377 North Karanpura TPP (3*660 MW) NTPC
54 Sterlite Energy U-1,2,3,4 4X600 MW
Ministry-Department
Power
Power
Civil Aviation
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Mines
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Coal
Railways
Power
Power
Power
Power
145 Forest Clearance for Mining Renewal for 122.18 Commerce and Industryha Forest Land-Project of Ambuja Cements at
DIPP
Darlaghat, Tehsil Arki, Dist. Solan, Himachal
Pradesh
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Power
Railways
Power
366 Khadia OC
Coal
Power
Power
Power
Power
Steel
Steel
Steel
Power
Shipping
Power
Power
Power
Power
Power
Power
Railways
Power
Power
Power
Power
Power
38 Penganga OC
Coal
152 MANIKPUR OC
Coal
Power
Coal
22 Dhuptala OC
Coal
23 Jamunia UG
Coal
Coal
Shipping
21 Jharkhand OC
Coal
35 Tetariakhar OCP
Coal
9 Lajkura
Coal
32 Inder UG to OC
Coal
36 Ara-Sarubera GoM
Coal
11 Samleshwari Expansion OC
Coal
37 Ray-Bachara-UG
Coal
10 Belpahar OCP
Coal
Steel
Power
Steel
Steel
Steel
Steel
Steel
Power
Power
Steel
Steel
Steel
Power
Steel
Power
Power
Power
Power
Power
Power
Power
Power
Steel
Steel
Power
247 Multi-product Special Economic Zone at Mundra, Commerce and Industry Adani Ports and Special Economic Zone Ltd.
Commerce
Power
Steel
Power
Power
Power
45 Mallavaram-Bhilwara-Bhopal-Vijaipur pipeline
Power
Power
Power
Power
Power
Power
Power
Power
Steel
Power
Power
Power
Steel
Power
Power
Power
Power
Power
Power
Power
Power
Steel
Power
Power
Shipping
Power
Power
Power
Power
Mines
Power
Mines
Power
Railways
Power
Railways
Power
Steel
Power
Power
Power
Railways
Power
Power
Power
Coal
Steel
Railways
384 Pipeline-Kochi-Koottanad-Bangalore-Mangalore
Phase II
Railways
Power
76 Hazira, Near well no 7, Via Surat, District Hazira Petroleum and Natural Gas
394 270 capacity expansion of existing LNG
Terminal 5 MMTPA to 10 MMTPA
Steel
365 Gevra OC
Coal
Railways
Power
Shipping
Power
192 Bhupdevpur-Korichapar-Dharamjaigarh
Coal
Power
Shipping
Power
Power
Mines
Railways
235 ONGC Project - Assam renewal Project ( Group- Petroleum and Natural Gas
A)
Railways
Coal
Power
Shipping
Power
26 Dipka OC
46 OIL Project - Integrated Crude Oil and Gas Field Petroleum and Natural Gas
Development project in Upper Assam districts.
Power
Mines
39 Alewadi Port
Shipping
Power
Power
346 Pink City Expressways Ltd (6-laning of Gurgaon- Road Transport and
Kotputli- Jaipur section of NH-8)
Highways
126 New Moynagudi-Jogigopa new line project
Railways
Shipping
373 New 4-Lane Elevated Road from Chennai Port - Road Transport and
Maduravoyal
Highways
201 300 MW Kaizen Power Limited
Power
Power
Railways
Steel
Power
Steel
178 GreenField Cement Manufacturing Plant-Dalmia Commerce and IndustryCement Bharat Ltd,
DIPP
179 GreenField Cement Manufacturing Plant- Dalmia Commerce and IndustryCement Bharat Ltd for establishing Green Field DIPP
Cement Manufacturing Plant of 4 MTPA Capacity
in Satna, District of Madhya Pradesh
180 GreenField Cement Manufacturing Plant- Dalmia Commerce and IndustryCement Bharat Ltd for establishing Green Field DIPP
Cement Manufacturing plant of 4 MTPA Capacity
in Chittorgarh, District of Rajasthan
Power
323 Shree Cement Ltd, Kodla Project Dist Gulbarga, Commerce and IndustryKarnataka
DIPP
Shipping
Shipping
Power
Railways
Textiles
Power
Shipping
Railways
Power
Power
Steel
Coal
Power
Coal
Railways
Steel
Railways
Power
Shipping
Railways
Coal
Coal
Railways
Shipping
151 BINA OC
Coal
Coal
Coal
Coal
Coal
Coal
27 Bharatpur OCP
Coal
Coal
Coal
Railways
8 Manikpur OC
13 Jhanjra UG
Coal
Coal
Coal
233 ONGC Project - Upgradation of Konaban GGS & Petroleum and Natural Gas
Pipeline Grid Project (Tripura Asset)
Railways
223 Orient(U/G) 4
Coal
Coal
Railways
Coal
Coal
Shipping
16 Urimari OC
Coal
29 Rohini OC
Coal
Coal
Coal
34 Bhakra UG
Coal
14 Dhanpuri UG
Coal
Coal
Coal
19 Kedla UG
Coal
20 Kedla OC
Coal
18 Murlidih OCP
Coal
Coal
30 Kapildhara UG
Coal
31 Chinda OC
Coal
17 Saunda - D
Coal
Estimated
Investment(in
Crores)
Status
15000 All issues Resolved
12000 All issues Resolved
12000 All issues Resolved
9977 All issues Resolved
Commissioning in 2011-12
Commissioning in 2014-15
1.5 Million MTPA Alumina Refinery Project. 8.5 Million MTPA Bauxite Mine
Project
Commissioning- 2014-15
Commissioning- 2013-14
Year of Commissioning U-1 2009-10 U-2 2010-11 U-3 2011-12 U-4 201112
Commissioning in 2013-14
Commissioning in 2013-14
Commissioning in 2012-13
Commissioning- 2011-12
Commissioning- 2014-15
Commissioning - 2013-14
Commissioning- 2012-13
Project Commissioned
Project Commissioned
Commissioning in 2009-10
Commissioning in 2014-15
Commissioning in 2014-15
Commissioning- 2014-15
Commissioning- 2009-10
Commissioning- 2010-11
Commissioning- 2014-15
Commissioning- 2011-12
Commissioning- 2009-10
Construction of 51.38 Km new B.G railway line from Bhairabi to Sarang for
providing connectivity to state capital of Mizoram.
