Calc Sheet
Calc Sheet
Calc Sheet
diameter
no diameter coefisient convert
power
mm x
mm cm cm
border width
border width
edge thickness
b b d
mm mm mm
EX:
1 15 15 3 15 15 3
2 15 15 4 15 15 4
3 20 20 3 20 20 3
4 20 20 4 20 20 4
5 0 0 0 0 0 0
weight lenght total weight
kg/m1 m1 kg/12m1
weight weight
kg kg
942.00 9.420
94.20 0.942
188.40 1.884
282.60 2.826
376.80 3.768
471.00 4.710
565.20 5.652
659.40 6.594
753.60 7.536
847.80 8.478
942.00 9.420
663.33 10.205
376.80 4.710
1,130.40 9.420
end of arc
Radius coeficient FORMULAS weight
radius
R r1 c d(2b-d) 0,215(R2-2r2)
d(2b-d) + (0,215(R2-2r2)
mm mm kg/m1
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan - 1
2
1 12.00 1.60 1.00 15.60 5.40
0
A B C
SUBTOTAL 1 =
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. Bhd.
70.60
Contractor
ngineering Sdn. Bhd. PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan - 1
2
H4
H3
75 20 20 115 135 20 20 175
H2
H1
B1 B2 B3 B1 B2 B3
SUB TOTAL 1+2 =
Acknoledgement
PT. SOCIMAS Lian Juan Engineering Sdn. Bh
SUB TOTAL
IMENSIONAL TOTAL POINT VOLUM
SQ H1 H2 H3 H4 HT VOLUME
M O E
P
17.88
Contractor
ngineering Sdn. Bhd. PT. Cemerlang Samudra Kontrindo
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan - 1
2
2 2 2 P 250 2.00 2 P 250
3 3 0 0 0 0.00 1 P 250
A B C
SUBTOTAL 1+2+3 =
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. Bhd.
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
B D T
C H
POINT
LEAN
OF
MENSIONAL VOLUME CONCRETE
PILE
VOLUMN
CONCRE CAP
TE M O P
COVER
data BxCxTx 10-6 data MxO
cm m3 point m3
0.32
Contractor
PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
UC3
2
3
UC3
1
1
A +0.30
STUMP
TOTAL AMOUNT 1 =
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. Bhd.
PLAN DRAWINGS
UC3
4
UC3
2
2,423.60
Contractor
ring Sdn. Bhd. PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
UC3 UC3
1
: Calculation Sheet
: N5. 2
SUB NAME WORK : UB1 - 203 x 133
PLAN DRAWINGS
X3
Y3
Y2
Y1
377.50
Contractor
PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
a R b
data data data data data (y1+y2)/cos a 2xR
UNIT PAYMENT = Kg
m1 m1 m1 m1 m1 m1 m1
A UB4
TOTAL AMOUNT =
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. Bhd.
T
TITLE DRAW : cAlcUlAtIOn shEEt
O
REF DRAW : N5. 3 T
SUB NAME WORK : UB2 - 254 x 146 A
L
W
SUB TOTAL point of TOTAL
E
subtraction total diagonal WEIGTH RaFteR WEIGTH
weight I
FactoR length
G
SF c W d e T F
data b - SF insert cxW data H dxe
m1 m1 kg/m1 kg bar m1
920.72
Contractor
PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
NO UB4 y1 A B
UB4
1 0.00 12.00 0.00
UB4
A UB4
TOTAL AMOUNT
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. Bhd.
1,080.00
Contractor
g Sdn. Bhd. PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
UB6
UB6
1 0.00 6.00 6.00
UB6
152 RJS
TOTAL AMOUNT
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. Bhd.
1,608.00
Contractor
g Sdn. Bhd. PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
CH1 CH1
1 1 2.00 0.00 0.00
2 2 1.50 0.00 0.00
1 19
427.22
Contractor
PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
degrees
NO 127 RSJ - 127x76 Steel Work [RaFter] y1 0,5y2 0,5y2 y3
a
data data data data data
Unit PaymenT : Kg
m1 m1 m1 m1 m1
y1 0,5.y2 0,5.y2 y3
y2
TOTAL AMOUNT
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. Bhd.
