5-ITP-Concrete Works PDF
5-ITP-Concrete Works PDF
5-ITP-Concrete Works PDF
Doc No. :
Rev No. :
Date :
Page :
Revision
Date
Name /Designation
18.10.2014
First Issue
Revision
Date
Name /Designation
Signature
QA Engineer
Author
Quality Manager
Checked by
Contract Manager
Authorized by
ACTIVITY
Varified by
REFERENCE
DOCUMENT
ACCEPTANCE CRITERIA
Doc No. :
Rev No. :
Date :
Page :
Varifying Document
H
HJB
W R
Remarks
M
CONCRETE WORKS
1
Review of drawings
2.0
Material approval
3.0
Material Storage
3.1
Cement
3.2
3.3
Aggregates
Admixture
Reinforcement bars
Store
Keeper/Civil
Supervisor/ Civil
QC Inspector
Store
Keeper/Civil
Supervisor / Civil
QC Inspector
SP1279 part
D,Sec. 2.3.1.2
SP1279 part
D,Sec. 2.3.2.2
SP1279 part
D,Sec. 2.3.7
Store
SP1279 part
Keeper/Civil
D,Sec. 2.3.3.1
Supervisor/ Civil HJB/Qsp.cvl.wi .4
QC Inspector
Civil Qc
Inspector/Civil
Supervisor
SP1279
PartD.Sec2.5
SP1279
PartD.Sec2.3. 2
BSEN197 or
ASTM C150
SP1279
PartD.Sec2.5. 2
SP1279
PartD.Sec2.5. 2
SP1279
PartD.Sec2.5. 1
SP1279
PartD.Sec2.5. 1
BS8110
HJB/Qsp.cvl.CI.4
Civil QC
inspector
Page 1 of 3
ACTIVITY
Varified by
REFERENCE
DOCUMENT
ACCEPTANCE CRITERIA
Design
Doc
No.Mix
: Test Report
Rev No. :
Date :
Page :
Varifying Document
X
0
18.10.2014
Total 1+3 pages
HJB
Client
W R M H W R
Remarks
M
CONCRETE WORKS
Admixture addition
5
6.0
7.0
8.0
9.0
SP1279
PartD.Sec2.3. 7
SP1279Part
DSec2.5.3,
Secl.4.2
SP
1279
Part As per approved drawing. All tying wire
HJB/Qsp.cvl.cl.4
"D"Sec.2.3.3. 3 BS knots within cage and shall not be located
4449, BS 6744 & towards the surface.
BS
4483
HJB/Qsp.cvl.wi .4
Spacing of spacer
blocks Cement
mortar blocks
Concrete Mixing Mix
concrete as per the
design mix
SP1279 Part D
Sec2.3.5
Civil foreman/
Civil QC
Inspector
Civil supervisor/
Civil QC
Inspector
SP1279 Part D
Design mix Ambient temp-max 46"c
Sec2.5.4,Sec2 .5.5 Concrete temp-max 30"c Weight Batch :
As per design mix Volume batch:
concreting<10m3 with Client approved
procedure. Admixture addition: as per
design mix Minimum mixing time:2
minutes
Page 2 of 3
Visual
ACTIVITY
Varified by
REFERENCE
DOCUMENT
ACCEPTANCE CRITERIA
Doc No. :
Rev No. :
Date :
Page :
Varifying Document
H
0
18.10.2014
Total 1+3 pages
HJB
Client
W R M H W R
Remarks
CONCRETE WORKS
10
11.
12
13
14.
SP1279 Part
D.Sec2.5.6
Civil Supervisor
Civil QC
Inspector
Concrete Protection - Civil Supervisor
Surface Finish
Civil QC
Inspector
Testing Concrete
Lab. Techn.
Cube Testing for 7
/Civil QC
days curing and 28
Inspector
days curing Slump
Test
Repair of Concrete
HJB/Qsp.cvl.cl.18
Civil Foreman
SP 1279 Part D Client approved methods of statement for HJB/Qsp.cvl.cl.18
Civil Supervisor/ Sec.2.5.10
repair of concrete. Air holes filled with
Civil QC
mortar sand (1 part) + cement (1.5 parts).If
required approved binding agent shall be
used.
Page 3 of 3