Commissioning in 2013-14(u-1) 2014-15(u-2)
Khadia OC
Promoted by KVK Energy & Infrastructure Pvt. Ltd., Nagai Power Private
Limited (NPPL) is a special purpose vehicle (SPV) implementing a 300 MW
(2 x 150 MW) Coal based thermal Power Plant in Okkur & Venkidanthangal
Village, Nagapattinam District, Tamil Nadu in two phases viz. Phase I of
150 MW and Phase II of 150 MW. The projects are implemented at a total
cost of Rs.1523.64 cr. Phase I will achieve COD by 1st October 2014 and
Phase II will achieve COD in about 24 months from the date of initial
disbursement
Installation of new state of the art Integrated Crude and Vacuum distillation
units of capacity 6.0 MMTPA with 30 percent design margin as a
replacement of old Crude and Vacuum units of BPCL. Overall Progress
achieved 26 percent. Engineering, Procurement and construction activities
are in progress.
commissioning- 2012-13
4x1000 TPD DRI Induction Furnace 2x12 TPD 14 MW Captive Power Plant
(CPP) Planning to expand their existing DRI plant into an Integrated Steel
Plant.
Shri Sidhbali Ispat Ltd. an integrated Steel Plant with Captive Power Plant
having proposed capacity of 1 Million tone steel (0.3 million tone first phase
with 20 MW CPP (12.8 MW CFBC + 7.2 MW WHR) already installed during
2010 and construction of second phase of 0.7 million tone steel and 35 MW
Captive Power Plant is on. The total cost of project is Rs.1050 Crore (300
Crores in first phase already commissioned and work of second phase is
going on) Captive Power Plant of 20 MW (12.8 MW CFBC and 7.2 MW WHR)
was commissioned on 11.10.2010. SLC (Long Term) for linkage approved
our case for issuing LOA for 12 MW in its meeting held on 18/01/2007. LOA
was issued by WCL and stipulated milestones were achieved within the LOA
period. On commissioning of plant (CPP) the capacity was slightly higher,
which was accepted by Ministry of Coal in its order dated 5th Aug 2010.
Inspite of approval by MOC the officials of WCL was not signing the FSA.
The matter was placed in the review committee (SLC-L
Commissioning in 2013-14
commissioning- 2010-11
Commissioning- 2009-10
Commissioning- 2009-10
Year of Commissioning-2011-12
Basundhra (W) - OCP - MCL This is a coal mining project submitted for
Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
HBI UG (Hirakhand Bundia) MCL This is a coal mining project submitted for
Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
The Coal To Liquids Project is being set up by Jindal Synfuels Limited which
involves Gasfication of Coal To Raw SynGas, Purifictaion of Raw Syngas,
Conversion of Purified Raw Syngas to Synthetic Crude and finally upgrading
the synthetic Crude in Refining Units to get Petroleum Products. The
Products will be primarily Diesel and Naphtha. The Project will produce
80,000 barrels per day of Liquids Fuels equivalent to 4 MMTPA of Diesel and
Naphtha.
77450 Pending
42345 Pending
40000 Pending
37500 Pending
6 Million Tons per annum integrated steel Plant with 1320 MW CPP 1 Million
ton per year capacity Bar Mill and 0.6 Million ton per year capacity wire rod
mill are already under production.
37367 Pending
10 MTPA Green Field Integrated Steel Plant and 800 MW Captive Power
Plant, ML granted by State Goverment. Allocated Iron Ore and Manganese
Mine at Ankua and Rohne Coking Coal Block.Purchase 378 Ac private land.
35000 Pending
29777 Pending
6 Milion Ton per annnum Steel Plant with 1142 MW CPP in two Phases
29285 Pending
6 MTPA Integrated Steel Plant & 900 MW Captive Power Plant (CPP). Major
activites of 2 MTPA Steel Plant completed. Major part of land i.e, 4147 Ac
out of 4332 Ac acquired. Operations of 1.5 MTPA Plate Mill started. 540 MW
CPP commissioned. Work for setting up balance 4 MTPA Steel Plant is in full
swing.
29285 Pending
28000 Pending
3,960 MW Sasan UMPP is the largest integrated power plant with captive
coal mines. It is also the countrys first domestic coal based Ultra Mega
Power Project (UMPP) and will benefit around 35 crore people in seven
states procuring power from the Project. The project is based on
supercritical technology which is more efficient and environment friendly.
