide input into the development of asset maintenance budgets
Participate in planning for major maintenance jobs and scheduled LNG train
shutdowns.
8
Identify specific part of equipment that requires maintenance jobs.
Supervise of rotating equipments overhauling job during shutdown.
Provide technical advice and support during equipment starts up.
Focus on long term objetives such as eliminating repeat failures, conducting risk
assessments and developing machinery turnaround work scope.
Worked along with MMS team to ensure equipment database, spares and
documentation are captured.
Review and recommend spare part, non stock material and tools requirement to
facilitate proper plant maintenance.
Ensure safety of personnel and equipment through compliance with EHS policies,
procedures and standard.
Provide progress report to Rotating Machinery & Reliability Superintendent.
2006 ~ 2007
RasGas Liquefied Natural Gas Company Limited, Qatar.
Position Held: Sr. Mechanical Static & Rotating Equipment Supervisor.
Maintenance Department, LNG Plant, Helium Plant and Sulfur Recovery
Unit.
9
Worked along with engineering department on equipment maintenance strategy
team to set up maintenance best practice for all critical rotating equipments.
Provide progress report to Head Maintenance Mechanical
2005 ~ 2006
RasGas Liquefied Natural Gas Company Limited, Qatar.
Position Held: Mechanical Static & Rotating equipments Supervisor.
Maintenance Department, LNG Plant, Helium Plant and Sulfur Recovery
Unit.
Carried out maintenance activities in LNG Train, Helium Plant and Sulfur
Recovery Unit. Preventive and breakdown maintenances for all rotating and
static equipments: Gas centrifugal compressor, air centrifugal compressor, frame
6 and 7 gas turbine, centrifugal pumps, reciprocating pumps and fin fans.
supervise and lead mechanical technician in overhauling LNG Cryogenic Pumps.
(LNG transfer product pumps, LNG circulation pumps and LNG loading pump).
Supervise and lead mechanical technician in overhauling Helical screw
compressor.
Supervise and lead mechanicall technicians in overhauling LNG hydraulic
turbine.
Supervise and lead mechanical technicians in shutdown job of Molecular sieves
dryer.
Supervise and lead mechanical technicians in shutdown job of Incinerator vessel
Supervise and lead mechanical technicians in shutdown job of Heat exchanger
Supervise and lead mechanical technicians in shutdown job of Incinerator blower
Supervise and lead mechanical technicians in shutdown job of Gas centrifugal
Compressor (Major overhaul for rotor and dry gas seal replacement).
Supervise and lead mechanical technician in shutdown job (Major Inspection) of
Frame 7 Gas turbine.
Supervise and lead mechanical technician in overhauling Centrifugal pump
( single stage and multi stages ).
Ensure all mechanical maintenance tasks are carried out safely, timely.
Prepare JSA as the job needs.
Prepare daily activities report.
Maintain equipment maintenance history and up date all relevant data in SAP
system.
Respond to emergency call out.
Provide progress report to Mechanical engineer specialist
1999 ~ 2005
QatarGas Liquefied Natural Gas Operating Company Limited, Qatar.
Position Held: Mechanical Static & Rotating equipments Foreman.
Maintenance Department, Gas Inlet Receiving, LNG & Condensate Strorage /
LNG and Condensate Loading Facilities.
10
Preventive and breakdown maintenances for all rotating and static equipments:
Off gas centrifugal compressor, boil off gas centrifugal compressor, transfer gas
centrifugal compressor, air centrifugal compressor, pumps for cryogenic services
(LNG loading pumps, LNG circulation pumps, LNG surge drain pumps),
condensate pumps, glycol pumps, heater, column, drum, heat exchanger, cooler
fans, valves, marine loading arms (LNG loading arm and condensate loading
arm), equiments in jetty area (mooring hooks, gang ways, hydraulic system),
equipments in sulfur loading facilities (sulfur ship loader, dust supprision unit,
cable rail with magnetic coupling, triple car, counterweight balance and belt
conveyor ).