DIAGONAL CALCULATE R
SUB TOTAL
REMARK
WEIGTH
diagonal TOTAL DIAGONAL weight unit
R S T U V W
(y1+y2)/cos a 2xR data data SxTxU -
m1 m1 kg/m1 bar kg -
331.21
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
7,850 12 25 25
T B
T B
CONTRACTOR :
AT DATA
SUB TOTAL
WEIGTH UNIT
WEIGTH
SQUARE SOLID H
CxTxB1xH1 CxTxBxH data J+K
cm2 cm3 kg/cm3 kg Nos kg
1,652.43
OWNER: CONSULTANT :
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
T C
M 12 THK, PLATE in EaVe JOINT DETAIL 7,850 12 15.60
T C
T C
4 M 16 B 7,850 16 30.00
356 ub 45 to column Flange Connection [UB4]
T C
7 M 10 7,850 10 4.80
8 M 12 7,850 12 10.00
in BRACING
M 8 7,850 8 7.50
9 ETC
1 SUBTOTAL =
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. B
SUB
AXIS LINE
TOTAL
SQUARE SOLID WEIGTH LAYER UNIT
B J
data
cm cm2 cm3 kg/cm3 kg nos
400.00
1,734.71
Contractor
ering Sdn. Bhd. PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
OWNER: CONSULTANT :
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
NO X
CH5 - 203 x 76
dataa
Unit Payment : kg cm1
X 2
2 Landing 1,200.00
3 X
YUSTIANUS GIRSANG
CONTRACTOR :
a b c L1 L2 M N
data data data X - (a+b+c) L1 x 10 -2
data L2 x M
cm1 - cm1 cm1 m1 bar m1
31.28
OWNER: CONSULTANT :
0.00
a b
1
SECTION
TOTAL AMOUNT 1
Acknoledgement Approved by
PT. SOCIMAS Lian Juan Engineering Sdn. Bhd.
: Calculation Sheet
: N5. 22
SUB NAME WORK : Grating f/ Platform Floor
PLAN DRAWINGS
B
b
DN
c
TOTAL
SQUARE UNIT
SQUARE
D E F
(A+B) x C data DxE
cm2 - m2
29.92
Contractor
PT. Cemerlang Samudra Kontrindo
Togar Simatupang
Site Manager
PROJECT : xxx
BUILDING : Liquit Loading Area
LOCATION : Kawasan Industri Medan
2 UB4
UB4 UB1
32.00
TOTAL
WEIGTH
L
J+K
kg
365.60
365.60
NO DESCRIPTION WORK
N 1 EARTHWORKS
N 1. 1 Bouwplank
N 1. 2 Structural Excavation
N 1. 3 Cut of Pile
SUB TOTAL EARTHWORKS
N 5 STELL WORK
N 5. 1 UC3 - 254 x 254
N 5. 2 UB1 - 203 x 133
N 5. 3 UB2 - 254 x 146
N 5. 4 UB4 - 356 x 171
N 5. 5 UB6 - 457 x 191
N 5. 6 CH1 - 102 x 5
N 5. 7 127 RSJ - 127 x 76
N 5. 8 152 RSJ - 152 x 89
N 5. 9 C 15019 - Lysaght 125 x 75
N 5. 10 Non Shrink grout f/ stell column
N 5. 11 Anchor Bolt M30
N 5. 12 Anchor Bolt M20
N 5. 13 Base Plate
N 5. 14 Gusset Plate, Stiffener Plate etc
N 5. 15 Wind Bracing 76,1
N 5. 16 Sag Rod M12
N 5. 17 M24 Bolt
N 5. 18 M20 Bolt
N 5. 19 M16 Bolt
N 5. 20 M12 Bolt
N 5. 21 Hand Railing f/ Platform
N 5. 22 Grating f/ Platform Floor
N 6 STAIRCASE
N 6. 1 Hand Railing 40 f x 3,2 x 1100 high incl, Kicker Plate
N 6. 2 Webforce WT 4 WA255/1
N 6. 3 CH1 - 102 x 51
N 6. 4 CH5 - 203 x 76
N 6. 5 Anchor Bolt M16 x 150
N 6. 6 M12 Bolt
N 6. 7 M20 Bolt
SUBTOTAL STAIRCASE
M1 70.60 67.20 +
M3 17.88 12.39 +
Nos 89.00 89.00 0
M3 0.32 0.31 +
M2 24.96 24.12 +
M2 10.24 8.40 +
Kg 598.90 757.23 -
M3 6.47 6.43 +
M3 0.51 0.42 +
M2 56.14 50.82 +
Kg 995.23 804.13 +
M3 7.18 5.84 +
M3 14.45 12.98 +
M2 20.67 31.61 -
Kg 6,586.75 6,100.96 +
M3 72.25 72.21 +
Kg 2,423.60 2,423.60 0
Kg 377.50 377.50 0
Kg 920.72 620.00 +
Kg 1,080.00 1,080.00 0
Kg 1,608.00 1,608.00 0
Kg 427.22 395.96 +
Kg 331.21 327.60 +
Kg 384.00 384.00 0
Kg 1,440.00 1,280.00 +
Nos 8.00 8.00 0
Nos 24.00 24.00 0
Nos 16.00 16.00 0
Kg 1,652.43 165.24 +
Kg 1,734.71 1,699.00 +
Kg 218.24 298.50 -
Kg 18.47 18.47 0
Nos 64.00 64.00 0
Nos 278.00 274.00 +
Nos 24.00 24.00 0
Nos 200.00 120.00 +
M1 31.28 29.60 +
M2 29.92 27.20 +
M1 14.87 14.88 -
M2 6.25 5.50 +
KG 491.82 239.66 +
KG 287.32 354.44 -
NOS 4.00 4.00 0
NOS 52.00 52.00 0
NOS 8.00 8.00 0
M2 161.48 162.46 -
M1 32.00 32.00 0
M1 16.00 16.00 0
M1 20.19 20.31 -
M1 32.06 40.00 -