The project will supply power at lowest levelized tariff of Rs 1.196/kwh for
PPA tenure of 25 years, thereby contributing significantly to economic
development in the country Construction of the project is in very advance
stage. Power generation from the first unit (660 MW) of the Project
commenced in March 2013. Construction of remaining five Units is also
progressing fast. Sasan UMPP has achieved financial closure and tied up
long term loan facilities with Indian as well as foreign banks / financial
institutions to finance the project on limited recourse basis. The project is
largest recipient of foreign currency loan f
25000 Pending
Etalin Hydro Electric Project is a Run Of the River Hydro Electric Scheme
with an Installed Capacity of 3097 MW. The Project is located on Dri River &
Tangon River in Dibang Valley District of Arunachal Pradesh. The project is
a Green Field development.
24214 Pending
22587 Pending
22587 Pending
20000 Pending
16190 Pending
15300 Pending
Acquired Non Contiguous 4600 Acres of Land sand spent Rs. 1800 Crores.
The balance land acquisition will happen only after the new Land Acqusition
Bill is passed by the Parliament.
15000 Pending
14650 Pending
13600 Pending
13167.46 Pending
To improve distillate yield by elimination of black oil pool, meet Euro-III and
Euro-IV specification for the entire diesel pool and increase crude
processing capacity from 12 MMTPA to 15 MMTPA. Overall Progress
achieved- 98.8 percent. Mechanical completion achieved for all Units except
for DCU. Further, CDU and VDU, HGU, DHTU and SRU have been
commissioned.
13195 Pending
13000 Pending
12160.24 Pending
11848 Pending
11000 Pending
10780 Pending
10500 Pending
10000 Pending
9700 Pending
2.51 MTPA Steel Plant. The project is now ready to commence production
from June 2013. Out of capex debt of Rs.824 crores, Rs.602 crores are
sanctioned and remained Rs.222 crores loan application are pending with
Union Bank- Rs. 150 crore, LIC - Rs. 50 crores and P&S Bank- Rs.35
crores. Due to delay in tying up the shortfall of Rs.222 crores, sanctioned
debt of Rs.602 crores is not being released by the consortium of banks.
9562 Pending
2.50 million Tonnes Per Annum (TPA) Integrated Steel Plant at Village:
Kotmar & Patrapalli of Raigarh Distt., Chhattisgarh as per MoU dated 8th
August 2008 between the Government of Chhattisgarh & Government of
Chhattisgarh. Date of Financial Closure Awaiting grant of Captive Iron Ore
Mining Lease. Expected date of Financial Closure within six months of
securing Iron Ore Mine in Chhattisgarh or Odisha. Implementation Status
Substantial portion of land already acquired. Environmental Clearance
already obtained. Allocation of Water from Sapnai River secured. Schedule
date of completion Three years from the date of Financial Closure
Anticipated date of Completion Three years from the date of Financial
Closure
9349 Pending
2x600 MW. Under construction. One unit have coal linkage and other linked
to coal block. FSA signed for the linkage unit. For Unit-II mining lease
clarification pending with MoC and MoEF st-II clearance pending at State
level.
9121 Pending
9000 Pending
The total area of SEZ is 18000 ha. out of which at present 6641.2784 ha.
area is notified and 1840 ha. area is under notification. Environmental
Impact Assessment including Environment Management Plan & Risk
Assessment is carried out for total area of 18000 ha. The Multi product SEZ
at Mundra comprising of Road Network, Rail Network, IT-Telecommunication
network, Electrical Network, Water supply, conservation & drainage
Network, River Training, Desalination Plant with proposed intake & outfall
locations, Common Effluent Treatment Plant & Sewage Treatment Plant,
Natural Gas line network, Social Infrastructure, Existing Airstrip & Waste
Management & Disposal site. The Environmental Clearance for associated
Water Front Development Plan have been obtained from MoEF, New Delhi.
Environmental Public Hearing was carried out for 18000 ha and completed
on 5th October, 2010. Multi-product SEZ will provide plots to various
industries and also develop dwelling units, hotels, shopping
9000 Pending
9000 Pending
8986 Pending
8981.04 Pending
8600 Pending
8290 Pending
Jagdishpur - Haldia Pipeline Project envisages following- Phase-I36/24/18/12 inch x 1860 Km, Ph-II- 24/18/12 x 190 Km and Compressor
Station at Haldia. Scheduled completion is 36 months from first 3i
notification. Present Status- 1. Route Survey completed 2. Office
established at Kolkata and Ranchi 3. Long Term gas sourcing agreements
finalized Issues- a. 3i notification yet to be published owing to customer
tie-up issues. b. Confirmation regarding Fertilizer Plants revival awaited
from Department of Fertilizers.
7596 Pending
7400 Pending
7255 Pending
7200 Pending
7020 Pending
7000 Pending
The blocks was awarded to EOL in the fourth round of CBM bidding in 2009.
EOL has 100% participating interest in the block and entered into a
contract with GoI for exploration and production of CBM gas on July 29,
2010. It is located in Rajmahal coal field in Jharkhand and covers an area of
1128 sq. km
7000 Pending
7000 Pending
(2X660) MW, one Unit linked to Linkage and one Unit liked to coal
block(Rampia).PL pending at with Orissa state Government last 3 years.
Issue of overlapping with MCL to be resolved by MoC.
6930 Pending
6848 Pending
6560 Pending
2.0 MTPA Integrated Steel Plant with 1.20 MTPA Sponge Iron making
facility and Power Plant. 0.25 MTPA steel capacities will come in Phase-I
remaining in Phase-II. Stage -I &II Forest Clearance obtained on
28.7.2006. Allocation of Utkal B2 Coal Block by Ministry of Coal since
16.8.1999. Prior approval under Section 5(i) for Mining Lease obtained on
20.9.2007.