Responsible for balancing jobs of all LNG Cryogenic pump rotors.
Lead Technician in disassembly / assembly LNG Cryogenic pumps
(LNG loading pump, LNG circulation pump, LNG surge drain pump)
Lead Technician in upstream area shutdown Jobs of heater, drum, column and
heat exchanger.
Team Leader in multi discipline performing parties for removing / installing LNG
loading and LNG circulation pumps on the top of LNG tank.
Lead Technician in overhauling helical screw compressor.
Lead Technician in overhauling gas centrifugal compressor.
Lead Technician for disassembly / assembly of seals (primary , secondary and
water seals) of style 40, 50, 80, swivels Joints of LNG loading arms.
Team Leader in multi discipline performing parties to perform double block valve
test of LNG loading arms.
Team Leader in setting the parallelism of pantograph of LNG loading arms.
Carried out monthly emergency release coupler test of LNG loading arms.
Carried out general maintenance jobs of LNG loading arms.
Carried out maintenance jobs of emergency release mooring hooks and its
hydraulic system.
Carried out maintenance jobs of jetty gangways and its hydraulic system.
Worked along with FMC engineer in installing centralized greasing system for the
structure of swivel joints of LNG loading arms.
Respond to emergency call out.
Provide progress report to Mechanical supervisor
1998 ~ 1999
PT Arun Natural Gas Liquefaction Company Limited, Indonesia.
Position Held: Sr. Rotating Equipment Inspector.
Operation Expansion Department, North Sumatra Offshore Platform & Onshore
LNG Plant Project.
11
Supervise progress of contractors mechanical works, ensuring that all works are
carried out in accordance with contract specifications, deal with project
engineers and project supervisors in installing all units of the rotating equipment
machinery (gas turbines, compressors, pumps, blowers, fin fan coolers, forced
draft fans).
Coordinating with various departments, QC. Project Engineering regarding
progress of the project activities.
Liaise with rotating equipment engineer to resolve any problem or discrepancies
which arise at site.
Prepare daily report, record completed jobs, highlight in coordination meeting
when mechanical works is behind schedule or does not comply with standard
and company regulation.
Coordination with contractor and project engineer and witnessing rotating
equipment inspection.
Punch listing and punch killing
Preparing site instructions. Plants and facilities precommissioning and start
ups.
Coordinating with the Operation department personnel for acceptance of
equipments and release for commisioning
Team Leader of rotating equipment technicians in supporting operation
department during pre commissioning, commissioning, pre start up and start up
the North Sumatra Offshore & Onshore LNG Plant.
Provide progress report to mechanical project superintendent
1996 ~ 1998
PT Arun Natural Gas Liquefaction Company Limited, Indonesia.
Position Held: Associate Rotating Equipment Engineer.
Technical Department, LNG / LPG Plants
12
Performing non destructive test ( dye liquid penetrant ) to identify if any crack of
particular parts of gas turbine ( liner combustion, transition piece, IGVs blades,
rotor and stator blades, wheel buckets, support pin, crossfire tubes ).
Carried out borescope inspection of particular parts of gas turbine during
shutdown inspection jobs.
Measuring referenced opening stretch of accessory coupling.
Carried out and responsible for measuring the clearances of particular parts in
overhauling the rotating equipments ( centrifugal pumps for cryogenic services,
gas centrifugal compressors, high pressure multi stage centrifugal pumps, gas
turbines, Turbo expanders ).
Close in supervising on the shaft alignment jobs.
Worked along with a team of rotating engineer of plant reliability engineering
group in providing engineering solution to company needs and undertake other
duties as required through maintenance activities to keep all rotating equipment
machinery operating at optimum level.
Worked along with the representative of General Electric Company during
overhaul gas turbines ( combustion inspection, hot gas path inspection and
major Inspection ) at site and in workshop.
