SITE VISIT REPORT


DAY -01
SITE LOCATION

MEERUT

SITE LOCATION
SITE LOCATION

BUILDING FRONT VIEW


SITE LOCATION

BUILDING FRONT VIEW


SITE IMAGES

SIGNAGES
SITE IMAGES

PARKING

Adequate amount of parking


facility is available with 2wheeler
stand, 4 wheeler stand
LANDSCAPE IMAGES
KEY PLAN

• Ground lvl +-00


5. 1. ENTRANCE AND PAPERBACK • As in rainy season waterlogging problem
DISPATCH occurs.
• In stock area there is no need of Heavy
Electricity only natural light and ventilation us
2 needed.
4. STOCK 2 2. WEB
• Controlled pressure in Fire water Tank and
Pipes.
• Drainage Should be managed
3.BINDING • Truck Dock unloader needed.
KEY PLAN
AREA ANALYSIS- • 10.15 acres total land
• Covd area – 1.05 acres

1. ENTRANCE AND PAPERBACK


• Approx 10 percent of area (450 sq.m)

2. WEB AREA - • Twice the area of Entrance an paperback (900 sq.m)

3. BINDING SECTION • It consists of machinery and other heavy printing machines have more
than 2600 sq.m area

4. STOCK • It almost have 500 sq.m of stock area having both raw materials and
casted products

5. DISPATCH
• It have less than 100 sq.m of area.
KEY PLAN

AREA ANALYSIS- OUTTER SPACES

OUTTER SPACES • OUTER STORE- passage type (60’ x 8’)


• PURCHASE AREA- 13’6” X 7’
• GATE 1- 12 FEET WIDE • DISPATCH- 20’ x 32’
• GATE 2- 12 FEET WIDE • GENERATOR AREA- not specified
• PARKING- OUTER SHED (2.5 X 5.0) M • TRANSFORMER AREA- 9’ X 15’
• GUARD ROOM- 8’6” X 10’ • OCB AREA- 6’6” X 14’
• VSIS ROOM- 8’ X 13’ • DG ROOM- 15’ X 34’
• COURTYARD PLANNING CONCEPT • CICULATION OF THESE SPACES- 14’6” WIDE LOBBY
MATERIALS USED
IN ELEVATIONS

1. CONCRETE AS A BASIC MATERIALS

2. RED BRICK AT EXTERNAL FAÇADE CLADDING

3. ACP WALL CLADDING AT CERTAIN PLACES

4. FLOOR TILES (ANTI SKID TILES FOR OUTER

5. STONES AND GRANITES AT INT. FLOORS


KEY PLAN

TOTAL HEIGHT-
• ALL THE SPACES ARE DEFINED AT THE
SAME HEIGHT LEVEL, THE BUILDING IS IN 3
FLOORS
• GROUND FLOOR HEIGHT- 12FEET
• FIRST FLOOR HEIGHT- 12 FEET
• SECOND FLOOR HEIGHT- 12 FEET
• TRIPLE HEIGHTED SPACE AT CENTER
Printing Machines
Printing Machines
Printing Machines
Printing Machines
Printing Machines
Printing Machines
Printing Machines
Printing Machines
Printing Machines
Printing Machines
Dispatch
Distribution
Preparatory
Skylight
Cutting and Handling
Cafeteria
Water Body
&
entrance gallery