6500 Pending
6449 Pending
6300 Pending
6290 Pending
6500 Pending
6300 Pending
6200 Pending
1.00 million Tonnes Per Annum (TPA) Integrated Special Steel Plant, 0.8
million TPA Coke Plant, 0.2 million TPA Ferro Chrome Plant and 250 MW
Captive Power Plant Phase I The company has already incurred a Capex of
approximately Rs.3,200 Crore and already established a 0.5 million TPA
Special Steel Plant (comprising of 0.225 million TPA Blast Furnace, 0.3
million TPA Sponge Iron Plant, 0.5 million TPA Special Steel Melt Shop and
0.5 million TPA Special Steel Rolling Mill for Bars and Wire Rods), 0.4 million
TPA Coke Plant and 150,000 TPA Ferro Chrome Plant with 75 MW Captive
Power Plant and infrastructure for the total capacity of Special Steel, Coke
and Ferro Chrome with Captive Power is in place Phase II To expand the
aforesaid capacity of Special Steel Plant from 0.5 million TPA to 1 million
TPA, Coke from 0.4 million TPA to 0.8 million TPA, Ferro Chrome Plant from
150,000 TPA to 200,000 TPA, Captive Power Plant from 75 MW to 250 MW
and construction of railway l
6000 Pending
Imported coal based plant. Approval for using sea water pending with State
Govt.
KVK Nilachal Power Private Limited (KNPL), an SPV, promoted by KVK
Energy & Infrastructure Private Limited (KEIL), is implementing a project to
set up 3x350 MW coal based power project in Cuttack District, Odisha in
two phases viz. Phase I of 1x350 MW and Phase II of 2x350 MW.
5795 Pending
5545 Pending
Maithon Power Limited (MPL ), a joint venture of The Tata Power Company
Limited and Damodar Valley Corporation, has set up 1050 MW thermal
power project at Maithon, Dhanbad, Jharkhand. Both the Unit 1 and 2 have
commissioned on 1st September, 2011 and 24th July, 2012 respectively.
5500 Pending
5430 Pending
5590 Pending
1. Brief Description of Project Ministry of Coal allotted MachhakataMahanadi Coal Blocks as captive mines jointly to Maharashtra State Power
Generation Company Limited i.e.MAHAGENCO and Gujarat State Electricity
Corporation Limited i.e.GSECL on 06.02.2006 under Government
Dispensation in the ratio of 60 and 40 respectively, to meet fuel
requirement of their power plants. MAHAGENCO and GSECL are State
Government Companies of Maharashtra and Gujarat respectively.
MAHAGENCO and GSECL have formed a Joint Venture company called
Mahaguj Collieries Limited i.e. MGCL to carry out development and
operation of the mine. MGCL has selected Mine Developer and Operator i.e.
MDO through International Competitive Bidding for development and
operation of Machhakata coal block. 2.Salient Features Location-Talcher
Coalfield, Chendipada, District Angul, Odisha Annual target- 30 MTPA ROM
coal Life - 33 Years Block area - 2103.34 Ha. Geological Proved Reserve
- 1400.65 MT Mineable Coal-
5416 Pending
5400 Pending
5200 Pending
4x250 MW imported coal based plant. Approval of land reforms Deptt and
Directorate of Town and Country Planning, Govt. of Tamil Nadu pending.
5189 Pending
Exisiting facilities - 8 Million tonnes per annum Pellet Plant at Vizag Andhra Pradesh, 8 Million tones per annum Beneficiation plant at Kirandul Chhattisgarh, 267 Kms slurry pipeline connecting Pellet Plant to
Beneficiation plant. (Rs. 3600 Crores)- To be implemented - Second
pipeline connecting Beneficiation plant to Pellet Plant - 463 Kms. (Rs. 1550
Crores)
5150 Pending
5093 Pending
5093 Pending
5000 Pending
Shell through its wholly owned subsidiary Andhra LNG Pvt Ltd is developing
an LNG regasification terminal to supply Andhra Pradesh with regasified
LNG. The terminal is being developed under the GOI policy permitting
100% FDI (automatic route) and is State of the art, latest generation,
floating regasification storage unit (FSRU) with up to 5 mtpa capacity using
the most efficient and environmentally friendly regasification process. The
project will provide earliest relief to 4,000 MW gas based power plants that
are now distressed. It requires no project financing thus saving significant
time. It entails FDI of approximately USD 800 mln for FSRU and
installations. The engineering and design for all elements of the project is
completed, and the FSRU has been selected. A full scale Environmental
Impact Assessment (EIA) was submitted to the state Pollution Control
Board on 28th March 2013 demonstrating only minimal environmental
impact. Several gas sales heads of agreements signed wit
5000 Pending
5000 Pending
5000 Pending
Attunli Hydro Electric Project is a Run Of the River Hydro Electric Scheme
with an Installed Capacity of 680 MW. The Project is located on Tangon
River in Dibang Valley District of Arunachal Pradesh. The project is a Green
Field development.
5000 Pending
4909.54 Pending
Unit-1 commissioned. St-I clearance for Mahan coal block linked to the
project has been issued by MoEF. St-II clearance to be forwarded by State
to MoEF
4860 Pending
4840 Pending
4660 Pending
4608 Pending
3x350 MW TPP. For Unit-I FSA signed. Balance two units in FSA list. CCEA
approved the list in its meeting held on 21.06.13
4540 Pending
4444 Pending
4200 Pending
4083 Pending
4000 Pending
4000 Pending
3955 Pending
THDC. The Project is a run off the river scheme with a gated Diversion Dam
of 65 m height, a water conductor system and an underground Power
House located 20 km downstream of head works.All clearances are in
place, project to be awarded by THDC.