Worked along with the representative of Ebara and Elliot Company during
overhaul gas centrifugal compressors at site and in workshop.
Dealing with respective planner and supervisor in repairing of major rotating
equipments during plant shutdown and normal operation.
Performing inspection, prepare procedures and technical standards which are
required in shutdown jobs ( minor or major overhaul ) and for process
modification of major rotating equipments.
Worked along with reliability engineer in maintaining databases for predictive
maintenance, preventive maintenance history, required materials, equipment
trending records and facilities inventories.
Respond to emergency call out.
Provide progress report to Head of Plant Reliability Equipment Group.
1994 ~ 1998
Islamic University of North Sumatra. Completed Study at Faculty of
Engineering, awarded Bachelor of science in Mechanical Engineering
1992 ~ 1994
PT Arun Natural Gas Liquefaction Company Limited, Indonesia.
Position Held: As a scholar of PT Arun NGL Co. Ltd. Indonesia, approved by
the Indonesias state oil and gas company ( PERTAMINA ). Study at Oil &
Gas Academy.
1990 ~ 1992
PT Arun Natural Gas Liquefaction Company Limited, INDONESIA
Position Held: Rotating Equipment Foreman
Maintenance Department, LNG / LPG Plants.
13
Carried out maintenance activities in LNG/LPG Plants.
Preventive and breakdown maintenance activities for all rotating equipments.
Lead Technician in overhauling of turbo expander compressor unit
( 60 17 E 23 C ) at site and in workshop.
Lead Technician in shutdown jobs / overhaul of gas turbine MS 5002
( combustion inspection, hot gas path inspection, major inspection )
at site and in workshop.
1988 ~ 1990
PT Arun Natural Gas Liquefaction Company Limited, Indonesia.
Position Held: Sr. Rotating Equipment Technician.
Maintenance Department, LNG and LPG Storage / Loading Facilities.
Carried out maintenance activities in LNG and LPG Storage / Loading Facilities.
Preventive, breakdown maintenances for all rotating equipments, emergency
release moring hooks, jetty gangways, LNG Cryogenic pumps and LNG loading
arms.
Sr. Technician in major overhaul submersible multi stages centrifugal pumps for
cryogenic services.
Sr. Technician in replacing pantograph cable of LNG loading arms.
Sr. Technician in replacing pantograph cable of condensate loading arms.
Sr. Technician in replacing water seals, primary seals, secondary seals of style
40, 50, 80 swivel joints of LNG loading arms.
Sr. Technician in major overhaul of LNG loading arms.
Sr. Technician in major overhaul of LNG loading arms.
14
Sr. Technician in shutdown jobs / overhaul gas centrifugal compressors.
Sr. Technician in overhaul LNG and LPG Cryogenic pumps
Respond to emergency call out.
Provide progress report to Lead rotating equipment technician
1986 ~ 1988
PT Arun Natural Gas Liquefaction Company Limited, Indonesia.
Position Held: Rotating Equipment Technician.
Maintenance Department, Utility Plant ( Steam. Water. Air. Nitrogen ) and Power
Generation.
1985 ~ 1986
PT Arun Natural Gas Liquefaction Company Limited, Indonesia.
Position Held: Rotating Equipment Mechanical Trainee.
REFERENCES:
2. Sijm Albertus
Head of Reliability Engineering
RasGas Liquefied Natural Gas Company Limited, Qatar
alsijm@rasgas.com.qa
Phone: + 974 44973104
Mobile Phone: + 974 55280792
15
3. Elham BRDM
Maintenance Advisor.
RasGas Liquefied Natural Gas Company Limited, Qatar
mhelham@rasgas.com.qa
Phone: + 974 4923202
Mobile Phone: + 974 55339511
3. Russel Gordon
Turnaroun & Shutdown Maintenance Manager.
RasGas Liquefied Natural Gas Company Limited, Qatar
rpgordon@rasgas.com.qa
Phone: + 974 44732538
Mobile Phone: + 974 55560648
16