PESES Evaluation Preliminary Questionnaire
PESES Evaluation Preliminary Questionnaire
PESES Evaluation Preliminary Questionnaire
C ate gor y
Scale of the Plant Scale of the Company
Company (Plant) Prof ile
Company (Plant) Prof ile
C ate gor y
2 Company (Plant ) Organization
division name
division name
Production preparati ve Capability <Management >
Ca teg ory Que sti on ite m
The meeting name which discusses the target value & achievement situation
in a factory
<man powerproduction plan Quality etc>
Top Management<QRQ>
The daily meeting name whitch TOP management participates
<QRQC meeting (Daily concern countermesure meeting etc>
The ratio of a regular employee and a temporary worker
TOP Management
Attendance rate (%)
Laber turnover rate(engineer and worker)
What kind of consideration is carried out in order not to make
employees turn over?
-Reduce the work load for leader & manager
-Wage setting based on other company base
Is there any correspondence rule when employee turn over
-Operating taking over
-Control of secrecy information
The contents of an effectuation of the cleanliness <5S> in a factory
The safety regulatipns in a factory
Shop floor management
The contents of the worker educational program
The contents of the acceptance educational program to a temporary worker
Existence of the nomination worker system of an important process and
Special processes
ISO TS16949
Certificated of ISO TS16949
Creation department of a "control plan" And existence of a "control plan
creation standard"
Quality management
Market claim incidence rate of an evaluation object part
The Delivery parts reject rate of an evaluation object part
(Scrap & Rework) rate in a process of an evaluation object part (every
key process)
Tire-N
The quality assurance standard document for a Tire-N supplier
Production preparati ve Capability <Management >
Ca teg ory Que sti on ite m
Production preparati ve Capability <New product project>
Ca teg ory Qu est ion ite m
The actual production quantity of evaluation pertinent parts
When there are no pertinent parts, Please reply similar part
name
& production quantity
management
The latest new product project in a factory
Project
The milestone meeting name in the company to a new product project
TOP Management
"The judgment person (TOP Management) to next process" and the
"participant" in a milestone meeting
Process design in charge
Department name, Number of engineer,
and Years of experience ( - )
Please fill in examination and the validation method of a
productive capacity.
The ratio made from in-house and outside-supplier of a "Die"
Process preparation
Die design in charge
Department name, Number of engineer,
and Years of experience ( - )
Jig & Tool design in charge
Department name, Number of engineer,
and Years of experience ( - )
Inspection gauge design in charge
Department name, Number of engineer,
and Years of experience ( - )
Create control plan in charge
Department name, Number of engineer,
and Years of experience ( - )
Create work instruction in charge
Department name, Number of engineer,
and Years of experience ( - )
<New product>
Purchased part receiving inspection in charge
Department name, Number of engineer,
and Years of experience ( - )
Inspection & Test
<New product>
In process inspection & completed product inspection in charge
Department name, Number of engineer,
and Years of experience ( - )
<New product>
Reliability in charge
Department name, Number of engineer,
and Years of experience ( - )
Production preparati ve Capability <New product project>
Ca teg ory Qu est ion ite m
5 The role of th e Mother plant to the Sup ply plant
Ca teg ory Que sti on i tem
Project management ( Gate revier etc )
Pr epar ation of a pr oduc tion Die ( De sign , Si mula tion , Ma nufac turi ng,
Bu y-of f)
Pr epar ation of a pr oduc tion JIG & To ol ( Des ign, Man ufac turin g, B uy-
of f)
Pr epar ation of a pr oduc tion Equ ipmen t ( Desi gn, Manu fact uring , Bu y-of f)
Preparation of a production Equipment ( Design, Manufacturing,
Buy-off)
Preparation of a Inspection tool ( Purchase order,
Manufacturing, Buy-off)
Pr epar ation of a In spec tion equ ipmen t ( Purc hase ord er, Manuf actu ring ,
Bu y-of f)
Pr oduc tion tria l
Tire2
Se lect ion o f Ti re2 supp lier
Im plem entat ion of a rel iabi lity test
Operator education and skill training
How is the physical support plan from the Mother plant to
fr om M oth er pla nt
Work Instructions, Appearance limit sample, etc. are
transfer from the Mother plant?
5 The role of th e Mother plant to the Sup ply plant
Ca teg ory Que sti on i tem
5 The role of th e Mother plant to the Sup ply plant
Ca teg ory Que sti on i tem
Project management ( Gate revier etc )
Pr epar ation of a pr oduc tion Die ( De sign , Si mula tion , Ma nufac turi ng,
Bu y-of f)
Pr epar ation of a pr oduc tion JIG & To ol ( Des ign, Man ufac turin g, B uy-
of f)
Pr epar ation of a pr oduc tion Equ ipmen t ( Desi gn, Manu fact uring , Bu y-of f)
Pr epar ation of a pr oduc tion pro cess ( Pr oces s de sign , Pr ocess
Preparation of a Inspection tool ( Purchase order,
Manufacturing, Buy-off)
Pr epar ation of a In spec tion equ ipmen t ( Purc hase ord er, Manuf actu ring ,
Bu y-of f)
Pr oduc tion tria l
Tire2
Se lect ion o f Ti re2 supp lier
Im plem entat ion of a rel iabi lity test
Operator education and skill training
How is the physical support plan from the Mother plant to
fr om M oth er pla nt
Work Instructions, Appearance limit sample, etc. are
transfer from the Mother plant?
5 The role of th e Mother plant to the Sup ply plant
Ca teg ory Que sti on i tem