3745.08 Pending
The blocks was awarded to EOL in the fourth round of CBM bidding in 2009.
EOL has 100% participating interest in the block and entered into a
contract with GoI for exploration and production of CBM gas on July 29,
2010. It is in southern end of the Mahanadi valley Gondwana belt in Orissa
and the block covers an area of 557 sq. km covering parts of three district
namely Angul, Sambalpur & Deogarh.
3500 Pending
The blocks was awarded to EOL in the fourth round of CBM bidding in 2009.
EOL has 100% participating interest in the block and entered into a
contract with GoI for exploration and production of CBM gas on July 29,
2010. It is situated in the northeastern part of the Sohagpur coalfield and
lies in the states of Madhya Pradesh & Chhattisgarh, covering an area of
339 sq. km
3500 Pending
3500 Pending
2x270 MW Coal based thermal power project with 25 year of PPA with
Punjab State Power Corporation for 100 percent generation. The
expenditure incurred so far is Rs. 3196 Crores till end of July 2013. BTG
Contractor - BHEL BOP Contractor - Punj Lloyd Source of coal - Captive coal
mine at Tokisud North Sub-block, South Karanpura Coal Fields, located in
Hazaribagh Dist. Jharkhand. Unit-1 Synchronized to grid on oil firing on 6th
July 2013. Project cost break up- Power Plant - Rs. 3200 Crores Coal mine Rs. 300 Crores
3500 Pending
3500 Pending
3500 Pending
3380 Pending
3379.45 Pending
3348 Pending
3250 Pending
One unit linked to coal block (Durgapur Saraya). St-II of Forest clearance
has been cleared by State Govt. and sent to MoEF in March, 13. Under
consideration of MoEF.
3200 Pending
3193 Pending
3027.59 Pending
3025 Pending
3000 Pending
The block was awarded to EOL in the fourth round of CBM bidding in 2009.
EOL has 100% participating interest in the block and entered into a
contract with GoI for exploration and production of CBM on July 29, 2010.
It is located in the IB valley coal field in Gondwana basin which forms the
central segment of the western Gondwana basin in the Mahanadi valley belt
in Orissa. This block covers an area of 209 sq. km. The block falls in two
districts Sundargarh (200 sq.km) & Jharsuguda (9 sq.km)
3000 Pending
2966.99 Pending
2957.21 Pending
2915 Pending
2900 Pending
2862 Pending
2844 Pending
2800 Pending
2800 Pending
Gevra OC
2675.87 Pending
Joka-BBD Bag metro project in Koklatta connect central business distt with
Joka area via Majerhat. Alignment runs parellel to flyovers and to
accomodate metro via duct land in some streches is required from mint
press, Kolkatta port trust and swapping of land from MoD.
2619 Pending
2542 Pending
2538 Pending
2500 Pending
2500 Pending
2500 Pending
2500 Pending
Phase-I of the Port with 2 berths of 550 m long quay, storage space,
unloading equipments, conveyors and stacking equipments are
commissioned in August 2009 and in operation. Phase-II DPR is ready for
implementation. Port Connectivity by 4-lane road to Mumbai-Goa Highway
(NH-17) and rail connectivity to Konkan Rail is pending for want to
approval.
2500 Pending
2500 Pending
The Kameng Hydro Electric Project is a 600 MW run of the river scheme,
situated in the West Kameng district of Arunachal Pradesh.
2496.9 Pending
2400 Pending
Sterlite Industries plans to expand its copper smelting and refining capacity
by 4 lakhs tonnes per annum with allied infrastructure. The facility will also
have 2.5 lakh tonne per annum of Phosphoric Acid plant. The project will be
set up in Tuticorin, Tamil Nadu. Sterlite is currently operating a 400,000
tonnes per annum Copper Smelter at Tuticorin and with this expansion, the
total capacity would be 8 lakh tonnes per annum making it one of the
largest single location copper smelter in the world. Land of approximately
320 acres has already been allotted by SIPCOT under 99 year lease. The
project would be set up as a Special Economic Zone and the SEZ has
already been notified CAPACITY-TONNES PER DAY Existing Post Expansion
Copper 1200 2400 Phosphoric Acid 800 1600 Copper Rod 410 1210
2400 Pending
6.0MTPA cement plant. 3MTPA in first phase with lime stone mining and
Captive Power plant of 80MW. The company is located at village Tigul, B.
Sardagi, Balawad & Kiranagi Dist Gulbarga, Karnataka. MOU signed on 8th
jun 2012
2400 Pending
2394 Pending
2388 Pending
2378.86 Pending
2345 Pending
This Rail Line (92.10 Km) was approved in August 2000 and Railways were
entrusted for the complete work (from land acquisition, forestry clearance
etc. up to commissioning)
2345 Pending
Six lane under NHDP Phase-V being constructed by KMC Constructions Ltd.
2340 Pending
This is the Phase-I of integrated steel Project.In Phase-I 0.4 MTPA DRI
Plant and 30 MW Power Plant with an investment of Rs.595 Cr is already
commissioned. The associated coal mining project with an investment of
Rs.885 Cr & the 0.4 MTPA Expansion (Phase-II) with an investment of
Rs.700 Cr are under implementation.The total cost of the Phase-I+PhaseII+ Mines is Rs.2179.39 Cr. The 0.4 MTPA DRI Plant is currently under shut
down due to delay in Working Capital disbursement.The financial closure of
DRI & Power Project was achieved on 31-03-2010.
2179.39 Pending
The Heo Hydro Electric Project is a 240 MW ROR Project, and the middle
Project of a cascade of 3 HEPs totalling 571 MW developed on the Yarjep
River, in the West Siang district of Arunachal Pradesh. The Heo HEP and the
two other HEPs (namely Pauk HEP and Tato-1 HEP) are developed as 100%
Foreign Direct Investment projects by Velcan Energy Group, a French group
listed on Nyse Euronext Paris.
2001 Pending
2000 Pending
L&T in jv with TIDCO has developed Kattupalli Minor Port near Chennai in
Tiruvallur district in Tamil Nadu with an investment of Rs. 2000 Crores. The
Port has a Container Terminal of 1.2 million TEU annual capacity which has
become operational since Jan 2013. The Port has not been able to attract
shipping lines for scheduling vessel calls at Kattupalli Port because of the
Customs related issues and the traffic through the port is insignificant. The
Port infrastructure is idling despite providing to EXIM community a good
and viable alternative to the conjested Chennai Port
2000 Pending
2000 Pending
1985 Pending
1968 Pending
1943.66 Pending
1875.5 Pending
1867 Pending
1856.36 Pending
1800 Pending
1800 Pending
1793 Pending
1.Installed capacity - 1 x 270 MW. 2.Coal Requirement - 1.3 MMT per year
per Unit. 3.Water Requirement - 7.8 MM3 per Year per Unit. 4.Energy
available for sale with 85 percent Plant Load Factor- 1829 MU per Year for
Phase-I. 5.Date of Commissioning - Phase-1- 18.07.2013-COD. 6.Land
Requirement - 141 Hectors 7.Project Implementation-Phase-1-1x270 MW.
8.PROJECT EXECUTION - PHASE-1 - commissioned 9. PROJECT LOCATION 51 kms from Nagpur on Nagpur - Chandrapur state Highway NH-7. 10.
Nearest village-Bela, Tahsil-Umred, District-Nagpur, Maharashtra State. 11.
Nearest Railway station- Borkhedi on Nagpur - Mumbai Central Railway at a
distance of 11 kms from Project site. 12. Nearest Airport Nagpur. 13).
Nearest Seaport Mumbai and Vizag. 14. MAIN PLANT i.e boiler turbine
generator and esp is supplied, erected and commissioned by bhel. 15.
Balance of plant comprising of CHP, AHP, treatme
1768 Pending
1704 Pending
The AMNEPL Power Plant with four units of 61.50 MW each has been
developed under PPP Model with Maharashtra Airport Development
Company Limited (a Government of Maharashtra Undertaking) as 26%
Partner. The Plant has been commissioned in August 2011. Presently the
Power Plant is incurring losses as is operating on costly market coal.
1677.85 Pending
1673.7 Pending
1656 Pending
Elevated four lane link road from Chennai Port and NH4 at Maduravoyal
1655 Pending
1655 Pending
1644 Pending
1638 Pending
1600 Pending
1584 Pending
0.35 MTPA Cold Rolled Closed Annealed Steel (CRCA) and Cold Rolled Non
Grain Oriented Steel (CRNO) Integrated Steel Plant Financial Cosure is
pending as the company is yet to complete the terms and conditions of
action, post which syndication will be initiated.
1563 Pending
1553 Pending
Manufacture of Steel Billets with 360,000 MTPA and captive power plant of
220MW.
Rampia and Dipside of Rampia Coal Block was allotted jointly to six
Companies vide Ministry of Coal letter no 38011/1/2007-CA-I dated 17th
January,2008 for providing onshore fuel to their Power Plants. 1) M/s
Sterlite Energy Ltd 2) M/s GMR Energy Ltd 3) M/s Arcellor Mittal India Ltd
4) M/s Lanco Group Ltd 5) M/s Nabbharat Power Pvt Ltd 6) M/s Reliance
Energy Ltd In terms of compliance of the said letter of MOC, a Joint
Venture Company Ms Rampia Coal Mine and Energy Pvt. Limited (RCMEPL)
was incorporated on 19th Feb 2008. RCMEPL submitted application for
grant of Prospecting License (PL) to Govt of Odisha within the stipulated
time of 3 months. Ministry of Coal, Government of India conveyed its prior
approval for grant of Prospecting License (PL) in favour of the allottees to
Govt. of Odisha vide letter No 13116/29/2009-CA-1 dated 13th Aug 2009.
However the production of coal from the Block could not commence due to
delay in grant of Prospective License from State.
1534 Pending
1500 Pending
1500 Pending
1500 Pending
1500 Pending
1507 Pending
Integrated Green Field Cement Plant of 3.0 MTPA Capacity along with CPP
of 36MW at N V Gothra Tehsil, Nawalgarh Dist JhunJhun, Rajasthan
1500 Pending
A Unit of Shree Cement Limited. Kondla project for 3.0MTPA Cement Plant
with lime stone mining & Internal Power plant 150MW. LOcated at Village
Kodla Benkanhalli, SEdam Dt. Gulbarga, Karnataka. MOU signed on 4th
June 2010
1450 Pending
1432 Pending
1432 Pending
1410 Pending
1366 Pending
1314 Pending
1312 Pending
1290 Pending
Lenzing Modi Fibers India Private Ltd. LMI is introducing in India, State of
the Art Technology, to manufacture Viscose Fibres. Viscose Fibers is
presently being imported by Textile Industries. Viscose Fiber is more
absorbent than Cotton. The demand for Viscose is projected at 1 million
TPA by 2020, where as production is only 3, 30,000 TPA. Renowned Modi
group has signed collaboration, technical, financial and management
agreements with Lenzing AG Austria in September 2008. Lenzing is world
largest producer of viscose fibers, having plants in Austria, UK,USA,
Indonesia and China. The LMI project is on the anvil since 2008. LMI
acquired MIDC 90 acres land at Adl. Patalganga, Taluka Panvel, District
Raigad, Declared as Industrial and Chemical Zone to manufacture 80,000
TPA viscose fiber plant. Government of Maharashtra has declared the
Project as Mega. Maharashtra Pollution Control Board has granted Consent
to Establish on October 1, 2005 & revised approval dated July 24,2012
1285 Pending
1272 Pending
1263 Pending
1269 Pending
1220.32 Pending
The 18 inch dia x 441 km long cross country white oil multi-product
pipeline of with design capacity of 7.98 MMTPA from Rewari to Kanpur will
pass through the states of Haryana, Rajasthan and Uttar Pradesh. The
Pipeline is proposed to be laid to transfer BS III MS, BS IV MS, BS III HSD,
BS IV HSD and SKO from the existing Tap off location at Rewari of Mundra
Delhi Pipeline in Haryana up to Kanpur in Uttar Pradesh. This pipeline will
be connected to HPCLs existing installations at Bharatpur, Mathura and new
proposed marketing installation at Kanpur.
1210.64 Pending
1200 Pending
1186 Pending
1170.52 Pending
1169 Pending
1157.16 Pending
1142 Pending
The Pare H.E. Project formerly known as Dikrong H.E. Project is situated in
the Papum Pare District of Arunachal Pradesh. The Project site is about 15
Km from Doimukh and 5 Km down stream of Hoz Power- House. NEEPCO
has taken up this Project to harness the Hydropower potential of the river
Dikrong which is a tributary of river Brahmaputra and also utilize the tail
race discharge of the Ranganadi H.E. Project stage-I. The project is planed
as run of the river scheme. The project envisages construction of a 78m
High concrete gravity Dam and 2.81Km long Head Race Tunnel having
7.50m diameter on the right bank of the river Dikrong. The installed
capacity of the Project is 110 MW and the catchment area of the Project is
824 Sq. Km with maximum available head will be about 67.36m. CEA has
accorded TEC to the project on 24.09.2007, as per which the project will
generate annual 506.42 MU of power. The CCEA clearnace of the project
was accorded on 4th Dec2008 at an approved estimated cost of Rs.573.99
crs.IDC and finance Charges of Rs.68.06Crores at June,2007 Price
Level.The project is scheduled to be commissioned in 44 months,i.e. by
August 2012.
1128.37 Pending
1123.69 Pending
1105.23 Pending
Sterlite Industries plans to set up 160 MW coal based thermal power plant
with allied insfrastructure like railway siding and Set up a desalination plant
of capacity of 20 million litres per day (20 MLD)
1100 Pending
1078.84 Pending
1078.54 Pending
1078 Pending
1072 Pending
1061 Pending
Sonepur Bazari OC
1070 Pending
1055.05 Pending
1055 Pending
1038 Pending
1050 Pending
1033.66 Pending
1008 Pending
1001 Pending
1000 Pending
Dell International Services India Private Limited has been granted approval
as a Co-Developer for providing infrastructure facilities in the IT/ITES
Special Economic Zone of M/s. Coimbatore Hitech Infrastructures Private
Limited at Keeranatham Village, Coimbatore North Taluk, Coimbatore, vide
your letter No.F.2/110/2005-EPZ dated 12th October, 2007. The
construction of Phase I has been completed and most of the permissions
have been received. We have also issued appointment letters to many
students, however, the joining dates have been moved as we have not
received the Consent To Operate (CTO) from the Tamil Nadu Pollution
Control Board (TNPCB). All inspections have been completed and the file is
ready to be approved. As a result, this has caused considerable delay in our
business activities and has consequently affected Dells planned business
expansion in India and impacted our Global plans. Therefore, we kindly
request your urgent intervention to sort this issue with the Sta
1000 Pending
1000 Pending
1000 Pending
1000 Pending
914 Pending
Project involves laying of 710 km long, 12 inch/10 inch dia LPG pipeline
from Paradip to Durgapur via Haldia along with the associated facilities for
transportation of LPG from Paradip and Haldia to the Bottling Plants at
Balasore, Budge-Budge, Kalyani and Durgapur. Overall progress of 29.52
percent has been achieved. All statutory clearances are available except
NOC for Forest Clearance for Odisha. Scheduled completion is 30 months
after receipt of statutory clearances. Project is delayed due to delay in
receipt of NOC for Forest Clearance in Odisha. The project is anticipated for
completion by December 2014 subject to the availability of NOC for Forest
Clearance in Odisha by September 2013.
913 Pending
898 Pending
810.78 Pending
778.15 Pending
778.15 Pending
Laying of 400 km Long cross country LPG Pipeline System from HPCL
Mangalore to BPCL Solur with Spur Pipeline from Hassan to HPCL Mysore.
The ultimate capacity of pipeline shall be 3.1 MMTPA. Project has achieved
physical progress of 22.92 percent as on June 2013. PNGRB Authorisation
obtained.Approval of High Level Clearance Committee of Government of
Karnataka obtained. Environmental Clearance from MOEF, GOI and PCB,
Karnataka obtained. Categorised as Infrastructure Project.Obtained
Crossing approvals from Railways, NH, SH,Other Roads, Water Bodies
including Rivers. Placed order for coated line pipes, valves, pumps and
other items. Pending Issues 1. Approval from Forest Dept for diversion of
forest land for laying pipeline. 2. Land acquisition for IP station at Neriya
Dakshina Kannada Dist, Karnataka 3. Land acquisition for SV stations 16
Nos. along the route of the pipeline."
701 Pending
700 Pending
653.55 Pending
638.5 Pending
600 Pending
540.92 Pending
535.96 Pending
469 Pending
466.31 Pending
457.77 Pending
447.72 Pending
446.64 Pending
Bharatpur OCP - MCL This is a coal mining project submitted for Stage-I
Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
434.25 Pending
434.25 Pending
395.87 Pending
394 Pending
336 Pending
321.5 Pending
12 / 10 inch dia 165 km long LPG Pipeline from BPCL, Uran near Navi
Mumbai to HPCL,IOCL,BPCL LPG Plants at Chakan and Shikrapur near Pune
Pipeline Procured and Major procurement POs placed. Pipeline laying order
ready for finalization.ROU acquisition and crossing approvals in final stages.
Forest Approval from RCCF, Bhopal awaited. The proposals at DFO, Alibag &
DFO, Pune are pending for the last 1.5 yrs.
309.81 Pending
Jhanjra UG - ECL This is a coal mining project submitted for Stage-I Forest
clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013
287.17 Pending
284.69 Pending
253.66 Pending
216.88 Pending
208 Pending
203 Pending
Orient(U/G) 1&2,3 &HRC The cost includes the cost of Orient (U/G 4)
MAHANADI COALFIELDS LIMITED
Doubling of 25.6 km Jharsugda Rengali section to enhance capacity of
saturated section.
Ukni Deep OCP-WCL This is a coal mining project submitted for
Environment Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
203 Pending
201 Pending
185.79 Pending
181.18 Pending
177 Pending
145 Pending
To construct 3 ETPs To deal with future water cut and injection water
quality requirement. Site survey for the Sobhasan is under progress. For
balance two sites Land Acquisition is pending.
144 Pending
Urimari OC - CCL This is a coal mining project submitted for Stage-I Forest
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013
143.57 Pending
134.43 Pending
128.3 Pending
The existing 30 inch crude oil pipe line from Chennai Port to Manali Refinery
was laid during the inception of Refinery in 1969. Presently the Refinery
capacity has been increased from 2.5 to 10.5 MMTPA. The transfer rate of
crude oil is limited due to smaller size of pipe line, deteriorating internal
surface and restricted operating pressure. This causes prolonged detention
of crude tankers leading to high demurrages. Habitations have come nearer
to the pipeline over a period of time and hence the pipeline passes through
congested and thickly populated areas. Hence a new 42 inch crude oil pipe
line is proposed to be laid under the service road of Ennore Manali Road
Improvement Project. The replacement of the old pipeline with a new
pipeline in a new, less habitated route is not only an operational necessity
for CPCL but also has the most important advantage of enhancing the
safety of Crude Oil transportation from chennai Port to Manali Refinery.
Scheduled completion is 18 months fr
126 Pending
All statutory clearances are available. The entire Right of Way for laying of
pipeline was progressively acquired by September 2012. Mainline laying
work was also in progress. About 40 percent of the mailine has been laid.
On 2.4.2013, Government of Tamil Nadu issued a letter to various district
collectors advising them to ensure- 1. GAIL gives up the present project of
laying Kochi-Kootanad-Bangalore-Mangalore Gas Pipeline Project through
agriculture land and take steps for laying of pipeline alongside the National
Highways. 2. GAIL should also close all the existing trenches excavated for
laying of pipeline and handover the lands in its original conditions to the
farmers & villagers. 3. To remove the pipes already laid so as to enable the
farmers to continue their agricultural activities. This has impacted ongoing
activities of CBR-Trichy Pipeline of IndianOil and may also affect projects in
other states. A PIL has also been filed in Madras High Court Bench. Hearing
is
108 Pending
108 Pending
HBI UG (Hirakhund Bundia) -MCL This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
105.78 Pending
Rohini OC - CCL This is a coal mining project submitted for Stage-I Forest
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013
105.67 Pending
92.11 Pending
82.25 Pending
55.28 Pending
54.7 Pending
22.52 Pending
20 Pending
Kedla UG - CCL This is a coal mining project submitted for Stage-II Forest
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013
19.86 Pending
Kedla OC - CCL This is a coal mining project submitted for Stage-II Forest
Clearance This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013
19.86 Pending
Murlidih OCP - BCCL This is a coal mining project submitted for Stage-I
Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
19.84 Pending
Kotma, Govinda and Meera - SECL This is a coal mining project submitted
for Stage-I Forest Clearance. This project is part of CCI Note vide Case
No.4/CCInvest/2013 dated 20-02-2013
19.14 Pending
17.98 Pending
17.79 Pending
Saunda - D - CCL This is a coal mining project submitted for Stage-I Forest
Clearance. This project is part of CCI Note vide Case No.4/CCInvest/2013
dated 20-02-2013
16.29 Pending
State Governments of Uttar Pradesh, Tamil Nadu, Gujarat and Delhi have
not signed the State Support Agreement. For smooth implementation of
the extensive programme for development of National Highways through
PPP, the Ministry of Road Transport & Highways enters into a State Support
Agreement with various state Governments for safeguarding the interest of
Concessionaires for all future programmes of National Highways in respect
of issues concerning the State Governments regarding Land Acquisition,
Utility shifting, restriction on competing roads/additional toll ways,
maintenance of Law & Order, removal of encroachments etc. with an
objective to provide umbrella uniform terms and conditions also to build up
the confidence of private investor into the Highway project.
0 Pending